This bridge inspection report details the condition of Structure No. 5570-096P, a concrete frame bridge located on the Natchez Trace Parkway at Mile Point 197.10 that carries a county road over the parkway. The 33.8-foot structure consists of a single span with concrete abutments on spread footings with piles.
The report finds the bridge to be in overall good condition but recommends replacing deteriorated expansion joint filler material, cleaning and sealing exposed rebar, and installing object markers at the abutments. Estimated preliminary maintenance costs total $3,000 while rehabilitation/reconstruction costs are estimated at $16,000. The next routine inspection is scheduled for 24 months from the October 29, 2020 inspection date.
The related federal contract opportunity is a pre-solicitation notice for drainage improvements on the Natchez Trace Parkway, specifically work on Structure Nos. 3N17 and 3H26, indicating future contract opportunities for maintenance and rehabilitation work on parkway bridges and drainage infrastructure may be forthcoming.
View the file
Other files
Show 40 more
Latest 50 of 59 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRIDGE INSPECTION REPORT
COUNTY ROAD BRIDGE AT MP 197.10
NATCHEZ TRACE PARKWAY OVER COUNTY ROAD
NATCHEZ TRACE PARKWAY
LOOKING SOUTH
STRUCTURE NO. 5570-096P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 10/29/2020
WEST SIDE
Report prepared by:
Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov https://bridge.flhd.fhwa.dot.gov
STRUCTURE SUMMARY STRUCTURE NO. 5570-096P
COUNTY ROAD BRIDGE AT MP 197.10 INSPECTION DATE: 10/29/2020
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL:
MAIN SPAN TYPE:
# OF BEAMS, MAIN SPAN: .
DECK TYPE:
WEARING SURFACE:
ABUT. FOUNDATIONS:
PIER FOUDNATION(S):
ABUTMENT / PIER MAT'L: ..
PROJ./PLAN REF. NO:
NPS ROAD CLASS:
STRUCTURE HISTORY:
1 - CONCRETE NO. OF MAIN SPANS:
07 - FRAME (EXCEPT FRAME NO. OF APPR. SPANS:
1 STRUCT. TOTAL LENGTH: . 33.8 FT (10.3 M)
1 - CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: ......... 26.6 FT (8.1 M)
6 - BITUMINOUS DECK WIDTH: ..................... 32.4 FT (9.9 M)
3 - SPREAD FOOTING ON PILES CURB TO CURB WIDTH: .... 28.0 FT (8.5 M)
6 - N/A YEAR BUILT:
1 - CONCRETE YEAR RECONSTRUCTED: . 0
3H17 SKEW ANGLE: .................... 12 °
1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ....... N
1982-JOINT REPAIR. 2007, 2013-STRUCTURE AND APPROACHES REPAVED;
PAVEMENT SAWCUT AND SEALED OVER FRAME ENDS.
LOCATION
NATCHEZ TRACE PARKWAY
STATE: .............................. 284 - MISSISSIPPI
FACILITY CARRIED: ......... NATCHEZ TRACE PARKWAY
FEATURE INTERSECTED: COUNTY ROAD
MILE POINT: .. 197.10 (KM PT 60.08)
LOCATION: .... 7.9 MILES SOUTH OF U.S. ROUTE 82
INSPECTION TEAM: B. Cazenas, R. Silvestry
CONDITION ASSESSMENT:
Reinaldo Silvestry
REPORT REVIEW:
Marcus Miller
REPORT APPROVAL: Date: 03/04/2021
Jorgomai Ceesay
STRUCTURE EVALUATION SUMMARY
This concrete frame bridge is in good condition overall. Main problems include severe deterioration of the filler material in the vertical joints between the abutment breastwalls and wingwalls that has caused settlement of the roadway behind the abutments; severe deterioration of the filler material in the curb and railing expansion joints; a minor spall with exposed rebar in the northwest approach rail; and minor erosion at the southwest wingwall.
Additional problems include transverse cracking of the wearing surface behind the previously sawcut joints over abutments. Additionally, the drop inlets in the underpass roadway ditches on the northeast corner of the structure is covered with soil.
Corrective measures should be taken as outlined in this report to help prevent the possible development of more serious or costly problems in the future.
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5570-096P
COUNTY ROAD BRIDGE AT MP 197.10 INSPECTION DATE : 10/29/2020
PRIORITY OF IMPROVEMENT226
A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.
B (Major) - Structure is seriously deficient or presents a safety hazzard, but can remain open at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D
Item No.
Maintenance Recomendations
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
222.7
REPLACE VERTICAL CLEARANCE SIGNS. INSTALL OBJECT
MARKERS AT ABUTMENTS FOR UNDERPASS ROADWAY.
222.9,60.
REMOVE SOIL AND DEBRIS FROM DROP INLET IN
UNDERPASS ROADWAY DITCH, NORTHEAST CORNER OF
STRUCTURE. UNCLOG WEEPHOLES AT BOTH
ABUTMENTS.
PRELIM. MAINTENANCE TOTAL :
Item No.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST ESTIMATES
REHAB RECONSTR
58.2,60.8 REPLACE FILLER MATERIAL IN CURB
EXPANSION JOINTS AND IN VERTICAL JOINTS
BETWEEN ABUTMENT BREASTWALLS AND
WINGWALLS.
58.6 CLEAN AND SEAL EXPOSED REBAR IN
NORTHWEST APPROACH RAIL WITH
APPROVED PROTECTIVE COATING.
CONTRACT COSTS FOR MOBILIZATION,
TRAFFIC CONTROL, DESIGN, AND
CONSTRUCTION ENGINEERING (70% TOTAL
REHAB COST) PLUS PARK LOCATION FACTOR.
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL :
PRELIM. REHABILITATION TOTAL :
PRELIM. RECONSTRUCTION TOTAL : ..
TOTAL ITEMIZED COSTS:
PRELIMINARY ESTIMATE TOTAL * :
(*Includes typical contract costs for mobilization, traffic control and design/construction engineering: but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for planning purposes only; they should not be used as a complete or final engineers estimate.)
Remarks : Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 5570-096P
COUNTY ROAD BRIDGE AT MP 197.10 INSPECTION DATE: 10/28/2020
58. DECK
1. DECK SLAB
4. RIDEABILITY
5. CURBS, SIDEWALKS, AND MEDIAN
6. PARAPETS AND/OR RAILINGS
7. DRAINS AND DRAINAGE
8. UTILITIES
9. DEFLECTION AND/OR VIBRATION
10.OTHER:
59. SUPERSTRUCTURE
1. BEARING DEVICES
2. GIRDERS OR BEAMS
3. ARCH(ES) OR SLAB(S)
4. FLOOR BEAMS AND STRINGERS
5. TRUSSES
6. DIAPHRAGMS AND BRACING
7. PAINT
8. FASCIA(E)
9. DEFLECTION AND/OR VIBRATION
10.ALIGNMENT
11.OTHER
60. SUBSTRUCTURE
61. CHANNEL
1. ALIGNMENT
2. EROSION AND/OR SCOUR
3. CHANNEL PROTECTION
4. WATERWAY OBSTRUCTIONS
5. OTHER
6. ADEQUACY OF OPENING
7. NORMAL VELOCITY
8. AVERAGE CLEAR OPENING
9. STREAMBED COMPOSITION:
222. APPROACHES
1. APPROACH SLABS
2. RELIEF JOINTS
3. APPROACH GUARDRAIL
4. SURFACING
5. EROSION
6. SETTLEMENT
7. SIGNS
8. ALIGNMENT
9. OTHER
223. RETAINING WALL
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
G
G
G
G
G
G
N
N
N
G
N
N
N
N
N
G
G
N
N
N
N
N
G
G
G
G
P
N
2. EXPANSION JOINTS P
3. WEARING SURFACE G
N FT
UNDERPASS DROP INLET
F
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLEN
EXCELLENT CONDITION9
VERY GOOD CONDITION - no problems noted.8
GOOD CONDITION - some minor problems.7
SATISFACTORY CONDITION - structural elements show some minor deterioration.6
FA R CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.4
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible. Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“ MM NENT” FA LURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability.
Structure is closed to
FA LED CONDITION - out of service; beyond corrective action. 0
ABUTMENTS
1. BREASTWALLS OR COLUMNS G
2. PILE BENTS N
3. CAPS AND/OR BEARING SEATS N
4. BACKWALLS AND/OR BULKHEADS N
5. FOUNDATIONS N
6. WINGWALLS G
7. WEEP HOLES P
8. EXPANSION JOINTS P
9. EROSION AND/OR SCOUR G
10.SETTLEMENT OR DEFLECTION G
11.SLOPE PROTECTION N
12.OTHER N
36. TRAFFIC AND SAFETY FEATURES
A. BRIDGE RAILINGS:
B. TRANSITIONS:
C. APPROACH GUARDRAILS:
D. APPROACH GUARDRAIL ENDS:
N
N
N
PIER(S) TRAFFIC SAFETY RATING CODES
13. WALLS AND/OR COLUMNS N
N
N
N
N
N
N
0 - Does not meet standards or a safety features is 14.PILE BENTS required and none is provided.
15.CAPS AND/OR BEARING SEATS
1 - Meets currently acceptable standards.
16.FOUNDATIONS
17.EROSION AND/OR SCOUR N - Not applicable or a safety features is not required.
18.SETTLEMENT OR DEFLECTION
19.OTHER
FIELD INSPECTION REPORT STRUCTURE NO. 5570-096P
ITEM REFERENCE AND REMARKS
58.1
59.3
MINOR HORIZONTAL CRACKING WITH EFFLORESCENCE ON ALL EXTERIOR CORNERS OF FRAME AT SPRINGLINE. MINOR COLLISION DAMAGE TO BOTH SIDES OF SLAB WITH SCRAPES ON SLAB UNDERSIDE. MINOR TRANSVERSE CRACKING OF SLAB
UNDERSIDE; MINOR ABRASION THROUGHOUT.
58.2 FILLER MATERIAL IS MISSING OR SEVERELY DETERIORATED IN CURB AND RAILING EXPANSION JOINTS.
58.3
222.4
PAVEMENT SAWCUT AND SEALED OVER ENDS OF STRUCTURE. MINOR TRANSVERSE CRACKING OF APPROACH PAVEMENT.
58.5
58.6
MINOR POPOUTS ON CURBS. MINOR SPALL ON END OF NORTHEAST APPROACH CURB. MINOR TRANSVERSE CRACKING OF
CURBS.
MINOR TRANSVERSE CRACKING OF RAILS. MINOR CRACKING WITH EFFLORESCENCE ON RAIL POSTS AT BRIDGE ENDS. MINOR SPALL WITH EXPOSED REBAR ON NORTHWEST APPROACH RAIL AT EXPANSION JOINT. MOWER DAMAGE ON END OF NORTHEAST
WINGWALL PARAPET END.
58.7 MINOR ACCUMULATION OF DEBRIS IN CURBLINES.
60.1
60.6
MINOR VERTICAL CRACKING OF ABUTMENT BREASTWALLS WITH FLAKING OF FINISH COAT AT TWO CRACKS. GRAFFITI ON BOTH
BREASTWALLS.
MINOR HORIZONTAL AND VERTICAL CRACKING WITH EFFLORESCENCE ON ALL WINGWALLS.
60.7 WEEP HOLES ARE PARTIALLY BURIED OR CLOGGED.
60.8 SEVERE DETERIORATION OF FILLER MATERIAL IN VERTICAL JOINTS BETWEEN WINGWALLS AND ABUTMENTS.
60.9 MINOR TO MODERATE EROSION (5'L X 2'W X 2'D) ADJACENT TO SOUTHWEST WINGWALL. MINOR TO MODERATE EROSION (6'L X
2'W X 2'D) ADJACENT TO NORTHWEST WINGWALL.
222.4
222.6
UP TO 1" SETTLEMENT OF APPROACHES BEHIND ABUTMENTS FOR 2'.
222.7 "13FT 0IN" SIGN ON BOTH SIDES OF SLAB. "13'-0"" VERTICAL CLEARANCE SIGNS AT BOTH UNDERPASS APPROACHES; EAST APPROACH SIGN DAMAGED AND BARELY LEGIBLE DUE TO MILDEW AND WEST APPROACH SIGN HAS MINOR GUNSHOT DAMAGE.
OBJECT MARKERS NOT PRESENT AT ABUTMENTS FOR UNDERPASS ROADWAY.
5" X 16" BLACK AND YELLOW STRIPED OBJECT MARKERS AT PARAPET ENDS.
222.9 SOIL AND DEBRIS COVERED DROP INLET AT UNDERPASS ROADWAY DITCHES ON NORTHEAST SIDE OF STRUCTURE.
STRUCTURE LOAD RATING STRUCTURE NO. 5570-096P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 22 20 37 34
HS 39 35 66 60
TYPE 3 34 31 57 52
TYPE 3S2 52 47 87 79
TYPE 3-3 67 61 112 102
DESIGN LOADING: 2 - H 15
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION: 06/15/2015
LOAD RATING CONTROLLED BY: POSITIVE MOMENT
REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-096P
STRUCTURE IDENTIFICATION
(201) PARK: NATCHEZ TRACE PARKWAY
(202) STRUCTURE NAME:..............COUNTY ROAD BRIDGE AT MP 197.10
(203) STRUCTURE KIND:............... 1 - BRIDGE
(204) STRUCTURE NUMBER:.........5570-096 P
4 - SOUTHEAST(205) NPS REGION:
(206) ROUTE CODE NUMBER:
(207) ROAD SECTION NO:
(208) NPS ROAD CLASS:............... 1 - PRINCIPAL PARK ROAD
(209) WITHIN NPS BNDRY?:.......... Yes
(210) OPERATING UNIT:.................DANCY
(211) PROJECT NO(S):................... 3H17
(212) DRAWING NUMBERS:...........3019A
(21) MAINTAINED BY:......................66 - NATIONAL PARK SERVICE
(22) OWNER:................................... 66 - NATIONAL PARK SERVICE
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY / PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR:
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORIC DESIGNATION:
284 - MISSISSIPPI
01019 CHEROKEE
00000
1 6 1 00001 0
COUNTY ROAD
NATCHEZ TRACE PARKWAY
5570096P0000000
7 9 MILES SOUTH OF U.S. ROUTE 82
99.99 FT ( 99.99 M)
197.1 (KM PT: 60.08)
3 - ON FREE ROAD
5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL:..........1 - CONCRETE (44A) APPR. STR. MATERIAL:............ 0 - Other
(43B) MAIN STR. TYPE:.................. 07 - FRAME (EXCEPT FRAME (44B) APPR. STR. TYPE:.................... 00 - OTHER
CULVERTS)
(45) NO. OF MAIN SPANS:..............001 (46) NO OF APPROACH SPANS:
(48) MAX. SPAN LENGTH:..............26.6 FT ( 8.1 M)
(49) STRUCTURE LENGTH:........... 33.8 FT ( 10.3 M) (108) WEAR SURFACE/PROTECT SYSTEM:
(216A) ABUTMENT #1 FDN:........... 3 - SPREAD FOOTING ON PILES A) TYPE WEARING SURFACE:.. 6 - BITUMINOUS
(216B) ABUTMENT #2 FDN:........... 3 - SPREAD FOOTING ON PILES B) TYPE MEMBRANE:................. 0 - NONE
(217A) PREDOM. PIER FDN:.......... 6 - N/A C) TYPE PROTECTION:.............. 0 - NONE
(217B) SECOND. PIER FDN:.......... 6 - N/A (218) IS SALT USED?.......................... NO
(107) DECK TYPE:.......................... 1 - CONCRETE CAST-IN-PLACE
LOAD RATING AND POSTING
(31) DESIGN LOAD:.........................2 - H 15 (41) LOAD RESTRICTION:.................. R - POSTED FOR OTHER LOAD-
CAPACITY RESTRICTION
(66) INVENTORY RATING:..............39 TONS ( 35.4 METRIC TONS) (70) BRIDGE POSTING:...................... 5 - EQUAL TO OR ABOVE LEGAL
LOADS
(64) OPERATING RATING:..............66 TONS ( 59.9 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 10/29/2020 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL:.......... N
(220) SPECIAL STUDY TYPE: 0 - NONE INSP. EVERY MONTHS - LAST INSP:
(221) SPECIAL STUDY DATE: (B) UNDERWATER:..................... N
INSP. EVERY MONTHS - LAST INSP:
(C) SPECIAL INSPECTION:........ N
INSP. EVERY MONTHS - LAST INSP:
https://LENGTH:
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-096P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE:................................ 33° 27'28.70" (51) CURB TO CURB WIDTH:............ 28.0 FT ( 8.5 M)
(17) LONGITUDE:............................ 89°13 '23 30" (52) DECK WIDTH:.......................... 32.4 FT ( 9.9 M)
(19) DETOUR LENGTH:.................. 15 MI ( 24 KM) (32) APPR. ROADWAY WIDTH:...... 32.0 FT ( 9.8 M)
(28A) LANES ON STRUCT:.............02 (213) APPR. PAVEMENT WIDTH:... 22.0 FT ( 6.7 M)
(28B) LANES UNDER STRUCT:......02 LEFT SHOULDER:............... 5 0 FT ( 1.5 M)
(42A) SERVICE ON:.........................1 - HIGHWAY RIGHT SHOULDER:.......... 5 0 FT ( 1.5 M)
(42B) SERVICE UNDER:................. 1 - HIGHWAY, WITH OR W/OUT (33) BRIDGE MEDIAN:.................... 0 - NO MEDIAN
PEDESTRIAN
(29) AVG DAILY TRAFFIC:..............1075 (34) SKEW ANGLE:......................... 12 °
(30) YEAR OF ADT:......................... 2012 (35) STRUCTURE FLARED:............ 0 - NO FLARE
(114) FUTURE ADT:.........................1183 (47) TOTAL HORIZ. CLEARANCE:.. 28 FT ( 8.5 M)
(115) YEAR OF FUTURE ADT:........2032 (50) SIDEWALKS
(101) PARALLEL STRUCTURE:......N - NO PARALLEL STRUCTURE LEFT:.................................... 0 0 FT ( 0 M)
(38) NAVIGATION CONTROL:.........N - NOT APPLICABLE, NO WATERWAY RIGHT:.................................. 0 0 FT ( 0 M)
(39) VERTICAL CLEARANCE:.........0 FT ( 0 M) (214) BRIDGE RAIL TYPE
(40) HORIZ. CLEARANCE:..............0 FT ( 0 M) RAIL CONFIGURATION:...... 1 - FULL HEIGHT (NO PARAPET)
(111) ABUT OR PIER PROT:........... MATERIAL:........................... 1 - CONCRETE
LATERAL UNDERCLEARANCE: DESIGN TYPE:..................... 1 - CONTINUOUS RAIL
(55) RIGHT:..............................5.00 FT ( 1.52 M) (215) BRIDGE RAIL HEIGHT:.......... 2 50 FT ( 0.76 M)
(56) LEFT:................................ 0 FT ( 0 M) (53) MIN. VRT. CLR. OVER DECK: 99.99 FT ( 99.99 M)
(54) MIN. VRT. UNDRCLRANCE:... 13.08 FT ( 3.99 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:....................................... 7 (67) STRUCTURAL EVALUATION:
(59) SUPERSTRUCTURE:...............7 (68) DECK GEOMETRY:
(60) SUBSTRUCTURE:.......... 7 (69) UNDERCLEARANCES:
(61) CHANNEL:................................N (71) WATERWAY ADEQUACY:........... N
(62) CULVERT:.................................N (72) APPROACH ALIGNMENT:
(222) APPROACHES:...................... 7 (113) SCOUR CRITICAL:.................... N - NOT OVER WATERWAY
(223) RETAINING WALL:.................N (225) PROPOSE OF IMPROVEMENT: 2 - REHAB/RECONSTRUCTION
(36) TRAFFIC SAFETY FEAT: 1 N N N (226) PRIORITY OF IMPROVEMENT: D - MINOR
(75A) TYPE OF WORK:................... (227) MAINTENANCE COST:.............$ 3000
(75B) WORK DONE BY:.................. (228) REHAB / RECNSTR COST:..... $ 16000
(76) IMPROVEMENT LENGTH:....... FT ( 0 M) (229) CONSTRUCTION COST:.......... $ 0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1982-JOINT REPAIR. 2007, 2013-STRUCTURE AND APPROACHES REPAVED; PAVEMENT SAWCUT AND SEALED OVER FRAME ENDS.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIGURATION INFORMATION:
https://27'28.70
Inspector: Reinaldo Silvestry Structure Number: 5570096P0000000
Inpsection Date: 10/29/2020 Facility Carried: NATCHEZ TRACE PAR
Bridge Inspection Report
Pictures
PHOTO 3
Description LOOKING NORTHBOUND TOWARD TUPELO
PHOTO 4
Description EAST SIDE
Bridge Inspection Report
Pictures
PHOTO 5
Description GENERAL VIEW OF NORTH APPROACH
PHOTO 6
Description GENERAL VIEW OF SOUTH APPROACH
Bridge Inspection Report
Pictures
PHOTO 7
Description EXPANSION JOINT OVER SOUTH ABUTMENT
PHOTO 8
Description NORTH ABUTMENT EXPANSION JOINT; NOTE EVIDENCE OF SETTLEMENT IN NORTH
APPROACH
Bridge Inspection Report
Pictures
PHOTO 9
Description WEST RAILING OVER NORTH ABUTMENT; NOTE SPALLING WITH EXPOSED REBAR
PHOTO 10
Description TYPICAL DRAINAGE INLET IN SOUTHWEST CORNER; NOTE DEBRIS ACCUMULATION
AROUND DRAIN
Bridge Inspection Report
Pictures
PHOTO 11
Description SOUTHWEST WINGWALL; NOTE VEGETATION GROWTH ALONG WINGWALL
PHOTO 12
Description EFFLORESCENCE FROM HORIZONTAL CONSTRUCTION JOINT AT SOUTHEAST WINGWALL
Bridge Inspection Report
Pictures
PHOTO 13
Description HORIZONTAL CRACK WITH EFFLORESCENCE AT BEARING AREA ON WEST SIDE OF
SOUTH ABUTMENT
PHOTO 14
Description GENERAL VIEW OF SOUTH ABUTMENT; NOTE PARTIALLY BURIED WEEP HOLES
Bridge Inspection Report
Pictures
PHOTO 15
Description SPALLING AND VEHICULAR SCRAPES AT EAST SIDE OF SLAB UNDERSIDE
PHOTO 16
Description UNDERSIDE VIEW OF SLAB LOOKING NORTH
Bridge Inspection Report
Pictures
PHOTO 17
Description WEST SIDE OF SLAB UNDERSIDE; NOTE SPALL AND SCRAPES DUE TO COLLISION
DAMAGE
PHOTO 18
Description GENERAL VIEW OF NORTH ABUTMENT
Bridge Inspection Report
Pictures
PHOTO 19
Description GENERAL VIEW OF NORTHEAST WINGWALL; NOTE VEGETATION GROWTH
PHOTO 20
Description NORTHWEST WINGWALL; NOTE EROSION HOLE (6'L X 2'W X 2'D) ALONG WINGWALL
Bridge Inspection Report
Pictures
PHOTO 21
Description VERTICAL CLEARANCE SIGN AT THE WEST APPROACH OF UNDERPASS ROAD; NOTE
GUN SHOTS
PHOTO 22
Description FADED VERTICAL CLEARANCE SIGN AT EAST APPROACH OF UNDERPASS ROAD