This document is an AF Form 66 Schedule of Material Submittals for the federal contract opportunity to Replace Utility Pole #97 on Jefferson Ave at Selfridge Air National Guard Base in Michigan. The project has a period of performance of 120 calendar days after the Notice to Proceed, is a 100% small business set-aside, and has a project magnitude between $25,000 and $100,000. The required submittals include product specifications, safety data sheets, warranties, pole components, and test reports. Prospective bidders are encouraged to attend a pre-bid conference and site visit. The solicitation will be posted on the federal contract opportunities website at SAM.gov.

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)PROJECT NO.PROJECT TITLESOLICITATION/CONTRACT NO.
VGLZ 242008Replace Utility Pole #97 - Jefferson Ave.
TO BE COMPLETED BY PROJECT ENGINEER
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCE AND CLOSEOUTSHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOTHER MATERIAL or DATAOPERATING INSTRUCTIONSSUBMITTAL

REQUIRED

BY 14 DAYS

AFTER

NTP DATE

RECEIVED

IN

CONTRACTING DATE

TO

CIVIL

ENGINEERING RETURN

SUSPENSION

DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
1SANGB Form 23
2Recycling and Disposal Form
3Affirmative Procurement Reporting Form
4DD Form 1354
5Product specification cut-sheetsxxXXXXX
6Product Safety Data Sheetsxxxxxxx
7Warranty of workX
8New Type 2, 60-foot treated wood pole with new componentsxxxxxxx
93” Aluminum label with feeder number and pole numberxxxxxxx
10New single cross arms (3), pole risers, grounding system, fuse cutouts, and insulatorsxxxxxx
11Lightning Arrestorsxxxxxx
12copper ground cablesxxxxxx
13copper ground rodxxxxxx
14Certified signed test reportx
15
16
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)PROJECT NO.PROJECT TITLESOLICITATION/CONTRACT NO.
VGLZ 242008Replace Utility Pole #97 - Jefferson Ave.
TO BE COMPLETED BY PROJECT ENGINEER
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCE AND CLOSEOUTSHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOTHER MATERIAL or DATAOPERATING INSTRUCTIONSSUBMITTAL

REQUIRED

BY 14 DAYS

AFTER NTP DATE

RECEIVED

IN

CONTRACTING DATE

TO

CIVIL

ENGINEERING RETURN

SUSPENSION

DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
1
2
3
4
5
6
7
8
9
10
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)PROJECT NO.PROJECT TITLESOLICITATION/CONTRACT NO.
VGLZ 242008Replace Utility Pole #97 - Jefferson Ave.
TO BE COMPLETED BY PROJECT ENGINEER
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCE AND CLOSEOUTSHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOTHER MATERIAL or DATAOPERATING INSTRUCTIONSSUBMITTAL

REQUIRED

BY 14 DAYS

AFTER NTP DATE

RECEIVED

IN

CONTRACTING DATE

TO

CIVIL

ENGINEERING RETURN

SUSPENSION

DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)PROJECT NO.PROJECT TITLESOLICITATION/CONTRACT NO.
VGLZ 242008Replace Utility Pole #97 - Jefferson Ave.
TO BE COMPLETED BY PROJECT ENGINEER
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCE AND CLOSEOUTSHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOTHER MATERIAL or DATAOPERATING INSTRUCTIONSSUBMITTAL

REQUIRED

BY 14 DAYS

AFTER NTP DATE

RECEIVED

IN

CONTRACTING DATE

TO

CIVIL

ENGINEERING RETURN

SUSPENSION

DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

File details come from the government source that posted it. Updated .