35 - AF 66 Schedule of Material Submittals.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
SABER IDIQ
Solicitation number
FA486125R0003
Issued by

About this file

The file "35 - AF 66 Schedule of Material Submittals.xlsx" appears to be a material submittal schedule related to the SABER IDIQ solicitation (FA486125R0003) issued by the 99th Contracting Squadron at Nellis Air Force Base. The solicitation is a Competitive HUBZone Procurement for design and construction projects across multiple Air Force locations, including Nellis Air Force Base, Creech Air Force Base Range 63, Point Bravo, and Nellis Test And Training Range (NTTR).

The IDIQ contract has a maximum ceiling amount between $100M and $250M (specifically noted as $185M in one description), with a five-year performance period and individual task orders estimated between $15,000 and $4,000,000. Task orders will cover a broad range of construction and engineering projects including carpentry, road repair, roofing, electrical, HVAC, plumbing, demolition, and other infrastructure-related work. The solicitation is anticipated to be issued electronically on SAM.gov around 15 August 2025, with proposals due by 12 November 2025 at 1430. Contractors must have in-house or readily accessible design capabilities. The procurement is limited to qualified HUBZone firms with a $40M bonding capability requirement.

View the file

Other files

File Type Posted
36 - AF 3000 Material Approval Submittal - 01 Sep 2003.pdf PDF
16_USAF Integrated Cultural Resources Mgmt Plan 32-7065 ICRMP - 06 Nov 2019.pdf PDF
33 - AF Form 3065 Progress Report Template - 01 Apr 1996.pdf PDF
19_UF3.PC Concrete Pad for Three Phase Requirement - Aug 2016.pdf PDF
42 - General Decision Number NV20240001 Bldg NTTR.pdf PDF
40 - General Decision Number NV20240058 Highway Clark County.pdf PDF
Atch 50_RFI Log_General Solicitation and Non-SABER Seed Related Questions.xlsx XLSX spreadsheet
23_Power Trench Sand and Backfill Requirements - Apr 2013.pdf PDF
1 - SABER SOW 25 Sep 25.pdf PDF
34 - Schedule of Values Template.xlsx XLSX spreadsheet
38_NTTR Automated Information System _AIS_ Equipment Form.pdf PDF
26 - Connection Charge Agreement - 22 Feb 23.pdf PDF
5_Nellis-Creech AFB Installation Facilities Standards (IFS) appendix - Fire Protection Requirements.pdf PDF
8_Nellis-Creech Lighting Req 2019-01-22.pdf PDF
18 - Nellis Supplement to DAFI 31-218 Motor Vehicle Traffic Supervision - 23 Mar 2023.pdf PDF
31 - AF Form 3052 Cost Estimate Template.xlsx XLSX spreadsheet
4 - PPQ _PAST_PERFORMANCE_QUESTIONNAIRE FA486125R0003.docx DOCX document
7 - Nellis-Creech Electrical Req 2023-10-17.pdf PDF
43 - General Decision Number_NV20250024 Heavy Clark County.pdf PDF
46 - Example SABER Design Intent Drawing Set Level 1_20 Nov.pdf PDF
14_ACC Sole Source EMCS Letter.pdf PDF
45 - Attachment Contract Information Sheet.pdf PDF
22_RUS Bulletin 1728F-806 UG Main VEA Standard - 18 October 2018.pdf PDF
2 - Price Schedule 23 September 25.pdf PDF
11_Nellis-Creech Plant List.pdf PDF
29 - Nuclear Gauge Form 2.docx DOCX document
52 - 99 SFS - Mass Pass Request Template.xlsx XLSX spreadsheet
30 - AF Form 103 Base Civil Engineering Work Clearance Request - 01 Aug 1994.pdf PDF
15 - Hazardous Material Management Guidance Document 2023-06-03.pdf PDF
9_Nellis-Creech Mech-Plumb Req 2020-07-07.pdf PDF
17 - Installation Plan 12 - Hazardous Waste Management Plan 27 Sep 23.pdf PDF
24_UG3.3 Three Phase Six Bushing Pad-mounted Transformer - Aug 2016.pdf PDF
51_RFI Log_ SABER Seed RKMF 2400010 Reno Honor Guard 99 FSS B10250.xlsx XLSX spreadsheet
10_Nellis-Creech Utility Meter Req 2019-09-13.pdf PDF
44 - SABER SOO RKMF240010 Renovate Honor Guard 99 FSS B10250_14Feb2025.pdf PDF
28 - Nuclear Gauge Form 1.xlsx XLSX spreadsheet
Solicitation - FA486125R0003.pdf PDF
20_UT1-UT5 Modified Trenching Drawing - Aug 2016.pdf PDF
21_US3.PJ Single and Three Phase Primary Junctions - Aug 2016.pdf PDF
12 - Env Permit-ATP Guidance 2023.pdf PDF
37 - BUILDER Inventory Sheet.xlsx XLSX spreadsheet
6 - Nellis-Creech Comm Req NC 2710 - Jun 2023.pdf PDF
32 - AF 3064 Progress Schedule Template - 01 Apr 1996.xlsx XLSX spreadsheet
3 - Self Score Worksheet SABER_23 Sept 2025.xlsx XLSX spreadsheet
13 - Work Clearance Triggers.pdf PDF
25 - UH1.2 - Grounding Assembly for Pad-mounted Transformers and Enclosures 2 Rods - Aug 2016.pdf PDF
48 - Example SABER Design Intent Drawing Sets_28 Nov.pdf PDF
39 - Form SS-PER-007-003 Internal Combustion Engine Worksheet.pdf PDF
49 - As-Builts.pdf PDF
41 - General Decision Number_NV20240038 Building Clark County.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:

(To be completed by Project Engineer or Contractor)(To be completed by Contract Administrator)
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALNUMBER OF COPIES REQUIREDREQUIRED SUBMISSION DATE

Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the date received from the Contractor. (MM/DD/YY)

DATE T CIVIL ENGINEERING

Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the date the submittal is due back from CE

(MM/DD/YY) SUBMITTAL NUMBERS

Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter Resubmittal Number

FINAL APPROVAL

Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter any comments pertaining to the submittal

CERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTS
APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the submittal final approval date

(MM/DD/YY)

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter any comments pertaining to the submittal

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Schedule of Material Submittals Template, Feb 05 (SAF/AQCP)

File details come from the government source that posted it. Updated .