49 - As-Builts.pdf

PDF 25 MB Posted

Attached to
SABER IDIQ
Solicitation number
FA486125R0003
Issued by

About this file

The document "49 - As-Builts.pdf" appears to be related to a Simplified Acquisition for Base Engineering Requirements (SABER) Indefinite-Delivery Indefinite-Quantity (IDIQ) contract for the Department of the Air Force Air Combat Command. The solicitation (FA486125R0003) is targeted for HUBZone firms and will cover construction and design projects at Nellis Air Force Base, Creech Air Force Base Range 63, Point Bravo, and Nellis Test And Training Range.

The contract has a maximum ceiling amount between $100M and $250M (specifically noted as $185M), with a five-year performance period. Task orders will range from $15,000 to $4,000,000 and encompass diverse construction activities including carpentry, road repair, roofing, electrical, HVAC, plumbing, demolition, and other infrastructure projects. The solicitation is estimated to be issued electronically on SAM.gov around 15 August 2025, with proposals due by 12 November 2025 at 1430. Contractors must have in-house or readily accessible design capabilities. The contracting office is the 99th Contracting Squadron at Nellis AFB, with Corrine Lemon as the contact point.

View the file

Other files

File Type Posted
51_RFI Log_ SABER Seed RKMF 2400010 Reno Honor Guard 99 FSS B10250.xlsx XLSX spreadsheet
45 - Attachment Contract Information Sheet.pdf PDF
44 - SABER SOO RKMF240010 Renovate Honor Guard 99 FSS B10250_14Feb2025.pdf PDF
36 - AF 3000 Material Approval Submittal - 01 Sep 2003.pdf PDF
33 - AF Form 3065 Progress Report Template - 01 Apr 1996.pdf PDF
30 - AF Form 103 Base Civil Engineering Work Clearance Request - 01 Aug 1994.pdf PDF
28 - Nuclear Gauge Form 1.xlsx XLSX spreadsheet
22_RUS Bulletin 1728F-806 UG Main VEA Standard - 18 October 2018.pdf PDF
20_UT1-UT5 Modified Trenching Drawing - Aug 2016.pdf PDF
15 - Hazardous Material Management Guidance Document 2023-06-03.pdf PDF
14_ACC Sole Source EMCS Letter.pdf PDF
10_Nellis-Creech Utility Meter Req 2019-09-13.pdf PDF
2 - Price Schedule 23 September 25.pdf PDF
52 - 99 SFS - Mass Pass Request Template.xlsx XLSX spreadsheet
Atch 50_RFI Log_General Solicitation and Non-SABER Seed Related Questions.xlsx XLSX spreadsheet
42 - General Decision Number NV20240001 Bldg NTTR.pdf PDF
40 - General Decision Number NV20240058 Highway Clark County.pdf PDF
31 - AF Form 3052 Cost Estimate Template.xlsx XLSX spreadsheet
24_UG3.3 Three Phase Six Bushing Pad-mounted Transformer - Aug 2016.pdf PDF
18 - Nellis Supplement to DAFI 31-218 Motor Vehicle Traffic Supervision - 23 Mar 2023.pdf PDF
17 - Installation Plan 12 - Hazardous Waste Management Plan 27 Sep 23.pdf PDF
16_USAF Integrated Cultural Resources Mgmt Plan 32-7065 ICRMP - 06 Nov 2019.pdf PDF
9_Nellis-Creech Mech-Plumb Req 2020-07-07.pdf PDF
8_Nellis-Creech Lighting Req 2019-01-22.pdf PDF
Solicitation - FA486125R0003.pdf PDF
46 - Example SABER Design Intent Drawing Set Level 1_20 Nov.pdf PDF
43 - General Decision Number_NV20250024 Heavy Clark County.pdf PDF
38_NTTR Automated Information System _AIS_ Equipment Form.pdf PDF
29 - Nuclear Gauge Form 2.docx DOCX document
26 - Connection Charge Agreement - 22 Feb 23.pdf PDF
21_US3.PJ Single and Three Phase Primary Junctions - Aug 2016.pdf PDF
12 - Env Permit-ATP Guidance 2023.pdf PDF
11_Nellis-Creech Plant List.pdf PDF
7 - Nellis-Creech Electrical Req 2023-10-17.pdf PDF
5_Nellis-Creech AFB Installation Facilities Standards (IFS) appendix - Fire Protection Requirements.pdf PDF
4 - PPQ _PAST_PERFORMANCE_QUESTIONNAIRE FA486125R0003.docx DOCX document
48 - Example SABER Design Intent Drawing Sets_28 Nov.pdf PDF
47 - Example SABER Design Intent Drawing Set Level 2_20 Nov.pdf PDF
41 - General Decision Number_NV20240038 Building Clark County.pdf PDF
39 - Form SS-PER-007-003 Internal Combustion Engine Worksheet.pdf PDF
37 - BUILDER Inventory Sheet.xlsx XLSX spreadsheet
35 - AF 66 Schedule of Material Submittals.xlsx XLSX spreadsheet
32 - AF 3064 Progress Schedule Template - 01 Apr 1996.xlsx XLSX spreadsheet
27 - NTTR Visit Request - 27 Jan 2023.pdf PDF
25 - UH1.2 - Grounding Assembly for Pad-mounted Transformers and Enclosures 2 Rods - Aug 2016.pdf PDF
19_UF3.PC Concrete Pad for Three Phase Requirement - Aug 2016.pdf PDF
13 - Work Clearance Triggers.pdf PDF
6 - Nellis-Creech Comm Req NC 2710 - Jun 2023.pdf PDF
3 - Self Score Worksheet SABER_23 Sept 2025.xlsx XLSX spreadsheet
34 - Schedule of Values Template.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPAIR 58 RQS VARIOUS COMBINED.pdf

02 arch various.pdf
694B-A1-1
694B-A2-1
694B-A2-2
694B-A2-3
694B-A2-4
694B-A2-5
694B-A3-1
694B-A4-1
694B-D1-1
694B-D1-2
694B-G1-1
03 civil.pdf
694B-C1.1-C1-1
694B-C2.1-C2.1
694B-C3.1-C3.1
694B-C4.1-C4.1
694B-C5.1-C5.1
694B-C6.1-C6.1
694B-C7.1-C7.1
04 RECORD SET_VARIOUS BLDGS_STRUCT.pdf
73-08_1.1
73-08_S0.1
73-08_S1.2
73-08_S2.1
73-08_S2.2
73-08_S2.3
73-08_S2.4
73-08_S2.5
08 fire alarm.pdf
FA-0, 30x42
FA-1, 30x42
FA-2, 30x42
FA-3, 30x42
FA-4, 30x42

Utilities Sheet.pdf

File details come from the government source that posted it. Updated .