VGLZ 242008 AF Form 66 Replace Utility Pole 97 Jefferson Ave.xls

XLS spreadsheet 45 KB Posted

Attached to
VGLZ 242008 - Replace Utility Pole Federal contract opportunity
Solicitation number
W50S8524B0004
Issued by
Department of the Army Michigan Army National Guard

About this file

This document is an AF Form 66 Schedule of Material Submittals for the federal contract opportunity to Replace Utility Pole #97 on Jefferson Ave at Selfridge Air National Guard Base in Michigan. The project has a period of performance of 120 calendar days after the Notice to Proceed, is a 100% small business set-aside, and has a project magnitude between $25,000 and $100,000. The required submittals include product specifications, safety data sheets, warranties, pole components, and test reports. Prospective bidders are encouraged to attend a pre-bid conference and site visit. The solicitation will be posted on the federal contract opportunities website at SAM.gov.

View the file

Other files for this federal contract opportunity

Other files attached to VGLZ 242008 - Replace Utility Pole, newest first.
File Type Posted
OF_1419 Abstract of Offers W50S8524B0004.pdf PDF
W50S8524B0004 bid opening sign in sheet.pdf PDF
OF_1419A W50S8524B0004.pdf PDF
RFI Document W50S8524B0004.pdf PDF
Amendment 1 W50S8524B0004.pdf PDF
Pre-Bid Conference_Site Visit W50S8524B0004.pdf PDF
Utility Pole Photo 2.jpg JPG image
UTILITY POLE MAP.jpg JPG image
W50S8524B0004.pdf PDF
Utility Pole Photo 1.jpg JPG image
Copy of 127 SFS Vetted Form (003).xlsx XLSX spreadsheet
3. Dawings_Replace utility pole 97.pdf PDF
02_General Contract Spec (1) (1).pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)PROJECT NO.PROJECT TITLESOLICITATION/CONTRACT NO.
VGLZ 242008Replace Utility Pole #97 - Jefferson Ave.
TO BE COMPLETED BY PROJECT ENGINEER
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCE AND CLOSEOUTSHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOTHER MATERIAL or DATAOPERATING INSTRUCTIONSSUBMITTAL

REQUIRED

BY 14 DAYS

AFTER

NTP DATE

RECEIVED

IN

CONTRACTING DATE

TO

CIVIL

ENGINEERING RETURN

SUSPENSION

DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
1SANGB Form 23
2Recycling and Disposal Form
3Affirmative Procurement Reporting Form
4DD Form 1354
5Product specification cut-sheetsxxXXXXX
6Product Safety Data Sheetsxxxxxxx
7Warranty of workX
8New Type 2, 60-foot treated wood pole with new componentsxxxxxxx
93” Aluminum label with feeder number and pole numberxxxxxxx
10New single cross arms (3), pole risers, grounding system, fuse cutouts, and insulatorsxxxxxx
11Lightning Arrestorsxxxxxx
12copper ground cablesxxxxxx
13copper ground rodxxxxxx
14Certified signed test reportx
15
16
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)PROJECT NO.PROJECT TITLESOLICITATION/CONTRACT NO.
VGLZ 242008Replace Utility Pole #97 - Jefferson Ave.
TO BE COMPLETED BY PROJECT ENGINEER
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCE AND CLOSEOUTSHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOTHER MATERIAL or DATAOPERATING INSTRUCTIONSSUBMITTAL

REQUIRED

BY 14 DAYS

AFTER NTP DATE

RECEIVED

IN

CONTRACTING DATE

TO

CIVIL

ENGINEERING RETURN

SUSPENSION

DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
1
2
3
4
5
6
7
8
9
10
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)PROJECT NO.PROJECT TITLESOLICITATION/CONTRACT NO.
VGLZ 242008Replace Utility Pole #97 - Jefferson Ave.
TO BE COMPLETED BY PROJECT ENGINEER
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCE AND CLOSEOUTSHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOTHER MATERIAL or DATAOPERATING INSTRUCTIONSSUBMITTAL

REQUIRED

BY 14 DAYS

AFTER NTP DATE

RECEIVED

IN

CONTRACTING DATE

TO

CIVIL

ENGINEERING RETURN

SUSPENSION

DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)PROJECT NO.PROJECT TITLESOLICITATION/CONTRACT NO.
VGLZ 242008Replace Utility Pole #97 - Jefferson Ave.
TO BE COMPLETED BY PROJECT ENGINEER
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCE AND CLOSEOUTSHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOTHER MATERIAL or DATAOPERATING INSTRUCTIONSSUBMITTAL

REQUIRED

BY 14 DAYS

AFTER NTP DATE

RECEIVED

IN

CONTRACTING DATE

TO

CIVIL

ENGINEERING RETURN

SUSPENSION

DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

File details come from the government source that posted it. Updated .