AF3052
| 19.0 | ENGINEER'S REVISED FINAL | ||||||||||
| 1.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 1 | OF | ||||||
| CONTRACTOR | ADDRESS | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS, REPLACE ASF BLDG. 2019 | 0.00 | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| Attachment 5 FA5685-08-R-0024 | AKNR 05-1022 | ASF, BALGAT-ANKARA TURKIYE | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| R E C A P I T U L A T I O N | |||||||||||
| 1 | CIVIL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||
| 2 | ARCHITECTURAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||
| 3 | STRUCTURAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||
| 4 | MECHANICAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||
| 5 | ELECTRICAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||
| 0 | |||||||||||
| 0 | |||||||||||
| T O T A L | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008) | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| ENGINEER'S REVISED FINAL | |||||||||||
| 2.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 2 | OF | 0 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS, REPLACE ASF BLDG. 2019 | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| Attachment 5 FA5685-08-R-0024 | AKNR 05-1022 | ASF, BALGAT-ANKARA TURKIYE | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| CIVIL | 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 1 | REMOVAL OF EXISTING CONCRETE WALKING AREA | SM | |||||||||
| 2 | REMOVAL OF EXISTING GREEN AREA AND TREES | LS | |||||||||
| 3 | REMOVAL OF EXISTING FENCE AND FENCE GATE | SM | |||||||||
| 4 | REMOVAL OF EXISTING PLANTER | LS | |||||||||
| 5 | REMOVAL OF EXISTING CANOPY C/W ALL POSTS | LS | |||||||||
| 6 | EXCAVATION FOR SIDEWALK AND UTILITIES | CM | |||||||||
| 7 | RELOCATION OF WATER LINES, VALVES AND OTHER UTILITIES UNDER THE NEW BUILDINGS | LS | |||||||||
| 8 | NEW CONCRETE PAVEMENT | SM | |||||||||
| 9 | NEW GRASS AREA | SM | |||||||||
| 10 | PROVIDE AND INSTALL NEW FENCE C/W POST AND FOUNDATION | SM | |||||||||
| 11 | PROVIDE AND INSTALL SEWER MANHOLE C/W COVER | EA | |||||||||
| 12 | PROVIDE AND INSTALL Ø150 PVC SEWER LINE | LM | |||||||||
| 13 | PROVIDE AND INSTALL NEW WATER LINE | LM | |||||||||
| 14 | CONSTRUCT SAND BEDDING FOR UTILITIES | CM | |||||||||
| 15 | PROVIDE AND INSTALL VALVE AND VALVE BOX | EA | |||||||||
| 16 | CONSTRUCT NEW REINFORCED CONCRETE RETAINING WALL | LM | |||||||||
| AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008) | |||||||||||
| ENGINEER'S REVISED FINAL | |||||||||||
| 3.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 3 | OF | 0 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS, REPLACE ASF BLDG. 2019 | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| Attachment 5 FA5685-08-R-0024 | AKNR 05-1022 | ASF, BALGAT-ANKARA TURKIYE | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 17 | CONSTRUCTION OF COMPACTED BASE COURSE | SM | |||||||||
| 18 | CONSTRUCT 1.20 M WIDE NEW CONCRETE WALKWAY | LM | |||||||||
| 19 | PROVIDE AND INSTALL CONDENSATION WATER DRAINAGE PIT C/W GRATING AND REINFORCED CONCRETE WALL | LS | |||||||||
| 20 | PROVIDE AND PLANT ACACIA TREES | EA | |||||||||
| 21 | SITE CLEAN UP | LS | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| C I V I L T O T A L | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008) | |||||||||||
| ENGINEER'S REVISED FINAL | |||||||||||
| 4.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 4 | OF | 0 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS, REPLACE ASF BLDG. 2019 | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| Attachment 5 FA5685-08-R-0024 | AKNR 05-1022 | ASF, BALGAT-ANKARA TURKIYE | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| ARCHITECTURAL | 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 1 | REMOVAL OF EXISTING WALLS, CONCRETE ROOF & FLOOR SLABS AND FOUNDATION | LS | |||||||||
| 2 | REMOVAL OF EXISTING DOORS | EA | |||||||||
| 3 | REMOVAL OF EXISTING ROOF | SM | |||||||||
| 4 | REMOVAL OF EXISTING WINDOWS | EA | |||||||||
| 5 | CONSTRUCT HOLLOW CONCRETE MASONRY UNIT WALL, 19x19x39 CM REBAR AND GROUT | SM | |||||||||
| 6 | CONSTRUCT HOLLOW CONCRETE MASONRY UNIT WALL, 15x19x39 CM REBAR AND GROUT | SM | |||||||||
| 7 | CONSTRUCT HOLLOW CONCRETE MASONRY UNIT WALL, 9x19x39 CM REBAR AND GROUT | SM | |||||||||
| 8 | PROVIDE AND INSTALL READY MIXED COLORED PLASTER | SM | |||||||||
| 9 | PROVIDE AND APPLY EXTERIOR PLASTER (3 CM) | SM | |||||||||
| 10 | PROVIDE AND APPLY INTERIOR PLASTER | SM | |||||||||
| 11 | PROVIDE PAINT AND PAINT EXTERIOR WALLS ONE COAT OF PRIMER AND TWO COATS OF SILICON-BASED PAINT | SM | |||||||||
| 12 | PROVIDE AND INSTALL GYPSUM BOARD PARTITION WALL, DOUBLE LAYERS ON BOTH SIDES C/W RUNNERS, STUDS AND 5 CM THICK GLASWOOL INSULATION | SM | |||||||||
| 13 | PROVIDE PAINT AND PAINT INTERIOR WALLS ONE COAT OF PRIMER AND TWO COATS OF WATER BASED SATIN PAINT | SM | |||||||||
| 14 | PROVIDE AND INSTALL GYPSUM PANELING ON OUTSIDE WALLS C/W 5 CM RIGID TYPE GLASSWOOL INSULATION, 12.5 MM GYPSUM BOARD AND FURRING (12.5 CM) | SM | |||||||||
| 15 | PROVIDE AND INSTALL GALVANIZED STEEL DOWNSPOUT (DIA 100 MM) | LM | |||||||||
| 16 | PROVIDE AND INSTALL ZINC GUTTER #12 | LM | |||||||||
| AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008) | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| ENGINEER'S REVISED FINAL | |||||||||||
| 5.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 5 | OF | 0 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS, REPLACE ASF BLDG. 2019 | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| Attachment 5 FA5685-08-R-0024 | AKNR 05-1022 | ASF, BALGAT-ANKARA TURKIYE | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 17 | PROVIDE AND INSTALL COIL COATED GALVANIZED CLAMPED TYPE SHEET METAL ROOF PANEL | SM | |||||||||
| 18 | PROVIDE AND INSTALL NON-SKID CERAMIC FLOOR TILES | SM | |||||||||
| 19 | PROVIDE AND INSTALL CERAMIC WALL TILE, 20x20 CM | SM | |||||||||
| 20 | PROVIDE AND INSTALL CERAMIC COVE BASE | LM | |||||||||
| 21 | PROVIDE AND INSTALL CARPET TILE | SM | |||||||||
| 22 | PROVIDE AND INSTALL TERRAZZO TILE COVERING | SM | |||||||||
| 23 | PROVIDE AND INSTALL TERRAZZO COVEBASE | LM | |||||||||
| 24 | PROVIDE AND INSTALL WERZALITE COVEBASE | LM | |||||||||
| 25 | PROVIDE AND INSTALL WERZALITE WALL GUARD | LM | |||||||||
| 26 | PROVIDE AND INSTALL FIRE EXTINGUISHER CABINET | EA | |||||||||
| 27 | PROVIDE AND INSTALL SINGLE STEEL DOOR C/W FRAME, FINISH AND ALL HARDWARE (D1) | EA | |||||||||
| 28 | PROVIDE AND INSTALL SINGLE STEEL DOOR C/W FRAME, FINISH AND ALL HARDWARE (D1A) | EA | |||||||||
| 29 | PROVIDE AND INSTALL DOUBLE STEEL DOOR C/W FRAME, FINISH AND ALL HARDWARE (D2) | EA | |||||||||
| 30 | PROVIDE AND INSTALL SINGLE WOOD DOOR C/W FRAME, FINISH AND ALL HARDWARE (D3) | EA | |||||||||
| 31 | PROVIDE AND INSTALL SINGLE WOOD DOOR C/W FRAME, FINISH AND ALL HARDWARE (D4) | EA | |||||||||
| 32 | PROVIDE AND INSTALL SINGLE WOOD DOOR C/W FRAME, FINISH AND ALL HARDWARE (D5) | EA | |||||||||
| 33 | PROVIDE AND INSTALL SINGLE WOOD DOOR C/W FRAME, FINISH AND ALL HARDWARE (D6) | EA | |||||||||
| 34 | PROVIDE AND INSTALL SINGLE WOOD DOOR C/W FRAME, FINISH AND ALL HARDWARE (D7) | EA | |||||||||
| AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008) | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| ENGINEER'S REVISED FINAL | |||||||||||
| 6.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 6 | OF | 0 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS, REPLACE ASF BLDG. 2019 | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| Attachment 5 FA5685-08-R-0024 | AKNR 05-1022 | ASF, BALGAT-ANKARA TURKIYE | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 35 | PROVIDE AND INSTALL SINGLE WOOD DOOR C/W FRAME, FINISH AND ALL HARDWARE (D8) | EA | |||||||||
| 36 | PROVIDE AND INSTALL STEEL WINDOW C/W GLAZING, FRAME, FINISH AND ALL HARDWARE (W1) | EA | |||||||||
| 37 | PROVIDE AND INSTALL STEEL WINDOW C/W GLAZING, FRAME, FINISH AND ALL HARDWARE (W2) | EA | |||||||||
| 38 | PROVIDE AND INSTALL STEEL LOUVER C/W FRAME, FINISH AND ALL HARDWARE (L1) | EA | |||||||||
| 39 | PROVIDE AND APPLY WATER INSULATION (SIKA TOP SEAL 107) | SM | |||||||||
| 40 | PROVIDE AND INSTALL TISSUE HOLDER | EA | |||||||||
| 41 | PROVIDE AND INSTALL SOAP DISPANSER | EA | |||||||||
| 42 | PROVIDE AND INSTALL FLUSH MOUNTED, RECESSED PAPER TOWEL HOLDER AND GARBAGE CAN | EA | |||||||||
| 43 | PROVIDE AND INSTALL MIRROR | EA | |||||||||
| 44 | PROVIDE AND INSTALL MIRROR SHELVING | EA | |||||||||
| 45 | PROVIDE AND INSTALL HOOK | EA | |||||||||
| 46 | PROVIDE AND INSTALL SHOWER SEAT | EA | |||||||||
| 47 | PROVIDE AND INSTALL URINAL PARTITION | EA | |||||||||
| 48 | PROVIDE AND INSTALL SHOWER CURTAIN | EA | |||||||||
| 49 | PROVIDE AND INSTALL STAINLESS STEEL GRAB BAR | EA | |||||||||
| 50 | PROVIDE AND INSTALL STEEL HANDRAIL C/W EPOXY PAINTING FOR EXTERIOR STAIRCASE | LM | |||||||||
| 51 | PROVIDE AND INSTALL ACOUSTICAL SUSPENDED CEILING C/W SUSPENSION SYSTEM (60x60 CM) | SM | |||||||||
| 52 | PROVIDE AND INSTALL HUMIDITY RESISTANT SUSPENDED CEILING C/W SUSPENSION SYSTEM (60x60 CM) | SM | |||||||||
| AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008) | |||||||||||
| ENGINEER'S REVISED FINAL | |||||||||||
| 7.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 7 | OF | 0 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS, REPLACE ASF BLDG. 2019 | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| Attachment 5 FA5685-08-R-0024 | AKNR 05-1022 | ASF, BALGAT-ANKARA TURKIYE | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 53 | PROVIDE AND INSTALL GLASSWOOL INSULATION IN ATTIC SPACE (20 CM THICK) | SM | |||||||||
| 54 | PROVIDE AND INSTALL EXTRUDED POLYSTRENE INSULATION UNDER FOUNDATION SLAB (10 CM THICK) | SM | |||||||||
| 55 | PROVIDE AND INSTALL WATER INSULATION UNDER FOUNDATION SLAB (PLASTOBIT PP 300) | SM | |||||||||
| 56 | PROVIDE AND INSTALL VAPOR BARRIER OVER ROOF SLAB | SM | |||||||||
| 57 | PROVIDE AND INSTALL UPPER AND BASE CABINETS C/W LAMINATED COUNTER AND ALL ACCESSORIES | LS | |||||||||
| 58 | PROVIDE AND INSTALL NON-SKID SAND BLASTED ANDESITE COVERING FOR INTERIOR STAIRCASE | LS | |||||||||
| 59 | PROVIDE AND INSTALL LAMINATED WALL PARTITION C/W DOORS | SM | |||||||||
| 60 | PROVIDE AND INSTALL GYPSUM BOARD COVERING C/W STRUCTURAL SYSTEM | LS | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| A R C H I T E C T U R A L T O T A L | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008) | |||||||||||
| ENGINEER'S REVISED FINAL | |||||||||||
| 8.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 8 | OF | 0 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS, REPLACE ASF BLDG. 2019 | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| Attachment 5 FA5685-08-R-0024 | AKNR 05-1022 | ASF, BALGAT-ANKARA TURKIYE | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| STRUCTURAL | 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 1 | EXCAVATION C/W HAULWAY COMPACTION OF SUBGRADE | CM | |||||||||
| 2 | CONSTRUCT AGGREGATE BASE COURSE AND COMPACT | CM | |||||||||
| 3 | CONCRETE C/W RE-BARS St IIIb OR WIRE MESH Q 131, CONCRETE C25 WITH FORMWORK, INCLUDING EXTERIOR STAIRCASE | CM | |||||||||
| 4 | 0.5 MM THICK POLYETHYLENE SHEET | SM | |||||||||
| 5 | LEAN CONCRETE 200 DOSAGE | CM | |||||||||
| 6 | STEEL ROOF C/W WELDING, BOLTS AND PAINTING | KG | |||||||||
| 7 | CONCRETE EQUIPMENT PAD C/W RE-BARS, CONCRETE C25 INCLUDING FORMWORK | CM | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| S T R U C T U R A L T O T A L | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008) | |||||||||||
| ENGINEER'S REVISED FINAL | |||||||||||
| 9.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 9 | OF | 0 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS, REPLACE ASF BLDG. 2019 | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| Attachment 5 FA5685-08-R-0024 | AKNR 05-1022 | ASF, BALGAT-ANKARA TURKIYE | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| MECHANICAL | 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 1 | PROVIDE AND INSTALL PPRC DOMESTIC COLD WATER PIPE C/W FITTINGS, 1/2" | LM | |||||||||
| 2 | PROVIDE AND INSTALL PPRC DOMESTIC COLD WATER PIPE C/W FITTINGS, 3/4" | LM | |||||||||
| 3 | PROVIDE AND INSTALL PPRC DOMESTIC COLD WATER PIPE C/W FITTINGS, 1" | LM | |||||||||
| 4 | PROVIDE AND INSTALL PPRC DOMESTIC COLD WATER PIPE C/W FITTINGS, 1-1/4" | LM | |||||||||
| 5 | PROVIDE AND INSTALL PPRC DOMESTIC COLD WATER PIPE C/W FITTINGS, 1-1/2" | LM | |||||||||
| 6 | PROVIDE AND INSTALL PPRC DOMESTIC HOT WATER PIPE C/W FITTINGS, 1/2" | LM | |||||||||
| 7 | PROVIDE AND INSTALL PPRC DOMESTIC HOT WATER PIPE C/W FITTINGS, 3/4" | LM | |||||||||
| 8 | PROVIDE AND INSTALL PPRC DOMESTIC HOT WATER PIPE C/W FITTINGS, 1-1/4" | LM | |||||||||
| 9 | PROVIDE AND INSTALL ELASTOMERIC RUBBER INSULATION FOR PIPES, 1/2" | LM | |||||||||
| 10 | PROVIDE AND INSTALL ELASTOMERIC RUBBER INSULATION FOR PIPES, 3/4" | LM | |||||||||
| 11 | PROVIDE AND INSTALL ELASTOMERIC RUBBER INSULATION FOR PIPES, 1" | LM | |||||||||
| 12 | PROVIDE AND INSTALL ELASTOMERIC RUBBER INSULATION FOR PIPES, 1-1/4" | LM | |||||||||
| 13 | PROVIDE AND INSTALL ELASTOMERIC RUBBER INSULATION FOR PIPES, 1-1/2" | LM | |||||||||
| 14 | PROVIDE AND INSTALL 50 MM PVC WASTE WATER PIPE C/W FITTINGS | LM | |||||||||
| 15 | PROVIDE AND INSTALL 70 MM PVC WASTE WATER PIPE C/W FITTINGS | LM | |||||||||
| 16 | PROVIDE AND INSTALL 100 MM PVC WASTE WATER PIPE C/W FITTINGS | LM | |||||||||
| AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008) | |||||||||||
| ENGINEER'S REVISED FINAL | |||||||||||
| 10.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 10 | OF | 0 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS, REPLACE ASF BLDG. 2019 | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| Attachment 5 FA5685-08-R-0024 | AKNR 05-1022 | ASF, BALGAT-ANKARA TURKIYE | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 17 | PROVIDE AND INSTALL 50 MM PVC VENT PIPE C/W FITTINGS | LM | |||||||||
| 18 | PROVIDE AND INSTALL 70 MM PVC VENT PIPE C/W FITTINGS | LM | |||||||||
| 19 | PROVIDE AND INSTALL 100 MM PVC VENT PIPE C/W FITTINGS | LM | |||||||||
| 20 | PROVIDE AND INSTALL WATER CLOSET FOR HANDICAPPED C/W FLUSH TANK | EA | |||||||||
| 21 | PROVIDE AND INSTALL WATER CLOSET C/W COVER, FLUSH TANK | EA | |||||||||
| 22 | PROVIDE AND INSTALL EASTERN TYPE TOILET C/W FLUSH SYSTEM | EA | |||||||||
| 23 | PROVIDE AND INSTALL FLOOR DRAIN | EA | |||||||||
| 24 | PROVIDE AND INSTALL SHOWER, C/W FIXTURE, VALVES & TRAP | EA | |||||||||
| 25 | PROVIDE AND INSTALL SHOWER FOR HANDICAPPED, C/W FIXTURE, VALVES & TRAP | EA | |||||||||
| 26 | PROVIDE AND INSTALL SERVICE SINK C/W FAUCET, VALVES & TRAP | EA | |||||||||
| 27 | PROVIDE AND INSTALL URINAL WITH AUTOMATIC FLUSH SYSTEM | EA | |||||||||
| 28 | PROVIDE AND INSTALL FROST PROOF HOSE BIBB, C/W VACUUM BREAKER | EA | |||||||||
| 29 | PROVIDE AND INSTALL WATER HAMMER ARRESTOR | EA | |||||||||
| 30 | PROVIDE AND INSTALL WALL TYPE EXHAUST FAN, 50 l/s | EA | |||||||||
| 31 | PROVIDE AND INSTALL WALL TYPE EXHAUST FAN, 150 l/s | EA | |||||||||
| 32 | PROVIDE AND INSTALL INLINE DUCT FAN, 50 l/s | EA | |||||||||
| 33 | PROVIDE AND INSTALL LAVATORY C/W FAUCET, VALVES AND TRAP | EA | |||||||||
| 34 | PROVIDE AND INSTALL LAVATORY FOR HANDICAPPED C/W FAUCET, VALVES AND TRAP | EA | |||||||||
| AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008) | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| ENGINEER'S REVISED FINAL | |||||||||||
| 11.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 11 | OF | 0 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS, REPLACE ASF BLDG. 2019 | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| Attachment 5 FA5685-08-R-0024 | AKNR 05-1022 | ASF, BALGAT-ANKARA TURKIYE | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 35 | PROVIDE AND INSTALL FAN COIL UNIT, 1.00 kW C/W VALVES AND ACCESSORIES | EA | 0.00 | ||||||||
| 36 | PROVIDE AND INSTALL FAN COIL UNIT, 2.00 kW C/W VALVES AND ACCESSORIES | EA | 0.00 | ||||||||
| 37 | PROVIDE AND INSTALL FAN COIL UNIT, 2.4 kW C/W VALVES AND ACCESSORIES | EA | 0.00 | ||||||||
| 38 | PROVIDE AND INSTALL FAN COIL UNIT, 3.8 kW C/W VALVES AND ACCESSORIES | EA | 0.00 | ||||||||
| 39 | PROVIDE AND INSTALL FAN COIL UNIT, 6.2 kW C/W VALVES AND ACCESSORIES | EA | 0.00 | ||||||||
| 40 | PROVIDE AND INSTALL 20 MM CONDENSATE PIPING FOR SPLIT A/C UNITS | LM | 0.00 | ||||||||
| 41 | PROVIDE AND INSTALL 32 MM CONDENSATE PIPING FOR SPLIT A/C UNITS | LM | 0.00 | ||||||||
| 42 | PROVIDE AND INSTALL HOT WATER BOILER, C/W BURNER, CONTROL PANEL AND SENSORS | EA | 0.00 | ||||||||
| 43 | PROVIDE AND INSTALL DOUBLE WALLED STAINLESS STEEL CHIMNEY C/W INSULATION | EA | 0.00 | ||||||||
| 44 | PROVIDE AND INSTALL HOT WATER CIRCULATION PUMP FOR FCU SYSTEM | EA | 0.00 | ||||||||
| 45 | PROVIDE AND INSTALL HOT WATER CIRCULATION PUMP FOR DOMESTIC USE | EA | 0.00 | ||||||||
| 46 | PROVIDE AND INSTALL HOT WATER CIRCULATION PUMP FOR HEAT EXCHANGER | EA | 0.00 | ||||||||
| 47 | PROVIDE AND INSTALL EXPANSION TANK, 24 L | EA | 0.00 | ||||||||
| 48 | PROVIDE AND INSTALL EXPANSION TANK, 80 L | EA | 0.00 | ||||||||
| 49 | PROVIDE AND INSTALL PLATE TYPE HEAT EXCHANGER | EA | 0.00 | ||||||||
| 50 | PROVIDE AND INSTALL PPRC PIPING FOR FAN COIL PIPING 3/4", C/W INSULATION | LM | 0.00 | ||||||||
| 51 | PROVIDE AND INSTALL PPRC PIPING FOR FAN COIL PIPING 1", C/W INSULATION | LM | 0.00 | ||||||||
| 52 | PROVIDE AND INSTALL PPRC PIPING FOR FAN COIL PIPING 1-1/2", C/W INSULATION | LM | 0.00 | ||||||||
| AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008) | |||||||||||
| ENGINEER'S REVISED FINAL | |||||||||||
| 12.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 12 | OF | 0 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS, REPLACE ASF BLDG. 2019 | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| Attachment 5 FA5685-08-R-0024 | AKNR 05-1022 | ASF, BALGAT-ANKARA TURKIYE | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 53 | PROVIDE AND INSTALL PPRC PIPING FOR FAN COIL PIPING 2", C/W INSULATION | LM | 0.00 | ||||||||
| 54 | PROVIDE AND INSTALL PPRC PIPING FOR HEATING 2-1/2", C/W INSULATION | LM | 0.00 | ||||||||
| 55 | PROVIDE AND INSTALL PPRC PIPING FOR HEATING 1-1/4", C/W INSULATION | LM | 0.00 | ||||||||
| 56 | PROVIDE AND INSTALL PPRC PIPING FOR HEATING 1", C/W INSULATION | LM | 0.00 | ||||||||
| 57 | PROVIDE AND INSTALL KITCHEN HOOD C/W EXHAUST FAN AND FIRE SUPPRESSION SYSTEM | EA | 0.00 | ||||||||
| 58 | PROVIDE AND INSTALL DOUBLE WALLED FUEL PIPING C/W INSULATION, FUEL FILTER AND VALVES | LS | 0.00 | ||||||||
| 59 | PROVIDE AND INSTALL DOUBLE WALLED FUEL STORAGE TANK C/W LEAK DETECTION SYSTEM AND INSULATION | EA | 0.00 | ||||||||
| 60 | PROVIDE AND INSTALL SPRINKLER PIPING C/W FITTINGS, 1" | LM | 0.00 | ||||||||
| 61 | PROVIDE AND INSTALL SPRINKLER PIPING C/W FITTINGS, 1-1/4" | LM | 0.00 | ||||||||
| 62 | PROVIDE AND INSTALL SPRINKLER PIPING C/W FITTINGS, 2" | LM | 0.00 | ||||||||
| 63 | PROVIDE AND INSTALL SPRINKLER PIPING C/W FITTINGS, 3" | LM | 0.00 | ||||||||
| 64 | PROVIDE AND INSTALL SPRINKLER PIPING C/W FITTINGS, 4" | LM | 0.00 | ||||||||
| 65 | PROVIDE AND INSTALL PENDANT SPRINKLER HEADS | EA | 0.00 | ||||||||
| 66 | PROVIDE AND INSTALL UPRIGHT SPRINKLER HEADS | EA | 0.00 | ||||||||
| 67 | PROVIDE AND INSTALL FLOW SWITCH | EA | 0.00 | ||||||||
| 68 | PROVIDE AND INSTALL WET ALARM VALVE, C/W ACCESSORIES AND TRIM, 4" | EA | 0.00 | ||||||||
| 69 | PROVIDE AND INSTALL BUITERFLY VALVE, 3" | EA | 0.00 | ||||||||
| 70 | PROVIDE AND INSTALL CHECK VALVE, 4" | EA | 0.00 | ||||||||
| AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008) | |||||||||||
| ENGINEER'S REVISED FINAL | |||||||||||
| 13.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 13 | OF | 0 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS, REPLACE ASF BLDG. 2019 | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| Attachment 5 FA5685-08-R-0024 | AKNR 05-1022 | ASF, BALGAT-ANKARA TURKIYE | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 71 | PROVIDE AND INSTALL BACKFLOW PREVENTER AND STRAINER, 4" | EA | 0.00 | ||||||||
| 72 | PROVIDE AND INSTALL BACKFLOW PREVENTER AND STRAINER, 1- 1/4" | EA | 0.00 | ||||||||
| 73 | PROVIDE AND INSTALL POST INDICATOR VALVE, 4" | EA | 0.00 | ||||||||
| 74 | PROVIDE AND INSTALL FIRE TRUCK CONNECTION, 4" | EA | 0.00 | ||||||||
| 75 | PROVIDE AND INSTALL TEST VALVE, 1" | EA | 0.00 | ||||||||
| 76 | PROVIDE AND INSTALL WATER MOTOR ALARM C/W RETARD CHAMBER AND ACCESSORIES | EA | 0.00 | ||||||||
| 77 | PROVIDE AND INSTALL BALL VALVE, 3/4" | EA | 0.00 | ||||||||
| 78 | PROVIDE AND INSTALL BALL VALVE, 1" | EA | 0.00 | ||||||||
| 79 | PROVIDE AND INSTALL BALL VALVE, 1-1/4" | EA | 0.00 | ||||||||
| 80 | PROVIDE AND INSTALL BALL VALVE, 1-1/2" | EA | 0.00 | ||||||||
| 81 | PROVIDE AND INSTALL BALL VALVE, 2" | EA | 0.00 | ||||||||
| 82 | PROVIDE AND INSTALL BALL VALVE, 2-1/2" | EA | 0.00 | ||||||||
| 83 | PROVIDE AND INSTALL STRAINER, 3/4" | EA | 0.00 | ||||||||
| 84 | PROVIDE AND INSTALL STRAINER, 2-1/2" | EA | 0.00 | ||||||||
| 85 | PROVIDE AND INSTALL CHECK VALVE, 1-1/4" | EA | 0.00 | ||||||||
| 86 | PROVIDE AND INSTALL CHECK VALVE, 3/4" | EA | 0.00 | ||||||||
| 87 | PROVIDE AND INSTALL CHECK VALVE, 2" | EA | 0.00 | ||||||||
| 88 | PROVIDE AND INSTALL THREE WAY VALVE, 1-1/4" | EA | 0.00 | ||||||||
| AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008) | |||||||||||
| ENGINEER'S REVISED FINAL | |||||||||||
| 14.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 14 | OF | 0 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS, REPLACE ASF BLDG. 2019 | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| Attachment 5 FA5685-08-R-0024 | AKNR 05-1022 | ASF, BALGAT-ANKARA TURKIYE | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 89 | PROVIDE AND INSTALL THREE WAY VALVE, 2" | EA | 0.00 | ||||||||
| 90 | INSTALL GFM SPLIT INDOOR AND OUTDOOR UNITS C/W GAS CHARGING | EA | 0.00 | ||||||||
| 91 | REMOVAL OF EXISTING OF EXISTING ASBESTOS CONTAINING MATERIAL INSULATION IN EXISTING MECHANICAL ROOM | LS | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| M E C H A N I C A L T O T A L | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008) | |||||||||||
| ENGINEER'S REVISED FINAL | |||||||||||
| 15.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 15 | OF | 0 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS, REPLACE ASF BLDG. 2019 | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| Attachment 5 FA5685-08-R-0024 | AKNR 05-1022 | ASF, BALGAT-ANKARA TURKIYE | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| ELECTRICAL | 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 1 | REMOVAL OF ELECTRICAL LINES | LS | 0.00 | ||||||||
| 2 | PROVIDE AND INSTALL CIRCUIT BREAKER FOR MAIN PANEL 3x200A, 36 kA IN TRANSFORMER SUBSTATION | EA | 0.00 | ||||||||
| 3 | PROVIDE AND INSTALL NEW FEEDER CABLE 3(1x150)+70 MM2 NYY | LM | 0.00 | ||||||||
| 4 | PROVIDE AND INSTALL FEEDER CABLE, 3x95+50 MM2 NYY | LM | 0.00 | ||||||||
| 5 | PROVIDE AND INSTALL FEEDER CABLE, 3x35+16 MM2 NYY | LM | 0.00 | ||||||||
| 6 | PROVIDE AND INSTALL MAIN PANEL, PANEL MP | EA | 0.00 | ||||||||
| 7 | PROVIDE AND INSTALL MAIN DISTRIBUTION PANEL, PANEL MDP | EA | 0.00 | ||||||||
| 8 | PROVIDE AND INSTALL MAIN EMERGENCY DISTRIBUTION PANEL, PANEL MDP1 | EA | 0.00 | ||||||||
| 9 | PROVIDE AND INSTALL 6 MM2 CU, GROUNDING CABLE | LM | 0.00 | ||||||||
| 10 | PROVIDE AND INSTALL 25 MM2 CU, GROUNDING CABLE | LM | 0.00 | ||||||||
| 11 | PROVIDE AND INSTALL 50 MM2 CU, MAIN GROUNDING CABLE | LM | 0.00 | ||||||||
| 12 | PROVIDE AND INSTALL 1x16 MM2 NYY FOR COMMUNICATION GROUNDING CABLE | LM | 0.00 | ||||||||
| 13 | PROVIDE AND INSTALL BOILER PANEL, PANEL BP | EA | 0.00 | ||||||||
| 14 | PROVIDE AND INSTALL LIGHTING AND RECEPTACLE PANEL, PANEL L1 | EA | 0.00 | ||||||||
| 15 | PROVIDE AND INSTALL LIGHTING AND RECEPTACLE PANEL, PANEL L2 | EA | 0.00 | ||||||||
| 16 | PROVIDE AND INSTALL POWER PANEL, PANEL P1 | EA | 0.00 | ||||||||
| AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008) | |||||||||||
| ENGINEER'S REVISED FINAL | |||||||||||
| 16.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 16 | OF | 0 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS, REPLACE ASF BLDG. 2019 | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| Attachment 5 FA5685-08-R-0024 | AKNR 05-1022 | ASF, BALGAT-ANKARA TURKIYE | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 17 | PROVIDE AND INSTALL POWER PANEL, PANEL P2 | EA | 0.00 | ||||||||
| 18 | PROVIDE AND INSTALL SURFACE-MOUNTED WEATHERPROOF 2x36 W FLUORESCENT LIGHTING FIXTURE WITH PRISMATIC POLYCARBONATE COVER | EA | 0.00 | ||||||||
| 19 | PROVIDE AND INSTALL RECESSED 4x18 W FLUORESCENT LIGHTING FIXTURE | EA | 0.00 | ||||||||
| 20 | PROVIDE AND INSTALL HIGH PRESSURE SODIUM VAPOR LIGHT FIXTURE, SON-T70W | EA | 0.00 | ||||||||
| 21 | PROVIDE AND INSTALL CEILING TYPE LIGHT FIXTURE, PL-C 1x26 W | EA | 0.00 | ||||||||
| 22 | PROVIDE AND INSTALL BATTEN FLUORESCENT LIGHT FIXTURE, PL-L 1x36 W | EA | 0.00 | ||||||||
| 23 | PROVIDE AND INSTALL EMERGENCY POWER PACK FOR FLUORESCENT LIGHT FIXTURE 2x36 W | EA | 0.00 | ||||||||
| 24 | PROVIDE AND INSTALL LIGHT SWITCH | EA | 0.00 | ||||||||
| 25 | PROVIDE AND INSTALL WEATHERPROOF LIGHT SWITCH | EA | 0.00 | ||||||||
| 26 | PROVIDE AND INSTALL DOUBLE POLE, DOUBLE THROW LIGHT SWITCH | EA | 0.00 | ||||||||
| 27 | PROVIDE AND INSTALL FAN SWITCH | EA | 0.00 | ||||||||
| 28 | PROVIDE AND INSTALL EXIT LIGHT C/W BATERIES CHARGER UNIT AND LAMP | EA | 0.00 | ||||||||
| 29 | PROVIDE AND INSTALL PHOTOCELL EYE | EA | 0.00 | ||||||||
| 30 | PROVIDE AND INSTALL DUPLEX RECEPTACLE, 16 A, 220 VAC | EA | 0.00 | ||||||||
| 31 | PROVIDE AND INSTALL WEATHERPROOF DUPLEX RECEPTACLE, 16 A, 220 VAC | EA | 0.00 | ||||||||
| 32 | PROVIDE AND INSTALL SINGLE RECEPTACLE, 16 A, 220 VAC | EA | 0.00 | ||||||||
| 33 | PROVIDE AND INSTALL FAN COIL SINGLE RECEPTACLE, 16 A, 220 VAC | EA | 0.00 | ||||||||
| 34 | PROVIDE AND INSTALL WEATHERPROOF THREE PHASE RECEPTACLE, 32 A, 220 VAC | EA | 0.00 | ||||||||
| AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008) | |||||||||||
| ENGINEER'S REVISED FINAL | |||||||||||
| 17.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 17 | OF | 0 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS, REPLACE ASF BLDG. 2019 | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| Attachment 5 FA5685-08-R-0024 | AKNR 05-1022 | ASF, BALGAT-ANKARA TURKIYE | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 35 | PROVIDE AND INSTALL NEMA TYPE RECEPTACLE FOR OVEN, 220 VAC, 50 A | EA | |||||||||
| 36 | PROVIDE AND INSTALL WEATHERPROOF DISCONNECT SWITCH | EA | |||||||||
| 37 | PROVIDE AND INSTALL DISCONNECT SWITCH | EA | |||||||||
| 38 | PROVIDE AND INSTALL ADDRESABLE FIRE ALARM CONTROL PANEL | EA | |||||||||
| 39 | PROVIDE AND INSTALL ADDRESSABLE MANUAL PULL STATION | EA | |||||||||
| 40 | PROVIDE AND INSTALL ADDRESSABLE MANUAL PULL STATION, WEATHERPROOF | EA | |||||||||
| 41 | PROVIDE AND INSTALL ADDRESSABLE FIRE ALARM HORN WITH STROBE LIGHT | EA | |||||||||
| 42 | PROVIDE AND INSTALL ADDRESSABLE FIRE ALARM HORN WITH STROBE LIGHT, WEATHERPROOF | EA | |||||||||
| 43 | PROVIDE AND INSTALL FIRE ALARM STROBE LIGHT | EA | |||||||||
| 44 | PROVIDE AND INSTALL SMOKE DETECTOR | EA | |||||||||
| 45 | PROVIDE AND INSTALL FIRE ALARM STROBE LIGHT, WEATHERPROOF | EA | |||||||||
| 46 | PROVIDE AND INSTALL MONITOR MODULE | EA | |||||||||
| 47 | PROVIDE AND INSTALL DUPLEX OUTLET, TELEPHONE AND LAN, RJ 45 | EA | |||||||||
| 48 | PROVIDE AND INSTALL SINGLE WALL PHONE OUTLET, RJ 45 | EA | |||||||||
| 49 | PROVIDE AND INSTALL 1x1.5 MM2 HO5SJ-K (SIAF-GL) HEAT RESISTANT CABLE | LM | |||||||||
| 50 | PROVIDE AND INSTALL 25 PAIR 22 AWG BFCAY TYPE CABLE | LM | |||||||||
| 51 | PROVIDE AND INSTALL CAT 5E UTP, 4x2x24 AWG, TELEPHONE CABLE | LM | |||||||||
| 52 | PROVIDE AND INSTALL 1.5 MM2 NYA CABLE | LM | |||||||||
| AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008) | |||||||||||
| ENGINEER'S REVISED FINAL | |||||||||||
| 18.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 18 | OF | 0 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS, REPLACE ASF BLDG. 2019 | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| Attachment 5 FA5685-08-R-0024 | AKNR 05-1022 | ASF, BALGAT-ANKARA TURKIYE | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 53 | PROVIDE AND INSTALL 2.5 MM2 NYA CABLE | LM | |||||||||
| 54 | PROVIDE AND INSTALL 4 MM2 NYA CABLE | LM | |||||||||
| 55 | PROVIDE AND INSTALL 6 MM2 NYA CABLE | LM | |||||||||
| 56 | PROVIDE AND INSTALL 10 MM2 NYA CABLE | LM | |||||||||
| 57 | PROVIDE AND INSTALL 16 MM2 NYA CABLE | LM | |||||||||
| 58 | PROVIDE AND INSTALL 1/2" LIQUID TYGHT FLEXIBLE CONDUIT | LM | |||||||||
| 59 | PROVIDE AND INSTALL 1/2" ELECTRICAL METALLING TUBING (EMT) | LM | |||||||||
| 60 | PROVIDE AND INSTALL 3/4" ELECTRICAL METALLING TUBING (EMT) | LM | |||||||||
| 61 | PROVIDE AND INSTALL 4" GALVANIZED RIGID STEEL PIPE WITH FITTINGS | LM | |||||||||
| 62 | PROVIDE AND INSTALL 2" GALVANIZED RIGID STEEL PIPE WITH FITTINGS | LM | |||||||||
| 63 | EXCAVATION AND BACKFILLING | CM | |||||||||
| 64 | PROVIDE AND INSTALL COMMUNICATION CABINET (COMPLETE) | EA | |||||||||
| 65 | PROVIDE AND INSTALL COMMUNICATION BOX | EA | |||||||||
| 66 | PROVIDE AND INSTALL 3 M-2 TYPE CLOSURE KIT FOR COMMUNICATION LINE | EA | |||||||||
| 67 | PROVIDE AND INSTALL CABLE TRAY, 10x5 CM | LM | |||||||||
| 68 | PROVIDE AND INSTALL CABLE TRAY, 20x5 CM | LM | |||||||||
| 69 | PROVIDE AND INSTALL GROUND ROD, SOLID COPPER, 3.30 M, 20 MM DIA | EA | |||||||||
| 70 | CONSTRUCT GROUNDING INSPECTION PIT WITH CAST IRON COVER | EA | |||||||||
| AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008) | |||||||||||
| FOR OFFICIAL USE ONLY | |||||||||||
| ENGINEER'S REVISED FINAL | |||||||||||
| 19.0 | CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET | NO | 19 | OF | 0 | |||||
| CONTRACTOR | ADDRESS | ||||||||||
| 0.00 | 0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| CNS, REPLACE ASF BLDG. 2019 | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| Attachment 5 FA5685-08-R-0024 | AKNR 05-1022 | ASF, BALGAT-ANKARA TURKIYE | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 71 | CONSTRUCT 1X4 " CONCRETE ENCASED DUCT LINE NEAR EXISTING DUCT LINE | M | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | |||||||||
| E L E C T R I C A L T O T A L | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008) | |||||||||||
| FOR OFFICIAL USE ONLY |
AF3052back
| INSTRUCTIONS FOR COMPLETING Form INC-1101 | |||||
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to | |||||
| permit itemizing of all direct costs. | |||||
| Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples : square yards - SY, cubic yards - CY, square | |||||
| feet - SF, linear feet - LF, board feet - BF, each - EA, pound -LB). | |||||
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be | |||||
| funished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract | |||||
| will be issued. Otherwise, the contractor is responsible for determining quantity estimates. | |||||
| Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1. | |||||
| Col 6, 7 and 8 Labor Costs. Enter in Col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. | |||||
| Enter in Col 7 the average rate per manhour (manday) and in Col 8 the total labor cost. | |||||
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract | |||||
| and of significant dollar value. | |||||
| Col 10 Line Total. Self-explanatory. | |||||
| NOTE: In addition to the other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last | |||||
| page as follows. | |||||
| TOTAL MATERIAL COSTS | $ | ||||
| ------------------------------- | |||||
| TOTAL LABOR COSTS | $ | ||||
| ------------------------------- | |||||
| TOTAL OTHER DIRECT COSTS | $ | ||||
| ------------------------------- | |||||
| TOTAL COSTS | $ | ||||
| ------------------------------- | |||||
| OVERHEAD | % | $ | |||
| ------------------------------- | |||||
| SUBTOTAL | $ | ||||
| ------------------------------- | |||||
| PROFIT | % | $ | |||
| ------------------------------- | |||||
| TOTAL PRICE | $ | ||||
| ------------------------------- | |||||
| DATE : | FIRM NAME | ||||
| ----------------------------------------------------------------- | |||||
| TITLE: | BY | ||||
| ---------------------------------------------------------- | ----------------------------------------------------------------- | ||||
| INSTRUCTIONS TO OFFERORS | |||||
| 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and | |||||
| estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from | |||||
| this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data | |||||
| (see ASPR 3-807.3(e) and 3-807.4). | |||||
| 2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this | |||||
| form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and | |||||
| analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of | |||||
| a. The existing, verifiable data. | |||||
| b. The judgmental factors applied in projecting from known data to the estimate, and | |||||
| c. The contingencies used by the offeror in his proposed price. | |||||
| In short, the offeror's estimating process itself needs to be disclosed. | |||||
| 3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), | |||||
| and made available to the contracting officer or his authorized representative upon request. | |||||
| 4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the | |||||
| purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate | |||||
| evaluation of such cost or pricing data, along with the computations and projections used herein. This right may be exercised in connection | |||||
| with any negotiations prior to contract award. | |||||
| (Reverse of Form INC-1101, Rev 0, May 08) |
Sheet1
Sheet2
Sheet3
Other versions and copies of AF Form 3052
Show all 20
Who attaches AF Form 3052
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .