This document is an AF Form 66 Schedule of Material Submittals for the federal contract opportunity to Replace Utility Pole #97 on Jefferson Ave at Selfridge Air National Guard Base in Michigan. The project has a period of performance of 120 calendar days after the Notice to Proceed, is a 100% small business set-aside, and has a project magnitude between $25,000 and $100,000. The required submittals include product specifications, safety data sheets, warranties, pole components, and test reports. Prospective bidders are encouraged to attend a pre-bid conference and site visit. The solicitation will be posted on the federal contract opportunities website at SAM.gov.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| OF_1419 Abstract of Offers W50S8524B0004.pdf | ||
| W50S8524B0004 bid opening sign in sheet.pdf | ||
| OF_1419A W50S8524B0004.pdf | ||
| RFI Document W50S8524B0004.pdf | ||
| Amendment 1 W50S8524B0004.pdf | ||
| Pre-Bid Conference_Site Visit W50S8524B0004.pdf | ||
| Utility Pole Photo 2.jpg | JPG image | |
| UTILITY POLE MAP.jpg | JPG image | |
| W50S8524B0004.pdf | ||
| Utility Pole Photo 1.jpg | JPG image | |
| Copy of 127 SFS Vetted Form (003).xlsx | XLSX spreadsheet | |
| 3. Dawings_Replace utility pole 97.pdf | ||
| 02_General Contract Spec (1) (1).pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| SCHEDULE OF MATERIAL SUBMITTALS | ||||||||||||||||
| (AF Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||
| VGLZ 242008 | Replace Utility Pole #97 - Jefferson Ave. | |||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | ||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OTHER MATERIAL or DATA | OPERATING INSTRUCTIONS | SUBMITTAL |
REQUIRED
BY 14 DAYS
AFTER
NTP DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | |||||||||
| APPROVAL | REMARKS | ||||||||||||
| APPROVED | DISAPPROVED | ||||||||||||
| 1 | SANGB Form 23 | ||||||||||||
| 2 | Recycling and Disposal Form | ||||||||||||
| 3 | Affirmative Procurement Reporting Form | ||||||||||||
| 4 | DD Form 1354 | ||||||||||||
| 5 | Product specification cut-sheets | x | x | X | X | X | X | X | |||||
| 6 | Product Safety Data Sheets | x | x | x | x | x | x | x | |||||
| 7 | Warranty of work | X | |||||||||||
| 8 | New Type 2, 60-foot treated wood pole with new components | x | x | x | x | x | x | x | |||||
| 9 | 3” Aluminum label with feeder number and pole number | x | x | x | x | x | x | x | |||||
| 10 | New single cross arms (3), pole risers, grounding system, fuse cutouts, and insulators | x | x | x | x | x | x | ||||||
| 11 | Lightning Arrestors | x | x | x | x | x | x | ||||||
| 12 | copper ground cables | x | x | x | x | x | x | ||||||
| 13 | copper ground rod | x | x | x | x | x | x | ||||||
| 14 | Certified signed test report | x | |||||||||||
| 15 | |||||||||||||
| 16 |
| SCHEDULE OF MATERIAL SUBMITTALS | ||||||||||||||||
| (AF Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||
| VGLZ 242008 | Replace Utility Pole #97 - Jefferson Ave. | |||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | ||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OTHER MATERIAL or DATA | OPERATING INSTRUCTIONS | SUBMITTAL |
REQUIRED
BY 14 DAYS
AFTER NTP DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | ||
| APPROVAL | REMARKS | |||||
| APPROVED | DISAPPROVED | |||||
| 1 | ||||||
| 2 | ||||||
| 3 | ||||||
| 4 | ||||||
| 5 | ||||||
| 6 | ||||||
| 7 | ||||||
| 8 | ||||||
| 9 | ||||||
| 10 |
| SCHEDULE OF MATERIAL SUBMITTALS | ||||||||||||||||
| (AF Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||
| VGLZ 242008 | Replace Utility Pole #97 - Jefferson Ave. | |||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | ||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OTHER MATERIAL or DATA | OPERATING INSTRUCTIONS | SUBMITTAL |
REQUIRED
BY 14 DAYS
AFTER NTP DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | ||
| APPROVAL | REMARKS | |||||
| APPROVED | DISAPPROVED | |||||
| 11 | ||||||
| 12 | ||||||
| 13 | ||||||
| 14 | ||||||
| 15 | ||||||
| 16 | ||||||
| 17 | ||||||
| 18 | ||||||
| 19 | ||||||
| 20 | ||||||
| 21 | ||||||
| 22 | ||||||
| 23 | ||||||
| 24 | ||||||
| 25 | ||||||
| 26 | ||||||
| 27 | ||||||
| 28 |
| SCHEDULE OF MATERIAL SUBMITTALS | ||||||||||||||||
| (AF Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||
| VGLZ 242008 | Replace Utility Pole #97 - Jefferson Ave. | |||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | ||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OTHER MATERIAL or DATA | OPERATING INSTRUCTIONS | SUBMITTAL |
REQUIRED
BY 14 DAYS
AFTER NTP DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | ||
| APPROVAL | REMARKS | |||||
| APPROVED | DISAPPROVED | |||||
| 11 | ||||||
| 12 | ||||||
| 13 | ||||||
| 14 | ||||||
| 15 | ||||||
| 16 | ||||||
| 17 | ||||||
| 18 | ||||||
| 19 | ||||||
| 20 | ||||||
| 21 | ||||||
| 22 | ||||||
| 23 | ||||||
| 24 | ||||||
| 25 | ||||||
| 26 | ||||||
| 27 | ||||||
| 28 |
File details come from the government source that posted it. Updated .