| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE RPR ATHLETIC TRACK, ASF | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| AKNR 04-1036 | ||||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| GENERAL | ||||||||||||||||||||||
| 1 | SAFETY & HEALTH PLAN, SPECS. SECTION 01351A and 01525 | 3 | ||||||||||||||||||||
| 2 | CONSTRUCTION QUALITY CONTROL PLAN, SPECS. SECTION 01450N | 3 | ||||||||||||||||||||
| 3 | CONTRACTOR QUALITY CONTROL PLAN, SPECS. SECTION 01450N | 3 | ||||||||||||||||||||
| 4 | PROGRESS SCHEDULE, SPECS. SECTION 01320A, 01320N and 01330 | 3 | ||||||||||||||||||||
| 5 | EQUIPMENT DELIVERY SCHEDULE, SPECS.SECTION 01320N | 3 | ||||||||||||||||||||
| 6 | LIST OF TESTING LABORATORIES, SPECS. SECTION 01450N | 3 | ||||||||||||||||||||
| 7 | NOTICES FOR PROJECT COMPLETION AND FINAL INSPECTION SPECS.SECTION 01770N and 01780A | 3 | ||||||||||||||||||||
| 8 | OPERATION AND MAINTENANCE MANUALS, SPECS. SECTION 01781 | 3 | ||||||||||||||||||||
| 9 | AS BUILT DATA, SPECS SECTION 01770N and 01780A | 1 CP + CD | ||||||||||||||||||||
| 10 | CONSTRUCTION PHASING PLAN | 3 | ||||||||||||||||||||
| 11 | HAZARDOUS MATERIAL LIST ON AF FORM 3952 | 3 | ||||||||||||||||||||
| 12 | ENVIRONMENTAL PROTECTION PLAN SPECS SECTION 01355A | 3 | ||||||||||||||||||||
| 13 | SUBMITTAL SCHEDULE | NTP+ 10 D |
&LRFP FA5685-08-R-0031&CATTACHMENT4
&L&6CP:COPY, ST:SET, PN:SAMPLES PANEL, MD:MODULE, SM:SQUARE METER, EA:EACH, KG:KILOGRAM, CON:CONTAINER, LM:LINEAR METER, MAT SUB: MATERIAL SUBMITTAL&R&6COMPUTER GENERATED AF 66, OCT 89
CIVIL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE RPR ATHLETIC TRACK, ASF | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| AKNR 04-1036 | RFP FA5685-08-R-0031 | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| CIVIL | ||||||||||||||||||||||
| 1 | TOPSOIL (SEC 02140A) | 0.5 kg | 3 CP | |||||||||||||||||||
| 2 | PLANT-MIX COURSE MATERIALS | 0.5 kg | 2 CP | |||||||||||||||||||
| 3 | AGGREGATE MATERIALS (SEC 02722A) | 0.5 kg | 3 CP | |||||||||||||||||||
| 4 | BASE COURSE MATERIAL (SEC 02722A) | 0.5 kg | 3 CP | |||||||||||||||||||
| 5 | PRIMER (SEC. 02748A) | 3 CP | 3 CP | |||||||||||||||||||
| 6 | TACK COAT (SEC. 02748A) | 3 CP | 3 CP | |||||||||||||||||||
| 7 | SEAL COAT (SEC. 02748A) | 3 CP | 3 CP | |||||||||||||||||||
| 8 | ASPHALT BINDER COURSE (SEC. 02741A) | 3 CP | ||||||||||||||||||||
| 9 | ASPHALT WEARING COURSE (SEC. 02741A) | 3 CP | ||||||||||||||||||||
| 10 | WOOD OR STEEL FORM MATERIAL (SEC. 03101A) | 0.2 M2 | ||||||||||||||||||||
| 11 | REINFORCING STEEL (SEC. 03200A) | 3 CP | 3 ST | 3 CP | ||||||||||||||||||
| 12 | WELDED STEEL WIRE FABRIC (SEC. 03200A) | 3 CP | 3 ST | 3 CP | ||||||||||||||||||
| 13 | DOWELS (SEC. 03200A) | 3 CP | 3 ST | |||||||||||||||||||
| 14 | SELECT FILL MATERIAL (SEC 02140A) | 0.5 kg | 3 CP | |||||||||||||||||||
| 15 | SHOP DRAWINGS FOR CAST IN PLACE DRAINAGE MANHOLES (SEC. 02630) | 6 ST | 3 CP | |||||||||||||||||||
| 16 | FRAME AND COVER FOR DRAINAGE MANHOLES | 3 CP | 6 ST | 3 ST | 3 CP | |||||||||||||||||
| 17 | PRECAST CURB | 3 CP | 6 ST | 3 ST | 3 CP | |||||||||||||||||
| 18 | DUCTILE IRON FRAME AND COVER FOR DRAINAGE SYSTEM | 3 CP | 6 ST | 3 ST | 3 CP | |||||||||||||||||
| 19 | POLYMER CONCRETE DRAINAGE CHANNEL (DWG C4) | 3 CP | 6 ST | 3 ST | ||||||||||||||||||
| 20 | STORM DRAINAGE PIPE C/W WATERTIGHT JOINT (RCP,PCP,PVC) (SEC. 02630) | 3 CP | 3CP | 3 ST | 3 CP | |||||||||||||||||
| 21 | SEED MIXTURE (SEC. 02921A) | 0.5 kg | 3 ST | 3 CP | ||||||||||||||||||
| 22 | SHOP DRAWING FOR NEW HEADWALLS WITH ELEVATIONS | 6 ST | ||||||||||||||||||||
| 23 | SHOP DRAWING FOR NEW ELEVATIONS OF NEW ATHLETIC TRACK WITH NEW STORM DRAINAGE SYSTEM | 6 ST | ||||||||||||||||||||
| 24 | WATER BASE ACRYLIC PAINT F0R COLOR LAYER AND LINE ( SEC. 02763A) | 3 CP | 0.2 KG | 3 CP | 3 CP | 3 CP | ||||||||||||||||
| 25 | PRIMER SURFACE FILLER | 3 CP | 3 CP | 3 CP | ||||||||||||||||||
| 26 | RESURFACER | 3 CP | 3 CP | 3 CP | ||||||||||||||||||
| 27 | READY MIXED CONCRETE (SEC. 03301A) | 3 CP | 3 ST | 3 CP | ||||||||||||||||||
| 28 | JOINT FILLER (SEC. 03151A) | 3 CP | 3 ST | 3 CP | ||||||||||||||||||
| 29 | CONSTRUCTION JOINT DEVICES (SEC. 03151A) | 3 CP | 3 ST | 3 CP | ||||||||||||||||||
| 30 | EXPANSION DEVICES (SEC. 03151A) | 3 CP | 3 ST | 3 CP | ||||||||||||||||||
| 31 | FLOOR DRAIN | 3 CP | 3 ST | |||||||||||||||||||
| 32 | JOINT SEALANT (SEC. 03151A) | 3 ST | 3 ST | 3 CP |
&LRFP FA5685-08-R-0031&CATTACHMENT4
&L&6CP:COPY, ST:SET, PN:SAMPLES PANEL, MD:MODULE, SM:SQUARE METER, EA:EACH, KG:KILOGRAM, CON:CONTAINER, LM:LINEAR METER, MAT SUB: MATERIAL SUBMITTAL&R&6COMPUTER GENERATED AF 66, OCT 89
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attach. 5- Untabulated Cost AKNR 04-1036 | — | |
| Attach 6 - Past Performance Survey | — | |
| Attach. 2- Drawings | — | |
| Attach. 2- Drawings | — | |
| Attach. 2- Drawings | — | |
| Attach. 2- Drawings | — | |
| RFP FA5685-08-R-0031.doc | DOC document | |
| Attach. 3- INCIRLIK INSTRUCTIONS | — | |
| Attach. 2- Drawings | — | |
| Attach. 1-Specs AKNR-04-1036 | — | |
| Attach. 2- Drawings | — | |
| A.8 Scheduled Site Visit | — | |
| A.8 Pre Proposal Reservation Form | — |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .