| File | Type | Posted |
|---|---|---|
| AF Form 3052 (BLANK).xlsx | XLSX spreadsheet | |
| Solicitation Amendment FA487723Q00090002 SF 30.pdf | ||
| LPS 5415 RFI Log 2.docx | DOCX document | |
| Solicitation Amendment FA487723Q00090001 SF 30.pdf | ||
| LPS 5415 RFIs.docx | DOCX document | |
| 05415-001-004.PDF | ||
| Sign-In Sheet-21APR23-LPSBLDG5415.pdf | ||
| 05415-001-006.PDF | ||
| 05415-001-002.PDF | ||
| 05415-001-005.PDF | ||
| 05415-001-007.PDF | ||
| 05415-001-001.PDF | ||
| 05415-001-003.PDF | ||
| 04-01011 - Design Requirements (Revised 05-01-2023) LPS 5415 Rev 1.pdf | ||
| (7) EAL.xls | XLS spreadsheet | |
| (5) Project FBNV230012 LPS 5415 Specifications.pdf | ||
| (4) DMAFB Design Compatibility Guidelines 2017.pdf | ||
| Solicitation - FA487723Q0009.pdf | ||
| (6) Contractor Environmental Guide (15 May 2019).pdf | ||
| (2) AF Form 3052.xlsx | XLSX spreadsheet | |
| (3) Wage Determination AZ (AZ20230032).txt | TXT text file |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF Form 66
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE: | SOLICITATION/CONTRACT NO.: | ||||||||||||||||||||
| FBNV 20-0011 | Repair/Abandon Water Well, 355 SFS North Parking Lot | ||||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | NO. OF COPIES REQUIRED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | |||||||||||||
| 01 Preconstruction Submittals | 02 Shop Drawings | 03 Product Data | 04 Samples | 05 Design Date | 06 Test Reports | 07 Certificates | 08 Manufacturer's Instructions | 09 Manufacturer's Field Reports | 10 Operation and Maintenance Manuals | 11 Closeout Submittal | Awarded: | ||||||||||||
| Pre-Con: | |||||||||||||||||||||||
| NTP: | |||||||||||||||||||||||
| Const. Start: | |||||||||||||||||||||||
| Const. End: | |||||||||||||||||||||||
| Finalled: | |||||||||||||||||||||||
| DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |||||||||||||||||
| APPROVED | DISAPPROVED | ||||||||||||||||||||||
| 1 | AF Form 103 Job Order | ||||||||||||||||||||||
| Sec 01010, Para 1.3c | 1 | ||||||||||||||||||||||
| 2 | Affidavits | ||||||||||||||||||||||
| Sec 01010, Para 1.6a | 1 | ||||||||||||||||||||||
| 3 | Certifications | ||||||||||||||||||||||
| Sec 01010, Para 1.6b | 1 | ||||||||||||||||||||||
| 4 | Hazardous Material Usage |
Sec 01010, Para 2.5c
| Env Cont Guide Sec 3.3 Hazardous Material | 1 | ||
| 5 | HAZMAT Usage Reports |
Sec 01010, Para 2.5c Env Cont Guide Sec 3.4 HAZMAT Usage 1 (1st of the month for projects >60days) (End of project for projects <60 days) 6 Air Quality Activity Permit Sec 01010, Para 2.5d
| Env Cont Guide Sec 3.3 Air Quality | 1 | 7 Days after Reciept of Permit | |
| 7 | AZPDES General Permit |
Sec 01010, Para 2.5d
| Env Cont Guide Sec 3.3 SWPP | 1 | 2 Days Prior to Construction | ||
| 8 | Construction & Demolition Debris Diversion Plan |
Sec 01010, Para 2.5e
| Env Cont Guide Sec 3.3 C&D Plan | 1 | ||
| 9 | SWPP Plan | ||
| Sec 01010, Para 2.5f | 1 | ||
| 10 | Waste Manifests |
Sec 01010, Para 2.5h
| Env Cont Guide Sec 3.4 Regulated Hazardous Waste | 1 | 3 days after Disposal | ||
| 11 | Recycling Manifests |
Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Waste & Recyclables 1 (1st of the month for projects >60days) (End of project for projects <60 days) 12 Radioactive Use Sec 01010, Para 2.5i
| Env Cont Guide Sec 3.3 Radioactive Material | 1 | ||||||||
| 13 | Progress Photographs | ||||||||
| Sec 01010, Para 2.8 | 1 | ||||||||
| 14 | Record As-Builts | ||||||||
| Sec 01010, Para 3.2.2.a | 1 | ||||||||
| 15 | Record Disks | ||||||||
| Sec 01010, Para 3.2.2.b | 1 | ||||||||
| 16 | DD Form 1354 | ||||||||
| Sec 01010, Para 3.2.2.c.1 | 1 | ||||||||
| 17 | Warranty/Guarantee Items | ||||||||
| Sec 01010, Para 3.2.2.c.3 | 1 | ||||||||
| 18 | O&M Manual | ||||||||
| Sec 01010, Para 3.2.2.d | 1 | ||||||||
| 19 | AF Form 3064 | ||||||||
| Sec 01011, Para 1.5.1 | 1 | ||||||||
| 20 | Design Charrette Submittal | ||||||||
| Sec 01011, Para 2.10.1 | 1 | 1 Package-Provide Copies as indicated | |||||||
| 21 | 65% Design Submittal | ||||||||
| Sec 01011, Para 2.10.3 | 1 | 1 Package-Provide Copies as indicated | |||||||
| 22 | 95% Design Submittal | ||||||||
| Sec 01011, Para 2.10.4 | 1 | 1 Package-Provide Copies as indicated | |||||||
| 23 | 100% Design Submittal | ||||||||
| Sec 01011, Para 2.10.5 | 1 | 1 Package-Provide Copies as indicated | |||||||
| 24 | Soil Compaction Test Results for Utilities and Facilities | ||||||||
| Sec 01011, Para 3.3 | 1 | ||||||||
| 25 | EMS Most Significant Environmental Aspects Awareness Form | ||||||||
| Env Cont Guide Sec 3.2 & Appendix E | 1 | At PreCon Meeting | |||||||
| 26 | EMS Awareness Training | ||||||||
| Env Cont Guide Sec 3.3 & Appendix F | 1 | At PreCon Meeting | |||||||
| 27 | Notifce of Termination | ||||||||
| Env Cont Guide 3.5 SWPP Plan | 1 | ||||||||
| 28 | Contractor to add Submittals required within specifications or as requested. | ||||||||
| 29 | |||||||||
| 30 | |||||||||
| 31 | |||||||||
| 32 | |||||||||
| 33 | |||||||||
| 34 | |||||||||
| 35 | |||||||||
| 36 | |||||||||
| 37 | |||||||||
| 38 | |||||||||
| 39 | |||||||||
| 40 | |||||||||
| 41 | |||||||||
| 42 | |||||||||
| 43 | |||||||||
| 44 | |||||||||
| 45 | |||||||||
| 46 | |||||||||
| 47 |