5570-108P-2018.pdf

PDF 3 MB Posted

Attached to
Natchez Trace Parkway Drainage Improvements - NP-NATR 3N17 3H26 ETC
Solicitation number
693C73-24-R-000004
Issued by

About this file

This document summarizes a bridge inspection report for Structure No. 5570-108P, known as the Poplar Creek Branch Bridge, located on the Natchez Trace Parkway in Mississippi. The bridge is a 105.2-foot-long, three-span concrete slab structure built in 1949 and last reconstructed in 2010. Inspection findings note moderate scour at the north pier, deteriorated expansion joint material, and spalls with exposed rebar in various locations. Recommended maintenance includes replacing expansion joint material, removing fallen trees, and coating exposed rebar. Estimated rehabilitation costs include repairing scour at the piers. Inspection photos document the noted deficiencies.

The related federal contract opportunity is a pre-solicitation for Natchez Trace Parkway Drainage Improvements, to be awarded by the Federal Highway Administration under Solicitation Number 693C73-24-R-000004. No other details are provided regarding required products or services, response dates, or other salient information.

View the file

Other files

File Type Posted
NTP 3H2 3 5-A.pdf PDF
NATR BMS FY20(1)_As-Built Drawings-Final.pdf PDF
NTP 3H2 3 5-B.pdf PDF
5570-092P-2020.pdf PDF
5570-093P-2020.pdf PDF
5570-098P-2020.pdf PDF
5570-106P-2022.pdf PDF
5570-105P-2018.pdf PDF
5570-103P-2022.pdf PDF
5570-094P-2020.pdf PDF
5570-106P-2018.pdf PDF
5570-096P-2020.pdf PDF
5570-110P-2018.pdf PDF
5570-097P-2022.pdf PDF
5570-101P-2022.pdf PDF
5570-103P-2018.pdf PDF
5570-097P-2018.pdf PDF
5570-107P-2018.pdf PDF
5570-104P-2020.pdf PDF
5570-093P-2022.pdf PDF
5570-099P-2018.pdf PDF
5570-091P-2022.pdf PDF
5570-108P-2022.pdf PDF
5570-109P-2022.pdf PDF
Amendment 0002 - NP-NATR 3N17 3H26.pdf PDF
5570-092P-2022.pdf PDF
5570-095P-2020.pdf PDF
5570-100P-2020.pdf PDF
5570-099P-2022.pdf PDF
5570-102P-2020.pdf PDF
5570-101P-2018.pdf PDF
5570-095P-2022.pdf PDF
5570-094P-2022.pdf PDF
5570-107P-2022.pdf PDF
5570-100P-2022.pdf PDF
5570-104P-2022.pdf PDF
5570-109P-2018.pdf PDF
5570-105P-2022.pdf PDF
5570-096P-2022.pdf PDF
5570-102P-2022.pdf PDF
5570-110P-2022.pdf PDF
5570-098P-2022.pdf PDF
Amendment 001 - NP NATR 3N17 3H26.pdf PDF
5570-090P-2020.pdf PDF
L_Pavement Rehabilitation and Safety Improvements_NPS CE.pdf PDF
5570-090P-2022.pdf PDF
5570-091P-2020.pdf PDF
G_NATR 2019 Traffic Counts MP 121 and 204.xlsx XLSX spreadsheet
B_CULVERT ASSESSMENT SUMMARY AND RECOMMENDATIONS.xlsx XLSX spreadsheet
A_MS NP NATR 3N17 3H26_ETC_concept plans.pdf PDF
Show 40 more

Latest 50 of 59 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STRUCTURE SUMMARY STRUCTURE NO. 5570-108P

POPLAR CREEK BRANCH BRIDGE INSPECTION DATE: 12/4/18

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... CONCRETE CONTINUOUS NO. OF MAIN SPANS:

MAIN SPAN TYPE: ............... SLAB NO. OF APPR. SPANS:

# OF BEAMS, MAIN SPAN: .. 1 STRUCT. TOTAL LENGTH: .. 105.2 FT (32.1 M)

DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 40.0 FT (12.2 M)

WEARING SURFACE: .......... BITUMINOUS DECK WIDTH: ...................... 32.4 FT (9.9 M)

ABUT. FOUNDATIONS: ........ SPREAD FOOTING ON PILES CURB TO CURB WIDTH: ..... 28.0 FT (8.5 M)

PIER FOUNDATION(S): ........ SPREAD FOOTING ON PILES YEAR BUILT:

ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A

PROJ./PLAN REF. NO: ......... 3J7 / 2293B SKEW ANGLE: ..................... 0 °

NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO

STRUCTURE HISTORY: ...... 1981-JOINT REPAIR. 2010 - ROADWAY RESURFACED

LOCATION

NATCHEZ TRACE PARKWAY MILE POINT: ..................... 181.08 (KM PT 291.41)

STATE: ................................. MISSISSIPPI LOCATION: 14.2 MILES SOUTH OF MS ROUTE 9

FACILITY CARRIED: ............ NATCHEZ TRACE PARKWAY

FEATURE INTERSECTED: .. POPLAR CREEK BRANCH

STRUCTURE EVALUATION SUMMARY

This concrete slab bridge is in fair condition overall. Problems include moderate scour at the north pier; deteriorated expansion joint material in the curbs and rails; spalls with exposed rebar on the south abutment breastwall; spalls with exposed rebar on the bridge rails at the north expansion joint; and fallen tree on northeast embankment and under north span.

Corrective action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.

INSPECTION TEAM: M. REGER, Z. BAILEY

CONDITION ASSESSMENT:

MICHAEL REGER, P.E., FIELD TEAM LEADER 703-948-1424

REPORT REVIEW:

MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 3/31/19

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5570-108P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

D 226 PRIORITY OF IMPROVEMENT

ITEM

NO.

ROUTINE MAINTENANCE QTY. UNIT UNIT

COST

PRELIM.

COST

ESTIMATE

58.2 REPLACE EXPANSION JOINT MATERIAL IN CURBS AND RAILING.

222.9 REMOVE FALLEN TREE FROM NORTHEAST EMBANKMENT AND SMALL TREE

GROWTH AT PIER ENDS.

60.1,3 CLEAN AND COAT EXPOSED REBAR AT BREASTWALL BEARING SEATS.

58.6 REPAIR SPALL OF WEST RAILING AT NORTH EXPANSION JOINT.

PRELIM. MAINTENANCE TOTAL :

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST

PRELIM. COST

ESTIMATES

REHAB. RECONSTR.

60.17 REPAIR SCOUR AT NORTH AND SOUTH PIER WITH ENGINEERED

RIPRAP.

CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL, AND

DESIGN AND CONSTRUCTION ENGINEERING (APPROXIMATELY 70%

OF TOTAL REHAB COST) PLUS PARK LOCATION FACTOR

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

FIELD INSPECTION REPORT STRUCTURE NO. 5570-108P

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

N

58. DECK ITEM REFERENCE AND REMARKS

OTHER

ALIGNMENT

DEFLECTION AND/OR VIBRATION

FASCIA(E)

DIAPHRAGMS AND BRACING

TRUSSES

FLOOR BEAMS AND STRINGERS

ARCH(ES) OR SLAB(S)

GIRDERS OR BEAMS

BEARING DEVICES

59. SUPERSTRUCTURE

OTHER

DEFLECTION AND/OR VIBRATION

UTILITIES

DRAINS AND DRAINAGE

PARAPETS AND/OR RAILINGS

CURBS, SIDEWALKS, AND MEDIAN

RIDEABILITY

WEARING SURFACE

EXPANSION JOINTS

DECK SLAB

OTHER

SETTLEMENT OR DEFLECTION

EROSION AND/OR SCOUR

FOUNDATIONS

CAPS AND/OR BEARING SEATS

PILE BENTS

WALLS AND/OR COLUMNS

PIER(S)

OTHER

SLOPE PROTECTION

SETTLEMENT OR DEFLECTION

EROSION AND/OR SCOUR

EXPANSION JOINTS

WEEP HOLES

WINGWALLS

FOUNDATIONS

BACKWALLS AND/OR BULKHEADS

CAPS AND/OR BEARING SEATS

PILE BENTS

BREASTWALLS OR COLUMNS

ABUTMENTS

60. SUBSTRUCTURE

1.

10.

2.

3.

4.

5.

6.

7.

8.

9.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

PAINT

11.

N N F N N N N N G

N G

F N F N N G F N F G N N

G N G G F G N

11.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

12.

13.

14.

15.

16.

17.

18.

19.

(SPR FTG/PILES)

58.1, 59.3 MINOR CRACKING WITH EFFLORESCENCE ON SLAB UNDERSIDE

ALONG CONSTRUCTION JOINTS AND ON DECK SIDES ABOVE PIERS.

MINOR SPALL ON SLAB UNDERSIDE IN CENTER SPAN, NEAR

CENTERLINE. MINOR SPALLING OF SLAB UNDERSIDE WITH

EXPOSED REBAR TOWARD EAST END OF SLAB DUE TO

INSUFFICIENT CONCRETE COVER, CENTER SPAN AT NORTH PIER.

MINOR CRACKING WITH EFFLORESCENCE ON SLAB UNDERSIDE

NEAR CENTERLINE OF NORTH SPAN.

MINOR POPOUTS ON BOTH DECK FACES THROUGHOUT.

58.2 SEVERELY DETERIORATED OR MISSING EXPANSION JOINT

MATERIAL IN CURBS AND RAILINGS.

58.5 MINOR CRACKING OF CURBS.

58.6 MINOR CRACKING OF RAILINGS. MODERATE CRACKING AND

SPALLING WITH EXPOSED REBAR IN RAILS AT NORTHWEST,

NORTHEAST, AND SOUTHWEST EXPANSION JOINTS; MINOR AT

SOUTHEAST EXPANSION JOINT.

60.1,3 MODERATE SPALLING WITH EXPOSED REBAR AT EAST AND WEST

CORNER OF SOUTH ABUTMENT BREASTWALL; MINOR SPALLING AT

WEST CORNER OF NORTH ABUTMENT BREASTWALL.

60.6 MINOR CRACKING WITH EFFLORESCENCE ON SOUTHEAST

WINGWALL. MINOR POPOUTS ON NORTHEAST, NORTHWEST, AND

SOUTHEAST WINGWALLS. MINOR SPALLING DUE TO MOWER

DAMAGE ALONG FACES OF NORTHEAST, SOUTHEAST, AND

SOUTHWEST WINGWALL ENDS.

60.7 SOIL LOSS THROUGH WEEP HOLES AT NORTH ABUTMENT

BREASTWALL.

60.9 MINOR EROSION BELOW DECK DRAINS. MINOR EROSION ALONG

FACE OF BOTH ABUTMENT BREASTWALLS.

G G G F G N

N

P

G

F

FIELD INSPECTION REPORT STRUCTURE NO. 5570-108P

ITEM REFERENCE AND REMARKS

STREAM BED COMPOSITION : 9.

AVERAGE CLEAR OPENING 8.

NORMAL VELOCITY 7.

ADEQUACY OF OPENING 6.

OTHER 5.

WATERWAY OBSTRUCTIONS 4.

CHANNEL PROTECTION 3.

EROSION AND/OR SCOUR 2.

ALIGNMENT 1.

61. CHANNEL 6

G F N G N

MED

SUFF

11 FT.

SILT

222. APPROACHES 7

1. APPROACH SLABS

2. RELIEF JOINTS

3. APPROACH GUARDRAIL

4. SURFACING

5. EROSION

6. SETTLEMENT

7. SIGNS

8. ALIGNMENT

9. OTHER (FALLEN TREE)

N N N G G G F G N

223. RETAINING WALL N

1. WALL

2. WEEP HOLES

3. FOUNDATION

4. EROSION AND/OR SCOUR

5. SETTLEMENT OR DEFLECTION

6. OTHER

36. TRAFFIC AND SAFETY FEATURES

A. BRIDGE RAILINGS

B. TRANSITIONS

C. APPROACH GUARDRAILS

D. APPROACH GUARDRAIL ENDS

N N N

60.13 MINOR SCALING ALONG BOTTOM OF NORTH FACE OF SOUTH PIER.

SMALL TREE GROWTH AT EAST END OF NORTH PIER.

60.17 MODERATE SCOUR ALONG NORTH FACE OF SOUTH PIER WITH

FOOTING EXPOSED, ALMOST FULL LENGTH AND ACROSS

UPSTREAM END (COULD NOT VERIFY THIS INSPECTION);

HOWEVER, PIER IS FOUNDED ON PILES. MODERATE SCOUR HOLE

AROUND NORTH PIER WITH WATER PONDING ON BOTH SIDES AND

OLD TIMBER PILES EXPOSED.

61.1 STREAM FLOWS AGAINST NORTH FACE OF SOUTH PIER.

61.2 MODERATE EROSION OF CHANNEL BANKS ON BOTH SIDES OF

STRUCTURE.

61.2 SEE BRIDGE FILE FOR SCOUR EVALUATION.

222.4 MINOR POT HOLE IN SOUTHBOUND LANE OF SOUTH APPROACH

PAVEMENT

222.7 TYPE 3 OBJECT MARKER IN PLACE AT ENDS OF PARAPETS.

222.9 FALLEN TREE ON NORTHEAST EMBANKMENT AND UNDER NORTH

SPAN.

TRAFFIC SAFETY RATING CODES

N

Does not meet standards or a safety feature is required and none is provided.

Meets currently acceptable standards.

Not applicable or a safety feature is not required.

STRUCTURE LOAD RATING STRUCTURE NO. 5570-108P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 18 16 30 27

HS 22 20 38 34

TYPE 3 22 20 36 33

TYPE 3S2 26 24 44 40

TYPE 3-3 36 33 60 54

DESIGN LOADING: H15 (M13.5)

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 11/14

LOAD RATING CONTROLLED BY:

REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-108P

STRUCTURE IDENTIFICATION

(201) PARK: NATCHEZ TRACE PARKWAY (1) STATE: ....................................... 284 - MISSISSIPPI (MS)

(202) STRUCTURE NAME: .......... POPLAR CREEK BRANCH BRIDGE (2) STATE HWY. AGENCY DIST:

(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 019 - CHOCTAW

(204) STRUCTURE NUMBER: ..... 5570-108P (4) CITY/PLACE CODE:

(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:

(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... POPLAR CREEK BRANCH

(207) ROAD SECTION NO: ..........108P (7) FACILITY CARRIED: .................. NATCHEZ TRACE PARKWAY

(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5570108P0000000

(209) WITHIN NPS BNDRY?: .......YES (9) LOCATION: ................................ 14.2 MILES SOUTH OF MS RO

(210) OPERATING UNIT: ............. KOSCIUSKO (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)

(211) PROJECT NO(S): ................3J7 (11) MILE POINT: .............................181.08 (KM PT 291.41)

(212) DRAWING NUMBERS: ....... 2293B (27) YEAR BUILT:

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................3 - FREE ROAD

(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

2 - CONCRETE CONTINUOUS

01 - SLAB

40.0 FT (12.2 M)

105.2 FT (32.1 M)

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION: .............. 0 - NONE

(218) IS SALT USED?: ..................... NO

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... R - POSTED (OTHER)

(66) INVENTORY RATING: ...... 22.0 TONS (20.0 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 38.0 TONS (34.5 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 12/18 (91) FREQ. OF INSP: 48 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 5 - SCOUR

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-108P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 33°17'48.60"

(17) LONGITUDE: ......................... 89°24'02.60"

(19) DETOUR LENGTH: ............... 25 MI (40 KM)

(28A) LANES ON STRUCT:

(28B) LANES UNDER STRUCT: ... 00

(42A) SERVICE ON: ..................... 1 - HIGHWAY

(42B) SERVICE UNDER: .............. 5 - WATERWAY

(29) AVG. DAILY TRAFFIC:

(30) YEAR OF ADT:

(114) FUTURE ADT:

(115) YEAR OF FUTURE ADT:

(101) PARALLEL STRUCTURE: ... N - NONE

(38) NAVIGATION CONTROL?: ... 0

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)

(111) ABUT. OR PIER PROT:

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 0.0 FT (0.0 M)

(56) LEFT: ......................... 0.0 FT (0.0 M)

(51) CURB TO CURB WIDTH:

(52) DECK WIDTH:

(32) APPR. ROADWAY WIDTH:

(213) APPR. PAVEMENT WIDTH:

LEFT SHOULDER:

RIGHT SHOULDER:

(33) BRIDGE MEDIAN:

(34) SKEW ANGLE:

(35) DECK FLARE?:

(47) TOTAL HORIZ. CLEARANCE:

(50) SIDEWALKS:

LEFT :

RIGHT :

(214) BRIDGE RAIL TYPE:

RAIL CONFIGURATION:

MATERIAL:

DESIGN TYPE:

(215) BRIDGE RAIL HEIGHT:

(53) MIN. VRT. CLEAR. OVER DECK:

(54) MIN. VRT. UNDERCLEARANCE:

28.0 FT (8.5 M)

32.4 FT (9.9 M)

32.0 FT (9.8 M)

22.0 FT (6.7 M)

5.0 FT (1.5 M)

5.0 FT (1.5 M)

0 - NO MEDIAN

0 °

NO

28.0 FT (8.5 M)

0.0 FT (0.0 M)

0.0 FT (0.0 M)

1 - FULL HEIGHT (NO PARAPE

1 - CONCRETE

1 - CONTINUOUS RAIL

2.33 FT (0.71 M)

99.99 FT (99.99 M)

0.00 FT (0.00 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL:

(62) CULVERT: ...........................N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 1NNN

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

4 - Stable; action required to pro

2 - REHAB/RECONSTRUCTION

D - MINOR

$6,000

$30,000

$0

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1981-JOINT REPAIR. 2010 - ROADWAY RESURFACED

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

APPENDIX STRUCTURE NO. 5570-108P

PHOTOGRAPHS STRUCTURE NO. 5570-108P

PHOTO #1 - LOOKING SOUTHBOUND TOWARD JACKSON

FLOW

PHOTO #2 - WEST (DOWNSTREAM) SIDE

PHOTO #3 - GENERAL TOPSIDE VIEW OF STRUCTURE LOOKING SOUTH

PHOTO #4 - GENERAL UNDERSIDE VIEW OF STRUCTURE IN CENTER

SPAN LOOKING SOUTH

PHOTO #5 - TYPICAL MISSING FILLER MATERIAL IN CURB AND RAILING

EXPANSION JOINTS, WEST CURB AND RAIL OVER NORTH ABUTMENT

SHOWN; ALSO NOTE SPALL WITH EXPOSED REBAR

PHOTO #6 - SPALL WITH EXPOSED REBAR ON WEST RAIL POST AT

SOUTH ABUTMENT

PHOTO #7 - TYPICAL MOSS GROWTH ON CURBS BELOW RAILING

PHOTO #8 - POT HOLE IN SOUTHBOUND LANE OF SOUTH APPROACH

PAVEMENT

PHOTO #9 - CRACKING WITH

EFFLORESCENCE ON SLAB UNDERSIDE NEAR

CENTERLINE OF NORTH SPAN, LOOKING

SOUTH

PHOTO #10 - CRACKING WITH

EFFLORESCENCE ALONG CONSTRUCTION

JOINT OF SLAB UNDERSIDE, WEST SIDE OF

SOUTH SPAN LOOKING NORTH

PHOTO #11 - SPALLS WITH EXPOSED REBAR ON DECK UNDERSIDE AT

EAST SIDE OF CENTER SPAN NEAR NORTH PIER

PHOTO #12 - SPALL WITH EXPOSED REBAR ON WEST CORNER OF

SOUTH ABUTMENT BREASTWALL

PHOTO #13 - SCOUR HOLE AT NORTH SIDE OF NORTH PIER IN NORTH

SPAN (PHOTO FROM 1/14/2016 INSPECTION REPORT)

PHOTO #14 - SCOUR ALONG NORTH SIDE OF SOUTH PIER (PHOTO

FROM 1/14/2016 INSPECTION REPORT)

PHOTO #15 - SCOUR HOLE WITH EXPOSED FOOTING AT UPSTREAM

END OF SOUTH PIER

PHOTO #16 - TREES GROWING AT EAST END OF NORTH PIER

PHOTO #17 - FALLEN TREE ON NORTHEAST BANK

PHOTO #18 - VIEW FROM BRIDGE LOOKING UPSTREAM

PHOTO #19 - VIEW FROM BRIDGE LOOKING DOWNSTREAM

File details come from the government source that posted it. Updated .