29 - Nuclear Gauge Form 2.docx

DOCX document 26 KB Posted

Attached to
SABER IDIQ
Solicitation number
FA486125R0003
Issued by

About this file

The document "29 - Nuclear Gauge Form 2.docx" appears to be related to a Simplified Acquisition for Base Engineering Requirements (SABER) Indefinite-Delivery Indefinite-Quantity (IDIQ) contract issued by the 99th Contracting Squadron at Nellis Air Force Base. The solicitation (FA486125R0003) is targeted for HUBZone firms and covers design and construction projects across Nellis Air Force Base, Creech Air Force Base Range 63, Point Bravo, and Nellis Test And Training Range.

The contract has a maximum ceiling amount between $100 million and $250 million (specifically noted as $185 million), with a five-year performance period. Task orders will range from $15,000 to $4 million and encompass diverse construction and engineering services including carpentry, road repair, roofing, electrical, HVAC, plumbing, demolition, and other infrastructure-related projects. The solicitation is anticipated to be issued electronically on SAM.gov around August 15, 2025, with proposals due by November 12, 2025 at 1430 hours. Contractors must demonstrate in-house or readily accessible design capabilities. The procurement is exclusively limited to qualified HUBZone small businesses under the Small Business Administration.

View the file

Other files

File Type Posted
52 - 99 SFS - Mass Pass Request Template.xlsx XLSX spreadsheet
Atch 50_RFI Log_General Solicitation and Non-SABER Seed Related Questions.xlsx XLSX spreadsheet
42 - General Decision Number NV20240001 Bldg NTTR.pdf PDF
40 - General Decision Number NV20240058 Highway Clark County.pdf PDF
31 - AF Form 3052 Cost Estimate Template.xlsx XLSX spreadsheet
24_UG3.3 Three Phase Six Bushing Pad-mounted Transformer - Aug 2016.pdf PDF
18 - Nellis Supplement to DAFI 31-218 Motor Vehicle Traffic Supervision - 23 Mar 2023.pdf PDF
17 - Installation Plan 12 - Hazardous Waste Management Plan 27 Sep 23.pdf PDF
16_USAF Integrated Cultural Resources Mgmt Plan 32-7065 ICRMP - 06 Nov 2019.pdf PDF
9_Nellis-Creech Mech-Plumb Req 2020-07-07.pdf PDF
8_Nellis-Creech Lighting Req 2019-01-22.pdf PDF
51_RFI Log_ SABER Seed RKMF 2400010 Reno Honor Guard 99 FSS B10250.xlsx XLSX spreadsheet
45 - Attachment Contract Information Sheet.pdf PDF
44 - SABER SOO RKMF240010 Renovate Honor Guard 99 FSS B10250_14Feb2025.pdf PDF
36 - AF 3000 Material Approval Submittal - 01 Sep 2003.pdf PDF
33 - AF Form 3065 Progress Report Template - 01 Apr 1996.pdf PDF
30 - AF Form 103 Base Civil Engineering Work Clearance Request - 01 Aug 1994.pdf PDF
28 - Nuclear Gauge Form 1.xlsx XLSX spreadsheet
22_RUS Bulletin 1728F-806 UG Main VEA Standard - 18 October 2018.pdf PDF
20_UT1-UT5 Modified Trenching Drawing - Aug 2016.pdf PDF
15 - Hazardous Material Management Guidance Document 2023-06-03.pdf PDF
14_ACC Sole Source EMCS Letter.pdf PDF
10_Nellis-Creech Utility Meter Req 2019-09-13.pdf PDF
2 - Price Schedule 23 September 25.pdf PDF
49 - As-Builts.pdf PDF
48 - Example SABER Design Intent Drawing Sets_28 Nov.pdf PDF
47 - Example SABER Design Intent Drawing Set Level 2_20 Nov.pdf PDF
41 - General Decision Number_NV20240038 Building Clark County.pdf PDF
39 - Form SS-PER-007-003 Internal Combustion Engine Worksheet.pdf PDF
37 - BUILDER Inventory Sheet.xlsx XLSX spreadsheet
35 - AF 66 Schedule of Material Submittals.xlsx XLSX spreadsheet
32 - AF 3064 Progress Schedule Template - 01 Apr 1996.xlsx XLSX spreadsheet
27 - NTTR Visit Request - 27 Jan 2023.pdf PDF
25 - UH1.2 - Grounding Assembly for Pad-mounted Transformers and Enclosures 2 Rods - Aug 2016.pdf PDF
19_UF3.PC Concrete Pad for Three Phase Requirement - Aug 2016.pdf PDF
13 - Work Clearance Triggers.pdf PDF
6 - Nellis-Creech Comm Req NC 2710 - Jun 2023.pdf PDF
3 - Self Score Worksheet SABER_23 Sept 2025.xlsx XLSX spreadsheet
34 - Schedule of Values Template.xlsx XLSX spreadsheet
1 - SABER SOW 25 Sep 25.pdf PDF
23_Power Trench Sand and Backfill Requirements - Apr 2013.pdf PDF
Solicitation - FA486125R0003.pdf PDF
46 - Example SABER Design Intent Drawing Set Level 1_20 Nov.pdf PDF
43 - General Decision Number_NV20250024 Heavy Clark County.pdf PDF
38_NTTR Automated Information System _AIS_ Equipment Form.pdf PDF
26 - Connection Charge Agreement - 22 Feb 23.pdf PDF
21_US3.PJ Single and Three Phase Primary Junctions - Aug 2016.pdf PDF
12 - Env Permit-ATP Guidance 2023.pdf PDF
11_Nellis-Creech Plant List.pdf PDF
7 - Nellis-Creech Electrical Req 2023-10-17.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR AUTHORIZATION TO BRING RADIOACTIVE MATERIALS (RAM) ONTO NELLIS AFB, CREECH AFB, OR THE NEVADA TEST AND TRAINING RANGE (NTTR)

1. NAME OF LICENSEE (person or firm proposing to conduct the activities described below)

2. TYPE OF REQUEST

|_| INITIAL |_| UPDATE

3. ADDRESS OF LICENSEE (mailing address or other location where licensee may be located)

4. LICENSEE CONTACT AND TITLE

5.
6. PHONE NUMBER

7. WORK CELL NUMBER

8. FAX NUMBER

9. LICENSEE RADIATION SAFETY OFFICER NAME

10. RSO PHONE NUMBER

11. LICENSEE EMAIL ADDRESS

12. ACTIVITES TO BE CONDUCTED ON THE INSTALLATION

|_| Well Logging |_| Leak Testing and/or Calibrations |_| Portable Gauges |_| Other (specify):

|_| Radiography

13. INSTALLATION WHERE ACTIVITIES WILL BE CONDUCTED

|_| Nellis AFB |_| Creech AFB

|_| NTTR

14. PRIMARY CONTRACTOR INFORMATION (Name, Address, City, State, Zip Code)

15. ACTUAL PHYSICAL ADDRESS OF WORK LOCATION (Provide GPS coordinates if known)

16. PRIMARY CONTRACTOR PHONE NUMBER
17. WORK LOCATION PHONE NUMBER

Office

Work Cell Office Work Cell

18. DATES FOR REQUEST AUTHORIZATION
19. NUMBER OF DAYS

20. ADD

21. DELETE

22. CONTRACT PROJECT NUMBER

FROM:

TO:

WEEKENDS

|_| YES |_| NO

LIST ADDITIONAL WORK SITES ON A SEPARATE SHEET(S) TO INCLUDE ALL INFORMATION CONTAINED IN ITEMS 12-21 ABOVE

23. PROVIDE A DESCRIPTION OF THE TYPE AND SCOPE OF THE ACTIVITIES TO BE PERFORMED

24. MANUFACTURER:

25. MODEL NO:

26. SERIAL NO:

27. RAM License Number:

28. STATE:
29. EXPIRATION DATE:

30. AUTHORIZED USERS: (Last Name, First Name) This request for authorization must be submitted to the Installation RSO at least 30 calendar days before bringing RAM onto the installation IAW AFI 40-201. Submission of this request for authorization with less than 30 days notice requires a signed letter by the requesting military organization addressing why the requirements of AFI 40-201 could not be met. The letter must also contain a signed acknowledgement from the requesting organization’s group commander.

In addition to this document the following information must be submitted as a part of the request for authorization:

· A copy of the USAF contract clause describing work to be performed at the installation and the inclusive dates of the work.

· A copy of a current NRC or Agreement State license

· Written authorization for the Installation RSO to conduct periodic assessments to ensure contractor personnel are complying with radiation safety practices to prevent exposures to USAF personnel and the general public, as well as, avoiding contamination of government property.

· Applicants holding a RAM license not issued by an Agreement State must also submit an approved NRC Form 241.

· Applicants applying to bring RAM onto NTTR must also submit an approved NRC Form 241.

· A copy of training certificates for all authorized users listed on this document. Training should be commensurate with the hazard/material being used.

· A copy of a current leak test certificate which meets the requirements of the RAM license.

Failure to submit a complete package containing the aforementioned documents will result in automatic denial of the request.

NOTE: If locations, dates, and times cannot be provided as a result of them being undetermined, written or email notification will be provided to the Installation RSO not later than 24 hours prior to bringing RAM onto the installation. The notification must contain the location, date, and time window of the activity is to be performed. Failure to comply with this requirement may result in rescinding of the authorization and notification to the NRC and/or State.

WARNING: False statements on this request for authorization to bring radioactive material onto Nellis AFB, Creech AFB, or the NTTR will result in immediate denial of this application or rescinding of your authorization if already issued. Additionally, notification will be made immediately to the Nuclear Regulatory Commission and/or the Agreement State jurisdictionally responsible for your license. Notification to the NRC or State may result in civil and/or criminal penalties.

File details come from the government source that posted it. Updated .