Pre-Bid Conference_Site Visit W50S8524B0005.pdf
PDF 312 KB Posted
- Attached to
- VGLZ 232026 Repair W. Ramp Airfield Gate A49
- Solicitation number
- W50S8524B0005
About this file
This document is a pre-bid conference presentation for the solicitation W50S8524B0005, which is for the repair of the West Ramp Airfield Gate A49 at Selfridge Air National Guard Base.
The key details are: The project is titled VGLZ 232026 Repair W. Ramp Airfield Gate A49, with a project magnitude range between $25,000 and $100,000. It is a firm-fixed-price contract set aside for small businesses, with a 90-calendar day period of performance after the notice to proceed is issued. The solicitation and all amendments will be posted on SAM.gov. Prospective bidders are required to attend the pre-bid conference and site visit on April 18, 2024. Bids must be submitted by the date and time specified in Block 13 of the SF 1442. The apparent low bidder may be required to provide additional responsibility information prior to award. No subcontracting plan is required for this requirement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Opening Sign in Sheet.pdf | ||
| OF_1419 Abstract of Offers W50S8524B0005.pdf | ||
| Amendment 1 W50S8524B0005.pdf | ||
| 2.Specifications _VGLZ232026_W. Ramp Airfield Gate (1).pdf | ||
| W50S8524B0005.pdf | ||
| 3. Drawing_Repair W.Ramp Airfield Gate A49 (1).pdf | ||
| 04_VGLZ_232026_AF Form 66_W. Ramp Gate A49.xls | XLS spreadsheet | |
| Copy of 127 SFS Vetted Form (003).xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Selfridge ANG Base Pre-Bid Submission Meeting and Site Visit
• Project # VGLZ 232026 Repair W. Ramp Airfield Gate A49
• Solicitation: W50S8524B0005
18 April 2024
Integrity – Excellence – Service
Agenda
• Admin Matters/Contact info
• Process for Questions and Answers (Requests for Information)
• Project Overview
• Notable Items
• Bid Schedule
• Sealed Bid Requirements and procedures for submission of bids
• Determination of Responsibility
• Small Business Subcontracting Plan
• Questions
Administrative Matters - Attendance Roster
• Ensure you sign the attendance roster
• We plan to post the roster and this power point presentation on https://sam.gov to facilitate communication amongst potential suppliers and subcontractors.
• No other site visits will be granted.
Contact Information
• Contracting Specialist
Mr. Steven Stocking steven.stocking.2@us.af.mil
• Contracting Officer Ms. Anna Randall anna.randall.1@us.af.mil mailto:jeremy.starrett.1@us.af.mil mailto:steven.stocking@us.af.mil
Process for Questions and Answers
• Submit questions (aka Requests for Information) to Steven Stocking and Anna Randall. See Section 00100 for instructions.
• Questions and Answers will be posted on SAM.gov on a non attributional basis with solicitation at https://sam.gov
• Submit questions not later than the fifth working day prior to bid opening.
• Any changes to the drawings, specifications, etc. will be issued in the form of an amendment. However, any answers that clarify or provide an interpretation to the drawings, specifications, etc. will NOT be posted via amendment.
https://sam.gov/
Project Overview
• Title: VGLZ232026 Repair W. Ramp Airfield Gate A49
• Magnitude: $25,000.00-$100,000.00
• A firm fixed price contract will be awarded to the lowest price, responsive, and responsible small business sealed bid offer
• Performance Period: 90 calendar Days after issuance of Notice to Proceed.
• The Notice to Proceed will be issued after formal approval of applicable bonds.
Project Overview
Project requirements include:
• Motor-driven gate (A-49), is used to control access to the airfield, are significantly worn and inoperable. Thecondition of the gate is a result of the age of the gate and the severe weather conditions the gates are exposed to. Thedisrepair of the gate causes accessibility to the airfield to be unreliable. Work to be accomplished under this contract includes, but is not limited to:Investigation of airfield gate (A49), including gate foundations, to identify all gate related parts that are causing the individual gate to be inoperable and/or unreliable.
Derive a plan to permanently repair the gates so that reliable functionality of gates is restored. The plans hall meet the minimum requirements outlined in Part 3 herein and shall conform to relevant codes and standards outlined in Part 5 herein. The plan shall be executed by the Contractor in accordance with the SOW and its standards as well as all other referenced terms and conditions.
Notable Items
Brand Name Requirements: N/A
DFARS 252.204-7020 NIST SP 800-171 DoD Assessment Requirements
- Contracting Officer shall verify..... prior to award (DFARS 204.7303 (b)(1))
- Complete the Assessment in the Supplier Performance Risk System (SPRS)
Request the SPRS vendor role: https//:piee.eb.mil
SPRS Access and NIST Quick Entry Guide:
https://www.sprs.csd.disa.mil/pdf/NISTSP800-171QuickEntryGuide.pdf
SPRS Frequently Asked Questions: https://www.sprs.csd.disa.mil/faqs.htm#nist
Bid Schedule
• CLIN 0001 – VGLZ 232026
Sealed Bid Procedures
The following is a brief overview of the sealed bid requirements:
• BIDDERS ARE STRONLY CAUTIONED TO CAREFULLY READ THE
REQUIREMENTS OF THE SOLICIATION AND COMPLY ACCORDINGLY
REFER TO THE SOLICITATION AND FAR 14 FOR DETAILS.
• Public bid opening occurs. Prices are read to the public. There will be no discussion.
• Bidders must submit sealed bids to be opened at the time and place stated int the solicitation for the public opening of bids
• After bids are publicly opened an award will be made to that responsible bidder whose bid conforming to the IFB will be most advantageous to the Government considering only price and price related factors.
• The bid abstract will be certified and posted on SAM.gov as soon as practicable.
Bid Requirements
• SF 1442, (Blocks 14-20c)-Do not enter less than 120 days in block 17
• Section 00010. Bid Schedule—all items must be priced.
• IAW Clause 252.236-7008, Contract Prices-Bidding Schedules (Dec
1991) the prices shown in the bidding schedule must reflect ALL COSTS involved in performing the work, as described in the plans and specifications.
• Reps and Certs (00 45 00): In addition, the bidder must have entered current and complete data within the past year via the Online Representatives and Certifications at https://sam.gov
• Acknowledge all amendments issued on an SF 30 on page 2 of SF1442 and/or by providing signed SF 30s with bid.
• Bid Bond/Guarantee for offers over $150K shall be 20% of the complete bid price and be issued the most recent edition of the SF 24 with a complete power of attorney.
http://www.sam.gov/
Bid Requirements-Bid Submission
• The bid opening will occur at the date and time specified on Block 13 of the SF 1442 at Selfridge Air National Guard Base, MI Bldg. 105
• Hand carried bids must be dropped off prior to the time established for the opening of bids. A Base access form must be generated for individuals attending the bid opening or to drop off bids.
• Mailed bids must be received at the location specified on block 7 prior to the time established for opening of bids.
• Mailing address:
USPFO MI 127 MISSION SUPPORT CONTRACTING
43200 MAPLE ST
SELFRIDGE ANGB MI 48045-5213
• Late receipt of bids due to entry delays may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance with FAR 14.304 and the clause at FAR 52.214-7
Determination of Responsibility
• IMPORTANT: REFER TO THE SOLICIATATION AND FAR
PART 9 FOR DETAILS
• To establish its responsibility, the apparent low bidder may be requested by the Government prior to award, to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial and bonding resources and plant available to be used in performing the work. This action may be requested to determine if the contractor is responsible.
Subcontracting Plan
• N/A: A Subcontracting Plan is not needed for this requirment.
Questions?
Questions will not be answered at the site visit.
Please ensure that the Request for Information process is utilized.
| Selfridge ANG Base�Pre-Bid Submission Meeting and Site Visit |
| Agenda |
| Administrative Matters -�Attendance Roster |
| Contact Information |
| Process for Questions and Answers |
| Project Overview |
| Project Overview |
| Notable Items |
| Bid Schedule |
| Sealed Bid Procedures |
| Bid Requirements |
| Bid Requirements-Bid Submission |
| Determination of Responsibility |
| Subcontracting Plan |
| Questions? |
File details come from the government source that posted it. Updated .