This bridge inspection report details the condition of Bridge #2 over Middle Byway Creek on the Natchez Trace Parkway in Mississippi. The 32-foot long concrete slab bridge was last inspected on March 10, 2022 and found to have minor deficiencies. Recommended repairs include replacing expansion joint material in railings, repairing erosion at piers and abutments with riprap, and cleaning and sealing exposed rebar on the north pier. Estimated rehabilitation costs range from $60,000 to $80,000. The related federal contract opportunity is for drainage improvements along the Natchez Trace Parkway and represents an opportunity for contractors to bid on repairing the deficiencies identified in this bridge inspection report.

View the file

Other files

File Type Posted
NTP 3H2 3 5-A.pdf PDF
NATR BMS FY20(1)_As-Built Drawings-Final.pdf PDF
NTP 3H2 3 5-B.pdf PDF
5570-092P-2020.pdf PDF
5570-093P-2020.pdf PDF
5570-098P-2020.pdf PDF
5570-106P-2022.pdf PDF
5570-105P-2018.pdf PDF
5570-103P-2022.pdf PDF
5570-094P-2020.pdf PDF
5570-106P-2018.pdf PDF
5570-096P-2020.pdf PDF
5570-110P-2018.pdf PDF
5570-097P-2022.pdf PDF
5570-103P-2018.pdf PDF
5570-097P-2018.pdf PDF
5570-107P-2018.pdf PDF
5570-104P-2020.pdf PDF
5570-093P-2022.pdf PDF
5570-099P-2018.pdf PDF
5570-091P-2022.pdf PDF
5570-108P-2022.pdf PDF
5570-109P-2022.pdf PDF
Amendment 0002 - NP-NATR 3N17 3H26.pdf PDF
5570-092P-2022.pdf PDF
5570-095P-2020.pdf PDF
5570-100P-2020.pdf PDF
5570-099P-2022.pdf PDF
5570-102P-2020.pdf PDF
5570-101P-2018.pdf PDF
5570-095P-2022.pdf PDF
5570-094P-2022.pdf PDF
5570-107P-2022.pdf PDF
5570-100P-2022.pdf PDF
5570-104P-2022.pdf PDF
5570-108P-2018.pdf PDF
5570-109P-2018.pdf PDF
5570-105P-2022.pdf PDF
5570-096P-2022.pdf PDF
5570-102P-2022.pdf PDF
5570-110P-2022.pdf PDF
5570-098P-2022.pdf PDF
Amendment 001 - NP NATR 3N17 3H26.pdf PDF
5570-090P-2020.pdf PDF
L_Pavement Rehabilitation and Safety Improvements_NPS CE.pdf PDF
5570-090P-2022.pdf PDF
5570-091P-2020.pdf PDF
G_NATR 2019 Traffic Counts MP 121 and 204.xlsx XLSX spreadsheet
B_CULVERT ASSESSMENT SUMMARY AND RECOMMENDATIONS.xlsx XLSX spreadsheet
A_MS NP NATR 3N17 3H26_ETC_concept plans.pdf PDF
Show 40 more

Latest 50 of 59 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRIDGE INSPECTION REPORT

MIDDLE BYWAY CREEK BRIDGE #2

NATCHEZ TRACE PARKWAY OVER MIDDLE BYWAY CREEK

NATCHEZ TRACE PARKWAY

LS

STRUCTURE NO. 5570-101P

INSPECTION TYPE: ROUTINE

INSPECTION DATE: 3/10/2022

WD

Report prepared by:

Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov

MILE POINT: 193.80

KILOMETER POINT: 59.07

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5570-101P

MIDDLE BYWAY CREEK BRIDGE #2 INSPECTION DATE : 03/10/2022

226 PRIORITY OF IMPROVEMENT D

A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.

B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

Item No.

Maintenance Recommendations

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT UNIT

COST

PRELIM.

COST

ESTIMATE

222.5

FILL EROSION HOLE AT NORTH END OF EAST PARAPET.

60.19

REMOVE TREES FROM PIER ENDS.

PRELIM. MAINTENANCE TOTAL :

Item REHABILITATION/RECONSTRUCTION

UNIT

UNIT PRELIM. COST ESTIMATES

No. (TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. COST

REHAB RECONSTR

58.2,58.6 REPLACE EXPANSION JOINT MATERIAL IN

RAILINGS.

60.9,60.

REPAIR EROSION AT PIERS AND ABUTMENTS

WITH ENGINEERED RIPRAP.

60.13 CLEAN AND SEAL EXPOSED REBAR ON NORTH

PIER WITH APPROVED PROTECTIVE COATING

AND PATCH SPALLS.

CONTRACT COSTS FOR MOBILIZATION,

TRAFFIC CONTROL, AND CONTINGENCIES.

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5570-101P

MIDDLE BYWAY CREEK BRIDGE #2 INSPECTION DATE : 03/10/2022

226 PRIORITY OF IMPROVEMENT D

A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.

B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

COST ESTIMATE SUMMARY

PRELIM. MAINTENANCE TOTAL :

PRELIM. REHABILITATION TOTAL :

PRELIM. RECONSTRUCTION TOTAL : .

TOTAL ITEMIZED COSTS:

PRELIMINARY ESTIMATE TOTAL * :

(*Includes typical contract costs for mobilization, traffic control and design/construction engineering: but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for planning purposes only; they should not be used as a complete or final engineers estimate.)

Remarks : Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

58.3 MINOR LONGITUDINAL CRACKS OVER STRUCTURE IN NORTHBOUND AND SOUTHBOUND LANES. MINOR FULL LENGTH LONGITUDINAL CRACK IN CENTERLINE OVER STRUCTURE AND AT APPROACHES. MINOR LANE WIDTH TRANSVERSE CRACKS AT

222.4 APPROACHES.

STRUCTURE LOAD RATING STRUCTURE NO. 5570-101P

MIDDLE BYWAY CREEK BRIDGE #2 INSPECTION DATE: 03/09/2022

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 17 15 28 25

HS 29 26 48 44

TYPE 3 25 23 42 38

TYPE 3S2 30 27 50 45

TYPE 3-3 38 34 63 57

DESIGN LOADING: 2 - H 15

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 06/30/2015

LOAD RATING CONTROLLED BY: TOP SLAB - MOMENT

REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-101P

STRUCTURE IDENTIFICATION

(201) PARK: NATCHEZ TRACE PARKWAY

(202) STRUCTURE NAME:..............MIDDLE BYWAY CREEK BRIDGE #2

(203) STRUCTURE KIND:............... 1 - BRIDGE

(204) STRUCTURE NUMBER:.........5570-101 P

4 - SOUTHEAST(205) NPS REGION:

(206) ROUTE CODE NUMBER:

(207) ROAD SECTION NO:

(208) NPS ROAD CLASS:............... 1 - PRINCIPAL PARK ROAD

(209) WITHIN NPS BNDRY?:.......... Yes

(210) OPERATING UNIT:.................DANCY

(211) PROJECT NO(S):................... 3H8

(212) DRAWING NUMBERS:...........2354A

(21) MAINTAINED BY:......................66 - NATIONAL PARK SERVICE

(22) OWNER:................................... 66 - NATIONAL PARK SERVICE

(1) STATE:

(2) STATE HWY. AGENCY DIST:

(3) COUNTY CODE:

(4) CITY / PLACE CODE:

(5) INVENTORY ROUTE:

(6) FEATURES INTERSECTED:

(7) FACILITY CARRIED:

(8) STATE STRUCTURE NO:

(9) LOCATION:

(10) INV. RTE. - MIN. VERT. CLR:

(11) MILE POINT:

(27) YEAR BUILT:

(106) YEAR RECONSTRUCTED:

(20) TOLL:

(37) HISTORIC DESIGNATION:

284 - MISSISSIPPI

28019 CHOCTAW

00000

1 6 1 00001 0

MIDDLE BYWAY CREEK

NATCHEZ TRACE PARKWAY

5570101P0000000

1.7 MILES SOUTH OF MS ROUTE 9

99.99 FT ( 99.99 M)

193.8 (KM PT: 59.07)

3 - ON FREE ROAD

5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL:..........2 - CONCRETE CONTINUOUS (44A) APPR. STR. MATERIAL:............ 0 - Other

(43B) MAIN STR. TYPE:.................. 01 - SLAB (44B) APPR. STR. TYPE:.................... 00 - OTHER

(45) NO. OF MAIN SPANS:..............003 (46) NO OF APPROACH SPANS:

(48) MAX. SPAN LENGTH:..............32 FT ( 9.8 M)

(49) STRUCTURE LENGTH:........... 87.0 FT ( 26.5 M) (108) WEAR SURFACE/PROTECT SYSTEM:

(216A) ABUTMENT #1 FDN:........... 3 - SPREAD FOOTING ON PILES A) TYPE WEARING SURFACE:.. 6 - BITUMINOUS

(216B) ABUTMENT #2 FDN:........... 3 - SPREAD FOOTING ON PILES B) TYPE MEMBRANE:................. 0 - NONE

(217A) PREDOM. PIER FDN:.......... 3 - SPREAD FOOTING ON PILES C) TYPE PROTECTION:.............. 0 - NONE

(217B) SECOND. PIER FDN:.......... 3 - SPREAD FOOTING ON PILES (218) IS SALT USED?.......................... NO

(107) DECK TYPE:.......................... 1 - CONCRETE CAST-IN-PLACE

LOAD RATING AND POSTING

(31) DESIGN LOAD:.........................2 - H 15 (41) LOAD RESTRICTION:.................. R - POSTED FOR OTHER LOAD-

CAPACITY RESTRICTION

(66) INVENTORY RATING:..............29 TONS ( 26.3 METRIC TONS) (70) BRIDGE POSTING:...................... 5 - EQUAL TO OR ABOVE LEGAL

LOADS

(64) OPERATING RATING:..............48 TONS ( 43.5 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 03/10/2022 (91) FREQ. OF INSP: 48 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL:.......... N

(220) SPECIAL STUDY TYPE: 0 - NONE INSP. EVERY MONTHS - LAST INSP:

(221) SPECIAL STUDY DATE: (B) UNDERWATER:..................... N

INSP. EVERY MONTHS - LAST INSP:

(C) SPECIAL INSPECTION:........ N

INSP. EVERY MONTHS - LAST INSP:

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-101P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE:................................ 33° 25'26 20" (51) CURB TO CURB WIDTH:............ 28.0 FT ( 8.5 M)

(17) LONGITUDE:............................ 89°15 '46 30" (52) DECK WIDTH:.......................... 32.3 FT ( 9.8 M)

(19) DETOUR LENGTH:.................. 25 MI ( 40 KM) (32) APPR. ROADWAY WIDTH:...... 32.0 FT ( 9.8 M)

(28A) LANES ON STRUCT:.............02 (213) APPR. PAVEMENT WIDTH:... 22.0 FT ( 6.7 M)

(28B) LANES UNDER STRUCT:......00 LEFT SHOULDER:............... 5 0 FT ( 1.5 M)

(42A) SERVICE ON:.........................1 - HIGHWAY RIGHT SHOULDER:.......... 5 0 FT ( 1.5 M)

(42B) SERVICE UNDER:................. 5 - WATERWAY (33) BRIDGE MEDIAN:.................... 0 - NO MEDIAN

(29) AVG DAILY TRAFFIC:..............1230 (34) SKEW ANGLE:......................... 0 °

(30) YEAR OF ADT:......................... 2012 (35) STRUCTURE FLARED:............ 0 - NO FLARE

(114) FUTURE ADT:.........................1353 (47) TOTAL HORIZ. CLEARANCE:.. 28 FT ( 8.5 M)

(115) YEAR OF FUTURE ADT:........2032 (50) SIDEWALKS

(101) PARALLEL STRUCTURE:......N - NO PARALLEL STRUCTURE LEFT:.................................... 0 0 FT ( 0 M)

(38) NAVIGATION CONTROL:.........0 - NO NAVIGATION CONTROL ON RIGHT:.................................. 0 0 FT ( 0 M)

WATERWAY (BRIDGE PERMIT NOT

REQUIRED)

(39) VERTICAL CLEARANCE:.........0 FT ( 0 M) (214) BRIDGE RAIL TYPE

1 - FULL HEIGHT (NO PARAPET)(40) HORIZ. CLEARANCE:..............0 FT ( 0 M) RAIL CONFIGURATION:

(111) ABUT OR PIER PROT:........... MATERIAL:........................... 1 - CONCRETE

LATERAL UNDERCLEARANCE: DESIGN TYPE:..................... 1 - CONTINUOUS RAIL

(55) RIGHT:...............................00 FT ( 0 M) (215) BRIDGE RAIL HEIGHT:.......... 2 50 FT ( 0.76 M)

(56) LEFT:................................ 0 FT ( 0 M) (53) MIN. VRT. CLR. OVER DECK: 99.99 FT ( 99.99 M)

(54) MIN. VRT. UNDRCLRANCE:... .00 FT ( 0 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:....................................... 6 (67) STRUCTURAL EVALUATION:

(59) SUPERSTRUCTURE:...............6 (68) DECK GEOMETRY:

(60) SUBSTRUCTURE:.......... 7 (69) UNDERCLEARANCES:................ N

(61) CHANNEL:................................6 (71) WATERWAY ADEQUACY:

(62) CULVERT:.................................N (72) APPROACH ALIGNMENT:

(222) APPROACHES:...................... 7 (113) SCOUR CRITICAL:.................... 5 - SCOUR WITHIN LIMITS OF

FOOTING OR PILES

(223) RETAINING WALL:.................N (225) PURPOSE OF IMPROVEMENT: 2 - REHAB/RECONSTRUCTION

(36) TRAFFIC SAFETY FEAT: 1 N N N (226) PRIORITY OF IMPROVEMENT: D - MINOR

(75A) TYPE OF WORK:................... (227) MAINTENANCE COST:

(75B) WORK DONE BY:.................. (228) REHAB / RECNSTR COST:

(76) IMPROVEMENT LENGTH:....... FT ( 0 M) (229) CONSTRUCTION COST:

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1982-JOINT REPAIR. 2007-NEW PAVEMENT. 2012 - ROADWAY CURRENTLY BEING RESURFACED.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIGURATION INFORMATION:

Inspector: Killian Baptiste Structure Number: 5570101P0000000

Inspection Date: 03/10/2022 Facility Carried: NATCHEZ TRACE PAR

Bridge Inspection Report

Pictures

PHOTO 3

Description LOOKING NORTH TOWARD TUPELO

PHOTO 4

Description EAST (UPSTREAM) SIDE

Bridge Inspection Report

Pictures

PHOTO 5

Description GENERAL TOPSIDE VIEW LOOKING NORTH

PHOTO 6

Description GENERAL UNDERSIDE VIEW OF SOUTH SPAN LOOKING SOUTH

Bridge Inspection Report

Pictures

PHOTO 7

Description GENERAL UNDERSIDE VIEW OF CENTER SPAN LOOKING NORTH

PHOTO 8

Description GENERAL UNDERSIDE VIEW OF NORTH SPAN LOOKING NORTH

Bridge Inspection Report

Pictures

PHOTO 9

Description TYPICAL MISSING FILLER MATERIAL IN RAILING EXPANSION JOINT, EAST RAILING OVER

SOUTH ABUTMENT SHOWN

PHOTO 10

Description TYPICAL CRACKING WITH EFFLORESCENCE ON WEST CURB NEAR NORTH PIER SHOWN

Bridge Inspection Report

Pictures

PHOTO 11

Description TYPICAL TRANSVERSE CRACKING OF RAILINGS, WEST RAILING NEAR NORTH PIER

SHOWN

PHOTO 12

Description TYPICAL LONGITUDINAL CRACKING OF WEARING SURFACE

Bridge Inspection Report

Pictures

PHOTO 13

Description LONGITUDINAL CRACKING WITH EFFLORESCENCE OF DECK UNDERSIDE ON WEST SIDE

OF SOUTH SPAN

PHOTO 14

Description TYPICAL FULL WIDTH CRACKS UNDERSIDE OF RAILINGS

Bridge Inspection Report

Pictures

PHOTO 15

Description DIAGONAL AND LONGITUDINAL CRACKS WITH EFFLORESCENCE ON WEST END OF

CENTER SPAN

PHOTO 16

Description TYPICAL DIAGONAL CRACKS WITH EFFLORESCENCE AT CORNERS OF CENTER SPAN

Bridge Inspection Report

Pictures

PHOTO 17

Description TYPICAL SCALING AROUND SCUPPERS IN NORTH SPAN

PHOTO 18

Description EROSION ON WEST END OF NORTH ABUTMENT

Bridge Inspection Report

Pictures

PHOTO 19

Description GENERAL VIEW OF SOUTH FACE OF NORTH PIER

PHOTO 20

Description SPALLS WITH EXPOSED REBAR ON WEST FACE OF NORTH PIER

Bridge Inspection Report

Pictures

PHOTO 21

Description GENERAL VIEW OF NORTH FACE OF SOUTH PIER

PHOTO 22

Description TYPICAL VERTICAL CRACKS IN PIER, NORTH FACE OF SOUTH PIER NEAR CENTERLINE

SHOWN

Bridge Inspection Report

Pictures

PHOTO 23

Description EROSION AT EAST SIDE OF SOUTH PIER

PHOTO 24

Description GENERAL VIEW OF SOUTH ABUTMENT; NOTE EROSION CHANNEL

Bridge Inspection Report

Pictures

PHOTO 25

Description TYPICAL EDGE SPALLING AT ENDS OF DECK, SOUTHWEST CORNER SHOWN

PHOTO 26

Description EROSION HOLE AT NORTH END OF EAST PARAPET; NOTE UNDERMINING PRESENT

Bridge Inspection Report

Pictures

PHOTO 27

Description LOOKING UPSTREAM FROM DECK

PHOTO 28

Description LOOKING DOWNSTREAM FROM DECK

File details come from the government source that posted it. Updated .