13 - Work Clearance Triggers.pdf

PDF 154 KB Posted

Attached to
SABER IDIQ
Solicitation number
FA486125R0003
Issued by

About this file

This document is a Work Clearance Triggers guide detailing environmental and regulatory compliance requirements for construction and equipment-related activities. The first section covers Air Quality and Clark County Dust Permit triggers, which include disturbances over 0.25 acres, mechanized trenching over 100 linear feet, and mechanical demolition of structures larger than 1,000 square feet. Storm Water Pollution Prevention Permit requirements mandate a site-specific SWPPP for construction activities disturbing one or more acres, with specific exemptions for routine maintenance.

Additional sections outline requirements for Water Quality, Cultural Resources, and Natural Resources assessments, including permits for water line tapping and checks for archaeological and endangered species sites. The document also addresses Air Quality Title V Permit Revisions, which require detailed reporting for new or replaced emissions equipment, with a 120-day processing period. Petroleum, Oils, and Lubricants (POL) storage tank modifications must be reported to the Nellis AFB POL Program Manager, including detailed information about tank location, serial number, usage, and capacity, with custodians required to report tank service changes or movements.

View the file

Other files

File Type Posted
51_RFI Log_ SABER Seed RKMF 2400010 Reno Honor Guard 99 FSS B10250.xlsx XLSX spreadsheet
45 - Attachment Contract Information Sheet.pdf PDF
44 - SABER SOO RKMF240010 Renovate Honor Guard 99 FSS B10250_14Feb2025.pdf PDF
36 - AF 3000 Material Approval Submittal - 01 Sep 2003.pdf PDF
33 - AF Form 3065 Progress Report Template - 01 Apr 1996.pdf PDF
30 - AF Form 103 Base Civil Engineering Work Clearance Request - 01 Aug 1994.pdf PDF
28 - Nuclear Gauge Form 1.xlsx XLSX spreadsheet
22_RUS Bulletin 1728F-806 UG Main VEA Standard - 18 October 2018.pdf PDF
20_UT1-UT5 Modified Trenching Drawing - Aug 2016.pdf PDF
15 - Hazardous Material Management Guidance Document 2023-06-03.pdf PDF
14_ACC Sole Source EMCS Letter.pdf PDF
10_Nellis-Creech Utility Meter Req 2019-09-13.pdf PDF
2 - Price Schedule 23 September 25.pdf PDF
52 - 99 SFS - Mass Pass Request Template.xlsx XLSX spreadsheet
Atch 50_RFI Log_General Solicitation and Non-SABER Seed Related Questions.xlsx XLSX spreadsheet
42 - General Decision Number NV20240001 Bldg NTTR.pdf PDF
40 - General Decision Number NV20240058 Highway Clark County.pdf PDF
31 - AF Form 3052 Cost Estimate Template.xlsx XLSX spreadsheet
24_UG3.3 Three Phase Six Bushing Pad-mounted Transformer - Aug 2016.pdf PDF
18 - Nellis Supplement to DAFI 31-218 Motor Vehicle Traffic Supervision - 23 Mar 2023.pdf PDF
17 - Installation Plan 12 - Hazardous Waste Management Plan 27 Sep 23.pdf PDF
16_USAF Integrated Cultural Resources Mgmt Plan 32-7065 ICRMP - 06 Nov 2019.pdf PDF
9_Nellis-Creech Mech-Plumb Req 2020-07-07.pdf PDF
8_Nellis-Creech Lighting Req 2019-01-22.pdf PDF
49 - As-Builts.pdf PDF
48 - Example SABER Design Intent Drawing Sets_28 Nov.pdf PDF
47 - Example SABER Design Intent Drawing Set Level 2_20 Nov.pdf PDF
41 - General Decision Number_NV20240038 Building Clark County.pdf PDF
39 - Form SS-PER-007-003 Internal Combustion Engine Worksheet.pdf PDF
37 - BUILDER Inventory Sheet.xlsx XLSX spreadsheet
35 - AF 66 Schedule of Material Submittals.xlsx XLSX spreadsheet
32 - AF 3064 Progress Schedule Template - 01 Apr 1996.xlsx XLSX spreadsheet
27 - NTTR Visit Request - 27 Jan 2023.pdf PDF
25 - UH1.2 - Grounding Assembly for Pad-mounted Transformers and Enclosures 2 Rods - Aug 2016.pdf PDF
19_UF3.PC Concrete Pad for Three Phase Requirement - Aug 2016.pdf PDF
6 - Nellis-Creech Comm Req NC 2710 - Jun 2023.pdf PDF
3 - Self Score Worksheet SABER_23 Sept 2025.xlsx XLSX spreadsheet
34 - Schedule of Values Template.xlsx XLSX spreadsheet
1 - SABER SOW 25 Sep 25.pdf PDF
23_Power Trench Sand and Backfill Requirements - Apr 2013.pdf PDF
Solicitation - FA486125R0003.pdf PDF
46 - Example SABER Design Intent Drawing Set Level 1_20 Nov.pdf PDF
43 - General Decision Number_NV20250024 Heavy Clark County.pdf PDF
38_NTTR Automated Information System _AIS_ Equipment Form.pdf PDF
29 - Nuclear Gauge Form 2.docx DOCX document
26 - Connection Charge Agreement - 22 Feb 23.pdf PDF
21_US3.PJ Single and Three Phase Primary Junctions - Aug 2016.pdf PDF
12 - Env Permit-ATP Guidance 2023.pdf PDF
11_Nellis-Creech Plant List.pdf PDF
7 - Nellis-Creech Electrical Req 2023-10-17.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Work Clearance Triggers Air Quality- Clark County Dust Permit:

• 0.25 acre (10,890 square feet) disturbance in overall area

• Mechanized trenching more than one hundred (100) linear feet

• Mechanical demolition of any structure larger than one thousand (1,000) square feet

• Disturbance includes driving, laydown areas, earth moving activities, etc.

Storm Water Pollution Prevention Permit:

• Construction activities disturbing one (1) or more acres (more than 43,560 square feet) in aggregate require a site specific SWPPP and the timely submission of a Notice of Intent (NOI) to NDEP

• Per NDEP Permit NVR100000, part 1.4.6.2, Routine maintenance that disturbs less than 5 acres that is performed to maintain the original line and grade, hydraulic capacity, or original purpose of a facility or structure is exempt.

• Disturbance does not include driving, laydown areas, and paving repairs as long as soil is not exposed

Water Quality

• Any tapping activity to the main water lines will require specific permits through NDEP.

Cultural Resources:

• Check to see if disturbance will affect any archaeological sites.

Natural Resources:

• Check to see if disturbance will affect any endangered species sites, such as

Desert Tortoise, burrowing owls, and Desert Poppy.

Air Quality- Title V Permit Revisions:

• Any new emissions equipment (Storage Tank, Fuel Dispenser, Boiler, Generator, Fire Pump, Hush House, Paint Booth, Media Blaster, Cooling

Tower, Incinerator, Woodworking Equipment, Degreaser, Etc.) being added or replaced.

o It takes about 120 days to add a new item to the next permit revision, and equipment cannot be used until on the permit.

o Air Quality needs: list of equipment, manufacturer, model number, designed rated capacities/heat ratings, production/throughput, etc.

• Any old emissions equipment (see above list) being removed.

POL

• New or replacement POL storage tanks must be reported to the Nellis

AFB POL Program Manager. The program manager will need detailed information from the tank (location, serial number, model number, usage, capacity, etc.).

• Tank custodians must also report when a tank is taken out of service or moved.

File details come from the government source that posted it. Updated .