This bridge inspection report details the condition of a concrete bridge carrying the Natchez Trace Parkway over Poplar Creek Branch. The 105-foot-long structure was built in 1949 and last inspected on March 11, 2022. It consists of three spans supported by concrete abutments and piers with spread footings on piles.

The report documents numerous deficiencies including cracking and efflorescence of the deck and girders, spalling of concrete with exposed rebar, and scour around piers. Maintenance needs include repairing the scour, replacing expansion joint material, and cleaning exposed rebar. The structure's priority of improvement is listed as minor. Accompanying photos depict the noted deficiencies. The related federal contract opportunity is for drainage improvements along the Natchez Trace Parkway, with a pre-solicitation notice and information on the contracting agency.

View the file

Other files

File Type Posted
NTP 3H2 3 5-A.pdf PDF
NATR BMS FY20(1)_As-Built Drawings-Final.pdf PDF
NTP 3H2 3 5-B.pdf PDF
5570-092P-2020.pdf PDF
5570-093P-2020.pdf PDF
5570-098P-2020.pdf PDF
5570-106P-2022.pdf PDF
5570-105P-2018.pdf PDF
5570-103P-2022.pdf PDF
5570-094P-2020.pdf PDF
5570-106P-2018.pdf PDF
5570-096P-2020.pdf PDF
5570-110P-2018.pdf PDF
5570-097P-2022.pdf PDF
5570-101P-2022.pdf PDF
5570-103P-2018.pdf PDF
5570-097P-2018.pdf PDF
5570-107P-2018.pdf PDF
5570-104P-2020.pdf PDF
5570-093P-2022.pdf PDF
5570-099P-2018.pdf PDF
5570-091P-2022.pdf PDF
5570-109P-2022.pdf PDF
Amendment 0002 - NP-NATR 3N17 3H26.pdf PDF
5570-092P-2022.pdf PDF
5570-095P-2020.pdf PDF
5570-100P-2020.pdf PDF
5570-099P-2022.pdf PDF
5570-102P-2020.pdf PDF
5570-101P-2018.pdf PDF
5570-095P-2022.pdf PDF
5570-094P-2022.pdf PDF
5570-107P-2022.pdf PDF
5570-100P-2022.pdf PDF
5570-104P-2022.pdf PDF
5570-108P-2018.pdf PDF
5570-109P-2018.pdf PDF
5570-105P-2022.pdf PDF
5570-096P-2022.pdf PDF
5570-102P-2022.pdf PDF
5570-110P-2022.pdf PDF
5570-098P-2022.pdf PDF
Amendment 001 - NP NATR 3N17 3H26.pdf PDF
5570-090P-2020.pdf PDF
L_Pavement Rehabilitation and Safety Improvements_NPS CE.pdf PDF
5570-090P-2022.pdf PDF
5570-091P-2020.pdf PDF
G_NATR 2019 Traffic Counts MP 121 and 204.xlsx XLSX spreadsheet
B_CULVERT ASSESSMENT SUMMARY AND RECOMMENDATIONS.xlsx XLSX spreadsheet
A_MS NP NATR 3N17 3H26_ETC_concept plans.pdf PDF
Show 40 more

Latest 50 of 59 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRIDGE INSPECTION REPORT

POPLAR CREEK BRANCH BRIDGE

NATCHEZ TRACE PARKWAY OVER POPLAR CREEK BRANCH

NATCHEZ TRACE PARKWAY

LS

STRUCTURE NO. 5570-108P

INSPECTION TYPE: ROUTINE

INSPECTION DATE: 3/11/2022

WD

Report prepared by:

Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov

MILE POINT: 181.08

KILOMETER POINT: 55.19

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5570-108P

POPLAR CREEK BRANCH BRIDGE INSPECTION DATE : 03/11/2022

226 PRIORITY OF IMPROVEMENT D

A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.

B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

Item No.

Maintenance Recommendations

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT UNIT

COST

PRELIM.

COST

ESTIMATE

60.6

FILL SINKHOLE AT NORTHEAST WINGWALL.

58.7

ROUTINELY REMOVE DEBRIS AND VEGETATION ALONG

CURBS.

PRELIM. MAINTENANCE TOTAL :

Item No.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST

PRELIM. COST ESTIMATES

REHAB RECONSTR

60.17 REPAIR SCOUR AT NORTH AND SOUTH PIER

WITH ENGINEERED RIPRAP.

58.2 REPLACE EXPANSION JOINT MATERIAL IN

RAILINGS.

60.1,60.3 CLEAN AND COAT EXPOSED REBAR AT

BREASTWALL BEARING SEATS AND ON

UNDERSIDE.

58.3,222.

SEAL CRACKS IN PAVEMENT OVER

STRUCTURE AND AT APPROACHES.

CONTRACT COSTS FOR MOBILIZATION,

TRAFFIC CONTROL, AND CONTINGENCIES.

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5570-108P

POPLAR CREEK BRANCH BRIDGE INSPECTION DATE : 03/11/2022

226 PRIORITY OF IMPROVEMENT D

A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.

B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

COST ESTIMATE SUMMARY

PRELIM. MAINTENANCE TOTAL :

PRELIM. REHABILITATION TOTAL :

PRELIM. RECONSTRUCTION TOTAL : .

TOTAL ITEMIZED COSTS:

PRELIMINARY ESTIMATE TOTAL * :

(*Includes typical contract costs for mobilization, traffic control and design/construction engineering: but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for planning purposes only; they should not be used as a complete or final engineers estimate.)

Remarks : Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

STRUCTURE LOAD RATING STRUCTURE NO. 5570-108P

POPLAR CREEK BRANCH BRIDGE INSPECTION DATE: 03/10/2022

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 18 16 30 27

HS 22 20 38 34

TYPE 3 22 20 36 33

TYPE 3S2 26 24 44 40

TYPE 3-3 36 33 60 54

DESIGN LOADING: 2 - H 15

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 05/16/2019

LOAD RATING CONTROLLED BY: NEGATIVE MOMENT

REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-108P

STRUCTURE IDENTIFICATION

(201) PARK: NATCHEZ TRACE PARKWAY

(202) STRUCTURE NAME:..............POPLAR CREEK BRANCH BRIDGE

(203) STRUCTURE KIND:............... 1 - BRIDGE

(204) STRUCTURE NUMBER:.........5570-108 P

4 - SOUTHEAST(205) NPS REGION:

(206) ROUTE CODE NUMBER:

(207) ROAD SECTION NO:............. 108P

(208) NPS ROAD CLASS:............... 1 - PRINCIPAL PARK ROAD

(209) WITHIN NPS BNDRY?:.......... Yes

(210) OPERATING UNIT:.................KOSCIUSKO

(211) PROJECT NO(S):................... 3J7

(212) DRAWING NUMBERS:...........2293B

(21) MAINTAINED BY:......................66 - NATIONAL PARK SERVICE

(22) OWNER:................................... 66 - NATIONAL PARK SERVICE

(1) STATE:

(2) STATE HWY. AGENCY DIST:

(3) COUNTY CODE:

(4) CITY / PLACE CODE:

(5) INVENTORY ROUTE:

(6) FEATURES INTERSECTED:

(7) FACILITY CARRIED:

(8) STATE STRUCTURE NO:

(9) LOCATION:

(10) INV. RTE. - MIN. VERT. CLR:

(11) MILE POINT:

(27) YEAR BUILT:

(106) YEAR RECONSTRUCTED:

(20) TOLL:

(37) HISTORIC DESIGNATION:

284 - MISSISSIPPI

28019 CHOCTAW

00000

1 6 1 00001 0

POPLAR CREEK BRANCH

NATCHEZ TRACE PARKWAY

5570108P0000000

14.2 MILES SOUTH OF MS ROUTE 9

99.99 FT ( 99.99 M)

181.0 (KM PT: 55.19)

3 - ON FREE ROAD

5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL:..........2 - CONCRETE CONTINUOUS (44A) APPR. STR. MATERIAL:............ 0 - Other

(43B) MAIN STR. TYPE:.................. 01 - SLAB (44B) APPR. STR. TYPE:.................... 00 - OTHER

(45) NO. OF MAIN SPANS:..............003 (46) NO OF APPROACH SPANS:

(48) MAX. SPAN LENGTH:..............40 FT ( 12.2 M)

(49) STRUCTURE LENGTH:........... 105. FT ( 32.1 M) (108) WEAR SURFACE/PROTECT SYSTEM:

(216A) ABUTMENT #1 FDN:........... 3 - SPREAD FOOTING ON PILES A) TYPE WEARING SURFACE:.. 6 - BITUMINOUS

(216B) ABUTMENT #2 FDN:........... 3 - SPREAD FOOTING ON PILES B) TYPE MEMBRANE:................. 0 - NONE

(217A) PREDOM. PIER FDN:.......... 3 - SPREAD FOOTING ON PILES C) TYPE PROTECTION:.............. 0 - NONE

(217B) SECOND. PIER FDN:.......... 3 - SPREAD FOOTING ON PILES (218) IS SALT USED?.......................... NO

(107) DECK TYPE:.......................... 1 - CONCRETE CAST-IN-PLACE

LOAD RATING AND POSTING

(31) DESIGN LOAD:.........................2 - H 15 (41) LOAD RESTRICTION:.................. R - POSTED FOR OTHER LOAD-

CAPACITY RESTRICTION

(66) INVENTORY RATING:..............22 TONS ( 20 METRIC TONS) (70) BRIDGE POSTING:...................... 5 - EQUAL TO OR ABOVE LEGAL

LOADS

(64) OPERATING RATING:..............38 TONS ( 34.5 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 03/11/2022 (91) FREQ. OF INSP: 48 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL:.......... N

(220) SPECIAL STUDY TYPE: 5 - SCOUR INSP. EVERY MONTHS - LAST INSP:

(221) SPECIAL STUDY DATE: (B) UNDERWATER:..................... N

INSP. EVERY MONTHS - LAST INSP:

(C) SPECIAL INSPECTION:........ N

INSP. EVERY MONTHS - LAST INSP:

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-108P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE:................................ 33° 17'48.60" (51) CURB TO CURB WIDTH:............ 28.0 FT ( 8.5 M)

(17) LONGITUDE:............................ 89°24 '02.60" (52) DECK WIDTH:.......................... 32.4 FT ( 9.9 M)

(19) DETOUR LENGTH:.................. 25 MI ( 40 KM) (32) APPR. ROADWAY WIDTH:...... 32.0 FT ( 9.8 M)

(28A) LANES ON STRUCT:.............02 (213) APPR. PAVEMENT WIDTH:... 22.0 FT ( 6.7 M)

(28B) LANES UNDER STRUCT:......00 LEFT SHOULDER:............... 5 0 FT ( 1.5 M)

(42A) SERVICE ON:.........................1 - HIGHWAY RIGHT SHOULDER:.......... 5 0 FT ( 1.5 M)

(42B) SERVICE UNDER:................. 5 - WATERWAY (33) BRIDGE MEDIAN:.................... 0 - NO MEDIAN

(29) AVG DAILY TRAFFIC:..............1230 (34) SKEW ANGLE:......................... 0 °

(30) YEAR OF ADT:......................... 2012 (35) STRUCTURE FLARED:............ 0 - NO FLARE

(114) FUTURE ADT:.........................1353 (47) TOTAL HORIZ. CLEARANCE:.. 28 FT ( 8.5 M)

(115) YEAR OF FUTURE ADT:........2032 (50) SIDEWALKS

(101) PARALLEL STRUCTURE:......N - NO PARALLEL STRUCTURE LEFT:.................................... 0 0 FT ( 0 M)

(38) NAVIGATION CONTROL:.........0 - NO NAVIGATION CONTROL ON RIGHT:.................................. 0 0 FT ( 0 M)

WATERWAY (BRIDGE PERMIT NOT

REQUIRED)

(39) VERTICAL CLEARANCE:.........0 FT ( 0 M) (214) BRIDGE RAIL TYPE

1 - FULL HEIGHT (NO PARAPET)(40) HORIZ. CLEARANCE:..............0 FT ( 0 M) RAIL CONFIGURATION:

(111) ABUT OR PIER PROT:........... MATERIAL:........................... 1 - CONCRETE

LATERAL UNDERCLEARANCE: DESIGN TYPE:..................... 1 - CONTINUOUS RAIL

(55) RIGHT:...............................00 FT ( 0 M) (215) BRIDGE RAIL HEIGHT:.......... 2 33 FT ( 0.71 M)

(56) LEFT:................................ 0 FT ( 0 M) (53) MIN. VRT. CLR. OVER DECK: 99.99 FT ( 99.99 M)

(54) MIN. VRT. UNDRCLRANCE:... .00 FT ( 0 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:....................................... 6 (67) STRUCTURAL EVALUATION:

(59) SUPERSTRUCTURE:...............6 (68) DECK GEOMETRY:

(60) SUBSTRUCTURE:.......... 6 (69) UNDERCLEARANCES:................ N

(61) CHANNEL:................................6 (71) WATERWAY ADEQUACY:

(62) CULVERT:.................................N (72) APPROACH ALIGNMENT:

(222) APPROACHES:...................... 7 (113) SCOUR CRITICAL:.................... 4 - ACTION IS REQUIRED TO

PROTECT EXPOSED FOUNDATIONS

(223) RETAINING WALL:.................N (225) PURPOSE OF IMPROVEMENT: 2 - REHAB/RECONSTRUCTION

(36) TRAFFIC SAFETY FEAT: 1 N N N (226) PRIORITY OF IMPROVEMENT: D - MINOR

(75A) TYPE OF WORK:................... (227) MAINTENANCE COST:

(75B) WORK DONE BY:.................. (228) REHAB / RECNSTR COST:

(76) IMPROVEMENT LENGTH:....... FT ( 0 M) (229) CONSTRUCTION COST:

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1981-JOINT REPAIR. 2010 - ROADWAY RESURFACED

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIGURATION INFORMATION:

Inspector: Killian Baptiste Structure Number: 5570108P0000000

Inspection Date: 03/11/2022 Facility Carried: NATCHEZ TRACE PAR

Bridge Inspection Report

Pictures

PHOTO 3

Description LOOKING NORTH TOWARD TUPELO

PHOTO 4

Description EAST (UPSTREAM) SIDE

Bridge Inspection Report

Pictures

PHOTO 5

Description GENERAL TOPSIDE VIEW LOOKING NORTH

PHOTO 6

Description GENERAL UNDERSIDE VIEW OF CENTER SPAN LOOKING SOUTH

Bridge Inspection Report

Pictures

PHOTO 7

Description GENERAL UNDERSIDE VIEW OF SOUTH SPAN LOOKING SOUTH

PHOTO 8

Description GENERAL UNDERSIDE VIEW OF NORTH SPAN LOOKING SOUTH; NOTE TYPICAL

CRACKING WITH EFFLORESCENCE ALONG COLD JOINTS AND CENTERLINE

Bridge Inspection Report

Pictures

PHOTO 9

Description TRANSVERSE CRACK AND POT HOLE IN SOUTBOUND LANE OF SOUTH APPROACH

PHOTO 10

Description TYPICAL LONGITUDINAL CRACKING OF WEARING SURFACE ALONG CENTERLINE

Bridge Inspection Report

Pictures

PHOTO 11

Description TYPICAL DETERIORATION OF SHOULDER LANE STRIPING, EAST SHOULDER SHOWN

PHOTO 12

Description TYPICAL MISSING FILLER MATERIAL IN RAILING EXPANSION JOINTS, EAST RAILING OVER

NORTH ABUTMENT SHOWN; NOTE DIAGONAL CRACK IN RAIL POST

Bridge Inspection Report

Pictures

PHOTO 13

Description TYPICAL TRANSVERSE CRACKING OF RAILINGS, EAST RAILING NEAR MIDSPAN SHOWN

PHOTO 14

Description TYPICAL DEBRIS ACCUMULATION AND VEGETATION GROWTH ALONG CURBLINES, EAST

CURBLINE SHOWN

Bridge Inspection Report

Pictures

PHOTO 15

Description TYPICAL MOSS GROWTH ON SIDES OF STRUCTURE, WEST SIDE SHOWN

PHOTO 16

Description LONGITUDINAL CRACK WITH EFFLORESCENCE ALONG CENTERLINE OF SOUTH SPAN;

NOTE LEAKAGE

Bridge Inspection Report

Pictures

PHOTO 17

Description TYPICAL LONGITUDINAL CRACK WITH EFFLORESCENCE ALONG COLD JOINTS OF SOUTH

SPAN, WEST SIDE SHOWN

PHOTO 18

Description SPALLING WITH EXPOSED REBAR ON UNDERSIDE OF CENTER SPAN AT NORTH PIER

Bridge Inspection Report

Pictures

PHOTO 19

Description TYPICAL LONGITUDINAL CRACK WITH EFFLORESCENCE ALONG COLD JOINTS OF

CENTER SPAN, EAST SIDE SHOWN

PHOTO 20

Description HONEYCOMBING OF CENTER SPAN AT CENTERLINE 10' FROM NORTH PIER

Bridge Inspection Report

Pictures

PHOTO 21

Description TRANSVERSE CRACK OF CENTER SPAN AT MIDSPAN

PHOTO 22

Description GENERAL VIEW OF NORTH ABUTMENT

Bridge Inspection Report

Pictures

PHOTO 23

Description SPALL ON WEST END OF NORTH ABUTMENT

PHOTO 24

Description GENERAL VIEW OF SOUTH FACE OF NORTH PIER

Bridge Inspection Report

Pictures

PHOTO 25

Description GENERAL VIEW OF NORTH FACE OF SOUTH PIER; NOTE SCOUR AND EROSION OF

EMBANKMENT

PHOTO 26

Description EROSION AT WEST END OF SOUTH PIER; NOTE SCALING ALONG WATERLINE

Bridge Inspection Report

Pictures

PHOTO 27

Description GENERAL VIEW OF SOUTH ABUTMENT

PHOTO 28

Description SPALL ON EAST SIDE OF SOUTH ABUTMENT

Bridge Inspection Report

Pictures

PHOTO 29

Description WATER LEAKING AT CENTER OF SOUTH ABUTMENT

PHOTO 30

Description TYPICAL MOWER SCRAPES ON WINGWALLS, SOUTHEAST WINGWALL SHOWN

Bridge Inspection Report

Pictures

PHOTO 31

Description EROSION HOLE AT NORTHEAST WINGWALL

PHOTO 32

Description TYPICAL EDGE SPALLING OF PARAPETS, NORTHWEST PARAPET SHOWN

Bridge Inspection Report

Pictures

PHOTO 33

Description LOOKING UPSTREAM FROM DECK

PHOTO 34

Description LOOKING DOWNSTREAM FROM DECK

File details come from the government source that posted it. Updated .