04_VGLZ_232026_AF Form 66_W. Ramp Gate A49.xls

Air Force Form XLS spreadsheet 44 KB Posted

Attached to
VGLZ 232026 Repair W. Ramp Airfield Gate A49
Solicitation number
W50S8524B0005
Issued by

About this file

This document is a Schedule of Material Submittals (AF Form 66 Modified) for Project No. VGLZ 242008, "Replace Utility Pole #97 - Jefferson Ave." It lists the required submittals for this project, including product specifications, safety data sheets, warranties, and other documentation. The submittals are categorized by type, such as shop drawings, samples, and manufacturer's recommendations, and indicate the required number of copies and the submittal timeline of 14 days after the Notice to Proceed.

The related federal contract opportunity is for Solicitation Number W50S8524B0005, "VGLZ 232026 Repair W. Ramp Airfield Gate A49." This is a small business set-aside with a NAICS code of 238990 (All Other Specialty Trade Contractors) and a project magnitude range between $25,000 and $100,000. The Period of Performance is 90 Calendar Days after Notice to Proceed, and prospective bidders are encouraged to attend a pre-bid conference and site visit. The solicitation and all related information will be posted on the Contract Opportunities website on SAM.gov.

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)PROJECT NO.PROJECT TITLESOLICITATION/CONTRACT NO.
VGLZ 242008Replace Utility Pole #97 - Jefferson Ave.
TO BE COMPLETED BY PROJECT ENGINEER
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCE AND CLOSEOUTSHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOTHER MATERIAL or DATAOPERATING INSTRUCTIONSSUBMITTAL

REQUIRED

BY 14 DAYS

AFTER

NTP DATE

RECEIVED

IN

CONTRACTING DATE

TO

CIVIL

ENGINEERING RETURN

SUSPENSION

DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
1SANGB Form 23
2Recycling and Disposal Form
3Affirmative Procurement Reporting Form
4DD Form 1354
5Product specification cut-sheetsxxXXXXX
6Product Safety Data Sheetsxxxxxxx
7Warranty of workX
8Matster Slave Gate Operatorsxxxxxx
9Impact Collision Sensorsxxxxxxx
10Black Nylon-Coated Meshxxxxxxx
11
12
13
14
15
16
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)PROJECT NO.PROJECT TITLESOLICITATION/CONTRACT NO.
VGLZ 242008Replace Utility Pole #97 - Jefferson Ave.
TO BE COMPLETED BY PROJECT ENGINEER
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCE AND CLOSEOUTSHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOTHER MATERIAL or DATAOPERATING INSTRUCTIONSSUBMITTAL

REQUIRED

BY 14 DAYS

AFTER NTP DATE

RECEIVED

IN

CONTRACTING DATE

TO

CIVIL

ENGINEERING RETURN

SUSPENSION

DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
1
2
3
4
5
6
7
8
9
10
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)PROJECT NO.PROJECT TITLESOLICITATION/CONTRACT NO.
VGLZ 242008Replace Utility Pole #97 - Jefferson Ave.
TO BE COMPLETED BY PROJECT ENGINEER
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCE AND CLOSEOUTSHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOTHER MATERIAL or DATAOPERATING INSTRUCTIONSSUBMITTAL

REQUIRED

BY 14 DAYS

AFTER NTP DATE

RECEIVED

IN

CONTRACTING DATE

TO

CIVIL

ENGINEERING RETURN

SUSPENSION

DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)PROJECT NO.PROJECT TITLESOLICITATION/CONTRACT NO.
VGLZ 242008Replace Utility Pole #97 - Jefferson Ave.
TO BE COMPLETED BY PROJECT ENGINEER
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCE AND CLOSEOUTSHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOTHER MATERIAL or DATAOPERATING INSTRUCTIONSSUBMITTAL

REQUIRED

BY 14 DAYS

AFTER NTP DATE

RECEIVED

IN

CONTRACTING DATE

TO

CIVIL

ENGINEERING RETURN

SUSPENSION

DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

File details come from the government source that posted it. Updated .