FBNV240017 - AF Form 66.pdf

PDF 152 KB Posted

Attached to
FA487724R0020 - Upgrade PGS Fire System Federal contract opportunity
Solicitation number
FA487724R0020
Issued by
Department of the Air Force Air Combat Command

About this file

This document appears to be an Air Force Form 66 titled "Schedule of Material Submittals" related to a federal contract opportunity for the "Upgrade PGS Fire Suppression" project (Solicitation Number FA487724R0020).

The key details are:

  • This is a design-build contract opportunity issued by the Department of the Air Force, Air Combat Command.
  • The project involves the design, plans, specifications, and installation of a new fire suppression system in the 610 CACS Power Generation Shelter.
  • The document outlines the required submittals, including fire documentation, flow calculations, discharge piping isometrics, equipment, materials, construction progress reports, and other contract-related documents.
  • Specific submission dates and approval/disapproval processes are defined for each submittal item.
  • A site visit is scheduled for August 26, 2024, with limited attendance allowed per company.
  • The RFI due date is September 2, 2024, and the proposal due date is September 16, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to FA487724R0020 - Upgrade PGS Fire System, newest first.
File Type Posted
Solicitation Amendment FA487724R00200002 SF 30.pdf PDF
BLDG 74 - Upgrade PGS System Photos.pdf PDF
Solicitation Amendment FA487724R00200001 SF 30.pdf PDF
Wage Determination - Rev AZ202490040.pdf PDF
DMAFB Design Compatibility Guidelines 2017.pdf PDF
FBNV240017 - All Specifications.pdf PDF
FBNV 240017 DB Period of Performance.pdf PDF
Contractor Environmental Guide 15 May 2019.pdf PDF
FBNV240017 - AF Form 3052 Blank.xlsx XLSX spreadsheet
Solicitation - FA487724R0020.pdf PDF
Contractor EAL Template.xlsx XLSX spreadsheet
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NO. OF COPIES REQUIRED

Awarded:

Pre-Con:

NTP:

Const. Start:

Const. End:

Finalled:

APPROVED DISAPPROVED

Hazardous Material Usage Sec 01010, Para 2.7 c Env Cont Guide Sec 3.3 Hazardous Material

HAZMAT Usage Reports Sec 01010, Para 2.7c Env Cont Guide Sec 3.4 HAZMAT Usage

Air Quality Activity Permit Sec 01010, Para 2.7 Env Cont Guide Sec 3.3 Air Quality

AZPDES General Permit Sec 01010, Para 2.7d Env Cont Guide Sec 3.3 SWPP

Asbestos Removal/Demolition Activity Permit Sec 01010, Para 2.7d Env Cont Guide Sec 3.3 Asbestos

LBP Removal/Demolition Activity Permit Sec 01010, Para 2.7i Env Cont Guide Sec 3.3 Lead-Based Paint

Arizona Department of Agriculture Permit Sec 01010, Para 2.7d Env Cont Guide Sec 3.3 Protection of Native Plants

Asbestos Removal/Demolition Abatement Plan Sec 01010, Para 2.7e & f Env Cont Guide Sec 3.3 Asbestos

Construction & Demolition Debris Diversion Plan Sec 01010, Para 2.7e Env Cont Guide Sec 3.3 C&D Plan

Asbestos Manifests Sec 01010, Para 2.7h Env Cont Guide Sec 3.4 Asbestos Removal

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT TITLE: PROJECT NUMBER:

Design-Build

7 Days after Reciept of Permit

7 Days after Reciept of Permit

7 Days after Reciept of Asbestos Demolition Permit

7 Days after Reciept of Permit

(1st of the month for projects >60days) (End of project for projects <60 days)

2 Days Prior to Construction

7 Days after Reciept of Permit

REMARKS

RE

QU

IR

ED

S

UB

MI

SS

IO

N

DA

TE

FI

NA

L

AP

PR

OV

AL

DATE CONTRACTOR NOTIFIED

CO

NT

RA

CT

OR

R

ES

UB

MI

TT

AL

C er tif ic at es

M an uf ac tu re r's In st ru ct io ns

M an uf ac tu re r's F ie ld

R ep or ts

O pe ra tio n an d

M ai nt en an ce

M an ua ls

C lo se ou t S ub m itt al

LI

NE

N

UM

BE

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER

Upgrade PGS Fire SuppressionFBNV240017

DA

TE

R

EC

EI

VE

D

IN

C

ON

TR

AC

TI

NG

DA

TE

T O

CI

VI

L

EN

GI

NE

ER

IN

G

RE

TU

RN

S

US

PE

NS

E

DA

TE

SU

BM

IT

TA

L

NU

MB

ER

S

P re co ns tr uc tio n Su bm itt al s

S ho p

D ra w in gs

P ro du ct

D at a

S am pl es

D es ig n D at a

T es t R ep or ts

7 Days After Reciept of Manifest

AF FORM 66 (Computer Generated) PAGE 1 of 4

Pre-Con:

NTP:

Const. Start:

Const. End:

Finalled:

APPROVED DISAPPROVED

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT TITLE: PROJECT NUMBER:

Design-Build

REMARKS

RE

QU

IR

ED

S

UB

MI

SS

IO

N

DA

TE

FI

NA

L

AP

PR

OV

AL

DATE CONTRACTOR NOTIFIED

CO

NT

RA

CT

OR

R

ES

UB

MI

TT

AL

C er tif ic at es

M an uf ac tu re r's In st ru ct io ns

M an uf ac tu re r's F ie ld

R ep or ts

O pe ra tio n an d

M ai nt en an ce

M an ua ls

C lo se ou t S ub m itt al

LI

NE

N

UM

BE

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER

Upgrade PGS Fire SuppressionFBNV240017

DA

TE

R

EC

EI

VE

D

IN

C

ON

TR

AC

TI

NG

DA

TE

T O

CI

VI

L

EN

GI

NE

ER

IN

G

RE

TU

RN

S

US

PE

NS

E

DA

TE

SU

BM

IT

TA

L

NU

MB

ER

S

P re co ns tr uc tio n Su bm itt al s

S ho p

D ra w in gs

P ro du ct

D at a

S am pl es

D es ig n D at a

T es t R ep or ts

Non-Regulated Waste Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Regulated Hazardous Waste

Regulated Waste Disposal Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Regulated Hazardous Waste

Regulated Waste Manifests Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Regulated Hazardous Waste

Recycling Manifests Sec 01010, Para 2.7f Env Cont Guide Sec 3.4 Waste & Recyclables

Non-Hazardous Waste Manifests Sec 01010, Para 2.7i Env Cont Guide Sec 3.4 Waste & Recyclables

Radioactive Use Sec 01010, Para 2.7j Env Cont Guide Sec 3.3 Radioactive Material

17 Progress Photographs Sec 01010, Para 2.6

18 Record As-Builts Sec 01010, Para 4.2b

19 Record Disks Sec 01010, Para 4.2c 1

20 DD Form 1354 Sec 01010, Para 4.3

21 DD Form 1354 Checklist Sec 01010, Para 4.3

22 Warranty/Guarantee Items Sec 01010, Para 4.4 a3

23 O&M Manual Sec 01010, Para 4.4 b3 &4

AF Form 3064, Construction Schedule Sec 01011, Para 1.5

Design Charrette Submittal Sec 01011, Para 2.4.1 1

3 days after Disposal

Coordinated Prior to Removal from Installation

3 Days after Disposal (1st of the month for projects >60days) (End of project for projects <60 days)(1st of the month for projects >60days) (End of project for projects <60 days)

1 Package-Provide Copies as indicated

AF FORM 66 (Computer Generated) PAGE 2 of 4

Pre-Con:

NTP:

Const. Start:

Const. End:

Finalled:

APPROVED DISAPPROVED

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT TITLE: PROJECT NUMBER:

Design-Build

REMARKS

RE

QU

IR

ED

S

UB

MI

SS

IO

N

DA

TE

FI

NA

L

AP

PR

OV

AL

DATE CONTRACTOR NOTIFIED

CO

NT

RA

CT

OR

R

ES

UB

MI

TT

AL

C er tif ic at es

M an uf ac tu re r's In st ru ct io ns

M an uf ac tu re r's F ie ld

R ep or ts

O pe ra tio n an d

M ai nt en an ce

M an ua ls

C lo se ou t S ub m itt al

LI

NE

N

UM

BE

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER

Upgrade PGS Fire SuppressionFBNV240017

DA

TE

R

EC

EI

VE

D

IN

C

ON

TR

AC

TI

NG

DA

TE

T O

CI

VI

L

EN

GI

NE

ER

IN

G

RE

TU

RN

S

US

PE

NS

E

DA

TE

SU

BM

IT

TA

L

NU

MB

ER

S

P re co ns tr uc tio n Su bm itt al s

S ho p

D ra w in gs

P ro du ct

D at a

S am pl es

D es ig n D at a

T es t R ep or ts

26 65% Design Submittal Sec 01011, Para 2.12.2 1

27 95% Design Submittal Sec 01011, Para 2.12.3

28 100% Design Submittal Sec 01011, Para 2.12.4

EMS Most Significant Environmental Aspects Awareness Form Env Cont Guide Sec 3.2 & Appendix

Env Cont Guide Sec 3.3 & Appendix F 1

Survey of Native Life Env Cont Guide Sec 3.3 Protection of Native Birds & Wildlife

Survey of Cultural Resources Env Cont Guide Sec 3.3 Preservation of Cultural Resources

33 Asbestos Survey Env Cont Guide Sec 3.3 Asbestos

Lead-Based Paint Survey Env Cont Guide Sec 3.3 Lead-Based Paint

Outdoor Painting Exemption Env Cont Guide Sec 3.3 Minimize Organics

36 Notice of Intent to Drill Env Cont Guide Sec 3.3 NOI to Drill 1

37 Drill Card Env Cont Guide Sec 3.3 NOI to Drill

Radioactive Use Env Cont Guide Sec 3.3 Radioactive Material

Recovered Materials Certification Env Cont Guide Sec 3.5 Recovered Materials

40 Notice of Termination Env Cont Guide 3.5 SWPP Plan

7 Days after NTP 7 Days after Construction Complete (Only for Contracts >$100,000) 7 Days after Construction Complete

(7 Days after Reciept of Survey) Contact DM Env Ofice (x4885) for surveys already conducted

7 Days after Reciept of Excemption 7 Days after Reciept of Drill Card 7 Days after Reciept of Drill Card

At PreCon Meeting

At PreCon Meeting(7 Days after Reciept of Survey) Contact DM Env Ofice (x4035) for surveys already conducted (7 Days after Reciept of Survey) Contact DM Env Ofice (x4035)

(7 Days after Reciept of Survey) Contact DM Env Ofice (x4885)

1 Package-Provide Copies as indicated

1 Package-Provide Copies as indicated

1 Package-Provide Copies as indicated

AF FORM 66 (Computer Generated) PAGE 3 of 4

Pre-Con:

NTP:

Const. Start:

Const. End:

Finalled:

APPROVED DISAPPROVED

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT TITLE: PROJECT NUMBER:

Design-Build

REMARKS

RE

QU

IR

ED

S

UB

MI

SS

IO

N

DA

TE

FI

NA

L

AP

PR

OV

AL

DATE CONTRACTOR NOTIFIED

CO

NT

RA

CT

OR

R

ES

UB

MI

TT

AL

C er tif ic at es

M an uf ac tu re r's In st ru ct io ns

M an uf ac tu re r's F ie ld

R ep or ts

O pe ra tio n an d

M ai nt en an ce

M an ua ls

C lo se ou t S ub m itt al

LI

NE

N

UM

BE

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER

Upgrade PGS Fire SuppressionFBNV240017

DA

TE

R

EC

EI

VE

D

IN

C

ON

TR

AC

TI

NG

DA

TE

T O

CI

VI

L

EN

GI

NE

ER

IN

G

RE

TU

RN

S

US

PE

NS

E

DA

TE

SU

BM

IT

TA

L

NU

MB

ER

S

P re co ns tr uc tio n Su bm itt al s

S ho p

D ra w in gs

P ro du ct

D at a

S am pl es

D es ig n D at a

T es t R ep or ts

Fire documentation & copy flow calculations, discharge piping isometrics all equipment, material-submittals

42 Construction Progress reports AF form 3065

Contractor to add Submittals as required or requested.

AF FORM 66 (Computer Generated) PAGE 4 of 4

AF Form 66