This document appears to be an Air Force Form 66 titled "Schedule of Material Submittals" related to a federal contract opportunity for the "Upgrade PGS Fire Suppression" project (Solicitation Number FA487724R0020).
The key details are:
- This is a design-build contract opportunity issued by the Department of the Air Force, Air Combat Command.
- The project involves the design, plans, specifications, and installation of a new fire suppression system in the 610 CACS Power Generation Shelter.
- The document outlines the required submittals, including fire documentation, flow calculations, discharge piping isometrics, equipment, materials, construction progress reports, and other contract-related documents.
- Specific submission dates and approval/disapproval processes are defined for each submittal item.
- A site visit is scheduled for August 26, 2024, with limited attendance allowed per company.
- The RFI due date is September 2, 2024, and the proposal due date is September 16, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA487724R00200002 SF 30.pdf | ||
| BLDG 74 - Upgrade PGS System Photos.pdf | ||
| Solicitation Amendment FA487724R00200001 SF 30.pdf | ||
| Wage Determination - Rev AZ202490040.pdf | ||
| DMAFB Design Compatibility Guidelines 2017.pdf | ||
| FBNV240017 - All Specifications.pdf | ||
| FBNV 240017 DB Period of Performance.pdf | ||
| Contractor Environmental Guide 15 May 2019.pdf | ||
| FBNV240017 - AF Form 3052 Blank.xlsx | XLSX spreadsheet | |
| Solicitation - FA487724R0020.pdf | ||
| Contractor EAL Template.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NO. OF COPIES REQUIRED
Awarded:
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVED
Hazardous Material Usage Sec 01010, Para 2.7 c Env Cont Guide Sec 3.3 Hazardous Material
HAZMAT Usage Reports Sec 01010, Para 2.7c Env Cont Guide Sec 3.4 HAZMAT Usage
Air Quality Activity Permit Sec 01010, Para 2.7 Env Cont Guide Sec 3.3 Air Quality
AZPDES General Permit Sec 01010, Para 2.7d Env Cont Guide Sec 3.3 SWPP
Asbestos Removal/Demolition Activity Permit Sec 01010, Para 2.7d Env Cont Guide Sec 3.3 Asbestos
LBP Removal/Demolition Activity Permit Sec 01010, Para 2.7i Env Cont Guide Sec 3.3 Lead-Based Paint
Arizona Department of Agriculture Permit Sec 01010, Para 2.7d Env Cont Guide Sec 3.3 Protection of Native Plants
Asbestos Removal/Demolition Abatement Plan Sec 01010, Para 2.7e & f Env Cont Guide Sec 3.3 Asbestos
Construction & Demolition Debris Diversion Plan Sec 01010, Para 2.7e Env Cont Guide Sec 3.3 C&D Plan
Asbestos Manifests Sec 01010, Para 2.7h Env Cont Guide Sec 3.4 Asbestos Removal
SOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
PROJECT TITLE: PROJECT NUMBER:
Design-Build
7 Days after Reciept of Permit
7 Days after Reciept of Permit
7 Days after Reciept of Asbestos Demolition Permit
7 Days after Reciept of Permit
(1st of the month for projects >60days) (End of project for projects <60 days)
2 Days Prior to Construction
7 Days after Reciept of Permit
REMARKS
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
FI
NA
L
AP
PR
OV
AL
DATE CONTRACTOR NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
C er tif ic at es
M an uf ac tu re r's In st ru ct io ns
M an uf ac tu re r's F ie ld
R ep or ts
O pe ra tio n an d
M ai nt en an ce
M an ua ls
C lo se ou t S ub m itt al
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Upgrade PGS Fire SuppressionFBNV240017
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
P re co ns tr uc tio n Su bm itt al s
S ho p
D ra w in gs
P ro du ct
D at a
S am pl es
D es ig n D at a
T es t R ep or ts
7 Days After Reciept of Manifest
AF FORM 66 (Computer Generated) PAGE 1 of 4
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVED
SOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
PROJECT TITLE: PROJECT NUMBER:
Design-Build
REMARKS
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
FI
NA
L
AP
PR
OV
AL
DATE CONTRACTOR NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
C er tif ic at es
M an uf ac tu re r's In st ru ct io ns
M an uf ac tu re r's F ie ld
R ep or ts
O pe ra tio n an d
M ai nt en an ce
M an ua ls
C lo se ou t S ub m itt al
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Upgrade PGS Fire SuppressionFBNV240017
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
P re co ns tr uc tio n Su bm itt al s
S ho p
D ra w in gs
P ro du ct
D at a
S am pl es
D es ig n D at a
T es t R ep or ts
Non-Regulated Waste Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Regulated Hazardous Waste
Regulated Waste Disposal Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Regulated Hazardous Waste
Regulated Waste Manifests Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Regulated Hazardous Waste
Recycling Manifests Sec 01010, Para 2.7f Env Cont Guide Sec 3.4 Waste & Recyclables
Non-Hazardous Waste Manifests Sec 01010, Para 2.7i Env Cont Guide Sec 3.4 Waste & Recyclables
Radioactive Use Sec 01010, Para 2.7j Env Cont Guide Sec 3.3 Radioactive Material
17 Progress Photographs Sec 01010, Para 2.6
18 Record As-Builts Sec 01010, Para 4.2b
19 Record Disks Sec 01010, Para 4.2c 1
20 DD Form 1354 Sec 01010, Para 4.3
21 DD Form 1354 Checklist Sec 01010, Para 4.3
22 Warranty/Guarantee Items Sec 01010, Para 4.4 a3
23 O&M Manual Sec 01010, Para 4.4 b3 &4
AF Form 3064, Construction Schedule Sec 01011, Para 1.5
Design Charrette Submittal Sec 01011, Para 2.4.1 1
3 days after Disposal
Coordinated Prior to Removal from Installation
3 Days after Disposal (1st of the month for projects >60days) (End of project for projects <60 days)(1st of the month for projects >60days) (End of project for projects <60 days)
1 Package-Provide Copies as indicated
AF FORM 66 (Computer Generated) PAGE 2 of 4
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVED
SOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
PROJECT TITLE: PROJECT NUMBER:
Design-Build
REMARKS
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
FI
NA
L
AP
PR
OV
AL
DATE CONTRACTOR NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
C er tif ic at es
M an uf ac tu re r's In st ru ct io ns
M an uf ac tu re r's F ie ld
R ep or ts
O pe ra tio n an d
M ai nt en an ce
M an ua ls
C lo se ou t S ub m itt al
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Upgrade PGS Fire SuppressionFBNV240017
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
P re co ns tr uc tio n Su bm itt al s
S ho p
D ra w in gs
P ro du ct
D at a
S am pl es
D es ig n D at a
T es t R ep or ts
26 65% Design Submittal Sec 01011, Para 2.12.2 1
27 95% Design Submittal Sec 01011, Para 2.12.3
28 100% Design Submittal Sec 01011, Para 2.12.4
EMS Most Significant Environmental Aspects Awareness Form Env Cont Guide Sec 3.2 & Appendix
Env Cont Guide Sec 3.3 & Appendix F 1
Survey of Native Life Env Cont Guide Sec 3.3 Protection of Native Birds & Wildlife
Survey of Cultural Resources Env Cont Guide Sec 3.3 Preservation of Cultural Resources
33 Asbestos Survey Env Cont Guide Sec 3.3 Asbestos
Lead-Based Paint Survey Env Cont Guide Sec 3.3 Lead-Based Paint
Outdoor Painting Exemption Env Cont Guide Sec 3.3 Minimize Organics
36 Notice of Intent to Drill Env Cont Guide Sec 3.3 NOI to Drill 1
37 Drill Card Env Cont Guide Sec 3.3 NOI to Drill
Radioactive Use Env Cont Guide Sec 3.3 Radioactive Material
Recovered Materials Certification Env Cont Guide Sec 3.5 Recovered Materials
40 Notice of Termination Env Cont Guide 3.5 SWPP Plan
7 Days after NTP 7 Days after Construction Complete (Only for Contracts >$100,000) 7 Days after Construction Complete
(7 Days after Reciept of Survey) Contact DM Env Ofice (x4885) for surveys already conducted
7 Days after Reciept of Excemption 7 Days after Reciept of Drill Card 7 Days after Reciept of Drill Card
At PreCon Meeting
At PreCon Meeting(7 Days after Reciept of Survey) Contact DM Env Ofice (x4035) for surveys already conducted (7 Days after Reciept of Survey) Contact DM Env Ofice (x4035)
(7 Days after Reciept of Survey) Contact DM Env Ofice (x4885)
1 Package-Provide Copies as indicated
1 Package-Provide Copies as indicated
1 Package-Provide Copies as indicated
AF FORM 66 (Computer Generated) PAGE 3 of 4
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVED
SOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
PROJECT TITLE: PROJECT NUMBER:
Design-Build
REMARKS
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
FI
NA
L
AP
PR
OV
AL
DATE CONTRACTOR NOTIFIED
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
C er tif ic at es
M an uf ac tu re r's In st ru ct io ns
M an uf ac tu re r's F ie ld
R ep or ts
O pe ra tio n an d
M ai nt en an ce
M an ua ls
C lo se ou t S ub m itt al
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Upgrade PGS Fire SuppressionFBNV240017
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
P re co ns tr uc tio n Su bm itt al s
S ho p
D ra w in gs
P ro du ct
D at a
S am pl es
D es ig n D at a
T es t R ep or ts
Fire documentation & copy flow calculations, discharge piping isometrics all equipment, material-submittals
42 Construction Progress reports AF form 3065
Contractor to add Submittals as required or requested.
AF FORM 66 (Computer Generated) PAGE 4 of 4