VGLZ 242008 AF Form 66 Replace Utility Pole 97 Jefferson Ave.xls
Air Force Form XLS spreadsheet 45 KB Posted
- Attached to
- VGLZ 242008 - Replace Utility Pole
- Solicitation number
- W50S8524B0004
About this file
This document is an AF Form 66 Schedule of Material Submittals for the federal contract opportunity to Replace Utility Pole #97 on Jefferson Ave at Selfridge Air National Guard Base in Michigan. The project has a period of performance of 120 calendar days after the Notice to Proceed, is a 100% small business set-aside, and has a project magnitude between $25,000 and $100,000. The required submittals include product specifications, safety data sheets, warranties, pole components, and test reports. Prospective bidders are encouraged to attend a pre-bid conference and site visit. The solicitation will be posted on the federal contract opportunities website at SAM.gov.
View the file
Other versions and copies of AF Form 66
Show all 20
Who attaches AF Form 66
| State | Files |
|---|---|
| Iowa | 1 |
| Massachusetts | 1 |
Other files
| File | Type | Posted |
|---|---|---|
| OF_1419 Abstract of Offers W50S8524B0004.pdf | ||
| OF_1419A W50S8524B0004.pdf | ||
| W50S8524B0004 bid opening sign in sheet.pdf | ||
| RFI Document W50S8524B0004.pdf | ||
| Amendment 1 W50S8524B0004.pdf | ||
| Pre-Bid Conference_Site Visit W50S8524B0004.pdf | ||
| 02_General Contract Spec (1) (1).pdf | ||
| 3. Dawings_Replace utility pole 97.pdf | ||
| Utility Pole Photo 2.jpg | JPG image | |
| UTILITY POLE MAP.jpg | JPG image | |
| W50S8524B0004.pdf | ||
| Copy of 127 SFS Vetted Form (003).xlsx | XLSX spreadsheet | |
| Utility Pole Photo 1.jpg | JPG image |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| SCHEDULE OF MATERIAL SUBMITTALS | ||||||||||||||||
| (AF Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||
| VGLZ 242008 | Replace Utility Pole #97 - Jefferson Ave. | |||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | ||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OTHER MATERIAL or DATA | OPERATING INSTRUCTIONS | SUBMITTAL |
REQUIRED
BY 14 DAYS
AFTER
NTP DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | |||||||||
| APPROVAL | REMARKS | ||||||||||||
| APPROVED | DISAPPROVED | ||||||||||||
| 1 | SANGB Form 23 | ||||||||||||
| 2 | Recycling and Disposal Form | ||||||||||||
| 3 | Affirmative Procurement Reporting Form | ||||||||||||
| 4 | DD Form 1354 | ||||||||||||
| 5 | Product specification cut-sheets | x | x | X | X | X | X | X | |||||
| 6 | Product Safety Data Sheets | x | x | x | x | x | x | x | |||||
| 7 | Warranty of work | X | |||||||||||
| 8 | New Type 2, 60-foot treated wood pole with new components | x | x | x | x | x | x | x | |||||
| 9 | 3” Aluminum label with feeder number and pole number | x | x | x | x | x | x | x | |||||
| 10 | New single cross arms (3), pole risers, grounding system, fuse cutouts, and insulators | x | x | x | x | x | x | ||||||
| 11 | Lightning Arrestors | x | x | x | x | x | x | ||||||
| 12 | copper ground cables | x | x | x | x | x | x | ||||||
| 13 | copper ground rod | x | x | x | x | x | x | ||||||
| 14 | Certified signed test report | x | |||||||||||
| 15 | |||||||||||||
| 16 |
| SCHEDULE OF MATERIAL SUBMITTALS | ||||||||||||||||
| (AF Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||
| VGLZ 242008 | Replace Utility Pole #97 - Jefferson Ave. | |||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | ||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OTHER MATERIAL or DATA | OPERATING INSTRUCTIONS | SUBMITTAL |
REQUIRED
BY 14 DAYS
AFTER NTP DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | ||
| APPROVAL | REMARKS | |||||
| APPROVED | DISAPPROVED | |||||
| 1 | ||||||
| 2 | ||||||
| 3 | ||||||
| 4 | ||||||
| 5 | ||||||
| 6 | ||||||
| 7 | ||||||
| 8 | ||||||
| 9 | ||||||
| 10 |
| SCHEDULE OF MATERIAL SUBMITTALS | ||||||||||||||||
| (AF Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||
| VGLZ 242008 | Replace Utility Pole #97 - Jefferson Ave. | |||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | ||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OTHER MATERIAL or DATA | OPERATING INSTRUCTIONS | SUBMITTAL |
REQUIRED
BY 14 DAYS
AFTER NTP DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | ||
| APPROVAL | REMARKS | |||||
| APPROVED | DISAPPROVED | |||||
| 11 | ||||||
| 12 | ||||||
| 13 | ||||||
| 14 | ||||||
| 15 | ||||||
| 16 | ||||||
| 17 | ||||||
| 18 | ||||||
| 19 | ||||||
| 20 | ||||||
| 21 | ||||||
| 22 | ||||||
| 23 | ||||||
| 24 | ||||||
| 25 | ||||||
| 26 | ||||||
| 27 | ||||||
| 28 |
| SCHEDULE OF MATERIAL SUBMITTALS | ||||||||||||||||
| (AF Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||
| VGLZ 242008 | Replace Utility Pole #97 - Jefferson Ave. | |||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | ||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OTHER MATERIAL or DATA | OPERATING INSTRUCTIONS | SUBMITTAL |
REQUIRED
BY 14 DAYS
AFTER NTP DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | ||
| APPROVAL | REMARKS | |||||
| APPROVED | DISAPPROVED | |||||
| 11 | ||||||
| 12 | ||||||
| 13 | ||||||
| 14 | ||||||
| 15 | ||||||
| 16 | ||||||
| 17 | ||||||
| 18 | ||||||
| 19 | ||||||
| 20 | ||||||
| 21 | ||||||
| 22 | ||||||
| 23 | ||||||
| 24 | ||||||
| 25 | ||||||
| 26 | ||||||
| 27 | ||||||
| 28 |
File details come from the government source that posted it. Updated .