35 - AF 66 Schedule of Material Submittals.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- SABER IDIQ
- Solicitation number
- FA486125R0003
About this file
The file "35 - AF 66 Schedule of Material Submittals.xlsx" appears to be a material submittal schedule related to the SABER IDIQ solicitation (FA486125R0003) issued by the 99th Contracting Squadron at Nellis Air Force Base. The solicitation is a Competitive HUBZone Procurement for design and construction projects across multiple Air Force locations, including Nellis Air Force Base, Creech Air Force Base Range 63, Point Bravo, and Nellis Test And Training Range (NTTR).
The IDIQ contract has a maximum ceiling amount between $100M and $250M (specifically noted as $185M in one description), with a five-year performance period and individual task orders estimated between $15,000 and $4,000,000. Task orders will cover a broad range of construction and engineering projects including carpentry, road repair, roofing, electrical, HVAC, plumbing, demolition, and other infrastructure-related work. The solicitation is anticipated to be issued electronically on SAM.gov around 15 August 2025, with proposals due by 12 November 2025 at 1430. Contractors must have in-house or readily accessible design capabilities. The procurement is limited to qualified HUBZone firms with a $40M bonding capability requirement.
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:
| (To be completed by Project Engineer or Contractor) | (To be completed by Contract Administrator) | |||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | NUMBER OF COPIES REQUIRED | REQUIRED SUBMISSION DATE |
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the date received from the Contractor. (MM/DD/YY)
DATE T CIVIL ENGINEERING
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the date the submittal is due back from CE
(MM/DD/YY) SUBMITTAL NUMBERS
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter Resubmittal Number
FINAL APPROVAL
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter any comments pertaining to the submittal
| CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | |
| APPROVED |
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the submittal final approval date
(MM/DD/YY)
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter any comments pertaining to the submittal
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 8 |
| 9 |
| 10 |
| 11 |
| 12 |
| 13 |
| 14 |
| 15 |
| 16 |
| 17 |
| 18 |
| 19 |
| 20 |
| 21 |
| 22 |
| 23 |
| 24 |
| Schedule of Material Submittals Template, Feb 05 (SAF/AQCP) |
File details come from the government source that posted it. Updated .