AF3052

19.0ENGINEER'S REVISED FINAL
1.0CONSTRUCTION COST ESTIMATE BREAKDOWNSHEETNO1OF
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
CNS, REPLACE ASF BLDG. 20190.00
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
Attachment 5 FA5685-08-R-0024AKNR 05-1022ASF, BALGAT-ANKARA TURKIYE
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMANDAYSAVERAGETOTALDIRECTTOTAL
RATECOSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
R E C A P I T U L A T I O N
1CIVIL0.000.000.000.000.00
2ARCHITECTURAL0.000.000.000.000.00
3STRUCTURAL0.000.000.000.000.00
4MECHANICAL0.000.000.000.000.00
5ELECTRICAL0.000.000.000.000.00
0
0
T O T A L0.000.000.000.000.00
AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008)
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
ENGINEER'S REVISED FINAL
2.0CONSTRUCTION COST ESTIMATE BREAKDOWNSHEETNO2OF0
CONTRACTORADDRESS
0.000.00
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
CNS, REPLACE ASF BLDG. 2019
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
Attachment 5 FA5685-08-R-0024AKNR 05-1022ASF, BALGAT-ANKARA TURKIYE
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMANDAYSAVERAGETOTALDIRECTTOTAL
RATECOSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
CIVIL0.000.000.00
0.000.000.00
1REMOVAL OF EXISTING CONCRETE WALKING AREASM
2REMOVAL OF EXISTING GREEN AREA AND TREESLS
3REMOVAL OF EXISTING FENCE AND FENCE GATESM
4REMOVAL OF EXISTING PLANTERLS
5REMOVAL OF EXISTING CANOPY C/W ALL POSTSLS
6EXCAVATION FOR SIDEWALK AND UTILITIESCM
7RELOCATION OF WATER LINES, VALVES AND OTHER UTILITIES UNDER THE NEW BUILDINGSLS
8NEW CONCRETE PAVEMENTSM
9NEW GRASS AREASM
10PROVIDE AND INSTALL NEW FENCE C/W POST AND FOUNDATIONSM
11PROVIDE AND INSTALL SEWER MANHOLE C/W COVEREA
12PROVIDE AND INSTALL Ø150 PVC SEWER LINELM
13PROVIDE AND INSTALL NEW WATER LINELM
14CONSTRUCT SAND BEDDING FOR UTILITIESCM
15PROVIDE AND INSTALL VALVE AND VALVE BOXEA
16CONSTRUCT NEW REINFORCED CONCRETE RETAINING WALLLM
AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008)
ENGINEER'S REVISED FINAL
3.0CONSTRUCTION COST ESTIMATE BREAKDOWNSHEETNO3OF0
CONTRACTORADDRESS
0.000.00
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
CNS, REPLACE ASF BLDG. 2019
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
Attachment 5 FA5685-08-R-0024AKNR 05-1022ASF, BALGAT-ANKARA TURKIYE
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMANDAYSAVERAGETOTALDIRECTTOTAL
RATECOSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
17CONSTRUCTION OF COMPACTED BASE COURSESM
18CONSTRUCT 1.20 M WIDE NEW CONCRETE WALKWAYLM
19PROVIDE AND INSTALL CONDENSATION WATER DRAINAGE PIT C/W GRATING AND REINFORCED CONCRETE WALLLS
20PROVIDE AND PLANT ACACIA TREESEA
21SITE CLEAN UPLS
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
C I V I L T O T A L0.000.000.000.000.00
AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008)
ENGINEER'S REVISED FINAL
4.0CONSTRUCTION COST ESTIMATE BREAKDOWNSHEETNO4OF0
CONTRACTORADDRESS
0.000.00
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
CNS, REPLACE ASF BLDG. 2019
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
Attachment 5 FA5685-08-R-0024AKNR 05-1022ASF, BALGAT-ANKARA TURKIYE
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMANDAYSAVERAGETOTALDIRECTTOTAL
RATECOSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
ARCHITECTURAL0.000.000.00
0.000.000.00
1REMOVAL OF EXISTING WALLS, CONCRETE ROOF & FLOOR SLABS AND FOUNDATIONLS
2REMOVAL OF EXISTING DOORSEA
3REMOVAL OF EXISTING ROOFSM
4REMOVAL OF EXISTING WINDOWSEA
5CONSTRUCT HOLLOW CONCRETE MASONRY UNIT WALL, 19x19x39 CM REBAR AND GROUTSM
6CONSTRUCT HOLLOW CONCRETE MASONRY UNIT WALL, 15x19x39 CM REBAR AND GROUTSM
7CONSTRUCT HOLLOW CONCRETE MASONRY UNIT WALL, 9x19x39 CM REBAR AND GROUTSM
8PROVIDE AND INSTALL READY MIXED COLORED PLASTERSM
9PROVIDE AND APPLY EXTERIOR PLASTER (3 CM)SM
10PROVIDE AND APPLY INTERIOR PLASTERSM
11PROVIDE PAINT AND PAINT EXTERIOR WALLS ONE COAT OF PRIMER AND TWO COATS OF SILICON-BASED PAINTSM
12PROVIDE AND INSTALL GYPSUM BOARD PARTITION WALL, DOUBLE LAYERS ON BOTH SIDES C/W RUNNERS, STUDS AND 5 CM THICK GLASWOOL INSULATIONSM
13PROVIDE PAINT AND PAINT INTERIOR WALLS ONE COAT OF PRIMER AND TWO COATS OF WATER BASED SATIN PAINTSM
14PROVIDE AND INSTALL GYPSUM PANELING ON OUTSIDE WALLS C/W 5 CM RIGID TYPE GLASSWOOL INSULATION, 12.5 MM GYPSUM BOARD AND FURRING (12.5 CM)SM
15PROVIDE AND INSTALL GALVANIZED STEEL DOWNSPOUT (DIA 100 MM)LM
16PROVIDE AND INSTALL ZINC GUTTER #12LM
AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008)
FOR OFFICIAL USE ONLY
ENGINEER'S REVISED FINAL
5.0CONSTRUCTION COST ESTIMATE BREAKDOWNSHEETNO5OF0
CONTRACTORADDRESS
0.000.00
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
CNS, REPLACE ASF BLDG. 2019
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
Attachment 5 FA5685-08-R-0024AKNR 05-1022ASF, BALGAT-ANKARA TURKIYE
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMANDAYSAVERAGETOTALDIRECTTOTAL
RATECOSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
17PROVIDE AND INSTALL COIL COATED GALVANIZED CLAMPED TYPE SHEET METAL ROOF PANELSM
18PROVIDE AND INSTALL NON-SKID CERAMIC FLOOR TILESSM
19PROVIDE AND INSTALL CERAMIC WALL TILE, 20x20 CMSM
20PROVIDE AND INSTALL CERAMIC COVE BASELM
21PROVIDE AND INSTALL CARPET TILESM
22PROVIDE AND INSTALL TERRAZZO TILE COVERINGSM
23PROVIDE AND INSTALL TERRAZZO COVEBASELM
24PROVIDE AND INSTALL WERZALITE COVEBASELM
25PROVIDE AND INSTALL WERZALITE WALL GUARDLM
26PROVIDE AND INSTALL FIRE EXTINGUISHER CABINETEA
27PROVIDE AND INSTALL SINGLE STEEL DOOR C/W FRAME, FINISH AND ALL HARDWARE (D1)EA
28PROVIDE AND INSTALL SINGLE STEEL DOOR C/W FRAME, FINISH AND ALL HARDWARE (D1A)EA
29PROVIDE AND INSTALL DOUBLE STEEL DOOR C/W FRAME, FINISH AND ALL HARDWARE (D2)EA
30PROVIDE AND INSTALL SINGLE WOOD DOOR C/W FRAME, FINISH AND ALL HARDWARE (D3)EA
31PROVIDE AND INSTALL SINGLE WOOD DOOR C/W FRAME, FINISH AND ALL HARDWARE (D4)EA
32PROVIDE AND INSTALL SINGLE WOOD DOOR C/W FRAME, FINISH AND ALL HARDWARE (D5)EA
33PROVIDE AND INSTALL SINGLE WOOD DOOR C/W FRAME, FINISH AND ALL HARDWARE (D6)EA
34PROVIDE AND INSTALL SINGLE WOOD DOOR C/W FRAME, FINISH AND ALL HARDWARE (D7)EA
AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008)
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
ENGINEER'S REVISED FINAL
6.0CONSTRUCTION COST ESTIMATE BREAKDOWNSHEETNO6OF0
CONTRACTORADDRESS
0.000.00
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
CNS, REPLACE ASF BLDG. 2019
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
Attachment 5 FA5685-08-R-0024AKNR 05-1022ASF, BALGAT-ANKARA TURKIYE
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMANDAYSAVERAGETOTALDIRECTTOTAL
RATECOSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
35PROVIDE AND INSTALL SINGLE WOOD DOOR C/W FRAME, FINISH AND ALL HARDWARE (D8)EA
36PROVIDE AND INSTALL STEEL WINDOW C/W GLAZING, FRAME, FINISH AND ALL HARDWARE (W1)EA
37PROVIDE AND INSTALL STEEL WINDOW C/W GLAZING, FRAME, FINISH AND ALL HARDWARE (W2)EA
38PROVIDE AND INSTALL STEEL LOUVER C/W FRAME, FINISH AND ALL HARDWARE (L1)EA
39PROVIDE AND APPLY WATER INSULATION (SIKA TOP SEAL 107)SM
40PROVIDE AND INSTALL TISSUE HOLDEREA
41PROVIDE AND INSTALL SOAP DISPANSEREA
42PROVIDE AND INSTALL FLUSH MOUNTED, RECESSED PAPER TOWEL HOLDER AND GARBAGE CANEA
43PROVIDE AND INSTALL MIRROREA
44PROVIDE AND INSTALL MIRROR SHELVINGEA
45PROVIDE AND INSTALL HOOKEA
46PROVIDE AND INSTALL SHOWER SEATEA
47PROVIDE AND INSTALL URINAL PARTITIONEA
48PROVIDE AND INSTALL SHOWER CURTAINEA
49PROVIDE AND INSTALL STAINLESS STEEL GRAB BAREA
50PROVIDE AND INSTALL STEEL HANDRAIL C/W EPOXY PAINTING FOR EXTERIOR STAIRCASELM
51PROVIDE AND INSTALL ACOUSTICAL SUSPENDED CEILING C/W SUSPENSION SYSTEM (60x60 CM)SM
52PROVIDE AND INSTALL HUMIDITY RESISTANT SUSPENDED CEILING C/W SUSPENSION SYSTEM (60x60 CM)SM
AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008)
ENGINEER'S REVISED FINAL
7.0CONSTRUCTION COST ESTIMATE BREAKDOWNSHEETNO7OF0
CONTRACTORADDRESS
0.000.00
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
CNS, REPLACE ASF BLDG. 2019
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
Attachment 5 FA5685-08-R-0024AKNR 05-1022ASF, BALGAT-ANKARA TURKIYE
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMANDAYSAVERAGETOTALDIRECTTOTAL
RATECOSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
53PROVIDE AND INSTALL GLASSWOOL INSULATION IN ATTIC SPACE (20 CM THICK)SM
54PROVIDE AND INSTALL EXTRUDED POLYSTRENE INSULATION UNDER FOUNDATION SLAB (10 CM THICK)SM
55PROVIDE AND INSTALL WATER INSULATION UNDER FOUNDATION SLAB (PLASTOBIT PP 300)SM
56PROVIDE AND INSTALL VAPOR BARRIER OVER ROOF SLABSM
57PROVIDE AND INSTALL UPPER AND BASE CABINETS C/W LAMINATED COUNTER AND ALL ACCESSORIESLS
58PROVIDE AND INSTALL NON-SKID SAND BLASTED ANDESITE COVERING FOR INTERIOR STAIRCASELS
59PROVIDE AND INSTALL LAMINATED WALL PARTITION C/W DOORSSM
60PROVIDE AND INSTALL GYPSUM BOARD COVERING C/W STRUCTURAL SYSTEMLS
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
A R C H I T E C T U R A L T O T A L0.000.000.000.000.00
AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008)
ENGINEER'S REVISED FINAL
8.0CONSTRUCTION COST ESTIMATE BREAKDOWNSHEETNO8OF0
CONTRACTORADDRESS
0.000.00
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
CNS, REPLACE ASF BLDG. 2019
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
Attachment 5 FA5685-08-R-0024AKNR 05-1022ASF, BALGAT-ANKARA TURKIYE
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMANDAYSAVERAGETOTALDIRECTTOTAL
RATECOSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
STRUCTURAL0.000.000.00
0.000.000.00
1EXCAVATION C/W HAULWAY COMPACTION OF SUBGRADECM
2CONSTRUCT AGGREGATE BASE COURSE AND COMPACTCM
3CONCRETE C/W RE-BARS St IIIb OR WIRE MESH Q 131, CONCRETE C25 WITH FORMWORK, INCLUDING EXTERIOR STAIRCASECM
40.5 MM THICK POLYETHYLENE SHEETSM
5LEAN CONCRETE 200 DOSAGECM
6STEEL ROOF C/W WELDING, BOLTS AND PAINTINGKG
7CONCRETE EQUIPMENT PAD C/W RE-BARS, CONCRETE C25 INCLUDING FORMWORKCM
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
S T R U C T U R A L T O T A L0.000.000.000.000.00
AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008)
ENGINEER'S REVISED FINAL
9.0CONSTRUCTION COST ESTIMATE BREAKDOWNSHEETNO9OF0
CONTRACTORADDRESS
0.000.00
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
CNS, REPLACE ASF BLDG. 2019
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
Attachment 5 FA5685-08-R-0024AKNR 05-1022ASF, BALGAT-ANKARA TURKIYE
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMANDAYSAVERAGETOTALDIRECTTOTAL
RATECOSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
MECHANICAL0.000.000.00
0.000.000.00
1PROVIDE AND INSTALL PPRC DOMESTIC COLD WATER PIPE C/W FITTINGS, 1/2"LM
2PROVIDE AND INSTALL PPRC DOMESTIC COLD WATER PIPE C/W FITTINGS, 3/4"LM
3PROVIDE AND INSTALL PPRC DOMESTIC COLD WATER PIPE C/W FITTINGS, 1"LM
4PROVIDE AND INSTALL PPRC DOMESTIC COLD WATER PIPE C/W FITTINGS, 1-1/4"LM
5PROVIDE AND INSTALL PPRC DOMESTIC COLD WATER PIPE C/W FITTINGS, 1-1/2"LM
6PROVIDE AND INSTALL PPRC DOMESTIC HOT WATER PIPE C/W FITTINGS, 1/2"LM
7PROVIDE AND INSTALL PPRC DOMESTIC HOT WATER PIPE C/W FITTINGS, 3/4"LM
8PROVIDE AND INSTALL PPRC DOMESTIC HOT WATER PIPE C/W FITTINGS, 1-1/4"LM
9PROVIDE AND INSTALL ELASTOMERIC RUBBER INSULATION FOR PIPES, 1/2"LM
10PROVIDE AND INSTALL ELASTOMERIC RUBBER INSULATION FOR PIPES, 3/4"LM
11PROVIDE AND INSTALL ELASTOMERIC RUBBER INSULATION FOR PIPES, 1"LM
12PROVIDE AND INSTALL ELASTOMERIC RUBBER INSULATION FOR PIPES, 1-1/4"LM
13PROVIDE AND INSTALL ELASTOMERIC RUBBER INSULATION FOR PIPES, 1-1/2"LM
14PROVIDE AND INSTALL 50 MM PVC WASTE WATER PIPE C/W FITTINGSLM
15PROVIDE AND INSTALL 70 MM PVC WASTE WATER PIPE C/W FITTINGSLM
16PROVIDE AND INSTALL 100 MM PVC WASTE WATER PIPE C/W FITTINGSLM
AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008)
ENGINEER'S REVISED FINAL
10.0CONSTRUCTION COST ESTIMATE BREAKDOWNSHEETNO10OF0
CONTRACTORADDRESS
0.000.00
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
CNS, REPLACE ASF BLDG. 2019
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
Attachment 5 FA5685-08-R-0024AKNR 05-1022ASF, BALGAT-ANKARA TURKIYE
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMANDAYSAVERAGETOTALDIRECTTOTAL
RATECOSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
17PROVIDE AND INSTALL 50 MM PVC VENT PIPE C/W FITTINGSLM
18PROVIDE AND INSTALL 70 MM PVC VENT PIPE C/W FITTINGSLM
19PROVIDE AND INSTALL 100 MM PVC VENT PIPE C/W FITTINGSLM
20PROVIDE AND INSTALL WATER CLOSET FOR HANDICAPPED C/W FLUSH TANKEA
21PROVIDE AND INSTALL WATER CLOSET C/W COVER, FLUSH TANKEA
22PROVIDE AND INSTALL EASTERN TYPE TOILET C/W FLUSH SYSTEMEA
23PROVIDE AND INSTALL FLOOR DRAINEA
24PROVIDE AND INSTALL SHOWER, C/W FIXTURE, VALVES & TRAPEA
25PROVIDE AND INSTALL SHOWER FOR HANDICAPPED, C/W FIXTURE, VALVES & TRAPEA
26PROVIDE AND INSTALL SERVICE SINK C/W FAUCET, VALVES & TRAPEA
27PROVIDE AND INSTALL URINAL WITH AUTOMATIC FLUSH SYSTEMEA
28PROVIDE AND INSTALL FROST PROOF HOSE BIBB, C/W VACUUM BREAKEREA
29PROVIDE AND INSTALL WATER HAMMER ARRESTOREA
30PROVIDE AND INSTALL WALL TYPE EXHAUST FAN, 50 l/sEA
31PROVIDE AND INSTALL WALL TYPE EXHAUST FAN, 150 l/sEA
32PROVIDE AND INSTALL INLINE DUCT FAN, 50 l/sEA
33PROVIDE AND INSTALL LAVATORY C/W FAUCET, VALVES AND TRAPEA
34PROVIDE AND INSTALL LAVATORY FOR HANDICAPPED C/W FAUCET, VALVES AND TRAPEA
AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008)
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
ENGINEER'S REVISED FINAL
11.0CONSTRUCTION COST ESTIMATE BREAKDOWNSHEETNO11OF0
CONTRACTORADDRESS
0.000.00
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
CNS, REPLACE ASF BLDG. 2019
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
Attachment 5 FA5685-08-R-0024AKNR 05-1022ASF, BALGAT-ANKARA TURKIYE
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMANDAYSAVERAGETOTALDIRECTTOTAL
RATECOSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
35PROVIDE AND INSTALL FAN COIL UNIT, 1.00 kW C/W VALVES AND ACCESSORIESEA0.00
36PROVIDE AND INSTALL FAN COIL UNIT, 2.00 kW C/W VALVES AND ACCESSORIESEA0.00
37PROVIDE AND INSTALL FAN COIL UNIT, 2.4 kW C/W VALVES AND ACCESSORIESEA0.00
38PROVIDE AND INSTALL FAN COIL UNIT, 3.8 kW C/W VALVES AND ACCESSORIESEA0.00
39PROVIDE AND INSTALL FAN COIL UNIT, 6.2 kW C/W VALVES AND ACCESSORIESEA0.00
40PROVIDE AND INSTALL 20 MM CONDENSATE PIPING FOR SPLIT A/C UNITSLM0.00
41PROVIDE AND INSTALL 32 MM CONDENSATE PIPING FOR SPLIT A/C UNITSLM0.00
42PROVIDE AND INSTALL HOT WATER BOILER, C/W BURNER, CONTROL PANEL AND SENSORSEA0.00
43PROVIDE AND INSTALL DOUBLE WALLED STAINLESS STEEL CHIMNEY C/W INSULATIONEA0.00
44PROVIDE AND INSTALL HOT WATER CIRCULATION PUMP FOR FCU SYSTEMEA0.00
45PROVIDE AND INSTALL HOT WATER CIRCULATION PUMP FOR DOMESTIC USEEA0.00
46PROVIDE AND INSTALL HOT WATER CIRCULATION PUMP FOR HEAT EXCHANGEREA0.00
47PROVIDE AND INSTALL EXPANSION TANK, 24 LEA0.00
48PROVIDE AND INSTALL EXPANSION TANK, 80 LEA0.00
49PROVIDE AND INSTALL PLATE TYPE HEAT EXCHANGEREA0.00
50PROVIDE AND INSTALL PPRC PIPING FOR FAN COIL PIPING 3/4", C/W INSULATIONLM0.00
51PROVIDE AND INSTALL PPRC PIPING FOR FAN COIL PIPING 1", C/W INSULATIONLM0.00
52PROVIDE AND INSTALL PPRC PIPING FOR FAN COIL PIPING 1-1/2", C/W INSULATIONLM0.00
AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008)
ENGINEER'S REVISED FINAL
12.0CONSTRUCTION COST ESTIMATE BREAKDOWNSHEETNO12OF0
CONTRACTORADDRESS
0.000.00
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
CNS, REPLACE ASF BLDG. 2019
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
Attachment 5 FA5685-08-R-0024AKNR 05-1022ASF, BALGAT-ANKARA TURKIYE
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMANDAYSAVERAGETOTALDIRECTTOTAL
RATECOSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
53PROVIDE AND INSTALL PPRC PIPING FOR FAN COIL PIPING 2", C/W INSULATIONLM0.00
54PROVIDE AND INSTALL PPRC PIPING FOR HEATING 2-1/2", C/W INSULATIONLM0.00
55PROVIDE AND INSTALL PPRC PIPING FOR HEATING 1-1/4", C/W INSULATIONLM0.00
56PROVIDE AND INSTALL PPRC PIPING FOR HEATING 1", C/W INSULATIONLM0.00
57PROVIDE AND INSTALL KITCHEN HOOD C/W EXHAUST FAN AND FIRE SUPPRESSION SYSTEMEA0.00
58PROVIDE AND INSTALL DOUBLE WALLED FUEL PIPING C/W INSULATION, FUEL FILTER AND VALVESLS0.00
59PROVIDE AND INSTALL DOUBLE WALLED FUEL STORAGE TANK C/W LEAK DETECTION SYSTEM AND INSULATIONEA0.00
60PROVIDE AND INSTALL SPRINKLER PIPING C/W FITTINGS, 1"LM0.00
61PROVIDE AND INSTALL SPRINKLER PIPING C/W FITTINGS, 1-1/4"LM0.00
62PROVIDE AND INSTALL SPRINKLER PIPING C/W FITTINGS, 2"LM0.00
63PROVIDE AND INSTALL SPRINKLER PIPING C/W FITTINGS, 3"LM0.00
64PROVIDE AND INSTALL SPRINKLER PIPING C/W FITTINGS, 4"LM0.00
65PROVIDE AND INSTALL PENDANT SPRINKLER HEADSEA0.00
66PROVIDE AND INSTALL UPRIGHT SPRINKLER HEADSEA0.00
67PROVIDE AND INSTALL FLOW SWITCHEA0.00
68PROVIDE AND INSTALL WET ALARM VALVE, C/W ACCESSORIES AND TRIM, 4"EA0.00
69PROVIDE AND INSTALL BUITERFLY VALVE, 3"EA0.00
70PROVIDE AND INSTALL CHECK VALVE, 4"EA0.00
AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008)
ENGINEER'S REVISED FINAL
13.0CONSTRUCTION COST ESTIMATE BREAKDOWNSHEETNO13OF0
CONTRACTORADDRESS
0.000.00
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
CNS, REPLACE ASF BLDG. 2019
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
Attachment 5 FA5685-08-R-0024AKNR 05-1022ASF, BALGAT-ANKARA TURKIYE
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMANDAYSAVERAGETOTALDIRECTTOTAL
RATECOSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
71PROVIDE AND INSTALL BACKFLOW PREVENTER AND STRAINER, 4"EA0.00
72PROVIDE AND INSTALL BACKFLOW PREVENTER AND STRAINER, 1- 1/4"EA0.00
73PROVIDE AND INSTALL POST INDICATOR VALVE, 4"EA0.00
74PROVIDE AND INSTALL FIRE TRUCK CONNECTION, 4"EA0.00
75PROVIDE AND INSTALL TEST VALVE, 1"EA0.00
76PROVIDE AND INSTALL WATER MOTOR ALARM C/W RETARD CHAMBER AND ACCESSORIESEA0.00
77PROVIDE AND INSTALL BALL VALVE, 3/4"EA0.00
78PROVIDE AND INSTALL BALL VALVE, 1"EA0.00
79PROVIDE AND INSTALL BALL VALVE, 1-1/4"EA0.00
80PROVIDE AND INSTALL BALL VALVE, 1-1/2"EA0.00
81PROVIDE AND INSTALL BALL VALVE, 2"EA0.00
82PROVIDE AND INSTALL BALL VALVE, 2-1/2"EA0.00
83PROVIDE AND INSTALL STRAINER, 3/4"EA0.00
84PROVIDE AND INSTALL STRAINER, 2-1/2"EA0.00
85PROVIDE AND INSTALL CHECK VALVE, 1-1/4"EA0.00
86PROVIDE AND INSTALL CHECK VALVE, 3/4"EA0.00
87PROVIDE AND INSTALL CHECK VALVE, 2"EA0.00
88PROVIDE AND INSTALL THREE WAY VALVE, 1-1/4"EA0.00
AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008)
ENGINEER'S REVISED FINAL
14.0CONSTRUCTION COST ESTIMATE BREAKDOWNSHEETNO14OF0
CONTRACTORADDRESS
0.000.00
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
CNS, REPLACE ASF BLDG. 2019
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
Attachment 5 FA5685-08-R-0024AKNR 05-1022ASF, BALGAT-ANKARA TURKIYE
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMANDAYSAVERAGETOTALDIRECTTOTAL
RATECOSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
89PROVIDE AND INSTALL THREE WAY VALVE, 2"EA0.00
90INSTALL GFM SPLIT INDOOR AND OUTDOOR UNITS C/W GAS CHARGINGEA0.00
91REMOVAL OF EXISTING OF EXISTING ASBESTOS CONTAINING MATERIAL INSULATION IN EXISTING MECHANICAL ROOMLS0.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
M E C H A N I C A L T O T A L0.000.000.000.000.00
AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008)
ENGINEER'S REVISED FINAL
15.0CONSTRUCTION COST ESTIMATE BREAKDOWNSHEETNO15OF0
CONTRACTORADDRESS
0.000.00
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
CNS, REPLACE ASF BLDG. 2019
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
Attachment 5 FA5685-08-R-0024AKNR 05-1022ASF, BALGAT-ANKARA TURKIYE
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMANDAYSAVERAGETOTALDIRECTTOTAL
RATECOSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
ELECTRICAL0.000.000.00
0.000.000.00
1REMOVAL OF ELECTRICAL LINESLS0.00
2PROVIDE AND INSTALL CIRCUIT BREAKER FOR MAIN PANEL 3x200A, 36 kA IN TRANSFORMER SUBSTATIONEA0.00
3PROVIDE AND INSTALL NEW FEEDER CABLE 3(1x150)+70 MM2 NYYLM0.00
4PROVIDE AND INSTALL FEEDER CABLE, 3x95+50 MM2 NYYLM0.00
5PROVIDE AND INSTALL FEEDER CABLE, 3x35+16 MM2 NYYLM0.00
6PROVIDE AND INSTALL MAIN PANEL, PANEL MPEA0.00
7PROVIDE AND INSTALL MAIN DISTRIBUTION PANEL, PANEL MDPEA0.00
8PROVIDE AND INSTALL MAIN EMERGENCY DISTRIBUTION PANEL, PANEL MDP1EA0.00
9PROVIDE AND INSTALL 6 MM2 CU, GROUNDING CABLELM0.00
10PROVIDE AND INSTALL 25 MM2 CU, GROUNDING CABLELM0.00
11PROVIDE AND INSTALL 50 MM2 CU, MAIN GROUNDING CABLELM0.00
12PROVIDE AND INSTALL 1x16 MM2 NYY FOR COMMUNICATION GROUNDING CABLELM0.00
13PROVIDE AND INSTALL BOILER PANEL, PANEL BPEA0.00
14PROVIDE AND INSTALL LIGHTING AND RECEPTACLE PANEL, PANEL L1EA0.00
15PROVIDE AND INSTALL LIGHTING AND RECEPTACLE PANEL, PANEL L2EA0.00
16PROVIDE AND INSTALL POWER PANEL, PANEL P1EA0.00
AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008)
ENGINEER'S REVISED FINAL
16.0CONSTRUCTION COST ESTIMATE BREAKDOWNSHEETNO16OF0
CONTRACTORADDRESS
0.000.00
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
CNS, REPLACE ASF BLDG. 2019
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
Attachment 5 FA5685-08-R-0024AKNR 05-1022ASF, BALGAT-ANKARA TURKIYE
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMANDAYSAVERAGETOTALDIRECTTOTAL
RATECOSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
17PROVIDE AND INSTALL POWER PANEL, PANEL P2EA0.00
18PROVIDE AND INSTALL SURFACE-MOUNTED WEATHERPROOF 2x36 W FLUORESCENT LIGHTING FIXTURE WITH PRISMATIC POLYCARBONATE COVEREA0.00
19PROVIDE AND INSTALL RECESSED 4x18 W FLUORESCENT LIGHTING FIXTUREEA0.00
20PROVIDE AND INSTALL HIGH PRESSURE SODIUM VAPOR LIGHT FIXTURE, SON-T70WEA0.00
21PROVIDE AND INSTALL CEILING TYPE LIGHT FIXTURE, PL-C 1x26 WEA0.00
22PROVIDE AND INSTALL BATTEN FLUORESCENT LIGHT FIXTURE, PL-L 1x36 WEA0.00
23PROVIDE AND INSTALL EMERGENCY POWER PACK FOR FLUORESCENT LIGHT FIXTURE 2x36 WEA0.00
24PROVIDE AND INSTALL LIGHT SWITCHEA0.00
25PROVIDE AND INSTALL WEATHERPROOF LIGHT SWITCHEA0.00
26PROVIDE AND INSTALL DOUBLE POLE, DOUBLE THROW LIGHT SWITCHEA0.00
27PROVIDE AND INSTALL FAN SWITCHEA0.00
28PROVIDE AND INSTALL EXIT LIGHT C/W BATERIES CHARGER UNIT AND LAMPEA0.00
29PROVIDE AND INSTALL PHOTOCELL EYEEA0.00
30PROVIDE AND INSTALL DUPLEX RECEPTACLE, 16 A, 220 VACEA0.00
31PROVIDE AND INSTALL WEATHERPROOF DUPLEX RECEPTACLE, 16 A, 220 VACEA0.00
32PROVIDE AND INSTALL SINGLE RECEPTACLE, 16 A, 220 VACEA0.00
33PROVIDE AND INSTALL FAN COIL SINGLE RECEPTACLE, 16 A, 220 VACEA0.00
34PROVIDE AND INSTALL WEATHERPROOF THREE PHASE RECEPTACLE, 32 A, 220 VACEA0.00
AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008)
ENGINEER'S REVISED FINAL
17.0CONSTRUCTION COST ESTIMATE BREAKDOWNSHEETNO17OF0
CONTRACTORADDRESS
0.000.00
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
CNS, REPLACE ASF BLDG. 2019
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
Attachment 5 FA5685-08-R-0024AKNR 05-1022ASF, BALGAT-ANKARA TURKIYE
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMANDAYSAVERAGETOTALDIRECTTOTAL
RATECOSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
35PROVIDE AND INSTALL NEMA TYPE RECEPTACLE FOR OVEN, 220 VAC, 50 AEA
36PROVIDE AND INSTALL WEATHERPROOF DISCONNECT SWITCHEA
37PROVIDE AND INSTALL DISCONNECT SWITCHEA
38PROVIDE AND INSTALL ADDRESABLE FIRE ALARM CONTROL PANELEA
39PROVIDE AND INSTALL ADDRESSABLE MANUAL PULL STATIONEA
40PROVIDE AND INSTALL ADDRESSABLE MANUAL PULL STATION, WEATHERPROOFEA
41PROVIDE AND INSTALL ADDRESSABLE FIRE ALARM HORN WITH STROBE LIGHTEA
42PROVIDE AND INSTALL ADDRESSABLE FIRE ALARM HORN WITH STROBE LIGHT, WEATHERPROOFEA
43PROVIDE AND INSTALL FIRE ALARM STROBE LIGHTEA
44PROVIDE AND INSTALL SMOKE DETECTOREA
45PROVIDE AND INSTALL FIRE ALARM STROBE LIGHT, WEATHERPROOFEA
46PROVIDE AND INSTALL MONITOR MODULEEA
47PROVIDE AND INSTALL DUPLEX OUTLET, TELEPHONE AND LAN, RJ 45EA
48PROVIDE AND INSTALL SINGLE WALL PHONE OUTLET, RJ 45EA
49PROVIDE AND INSTALL 1x1.5 MM2 HO5SJ-K (SIAF-GL) HEAT RESISTANT CABLELM
50PROVIDE AND INSTALL 25 PAIR 22 AWG BFCAY TYPE CABLELM
51PROVIDE AND INSTALL CAT 5E UTP, 4x2x24 AWG, TELEPHONE CABLELM
52PROVIDE AND INSTALL 1.5 MM2 NYA CABLELM
AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008)
ENGINEER'S REVISED FINAL
18.0CONSTRUCTION COST ESTIMATE BREAKDOWNSHEETNO18OF0
CONTRACTORADDRESS
0.000.00
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
CNS, REPLACE ASF BLDG. 2019
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
Attachment 5 FA5685-08-R-0024AKNR 05-1022ASF, BALGAT-ANKARA TURKIYE
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMANDAYSAVERAGETOTALDIRECTTOTAL
RATECOSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
53PROVIDE AND INSTALL 2.5 MM2 NYA CABLELM
54PROVIDE AND INSTALL 4 MM2 NYA CABLELM
55PROVIDE AND INSTALL 6 MM2 NYA CABLELM
56PROVIDE AND INSTALL 10 MM2 NYA CABLELM
57PROVIDE AND INSTALL 16 MM2 NYA CABLELM
58PROVIDE AND INSTALL 1/2" LIQUID TYGHT FLEXIBLE CONDUITLM
59PROVIDE AND INSTALL 1/2" ELECTRICAL METALLING TUBING (EMT)LM
60PROVIDE AND INSTALL 3/4" ELECTRICAL METALLING TUBING (EMT)LM
61PROVIDE AND INSTALL 4" GALVANIZED RIGID STEEL PIPE WITH FITTINGSLM
62PROVIDE AND INSTALL 2" GALVANIZED RIGID STEEL PIPE WITH FITTINGSLM
63EXCAVATION AND BACKFILLINGCM
64PROVIDE AND INSTALL COMMUNICATION CABINET (COMPLETE)EA
65PROVIDE AND INSTALL COMMUNICATION BOXEA
66PROVIDE AND INSTALL 3 M-2 TYPE CLOSURE KIT FOR COMMUNICATION LINEEA
67PROVIDE AND INSTALL CABLE TRAY, 10x5 CMLM
68PROVIDE AND INSTALL CABLE TRAY, 20x5 CMLM
69PROVIDE AND INSTALL GROUND ROD, SOLID COPPER, 3.30 M, 20 MM DIAEA
70CONSTRUCT GROUNDING INSPECTION PIT WITH CAST IRON COVEREA
AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008)
FOR OFFICIAL USE ONLY
ENGINEER'S REVISED FINAL
19.0CONSTRUCTION COST ESTIMATE BREAKDOWNSHEETNO19OF0
CONTRACTORADDRESS
0.000.00
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
CNS, REPLACE ASF BLDG. 2019
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
Attachment 5 FA5685-08-R-0024AKNR 05-1022ASF, BALGAT-ANKARA TURKIYE
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMANDAYSAVERAGETOTALDIRECTTOTAL
RATECOSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
71CONSTRUCT 1X4 " CONCRETE ENCASED DUCT LINE NEAR EXISTING DUCT LINEM
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
0.000.000.00
E L E C T R I C A L T O T A L0.000.000.000.000.00
AF INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008)
FOR OFFICIAL USE ONLY

AF3052back

INSTRUCTIONS FOR COMPLETING Form INC-1101
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to
permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples : square yards - SY, cubic yards - CY, square
feet - SF, linear feet - LF, board feet - BF, each - EA, pound -LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be
funished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract
will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in Col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1.
Enter in Col 7 the average rate per manhour (manday) and in Col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract
and of significant dollar value.
Col 10 Line Total. Self-explanatory.
NOTE: In addition to the other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last
page as follows.
TOTAL MATERIAL COSTS$
-------------------------------
TOTAL LABOR COSTS$
-------------------------------
TOTAL OTHER DIRECT COSTS$
-------------------------------
TOTAL COSTS$
-------------------------------
OVERHEAD%$
-------------------------------
SUBTOTAL$
-------------------------------
PROFIT%$
-------------------------------
TOTAL PRICE$
-------------------------------
DATE :FIRM NAME
-----------------------------------------------------------------
TITLE:BY
---------------------------------------------------------------------------------------------------------------------------
INSTRUCTIONS TO OFFERORS
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and
estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from
this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data
(see ASPR 3-807.3(e) and 3-807.4).
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this
form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and
analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate),
and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the
purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate
evaluation of such cost or pricing data, along with the computations and projections used herein. This right may be exercised in connection
with any negotiations prior to contract award.
(Reverse of Form INC-1101, Rev 0, May 08)

Sheet1

Sheet2

Sheet3

Other versions and copies of AF Form 3052

File Revision Posted Attached to
Attachment E - Blank Sample AF Form 3052.xls Revision not stated Robins AFB Paving Multi-Award IDIQ
Attachment 5 - PNQS 24-4829 Airfield Improvements AF Form 3052 - Amendment 0002.xlsx Revision not stated Maxwell AFB - Airfield Repairs - Amendment 0006
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
B6 AF Form 3052 - Construction Cost Estimate.pdf Revision not stated Emergent Requirements Construction IDIQ (Single-Award)
AF Form 3052 (Blank) ReplCath Prot 240026 at Multi Facs -- .xlsx Revision not stated FBNV240026 Replace Cathodic Protection Test Points DMAFB
FBNV240017 - AF Form 3052 Blank.xlsx Revision not stated FA487724R0020 - Upgrade PGS Fire System
Attachment 4 - JUBJ 22 1016 Construct RIC - AF Form 3052.xlsx Revision not stated Construct Research Information Center (Solicitation Amendment 0002)
Attachment 4 - PNQS 24-3992 Replace Localizer Pad - AF Form 3052.xlsx Revision not stated PNQS 24-3992 Replace Localizer Pad (Solicitation Amendment 0001)
05. FBNV230009_AF Form 3052 (Blank).xlsx Revision not stated Solicitation - Repair Command Post Bldg 2300 - DMAFB
B941 Replace AHU AF Form 3052 - Construction Cost Estimate.xlsx Revision not stated Bldg 941 Replace Air Handling Unit 1
AF Form 3052.xlsx Revision not stated BLDG 4868 Additional Electrical Panel for DMAFB
Atch 7 AF Form 3052.xlsx Revision not stated B324 Add Sewer Line, FE Warren AFB, WY
AF Form 3052-Construction Cost Estimate Breakdown (3).xlsx Revision not stated Barnes Center Command Suite Modification Bldg. 832 Gunter Annex (Amendment 0003)
5. AF Form 3052-BLANK.xlsx Revision not stated Replace Swamp Cooler B5045
Copy of Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Battery Room - Maxwell AFB, AL (Solicitation)
Attachment 4 - PNQS 23-0379 Connect Fire Mains - AF Form 3052.xlsx Revision not stated PNQS 23-0379 Connect Fire Mains Bldgs. 849 & 1143, MAFB & Gunter Annex
17. AF Form 3052 (Blank) - FBNV190002.xlsx Revision not stated Repair and Construct Primary Electric Distribution
Attachment 2.12 - AF Form 3052 Construction Cost Estimate Breakdown Template.xlsx Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Rooms, Building 1410 Gunter
Show all 20

Who attaches AF Form 3052

Other files

File Type Posted
A.13 Attach 4 - AF FORM 66 —
A.13 Attach 6 - Past Performance Survey —
A.13 Attach 2 - DRAWINGS —
A.13 Attach 2 - DRAWINGS —
A.13 Attach. 3- INCIRLIK INSTRUCTIONS —
A.13 Attach 1 - SPECS —
RFP FA5685-08-R-0024.doc DOC document
A.8 Scheduled Site Visit —
A.8 Pre Proposal Reservation Form —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .