JA-3_AF_Form_66.pdf

Air Force Form PDF 13 KB Posted

Attached to
Roof Repair Bldg 3446- FTQW18-1018 - FA5004-18-B-C002
Solicitation number
FA5004-18-B-C002
Issued by

About this file

JA-3 AF Form 66

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

File Type Posted
FA5004-18-B-C002-P0002.pdf PDF
BC002-_Q&A's.pdf PDF
JA-1_Statement_of_Work_.pdf PDF
FA5004-18-B-C002-U0001.docx.pdf PDF
JA-5_Wage_Determination.pdf PDF
JA-4_Site_Plan.pdf PDF
JA-1_Statement_of_Work.pdf PDF
JA-2_Specifications.pdf PDF
JA-6_As_Builts.pdf PDF
FA5004-18-B-C002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION/CONTRACT NO.

MATERIAL SUBMITTALS

KEY: 1 SC -1 WEEK PRIOR TO SUBSTANTIAL COMPLETION INSPECTION 2 CM -2 WEEKS PRIOR TO COMMISSIONING 4 15 -4 WEEKS PRIOR TO ORDERING MATS/EQUIP FOR DIVISION 15 4 SC -4 WEEKS PRIOR TO SUBSTANTIAL COMPLETION INSPECTION 4 CM -4 WEEKS PRIOR TO COMMISSIONING 4 M -4 WEEKS PRIOR TO ORDERING MATS/EQUIP FOR SPEC SECTION

PR -4 WEEKS PRIOR TO CONSTRUCTION ACTIVITY

ED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TR

'S

R

EC

O M

M

EN

D A

TI

O

N S

M A

N U

FA

C

TU

R

ER

'S

W A

R R

A N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

SE

R

VI

C

E / S

IZ

E

/ U

SE

S C

H

ED

U

LE

O

TH

ER

REQUIRED

SUB-

MISSION

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP

DATE

CONTRACTOR

NOTIFIED

CONTRAC-

TOR RE-

SUBMIT-

TAL

FINAL APPROVAL REMARKS

APPROV

ED

DIS-

APPROV

ED

Spec. 01 14 00

1 Construction Operations and Safety Plan - 1.4 and 1.7 2 4 wks prior to work

2 Accident Prevent Plan - 1.4 and

1.8 2 4 wks prior to work

Safety and Health Plan - 1.8

2 4 wks prior to work

Request for use of Ionizing Radiation (if required) - 1.4 and 1.11

3 4 wks prior to work

5 Request for use of Lasers (if required) - 1.12 4 4 wks prior to work

6 9. Environmental Protection Plan - 1.4 and 1.21 4 4 wks prior to work

7 Hazardous Waste Accumulation Log (Initial, quarterly & final) - 1.23

4 4 wks prior to work

Spec. 01 01 00

8 AF Form 103 01 01 00 1.11 3 2 wks prior to work start Spec. 01 40 00

9 Testing laboratory Information-

1.8 3

2 wks prior to ordering materials

Spec. 01 70 00

10 Construction Photos -1.4 3

Within 10 days of Construction Completion (Before Final Payment)

11 As-built Drawings - 1.4 3

Within 10 days of Construction Completion (Before Final Payment)

12 Operation and Maintenace Data -1.5 3

Within 10 days of Construction Completion (Before Final Payment)

FTQW 18-1018 Replace B3446 Roof

SOLICITATION/CONTRACT NO.

MATERIAL SUBMITTALS

KEY: 1 SC -1 WEEK PRIOR TO SUBSTANTIAL COMPLETION INSPECTION 2 CM -2 WEEKS PRIOR TO COMMISSIONING 4 15 -4 WEEKS PRIOR TO ORDERING MATS/EQUIP FOR DIVISION 15 4 SC -4 WEEKS PRIOR TO SUBSTANTIAL COMPLETION INSPECTION 4 CM -4 WEEKS PRIOR TO COMMISSIONING 4 M -4 WEEKS PRIOR TO ORDERING MATS/EQUIP FOR SPEC SECTION

PR -4 WEEKS PRIOR TO CONSTRUCTION ACTIVITY

ED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TR

'S

R

EC

O M

M

EN

D A

TI

O

N S

M A

N U

FA

C

TU

R

ER

'S

W A

R R

A N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

SE

R

VI

C

E / S

IZ

E

/ U

SE

S C

H

ED

U

LE

O

TH

ER

REQUIRED

SUB-

MISSION

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW-UP

DATE

CONTRACTOR

NOTIFIED

CONTRAC-

TOR RE-

SUBMIT-

TAL

FINAL APPROVAL REMARKS

APPROV

ED

DIS-

APPROV

ED

FTQW 18-1018 Replace B3446 Roof

13 Warranties - 1.6 3

Within 10 days of Construction Completion (Before Final Payment)

Spec. 07 54 19

14 PVC Prefabricated Deck Sheets

- 1.4 B., F. and 2.2 3 3 4 wks prior to work

15 Fiberglass Faced Roof Board -

1.4 B., F. and 2.4 3 3 4 wks prior to

work

16 Polyisocyanurate (Insulation) -

1.4 B., F. and 2.3 3 3 4 wks prior to

work

17 Vapor Barrier Membrane- 1.4 B., F. and 2.2 3 3 4 wks prior to work

18 Roof System Flashing - 1.4 B., F. and 2.2 3 3 4 wks prior to work

19 Sustainability Documentation -

1.4 C. 3 4 wks prior to

work

20 Wind Uplift Calculations - 1.4 D. 3 4 wks prior to work

21 Shop Drawings- 1.4 E. 3 4 wks prior to work

22 Installer Certification - 1.4 G. 3 4 wks prior to work

23 Manufacturer's Warranty - 1.4 H. and 1.9 3 Prior to Final

Payment Spec. 07 65 00

24 Metal Flashing - 1.3 3 3 3 4 wks prior to work

File details come from the government source that posted it.