FBNV240017 - AF Form 66.pdf

Air Force Form PDF 152 KB Posted

Attached to
FA487724R0020 - Upgrade PGS Fire System
Solicitation number
FA487724R0020
Issued by

About this file

This document appears to be an Air Force Form 66 titled "Schedule of Material Submittals" related to a federal contract opportunity for the "Upgrade PGS Fire Suppression" project (Solicitation Number FA487724R0020).

The key details are:

  • This is a design-build contract opportunity issued by the Department of the Air Force, Air Combat Command.
  • The project involves the design, plans, specifications, and installation of a new fire suppression system in the 610 CACS Power Generation Shelter.
  • The document outlines the required submittals, including fire documentation, flow calculations, discharge piping isometrics, equipment, materials, construction progress reports, and other contract-related documents.
  • Specific submission dates and approval/disapproval processes are defined for each submittal item.
  • A site visit is scheduled for August 26, 2024, with limited attendance allowed per company.
  • The RFI due date is September 2, 2024, and the proposal due date is September 16, 2024.

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NO. OF COPIES REQUIRED

Awarded:

Pre-Con:

NTP:

Const. Start:

Const. End:

Finalled:

APPROVED DISAPPROVED

Hazardous Material Usage Sec 01010, Para 2.7 c Env Cont Guide Sec 3.3 Hazardous Material

HAZMAT Usage Reports Sec 01010, Para 2.7c Env Cont Guide Sec 3.4 HAZMAT Usage

Air Quality Activity Permit Sec 01010, Para 2.7 Env Cont Guide Sec 3.3 Air Quality

AZPDES General Permit Sec 01010, Para 2.7d Env Cont Guide Sec 3.3 SWPP

Asbestos Removal/Demolition Activity Permit Sec 01010, Para 2.7d Env Cont Guide Sec 3.3 Asbestos

LBP Removal/Demolition Activity Permit Sec 01010, Para 2.7i Env Cont Guide Sec 3.3 Lead-Based Paint

Arizona Department of Agriculture Permit Sec 01010, Para 2.7d Env Cont Guide Sec 3.3 Protection of Native Plants

Asbestos Removal/Demolition Abatement Plan Sec 01010, Para 2.7e & f Env Cont Guide Sec 3.3 Asbestos

Construction & Demolition Debris Diversion Plan Sec 01010, Para 2.7e Env Cont Guide Sec 3.3 C&D Plan

Asbestos Manifests Sec 01010, Para 2.7h Env Cont Guide Sec 3.4 Asbestos Removal

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT TITLE: PROJECT NUMBER:

Design-Build

7 Days after Reciept of Permit

7 Days after Reciept of Permit

7 Days after Reciept of Asbestos Demolition Permit

7 Days after Reciept of Permit

(1st of the month for projects >60days) (End of project for projects <60 days)

2 Days Prior to Construction

7 Days after Reciept of Permit

REMARKS

RE

QU

IR

ED

S

UB

MI

SS

IO

N

DA

TE

FI

NA

L

AP

PR

OV

AL

DATE CONTRACTOR NOTIFIED

CO

NT

RA

CT

OR

R

ES

UB

MI

TT

AL

C er tif ic at es

M an uf ac tu re r's In st ru ct io ns

M an uf ac tu re r's F ie ld

R ep or ts

O pe ra tio n an d

M ai nt en an ce

M an ua ls

C lo se ou t S ub m itt al

LI

NE

N

UM

BE

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER

Upgrade PGS Fire SuppressionFBNV240017

DA

TE

R

EC

EI

VE

D

IN

C

ON

TR

AC

TI

NG

DA

TE

T O

CI

VI

L

EN

GI

NE

ER

IN

G

RE

TU

RN

S

US

PE

NS

E

DA

TE

SU

BM

IT

TA

L

NU

MB

ER

S

P re co ns tr uc tio n Su bm itt al s

S ho p

D ra w in gs

P ro du ct

D at a

S am pl es

D es ig n D at a

T es t R ep or ts

7 Days After Reciept of Manifest

AF FORM 66 (Computer Generated) PAGE 1 of 4

Pre-Con:

NTP:

Const. Start:

Const. End:

Finalled:

APPROVED DISAPPROVED

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT TITLE: PROJECT NUMBER:

Design-Build

REMARKS

RE

QU

IR

ED

S

UB

MI

SS

IO

N

DA

TE

FI

NA

L

AP

PR

OV

AL

DATE CONTRACTOR NOTIFIED

CO

NT

RA

CT

OR

R

ES

UB

MI

TT

AL

C er tif ic at es

M an uf ac tu re r's In st ru ct io ns

M an uf ac tu re r's F ie ld

R ep or ts

O pe ra tio n an d

M ai nt en an ce

M an ua ls

C lo se ou t S ub m itt al

LI

NE

N

UM

BE

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER

Upgrade PGS Fire SuppressionFBNV240017

DA

TE

R

EC

EI

VE

D

IN

C

ON

TR

AC

TI

NG

DA

TE

T O

CI

VI

L

EN

GI

NE

ER

IN

G

RE

TU

RN

S

US

PE

NS

E

DA

TE

SU

BM

IT

TA

L

NU

MB

ER

S

P re co ns tr uc tio n Su bm itt al s

S ho p

D ra w in gs

P ro du ct

D at a

S am pl es

D es ig n D at a

T es t R ep or ts

Non-Regulated Waste Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Regulated Hazardous Waste

Regulated Waste Disposal Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Regulated Hazardous Waste

Regulated Waste Manifests Sec 01010, Para 2.5h Env Cont Guide Sec 3.4 Regulated Hazardous Waste

Recycling Manifests Sec 01010, Para 2.7f Env Cont Guide Sec 3.4 Waste & Recyclables

Non-Hazardous Waste Manifests Sec 01010, Para 2.7i Env Cont Guide Sec 3.4 Waste & Recyclables

Radioactive Use Sec 01010, Para 2.7j Env Cont Guide Sec 3.3 Radioactive Material

17 Progress Photographs Sec 01010, Para 2.6

18 Record As-Builts Sec 01010, Para 4.2b

19 Record Disks Sec 01010, Para 4.2c 1

20 DD Form 1354 Sec 01010, Para 4.3

21 DD Form 1354 Checklist Sec 01010, Para 4.3

22 Warranty/Guarantee Items Sec 01010, Para 4.4 a3

23 O&M Manual Sec 01010, Para 4.4 b3 &4

AF Form 3064, Construction Schedule Sec 01011, Para 1.5

Design Charrette Submittal Sec 01011, Para 2.4.1 1

3 days after Disposal

Coordinated Prior to Removal from Installation

3 Days after Disposal (1st of the month for projects >60days) (End of project for projects <60 days)(1st of the month for projects >60days) (End of project for projects <60 days)

1 Package-Provide Copies as indicated

AF FORM 66 (Computer Generated) PAGE 2 of 4

Pre-Con:

NTP:

Const. Start:

Const. End:

Finalled:

APPROVED DISAPPROVED

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT TITLE: PROJECT NUMBER:

Design-Build

REMARKS

RE

QU

IR

ED

S

UB

MI

SS

IO

N

DA

TE

FI

NA

L

AP

PR

OV

AL

DATE CONTRACTOR NOTIFIED

CO

NT

RA

CT

OR

R

ES

UB

MI

TT

AL

C er tif ic at es

M an uf ac tu re r's In st ru ct io ns

M an uf ac tu re r's F ie ld

R ep or ts

O pe ra tio n an d

M ai nt en an ce

M an ua ls

C lo se ou t S ub m itt al

LI

NE

N

UM

BE

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER

Upgrade PGS Fire SuppressionFBNV240017

DA

TE

R

EC

EI

VE

D

IN

C

ON

TR

AC

TI

NG

DA

TE

T O

CI

VI

L

EN

GI

NE

ER

IN

G

RE

TU

RN

S

US

PE

NS

E

DA

TE

SU

BM

IT

TA

L

NU

MB

ER

S

P re co ns tr uc tio n Su bm itt al s

S ho p

D ra w in gs

P ro du ct

D at a

S am pl es

D es ig n D at a

T es t R ep or ts

26 65% Design Submittal Sec 01011, Para 2.12.2 1

27 95% Design Submittal Sec 01011, Para 2.12.3

28 100% Design Submittal Sec 01011, Para 2.12.4

EMS Most Significant Environmental Aspects Awareness Form Env Cont Guide Sec 3.2 & Appendix

Env Cont Guide Sec 3.3 & Appendix F 1

Survey of Native Life Env Cont Guide Sec 3.3 Protection of Native Birds & Wildlife

Survey of Cultural Resources Env Cont Guide Sec 3.3 Preservation of Cultural Resources

33 Asbestos Survey Env Cont Guide Sec 3.3 Asbestos

Lead-Based Paint Survey Env Cont Guide Sec 3.3 Lead-Based Paint

Outdoor Painting Exemption Env Cont Guide Sec 3.3 Minimize Organics

36 Notice of Intent to Drill Env Cont Guide Sec 3.3 NOI to Drill 1

37 Drill Card Env Cont Guide Sec 3.3 NOI to Drill

Radioactive Use Env Cont Guide Sec 3.3 Radioactive Material

Recovered Materials Certification Env Cont Guide Sec 3.5 Recovered Materials

40 Notice of Termination Env Cont Guide 3.5 SWPP Plan

7 Days after NTP 7 Days after Construction Complete (Only for Contracts >$100,000) 7 Days after Construction Complete

(7 Days after Reciept of Survey) Contact DM Env Ofice (x4885) for surveys already conducted

7 Days after Reciept of Excemption 7 Days after Reciept of Drill Card 7 Days after Reciept of Drill Card

At PreCon Meeting

At PreCon Meeting(7 Days after Reciept of Survey) Contact DM Env Ofice (x4035) for surveys already conducted (7 Days after Reciept of Survey) Contact DM Env Ofice (x4035)

(7 Days after Reciept of Survey) Contact DM Env Ofice (x4885)

1 Package-Provide Copies as indicated

1 Package-Provide Copies as indicated

1 Package-Provide Copies as indicated

AF FORM 66 (Computer Generated) PAGE 3 of 4

Pre-Con:

NTP:

Const. Start:

Const. End:

Finalled:

APPROVED DISAPPROVED

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT TITLE: PROJECT NUMBER:

Design-Build

REMARKS

RE

QU

IR

ED

S

UB

MI

SS

IO

N

DA

TE

FI

NA

L

AP

PR

OV

AL

DATE CONTRACTOR NOTIFIED

CO

NT

RA

CT

OR

R

ES

UB

MI

TT

AL

C er tif ic at es

M an uf ac tu re r's In st ru ct io ns

M an uf ac tu re r's F ie ld

R ep or ts

O pe ra tio n an d

M ai nt en an ce

M an ua ls

C lo se ou t S ub m itt al

LI

NE

N

UM

BE

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER

Upgrade PGS Fire SuppressionFBNV240017

DA

TE

R

EC

EI

VE

D

IN

C

ON

TR

AC

TI

NG

DA

TE

T O

CI

VI

L

EN

GI

NE

ER

IN

G

RE

TU

RN

S

US

PE

NS

E

DA

TE

SU

BM

IT

TA

L

NU

MB

ER

S

P re co ns tr uc tio n Su bm itt al s

S ho p

D ra w in gs

P ro du ct

D at a

S am pl es

D es ig n D at a

T es t R ep or ts

Fire documentation & copy flow calculations, discharge piping isometrics all equipment, material-submittals

42 Construction Progress reports AF form 3065

Contractor to add Submittals as required or requested.

AF FORM 66 (Computer Generated) PAGE 4 of 4

AF Form 66