(2) AF Form 3052.xlsx

Air Force Form XLSX spreadsheet 37 KB Posted

Attached to
Solicitation for LPS Bldg 5415
Solicitation number
FA487723Q0009
Issued by

View the file

Other versions and copies of AF Form 3052

File Revision Posted Attached to
Attachment E - Blank Sample AF Form 3052.xls Revision not stated Robins AFB Paving Multi-Award IDIQ
Attachment 5 - PNQS 24-4829 Airfield Improvements AF Form 3052 - Amendment 0002.xlsx Revision not stated Maxwell AFB - Airfield Repairs - Amendment 0006
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
B6 AF Form 3052 - Construction Cost Estimate.pdf Revision not stated Emergent Requirements Construction IDIQ (Single-Award)
AF Form 3052 (Blank) ReplCath Prot 240026 at Multi Facs -- .xlsx Revision not stated FBNV240026 Replace Cathodic Protection Test Points DMAFB
FBNV240017 - AF Form 3052 Blank.xlsx Revision not stated FA487724R0020 - Upgrade PGS Fire System
Attachment 4 - JUBJ 22 1016 Construct RIC - AF Form 3052.xlsx Revision not stated Construct Research Information Center (Solicitation Amendment 0002)
Attachment 4 - PNQS 24-3992 Replace Localizer Pad - AF Form 3052.xlsx Revision not stated PNQS 24-3992 Replace Localizer Pad (Solicitation Amendment 0001)
05. FBNV230009_AF Form 3052 (Blank).xlsx Revision not stated Solicitation - Repair Command Post Bldg 2300 - DMAFB
B941 Replace AHU AF Form 3052 - Construction Cost Estimate.xlsx Revision not stated Bldg 941 Replace Air Handling Unit 1
AF Form 3052.xlsx Revision not stated BLDG 4868 Additional Electrical Panel for DMAFB
Atch 7 AF Form 3052.xlsx Revision not stated B324 Add Sewer Line, FE Warren AFB, WY
AF Form 3052-Construction Cost Estimate Breakdown (3).xlsx Revision not stated Barnes Center Command Suite Modification Bldg. 832 Gunter Annex (Amendment 0003)
5. AF Form 3052-BLANK.xlsx Revision not stated Replace Swamp Cooler B5045
Copy of Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Battery Room - Maxwell AFB, AL (Solicitation)
Attachment 4 - PNQS 23-0379 Connect Fire Mains - AF Form 3052.xlsx Revision not stated PNQS 23-0379 Connect Fire Mains Bldgs. 849 & 1143, MAFB & Gunter Annex
17. AF Form 3052 (Blank) - FBNV190002.xlsx Revision not stated Repair and Construct Primary Electric Distribution
Attachment 2.12 - AF Form 3052 Construction Cost Estimate Breakdown Template.xlsx Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Rooms, Building 1410 Gunter
Show all 20

Who attaches AF Form 3052

Other files

File Type Posted
AF Form 3052 (BLANK).xlsx XLSX spreadsheet
Solicitation Amendment FA487723Q00090002 SF 30.pdf PDF
LPS 5415 RFI Log 2.docx DOCX document
Solicitation Amendment FA487723Q00090001 SF 30.pdf PDF
Sign-In Sheet-21APR23-LPSBLDG5415.pdf PDF
LPS 5415 RFIs.docx DOCX document
05415-001-006.PDF PDF
05415-001-002.PDF PDF
05415-001-005.PDF PDF
05415-001-004.PDF PDF
05415-001-007.PDF PDF
05415-001-001.PDF PDF
05415-001-003.PDF PDF
04-01011 - Design Requirements (Revised 05-01-2023) LPS 5415 Rev 1.pdf PDF
(3) Wage Determination AZ (AZ20230032).txt TXT text file
(6) Contractor Environmental Guide (15 May 2019).pdf PDF
Solicitation - FA487723Q0009.pdf PDF
(4) DMAFB Design Compatibility Guidelines 2017.pdf PDF
(5) Project FBNV230012 LPS 5415 Specifications.pdf PDF
(7) EAL.xls XLS spreadsheet
(1) AF Form 66.xlsx XLSX spreadsheet
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR(WORK TO BE PERFORMED)Repair/Abandon Water Well, 355 SFS North Parking LotPROPOSED TOTAL CONTRACT PRICE0
PURCHASE REQUEST NUMBERPROJECT NUMBERFBNVUnknownWORK LOCATIONDAVIS-MONTHAN AFB, AZ 85707
LINEUNIT OFMATERIAL COSTLABOR COSTDIRECTLINE
NO.ITEMMEASUREQUANTITYUNITTOTALMANHOURSRATETOTALCOSTSTOTAL
SUMMARY
1SUBTOTAL DIVISION 01 GENERAL CONDITIONS0.000.000.000.000.00
2SUBTOTAL DIVISION 02 EXISTING CONDITIONS0.000.000.000.000.00
3SUBTOTAL DIVISION 03 CONCRETE0.000.000.000.000.00
4SUBTOTAL DIVISION 05 METALS0.000.000.000.000.00
5SUBTOTAL DIVISION 07 THERMAL & MOISTURE PROTECTION0.000.000.000.000.00
6SUBTOTAL DIVISION 31 EARTHWORK0.000.000.000.000.00
7SUBTOTAL DIVISION 32 EXTERIOR IMPROVEMENTS0.000.000.000.000.00
7SUBTOTAL DIVISION 33 UTILITIES0.000.000.000.000.00
LINE TOTALS OVERALL0.000.000.000.00
OVERHEAD TOTAL OVERALL (___%)0.00
SUBTOTAL OVERALL W/ OVERHEAD0.00
PROFIT TOTAL OVERALL (___%)0.00
SUBTOTAL OVERALL W/ OVERHEAD AND PROFIT0.00
TAX OVERALL ____%0.00
BOND OVERALL (___%)0.00
TOTAL OVERALL PROJECT PRICE0.00
DATE:FIRM NAME:
TITLE:PROJECT MANAGERBY:
DIVISION 01 GENERAL CONDITIONS
1Well Abandonment Completion ReportLS
2As-built DrawingEA
3Swan Gate Search RequirementsLS
4Project ManagerWk
5SuperintendentWk
6Permits (Notice of Intent to Abandon)LS
7Proctor Compaction, 6" Modified Mold, ASTM D 698EA
8Testing Technician for earthworkEA
9Moilization/Demobilization - Small EquipmentEA
10Mobilization/Demobilization - Equipment hauled on 3-ton capacity towed trailerEA
11Mobilization/Demobilization - Equipment hauled on 20-ton capacity towed trailerEA
12Portable barricadeEA
13Water TruckWk
14Jobsite cleanupLS

SUBTOTAL DIVISION 01 GENERAL CONDITIONS 0.00 0.00 0.00 0.00 0.00

DIVISION 02 EXISTING CONDITIONS
1Survey LocationAcre0.023.000.000.000.000.000.000.00
1Remove CasingLF

SUBTOTAL DIVISION 02 EXISTING CONDITIONS 0.00 0.00 0.00 0.00 0.00

DIVISION 03 CONCRETE
1Concrete, 3000 PSICF
2Placing concrete, pile capCY

SUBTOTAL DIVISION 03 CONCRETE 0.00 0.00 0.00 0.00 0.00

DIVISION 05 METALS
1Sawcut CasingLF

SUBTOTAL DIVISION 05 METALS 0.00 0.00 0.00 0.00 0.00

DIVISION 07 THERMAL & MOISTURE PROTECTION
1Granular Betonite, 50 lb bags (.625 CF)BAG

SUBTOTAL DIVISION 07 THERMAL & MOISTURE PROTECTION 0.00 0.00 0.00 0.00 0.00

DIVISION 31 EARTHWORK
1Sand #60LCY
2Sand 10/20LCY
3Rough Grade SiteEA
4Excavate Casing, by handBCY
5Backfill SiteLCY
6Compaction in 6" layers, hand tampECY
7FillTon
8Material DeliveryTon
9Hauling, 4 mi Cycle, 30 MPH avgLCY
10Compaction in 6" layers, rammer tamper tampECY
11Grouting, Betonite mix 1:4CF

SUBTOTAL DIVISION 31 EARTHWORK 0.00 0.00 0.00 0.00 0.00

DIVISION 32 EXTERIOR IMPROVEMENTS
10.000.000.000.000.000.00
20.000.000.000.000.000.00

SUBTOTAL DIVISION 32 EXTERIOR IMPROVEMENTS 0.00 0.00 0.00 0.00 0.00

DIVISION 33 UTILITIES
1Surface Seal Well, concrete filledEA

SUBTOTAL DIVISION 33 UTILITIES 0.00 0.00 0.00 0.00 0.00