INC-1101 (Front)
| CONTRACTOR | ADDRESS | ||||||||||
| INCIRLIK AIR BASE | |||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| REPAIR ATHLETIC TRACK, ASF | 0.00 | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| RFP FA5685-08-R-0031 | AKNR 04-1036 | Balgat Air Base, Ankara,Turkey | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| R E C A P I T U L A T I O N | |||||||||||
| 1 | CIVIL/STRUCTURAL | 0.00 | 0.00 | 0.00 | |||||||
| 0 | |||||||||||
| 0 | 0.00 | ||||||||||
| 2,844.00 | |||||||||||
| T O T A L | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 2,300.00 | ||||
| CIVIL/STRUCTURAL | 0.00 | 0.00 | 0.00 | 1,124.00 | |||||||
| 0.00 | 0.00 | 0.00 | 390.00 | ||||||||
| 1 | DEMOLISH EXISTING ASPHALT TRACK AND DISPOSE EXISTING BASE COURSE | SM | 432.00 | ||||||||
| 2 | PROVIDE AND INSTALL NEW 30 CM THICK BASE COURSE AND COMPACT | CM | 2,734.00 | ||||||||
| 4 | PROVIDE AND INSTALL NEW 15 CM PLANT MIX COURSE AND COMPACT | CM | 10,039.04 | ||||||||
| 5 | PROVIDE AND INSTALL NEW 10 CM THICK ASPHALT C/W PRIMER AND RESURFACER | CM | 43.00 | ||||||||
| 6 | PROVIDE AND INSTALL NEW CONCRETE CURB | LM | 1,551.20 | ||||||||
| 7 | PROVIDE AND INSTALL DUCTILE IRON GRATING WITH CHANNEL | LM | 346.80 | ||||||||
| 8 | PROVIDE AND INSTALL NEW DRAINAGE SYSTEM C/W 6''PVC PIPE ,HEADWALL AND HANDHOLES | LM | 344.00 | ||||||||
| 9 | PROVIDE AND INSTALL WATER BASE ACRYLIC COLOR PAINT AND LINE PAINT | SM | 78.00 | ||||||||
| 10 | SEEDING AND MOBILIZATION | SM | |||||||||
| 1,270.00 | |||||||||||
| 516.12 | |||||||||||
| 11,700.00 | |||||||||||
| 420.00 | |||||||||||
| 2,090.00 | |||||||||||
| 430.12 | |||||||||||
| 5.20 | |||||||||||
| T O T A L | 0.00 | 0.00 | 0.00 | 0.00 | 4.00 |
&L&"Arial,Italic"&8
Engineer's Final &"Arial,Bold"&10CONSTRUCTION COST ESTIMATE BREAKDOWN&CATTACHMENT5 RFP FA5685-08-R-0031&R&"Arial,Bold"FOR OFFICIAL USE ONLY
SHEET NO. &P OF &N
&L&"Times New Roman,Bold"Form INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008)&R&"Arial,Bold"FOR OFFICIAL USE ONLY Label 1 Label 1 Label 1 Label 1 Label 1 Label 1 Label 1 Label 1 Label 1 Label 1 Label 1 Label 1 Label 1 Label 1 Label 1 Label 1 Label 1 Label 1 Label 1 Label 1 Label 1 Label 1 Label 1 Label 1 Label 1 Label 1 Label 1 Label 1 Label 1 Label 1 Label 1 Label 1 Label 1 Label 1
INC-1101 (Back)
| INSTRUCTIONS FOR COMPLETING Form INC-1101 | |||||
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to | |||||
| permit itemizing of all direct costs. | |||||
| Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples : square yards - SY, cubic yards - CY, square | |||||
| feet - SF, linear feet - LF, board feet - BF, each - EA, pound -LB). | |||||
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be | |||||
| funished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract | |||||
| will be issued. Otherwise, the contractor is responsible for determining quantity estimates. | |||||
| Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1. | |||||
| Col 6, 7 and 8 Labor Costs. Enter in Col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. | |||||
| Enter in Col 7 the average rate per manhour (manday) and in Col 8 the total labor cost. | |||||
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract | |||||
| and of significant dollar value. | |||||
| Col 10 Line Total. Self-explanatory. | |||||
| NOTE: In addition to the other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last | |||||
| page as follows. | |||||
| TOTAL MATERIAL COSTS | $ | 0.00 | |||
| ------------------------------- | |||||
| TOTAL LABOR COSTS | $ | 0.00 | |||
| ------------------------------- | |||||
| TOTAL OTHER DIRECT COSTS | $ | 0.00 | |||
| ------------------------------- | |||||
| TOTAL COSTS | $ | 0.00 | |||
| ------------------------------- | |||||
| OVERHEAD | % | $ | 0.00 | ||
| ------------------------------- | |||||
| SUBTOTAL | $ | 0.00 | |||
| ------------------------------- | |||||
| PROFIT | % | $ | 0.00 | ||
| ------------------------------- | |||||
| TOTAL PRICE | $ | 0.00 | |||
| DATE : | FIRM NAME | ||||
| ----------------------------------------------------------------- | |||||
| TITLE: | BY | ||||
| ---------------------------------------------------------- | ----------------------------------------------------------------- | ||||
| INSTRUCTIONS TO OFFERORS | |||||
| 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and | |||||
| estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from | |||||
| this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data | |||||
| (see ASPR 3-807.3(e) and 3-807.4). | |||||
| 2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this | |||||
| form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and | |||||
| analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of | |||||
| a. The existing, verifiable data. | |||||
| b. The judgmental factors applied in projecting from known data to the estimate, and | |||||
| c. The contingencies used by the offeror in his proposed price. | |||||
| In short, the offeror's estimating process itself needs to be disclosed. | |||||
| 3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), | |||||
| and made available to the contracting officer or his authorized representative upon request. | |||||
| 4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the | |||||
| purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate | |||||
| evaluation of such cost or pricing data, along with the computations and projections used herein. This right may be exercised in connection | |||||
| with any negotiations prior to contract award. | |||||
| (Reverse of INC-1101., MAY 08) |
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attach. 2- Drawings | — | |
| Attach. 2- Drawings | — | |
| Attach. 4-AF FORM 66-AKNR 04-1036 | — | |
| Attach 6 - Past Performance Survey | — | |
| Attach. 2- Drawings | — | |
| Attach. 2- Drawings | — | |
| RFP FA5685-08-R-0031.doc | DOC document | |
| Attach. 3- INCIRLIK INSTRUCTIONS | — | |
| Attach. 2- Drawings | — | |
| Attach. 1-Specs AKNR-04-1036 | — | |
| Attach. 2- Drawings | — | |
| A.8 Scheduled Site Visit | — | |
| A.8 Pre Proposal Reservation Form | — |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .