(2) AF Form 3052.xlsx

XLSX spreadsheet 37 KB Posted

Attached to
Solicitation for LPS Bldg 5415 Federal contract opportunity
Solicitation number
FA487723Q0009
Issued by
Department of the Air Force Air Combat Command

View the file

Other files for this federal contract opportunity

Other files attached to Solicitation for LPS Bldg 5415, newest first.
File Type Posted
LPS 5415 RFI Log 2.docx DOCX document
AF Form 3052 (BLANK).xlsx XLSX spreadsheet
Solicitation Amendment FA487723Q00090002 SF 30.pdf PDF
Solicitation Amendment FA487723Q00090001 SF 30.pdf PDF
05415-001-004.PDF PDF
Sign-In Sheet-21APR23-LPSBLDG5415.pdf PDF
05415-001-006.PDF PDF
05415-001-002.PDF PDF
05415-001-005.PDF PDF
05415-001-007.PDF PDF
LPS 5415 RFIs.docx DOCX document
05415-001-001.PDF PDF
05415-001-003.PDF PDF
04-01011 - Design Requirements (Revised 05-01-2023) LPS 5415 Rev 1.pdf PDF
Solicitation - FA487723Q0009.pdf PDF
(6) Contractor Environmental Guide (15 May 2019).pdf PDF
(7) EAL.xls XLS spreadsheet
(5) Project FBNV230012 LPS 5415 Specifications.pdf PDF
(4) DMAFB Design Compatibility Guidelines 2017.pdf PDF
(1) AF Form 66.xlsx XLSX spreadsheet
(3) Wage Determination AZ (AZ20230032).txt TXT text file
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR(WORK TO BE PERFORMED)Repair/Abandon Water Well, 355 SFS North Parking LotPROPOSED TOTAL CONTRACT PRICE0
PURCHASE REQUEST NUMBERPROJECT NUMBERFBNVUnknownWORK LOCATIONDAVIS-MONTHAN AFB, AZ 85707
LINEUNIT OFMATERIAL COSTLABOR COSTDIRECTLINE
NO.ITEMMEASUREQUANTITYUNITTOTALMANHOURSRATETOTALCOSTSTOTAL
SUMMARY
1SUBTOTAL DIVISION 01 GENERAL CONDITIONS0.000.000.000.000.00
2SUBTOTAL DIVISION 02 EXISTING CONDITIONS0.000.000.000.000.00
3SUBTOTAL DIVISION 03 CONCRETE0.000.000.000.000.00
4SUBTOTAL DIVISION 05 METALS0.000.000.000.000.00
5SUBTOTAL DIVISION 07 THERMAL & MOISTURE PROTECTION0.000.000.000.000.00
6SUBTOTAL DIVISION 31 EARTHWORK0.000.000.000.000.00
7SUBTOTAL DIVISION 32 EXTERIOR IMPROVEMENTS0.000.000.000.000.00
7SUBTOTAL DIVISION 33 UTILITIES0.000.000.000.000.00
LINE TOTALS OVERALL0.000.000.000.00
OVERHEAD TOTAL OVERALL (___%)0.00
SUBTOTAL OVERALL W/ OVERHEAD0.00
PROFIT TOTAL OVERALL (___%)0.00
SUBTOTAL OVERALL W/ OVERHEAD AND PROFIT0.00
TAX OVERALL ____%0.00
BOND OVERALL (___%)0.00
TOTAL OVERALL PROJECT PRICE0.00
DATE:FIRM NAME:
TITLE:PROJECT MANAGERBY:
DIVISION 01 GENERAL CONDITIONS
1Well Abandonment Completion ReportLS
2As-built DrawingEA
3Swan Gate Search RequirementsLS
4Project ManagerWk
5SuperintendentWk
6Permits (Notice of Intent to Abandon)LS
7Proctor Compaction, 6" Modified Mold, ASTM D 698EA
8Testing Technician for earthworkEA
9Moilization/Demobilization - Small EquipmentEA
10Mobilization/Demobilization - Equipment hauled on 3-ton capacity towed trailerEA
11Mobilization/Demobilization - Equipment hauled on 20-ton capacity towed trailerEA
12Portable barricadeEA
13Water TruckWk
14Jobsite cleanupLS

SUBTOTAL DIVISION 01 GENERAL CONDITIONS 0.00 0.00 0.00 0.00 0.00

DIVISION 02 EXISTING CONDITIONS
1Survey LocationAcre0.023.000.000.000.000.000.000.00
1Remove CasingLF

SUBTOTAL DIVISION 02 EXISTING CONDITIONS 0.00 0.00 0.00 0.00 0.00

DIVISION 03 CONCRETE
1Concrete, 3000 PSICF
2Placing concrete, pile capCY

SUBTOTAL DIVISION 03 CONCRETE 0.00 0.00 0.00 0.00 0.00

DIVISION 05 METALS
1Sawcut CasingLF

SUBTOTAL DIVISION 05 METALS 0.00 0.00 0.00 0.00 0.00

DIVISION 07 THERMAL & MOISTURE PROTECTION
1Granular Betonite, 50 lb bags (.625 CF)BAG

SUBTOTAL DIVISION 07 THERMAL & MOISTURE PROTECTION 0.00 0.00 0.00 0.00 0.00

DIVISION 31 EARTHWORK
1Sand #60LCY
2Sand 10/20LCY
3Rough Grade SiteEA
4Excavate Casing, by handBCY
5Backfill SiteLCY
6Compaction in 6" layers, hand tampECY
7FillTon
8Material DeliveryTon
9Hauling, 4 mi Cycle, 30 MPH avgLCY
10Compaction in 6" layers, rammer tamper tampECY
11Grouting, Betonite mix 1:4CF

SUBTOTAL DIVISION 31 EARTHWORK 0.00 0.00 0.00 0.00 0.00

DIVISION 32 EXTERIOR IMPROVEMENTS
10.000.000.000.000.000.00
20.000.000.000.000.000.00

SUBTOTAL DIVISION 32 EXTERIOR IMPROVEMENTS 0.00 0.00 0.00 0.00 0.00

DIVISION 33 UTILITIES
1Surface Seal Well, concrete filledEA

SUBTOTAL DIVISION 33 UTILITIES 0.00 0.00 0.00 0.00 0.00

File details come from the government source that posted it. Updated .