CIVIL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| AKNR 05-1022 | CNS REPLACE ASF BLDG. 2019 | Attachment 4 FA5685-08-R-0024 | ||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| CIVIL | ||||||||||||||||||||||
| 1 | SUBSOIL (02205-2.01) | 3 CP | TEST+ 3 D | |||||||||||||||||||
| 2 | AGGREGATE MATERIALS (02207) | 3 CP | TEST+ 3 D | |||||||||||||||||||
| 3 | AGGREGATE BASE COURSE (02231) | 3 CP | TEST+ 3 D | |||||||||||||||||||
| 4 | WOOD OR STEEL FORM MATERIAL (02520-2.01/A) | 3 ST | 3 ST | |||||||||||||||||||
| 5 | REINFORCING STEEL (02520-2.02/A) | 3 CP | 3 ST | 3 CP | ||||||||||||||||||
| 6 | WELDED STEEL WIRE FABRIC (02520-2.02/B) | 3 CP | 3 ST | 3 CP | ||||||||||||||||||
| 7 | DOWELS (02520-2.02/C) | 3 ST | 3 ST | |||||||||||||||||||
| 8 | CEMENT (02520-2.03/A) | 3 CP | ||||||||||||||||||||
| 9 | FINE AND COARSE MIX AGGREGATES FOR CONCRETE (02520-2.03/B) | 3 CP | ||||||||||||||||||||
| 10 | CURING COMPOUND (02520-2.04/A) | 3 ST | ||||||||||||||||||||
| 11 | MANHOLES AND COVERS (02607-2.01, 2.02) | 3 ST | ||||||||||||||||||||
| 12 | SHOP DRAWINGS FOR MANHOLE | 3 ST | ||||||||||||||||||||
| 13 | SEED MIXTURE (02936-2.02/A) | 3 CP | 3 ST | |||||||||||||||||||
| 14 | FERTILIZER (02936-2.04/B) | 3 CP | 3 ST | |||||||||||||||||||
| 15 | PVC PIPE (SHEET NO. C02) | 3 ST | 3 ST | |||||||||||||||||||
| 16 | FENCE (SHEET NO. C02) | 3 ST | ||||||||||||||||||||
| 17 | SHOP DRAWINGS FOR FENCE | 3 ST | ||||||||||||||||||||
| 18 | ACACIA TREES | 3 CP | 3 ST |
&L&6CP:COPY, ST:SET, PN:SAMPLES PANEL, MD:MODULE, SM:SQUARE METER, EA:EACH, KG:KILOGRAM, CON:CONTAINER, LM:LINEAR METER, MAT SUB: MATERIAL SUBMITTAL, EW: EXECUTION OF WORK&R&6COMPUTER GENERATED AF 66, OCT 89
STRUCTURAL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| AKNR 05-1022 | CNS REPLACE ASF BLDG. 2019 | Attachment 4 FA5685-08-R-0024 | ||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| STRUCTURAL | ||||||||||||||||||||||
| 1 | WOOD FORM MATERIAL (03100-2.01) | 0.25 SQM | 3 ST | |||||||||||||||||||
| 2 | FORM TIES (03100-2.03/A) | 3 EA | 3 ST | |||||||||||||||||||
| 3 | REINFORCING STEEL (03200-2.01/A) | 3 CP | 3 CP | |||||||||||||||||||
| 4 | WELDED STEEL WIRE FABRIC (03200-2.01/D) | 3 CP | 3 CP | |||||||||||||||||||
| 5 | CHAIRS, BOLSTERS, BAR SUPPORTS, SPACERS (03200-2.02/B) | 3 ST | ||||||||||||||||||||
| 6 | CONCRETE ADMIXTURES (03300-2.02) | 3 ST | 3 CP | 3 ST | ||||||||||||||||||
| 7 | READY MIXED CONCRETE (03300-2.05) | 3 ST | 3 CP | |||||||||||||||||||
| 8 | CURING COMPOUNDS (03370-2.01) | 3 CP | 3 ST | |||||||||||||||||||
| 9 | MORTAR MIXES (04100-2.05) | 3 ST | ||||||||||||||||||||
| 10 | CONCRETE MASONRY UNITS (04340-2.02) | 3 EA | 3 ST | 3 CP | ||||||||||||||||||
| 11 | STEEL SECTIONS (05500-2.01/A) | 3 CP | 3 ST | |||||||||||||||||||
| 12 | SHOP DRAWINGS FOR STEEL SECTIONS | 6 ST | ||||||||||||||||||||
| 13 | PLATES (05500-2.01/C) | 3 CP | 3 ST | |||||||||||||||||||
| 14 | FASTENERS (05500-2.01/E) | 3 CP | 3 ST | |||||||||||||||||||
| 15 | BOLTS, NUTS AND WASHERS (05500-2.01/F) | 3 CP | 3 ST | |||||||||||||||||||
| 16 | STEEL HANDRAILS AND RAILINGS (05520-2.03) | 3 CP | 3 ST | |||||||||||||||||||
| 17 | SHOP DRAWINGS FOR STEEL HANDRAILS AND RAILINGS | 6 ST |
&L&6CP:COPY, ST:SET, PN:SAMPLES PANEL, MD:MODULE, SM:SQUARE METER, EA:EACH, KG:KILOGRAM, CON:CONTAINER, LM:LINEAR METER, MAT SUB: MATERIAL SUBMITTAL, EW: EXECUTION OF WORK&R&6COMPUTER GENERATED AF 66, OCT 89
ARCHITECTURAL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| AKNR 05-1022 | CNS REPLACE ASF BLDG. 2019 | Attachment 4 FA5685-08-R-0024 | ||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| ARCHITECTURAL | ||||||||||||||||||||||
| 1 | INSULATION MATERIAL (07212-2.02) | 3 CP | 3 ST | |||||||||||||||||||
| 2 | SHEET VAPOR RETARDER (07212-2.05/A, B) | 3 ST | ||||||||||||||||||||
| 3 | BATT INSULATION (07213-2.02/A) | 3 CP | 3 ST | |||||||||||||||||||
| 4 | NAILS OR STAPLES (07213-2.02/C) | 3 CP | 3 ST | |||||||||||||||||||
| 5 | SHEET METAL ROOFING (07611-2.02) | 3 CP | 1 | 3 ST | ||||||||||||||||||
| 6 | SHOP DRAWINGS FOR METAL ROOFING | 3 ST | ||||||||||||||||||||
| 7 | FASTENERS (07611-2.03/A) | 1 | 3 ST | |||||||||||||||||||
| 8 | SEALANT (07611-2.03/F) | 1 | 3 ST | |||||||||||||||||||
| 9 | GUTTER SUPPORTS (07620-2.02/K) | 1 | 3 ST | |||||||||||||||||||
| 10 | DOWNSPOUT SUPPORTS (07620-2.02/L) | 1 | 3 ST | |||||||||||||||||||
| 11 | GALVANIZED STEEL SHEET FOR DOWNSPOUTS (07631-2.02/A) | 1 | 3 ST | |||||||||||||||||||
| 12 | GUTTERS (07631-2.03/A) | 1 | 3 ST | |||||||||||||||||||
| 13 | SHOP DRAWINGS FOR GUTTERS | 3 ST | ||||||||||||||||||||
| 14 | DOWNSPOUTS (07631-2.03/B) | 3 ST | 3 ST | |||||||||||||||||||
| 15 | SHOP DRAWINGS FOR DOWNSPOUTS | 3 ST | ||||||||||||||||||||
| 16 | STEEL DOORS AND DOOR FRAMES | 3 ST | 3 ST | |||||||||||||||||||
| 17 | SHOP DRAWINGS FOR STEEL DOORS AND DOOR FRAMES | 3 ST | ||||||||||||||||||||
| 18 | LAMINATED INSULATED GLASS (08111-2.04/B) | 3 CP | 3 ST | |||||||||||||||||||
| 19 | FRAMES (08112-2.02) | 3 ST | 3 ST | |||||||||||||||||||
| 20 | SHOP DRAWINGS FOR STEEL FRAMES | 3 ST | ||||||||||||||||||||
| 21 | DOOR CLOSER (SHEET A11 AND A12) | 3 CP | 3 ST | |||||||||||||||||||
| 22 | SHOP DRAWINGS FOR DOOR CLOSER | 3 ST | ||||||||||||||||||||
| 23 | WOOD DOORS (08211-2.02) | 3 CP | 3 ST | |||||||||||||||||||
| 24 | SHOP DRAWINGS FOR WOOD DOORS | 3 ST | ||||||||||||||||||||
| 25 | STEEL WINDOWS (08512-2) | 3 CP | 3 ST | |||||||||||||||||||
| 26 | GLAZING MATERIALS (08800-2.01 AND 2.02) | 3 CP | 3 CP | 3 CP | 3 ST | 3 CP | ||||||||||||||||
| 27 | FASTENERS FOR GYPSUM DRYWALLS (09260-2.02/D) | 3 CP | 3 ST | |||||||||||||||||||
| 28 | GYPSUM BOARD (09260-2.03) | 3 CP | 3 ST | |||||||||||||||||||
| 29 | SHOP DRAWINGS FOR GYPSUM BOARD SYSTEM | 3 ST | ||||||||||||||||||||
| 30 | ACOUSTIC INSULATION (09260-2.05/A) | 3 CP | 3 ST | |||||||||||||||||||
| 31 | FLOOR TILE (09306-2.02) | 3 CP | 1 | 3 ST | ||||||||||||||||||
| 32 | BASE (09306-2.04/A) | 3 CP | 1 | 3 ST | ||||||||||||||||||
| 33 | THRESHOLDS (09306-2.09/C) | 3 CP | 1 | 3 ST | ||||||||||||||||||
| 34 | WALL TILE (09307-2.02/A) | 3 CP | 1 | 3 ST | ||||||||||||||||||
| 35 | SUSPENDED CEILING GRID MATERIALS (09511-2.01/B) | 3 CP | 1 | 3 ST | ||||||||||||||||||
| 36 | SUSPENDED CEILING ACCESSORIES (09511-2.01/E) | 3 CP | 1 | 3 ST | ||||||||||||||||||
| 37 | SUSPENDED CEILING SUPORTS CHANNELS AND HANGERS (09511-2.01/F) | 3 CP | 1 | 3 ST | ||||||||||||||||||
| 38 | SUSPENDED CEILING PANELS (09511-2.02/A) | 3 CP | 1 | 3 ST | ||||||||||||||||||
| 39 | SHOP DRAWINGS FOR SUSPENDED CEILING PANELS | 3 ST | ||||||||||||||||||||
| 40 | CARPET TILE SIZE: 24"X24" (09690-2.02/A) | 3 CP | 1 | 3 ST | ||||||||||||||||||
| 41 | SUB-FLOOR FILLER FOR CARPET TILES (09690-2.03/A) | 3 CP | 1 | 3 ST | ||||||||||||||||||
| 42 | MOLDINGS AND EDGE STRIPS FOR CARPET TILES (09690-2.03/C) | 3 CP | 1 | 3 ST | ||||||||||||||||||
| 43 | CONTACT ADHESIVE FOR CARPET TILES (09690-2.03/E) | 3 CP | 3 ST | |||||||||||||||||||
| 44 | PAINT AND PRIMERS (09900-2.02) | 3 CP | 3 ST | 3 CP | 3 ST | |||||||||||||||||
| 45 | WALL AND CORNER GUARDS (10260-2.02/C) | 1 | 3 ST | |||||||||||||||||||
| 46 | TOILET PAPER DISPENSER (10800-2.04/A) | 3 CP | 1 | 3 ST | ||||||||||||||||||
| 47 | PAPER TOWEL DISPENSER AND WASTE RECEPTACLE (10800-2.04/D) | 3 CP | 1 | 3 ST | ||||||||||||||||||
| 48 | SOAP DISPENSER (10800-2.04/E) | 3 CP | 1 | 3 ST | ||||||||||||||||||
| 49 | MIRRORS (10800-2.04/F) | 3 CP | 1 | 3 ST | ||||||||||||||||||
| 50 | GRAB BARS (10800-2.04/H) | 3 CP | 1 | 3 ST | ||||||||||||||||||
| 51 | PLASTIC LAMINATE TOILET COMPARTMENTS (10165-2.02) | 3 CP | 1 | 3 ST | ||||||||||||||||||
| 52 | SHOP DRAWINGS FOR PLASTIC LAMINATE TOILET COMPARTMENTS | 3 ST | ||||||||||||||||||||
| 53 | SHOWER CURTAIN ROD (10800-2.05/A) | 3 CP | 1 | 3 ST | ||||||||||||||||||
| 54 | SHOWER CURTAIN (10800-2.05/B) | 3 CP | 1 | 3 ST | ||||||||||||||||||
| 55 | SHOWER SEAT (10800-2.05/C) | 3 CP | 1 | 3 ST | ||||||||||||||||||
| 56 | ANDESITE STEP (SHEET A20) | 3 CP | 1 | 3 ST | ||||||||||||||||||
| 57 | SHOP DRAWINGS FOR ANDESITE STEP | 3 ST | ||||||||||||||||||||
| 58 | KITCHEN CABINETS (SHEET NO. A15 AND A16) | 3 ST | 3 ST | |||||||||||||||||||
| 59 | SHOP DRAWINGS FOR KITCHEN CABINETS | 3 ST | ||||||||||||||||||||
| 60 | PANIC HARDWARE | 3 CP | 3 CP | 3 ST |
&L&6CP:COPY, ST:SET, PN:SAMPLES PANEL, MD:MODULE, SM:SQUARE METER, EA:EACH, KG:KILOGRAM, CON:CONTAINER, LM:LINEAR METER, MAT SUB: MATERIAL SUBMITTAL, EW: EXECUTION OF WORK&R&6COMPUTER GENERATED AF 66, OCT 89
MECHANICAL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| AKNR 05-1022 | CNS REPLACE ASF BLDG. 2019 | Attachment 4 FA5685-08-R-0024 | ||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| MECHANICAL | ||||||||||||||||||||||
| 1 | PIPE HANGERS AND SUPPORTS (15140-2.01) | 3 CP | 3 ST | 3 CP | ||||||||||||||||||
| 2 | SHOP DRAWINGS FOR PIPE HANGERS AND SUPPORTS (15140-1.06/B) | 3 ST | ||||||||||||||||||||
| 3 | PIPING INSULATION (15260) | 1 | 3 ST | 3 CP | ||||||||||||||||||
| 4 | SPRINKLER PIPING (15310) | 3 CP | 1 | 3 ST | 3 CP | |||||||||||||||||
| 5 | SHOP DRAWINGS FOR SPRINKLER SYSTEM | 6 ST | ||||||||||||||||||||
| 6 | SPRINKLERS (15325-2.2) | 3 CP | 1 | 3 ST | ||||||||||||||||||
| 7 | HYDRAULIC CALCULATIONS FOR SPRINKLER SYSTEM (15325-1.5/D) | 3 ST | ||||||||||||||||||||
| 8 | WET PIPE ALARM VALVE (SHEET NO. M19) | 3 CP | 3 CP | 3 ST | ||||||||||||||||||
| 9 | SANITARY SEWER PIPING, (15410-2) | 1 | 3 ST | |||||||||||||||||||
| 10 | WATER PIPING (15410-2) | 1 | 3 ST | |||||||||||||||||||
| 11 | FLANGES, UNIONS AND COUPLINGS (15410-2.11) | 3 ST | ||||||||||||||||||||
| 12 | PIPE HANGERS AND SUPPORTS (15410-2.12) | 1 | 3 ST | |||||||||||||||||||
| 13 | VALVES (15410-2) | 3 ST | 3 CP | |||||||||||||||||||
| 14 | STRAINERS (15410-2.23) | 3 ST | ||||||||||||||||||||
| 15 | FLOOR DRAINS (15430-2.7) | 3 CP | 3 CP | 3 ST | ||||||||||||||||||
| 16 | CLEANOUTS (15430-2.10) | 3 CP | 3 CP | 3 ST | ||||||||||||||||||
| 17 | BACKFLOW PREVENTERS (15430-2.15) | 3 CP | 3 CP | 3 ST | ||||||||||||||||||
| 18 | WATER HAMMER ARRESTORS (15430-2.16) | 3 CP | 3 CP | 3 ST | ||||||||||||||||||
| 19 | PLUMBING FIXTURES (15440-2) | 3 CP | 3 ST | |||||||||||||||||||
| 20 | FUEL OIL TANK AND PIPING (15484-1.06, 1.08) | 3 CP | 3 ST | 3 CP | ||||||||||||||||||
| 21 | HYDRONIC PIPING (15510-1.05) | 3 CP | 3 CP | |||||||||||||||||||
| 22 | BOILER (15561-1.04) | 3 CP | 3 CP | 3 CP | 3 CP | 3 ST | 3 CP | 3 CP | ||||||||||||||
| 23 | CHIMNEY (15575-1.06) | 3 CP | 3 ST | |||||||||||||||||||
| 24 | CENTRIFUGAL EXHAUST FANS (15860) | 3 CP | 3 CP | 3 ST | 3 CP | 3 CP | ||||||||||||||||
| 25 | FLOW SWITCH (SHEET NO. M14, M15) | 3 CP | 3 CP | 3 ST | ||||||||||||||||||
| 26 | FROST PROOF HOSE BIBB (SHEET NO. M04) | 3 CP | 3 CP | 3 ST | ||||||||||||||||||
| 27 | PLATE TYPE HEAT EXCHANGER (SHEET NO. M13) | 3 CP | 3 CP | 3 CP | 3 ST | 3 CP | 3 CP | |||||||||||||||
| 28 | FAN COILS (SHEET NO. M13) | 3 CP | 3 CP | 3 CP | 3 ST | 3 CP | 3 CP | |||||||||||||||
| 29 | KICHEN HOOD C/W FIRE SUPPRESSION SYSTEM (SHEET NO. M16) | 3 CP | 3 CP | 3 CP | 3 ST | 3 CP | 3 CP | |||||||||||||||
| 30 | CIRCULATION PUMP (SHEET NO. M13) | 3 CP | 3 CP | 3 CP | 3 ST | 3 CP | 3 CP |
&L&6CP:COPY, ST:SET, PN:SAMPLES PANEL, MD:MODULE, SM:SQUARE METER, EA:EACH, KG:KILOGRAM, CON:CONTAINER, LM:LINEAR METER, MAT SUB: MATERIAL SUBMITTAL, EW: EXECUTION OF WORK&R&6COMPUTER GENERATED AF 66, OCT 89
ELECTRICAL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| AKNR 05-1022 | CNS REPLACE ASF BLDG. 2019 | Attachment 4 FA5685-08-R-0024 | ||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| ELECTRICAL | ||||||||||||||||||||||
| 1 | METAL CONDUIT (16111-2.02) | 1 | 3 ST | |||||||||||||||||||
| 2 | LIQUID TIGHT FLEXIBLE METAL CONDUIT (16111-2.05) | 1 | 3 ST | |||||||||||||||||||
| 3 | ELECTRICAL METALLIC TUBING (16111-2.06) | 1 | 3 ST | |||||||||||||||||||
| 4 | BUILDING WIRE AND CABLE (16123-2.02) | 3 CP | 1 | 3 ST | 3 CP | |||||||||||||||||
| 5 | WIRING CONNECTORS (16123-2.13) | 3 CP | 1 | 3 ST | ||||||||||||||||||
| 6 | OUTLET BOXES (16130-2.01) | 3 CP | 1 | 3 ST | ||||||||||||||||||
| 7 | PULL AND JUNCTION BOXES (16130-2.03) | 3 CP | 1 | 3 ST | ||||||||||||||||||
| 8 | WALL SWITCHES (16140-2.01) | 3 CP | 1 | 3 ST | ||||||||||||||||||
| 9 | RECEPTACLES (16140-2.03) | 3 CP | 1 | 3 ST | ||||||||||||||||||
| 10 | WALL PLATES (16140-2.04) | 3 ST | ||||||||||||||||||||
| 11 | GROUNDING RODS (16170-2.01) | 3 CP | 3 ST | |||||||||||||||||||
| 12 | MECHANICAL CONNECTORS (16170-2.03) | 3 CP | 3 ST | 3 CP | ||||||||||||||||||
| 13 | EXOTHERMIC CONNECTIONS (16170-2.04) | 3 CP | 3 ST | 3 CP | ||||||||||||||||||
| 14 | COPPER GROUND WIRE (16170-2.05) | 3 CP | 3 ST | 3 CP | ||||||||||||||||||
| 15 | BRANCH CIRCUIT PANELBOARDS (16470-2.02) | 3 CP | ||||||||||||||||||||
| 16 | SHOP DRAWINGS FOR BRANCH CIRCUIT PANELBOARDS | 3 ST | ||||||||||||||||||||
| 17 | LUMINARIES (16510) | 3 CP | 3 ST | 3 CP | ||||||||||||||||||
| 18 | EXIT SIGNS (16510-2.03) | 3 CP | 3 ST | 3 CP | ||||||||||||||||||
| 19 | FLUORESCENT BALLASTS (16510-2.04) | 3 CP | 1 | 3 ST | 3 CP | |||||||||||||||||
| 20 | EMERGENCY POWER SUPPLY (16510-2.07) | 3 CP | 3 ST | 3 CP | ||||||||||||||||||
| 21 | SHOP DRAWINGS FOR EMERGENCY LIGHTING UNITS | 3 ST | ||||||||||||||||||||
| 22 | LAMPS (16510-2.08) | 3 CP | 3 ST | 3 CP | ||||||||||||||||||
| 23 | FIRE ALARM MANUAL STATION (16721-2.03/A) | 3 CP | 3 ST | 3 CP | ||||||||||||||||||
| 24 | ALARM HORN AND STROBE LIGHT (16721-2.04/A) | 3 CP | 1 | 3 ST | 3 CP | |||||||||||||||||
| 25 | DISCONNECT SWITCH (SHEET NO. E06) | 3 CP | 1 | 3 ST | 3 CP | |||||||||||||||||
| 26 | TELEPHONE AND DATA OUTLET (SHEET NO. E17) | 3 CP | 1 | 3 ST | ||||||||||||||||||
| 27 | CABLE TRAY (SHEET NO. E17) | 3 CP | 3 ST | |||||||||||||||||||
| 28 | COMMUNICATION BOX (SHEET NO. E17) | 3 CP | 3 CP | 3 CP | ||||||||||||||||||
| 29 | COMMUNICATION CABINET (SHEET NO. E17) | 3 CP | 3 CP | 3 CP | ||||||||||||||||||
| 30 | SHOP DRAWINGS FOR COMMUNICATION CABINET | 3 ST | ||||||||||||||||||||
| 31 | SHOP DRAWING FOR FUEL TANK LEVEL CONTROL | 3 ST | ||||||||||||||||||||
| 32 | SHOP DRAWING FOR ELECTRICAL CONNECTIONS FIRE SPRINKLER AND ALARM/DETECTION SYSTEM | 3 ST |
&L&6CP:COPY, ST:SET, PN:SAMPLES PANEL, MD:MODULE, SM:SQUARE METER, EA:EACH, KG:KILOGRAM, CON:CONTAINER, LM:LINEAR METER, MAT SUB: MATERIAL SUBMITTAL, EW: EXECUTION OF WORK&R&6COMPUTER GENERATED AF 66, OCT 89
GENERAL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| AKNR 05-1022 | CNS REPLACE ASF BLDG. 2019 | Attachment 4 FA5685-08-R-0024 | ||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| GENERAL | ||||||||||||||||||||||
| 1 | SAFETY PLAN, SPECS. SECTION 01420 | 3 CP | NTP+ 10 D | |||||||||||||||||||
| 2 | QUALITY CONTROL PLAN, SPECS. SECTION 01400 | 3 CP | NTP+ 10 D | |||||||||||||||||||
| 3 | KEY PERSONNEL LIST, SPECS. SECTION 01300 | 3 CP | NTP+ 10 D | |||||||||||||||||||
| 4 | PROGRESS SCHEDULE, SPECS. SECTION 01310 | 3 CP | NTP+ 10 D | |||||||||||||||||||
| 5 | EQUIPMENT DELIVERY SCHEDULE, SPECS. SECTION 01310 | 3 CP | NTP+ 10 D | |||||||||||||||||||
| 6 | LIST OF TESTING LABORATORIES, SPECS. SECTION 01410 | 3 CP | NTP+ 10 D | |||||||||||||||||||
| 7 | NOTICES FOR PROJECT COMPLETION AND FINAL INSPECTION SPECS. SECTION 01700 | 3 CP | FINAL - 10 D | |||||||||||||||||||
| 8 | OPERATION AND MAINTENANCE MANUALS, SPECS. SECTION 01730 | 3 CP | FINAL + 20 D | |||||||||||||||||||
| 9 | AS BUILT DATA, SPECS SECTION 01320 | 1 CP + CD | FINAL + 20 D | |||||||||||||||||||
| 10 | ASBESTOS REMOVAL PLAN | 3 CP | NTP+ 10 D | |||||||||||||||||||
| 11 | MATERIAL SUBMITTAL SCHEDULE | 3 CP | NTP+ 10 D |
&L&6CP:COPY, ST:SET, PN:SAMPLES PANEL, MD:MODULE, SM:SQUARE METER, EA:EACH, KG:KILOGRAM, CON:CONTAINER, LM:LINEAR METER, MAT SUB: MATERIAL SUBMITTAL, EW: EXECUTION OF WORK&R&6COMPUTER GENERATED AF 66, OCT 89
Sheet2
&A Page &P
Sheet3
Sheet4
Sheet5
Sheet6
Sheet7
Sheet8
Sheet9
Sheet10
Sheet11
Sheet12
Sheet13
Sheet14
Sheet15
Sheet16
Sheet17
Sheet18
Other versions and copies of AF Form 66
Show all 20
Who attaches AF Form 66
| State | Files |
|---|---|
| Iowa | 1 |
| Massachusetts | 1 |
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .