AF FORM 66
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 2.pdf | ||
| Paint - Unit Price - EUSTIS.xls | XLS spreadsheet | |
| Paint - Unit Price - LANGLEY.xls | XLS spreadsheet | |
| Amendment 1.pdf | ||
| Gen Decsion Number VA120112 - 6-15-12 - Building - Hampton.mht | MHT file | |
| FA4800-12-B-0004 - PAINT.doc | DOC document | |
| Paint - Unit Price - | — | |
| Specs.pdf | ||
| Gen Decsion Number VA120118 - 6-15-12 - Building - NN.mht | MHT file | |
| Gen Decsion Number VA120033 - 1-06-12 - Residential - Hampton.mht | MHT file | |
| Gen Decsion Number VA120025 - 1-06-12 - Residential - NN.mht | MHT file |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPROVED DISAPPROVED
1 Accident Prevention Plan (APP) 01 35 26 1.6
2 Activity Hazard Analysis (AHA) 01 35 26 1.7
3 Crane Critical Lift Plan 01 35 26 1.6.1
4 Crane Operators 01 35 26 1.5.1.3
5 Notifications and Reports 01 35 26 1.11
6 Accident Reports 01 35 26 1.11.2
7 Crane Reports 01 35 26 1.11.3
8 Confined Space Entry Permit 01 35 26 1.8
9 Hot work permit 01 35 26 1.8
10 License Certificates 01 35 26 1.13
11 Work Plan 02 42 91 1.1
12 Materials and Equipment 02 83 19.00 10 2.1
13 Expendable Supplies 02 83 19.00 10 2.1.1
REMARKS
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
E S
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
Paint Exterior Metal Railings, F. 669
(Paint IDIQ)
Solicitation/Contract Number
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
MUHJ 12-5000
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
AF Form 66 (Computer Generated) Page 1 of 24
REMARKS
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
E S
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
Paint Exterior Metal Railings, F. 669
(Paint IDIQ)
Solicitation/Contract Number
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
MUHJ 12-5000
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
14 Qualifications 02 83 19.00 10 1.5.1
15 Occupant Protection Plan 02 83 19.00 10 1.5.4
16 Pressure Differential Log 02 83 19.00 10 3.1.3
Licenses, Permits and Notifications 02 83 19.00 10
1.5.5
18 Sampling and Analysis 02 83 19.00 10 1.3.3
19 Abatement Report 02 83 19.00 10 3.5
20 Detail Drawings 03 01 30 1.5.2
21 Proportions of Mixtures 03 01 30 1.3.6
22 Qualifications 03 01 30 1.5
23 Materials 03 01 30 2.1
Sampling and Laboratory Testing of Materials 03 01
30 1.3.7
25 Materials 03 01 30 2.1
26 Concrete Mixture Proportions 03 31 01.00 10 1.3
AF Form 66 (Computer Generated) Page 2 of 24
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
E S
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
Paint Exterior Metal Railings, F. 669
(Paint IDIQ)
Solicitation/Contract Number
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
MUHJ 12-5000
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
27 Batch Plant 03 31 01.00 10 2.2
28 Concrete Mixers 03 31 01.00 10 2.2.5
29 Conveying Equipment 03 31 01.00 10 2.2.6
30 Placing Equipment 03 31 01.00 10 2.2
31 Testing Technicians 03 31 01.00 10 1.5
Concrete Transportation Construction Inspector (CTCI)
03 31 01.00 10 1.5
Concrete Construction Inspector (CCI) 03 31 01.00
10 1.5
34 Construction Joint Treatment 03 31 01.00 10 3.1.4
35 Cold-Weather Placing 03 31 01.00 10 3.2.4
36 Hot-Weather Placing 03 31 01.00 10 3.2.5
37 Aggregates 03 31 01.00 10 2.1.2.1
Cementitious Materials, Admixtures, and Curing
Compound 03 31 01.00 10 1.5.4
39 Quality of Aggregates 03 31 01.00 10 3.4.2.3
AF Form 66 (Computer Generated) Page 3 of 24
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
E S
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
Paint Exterior Metal Railings, F. 669
(Paint IDIQ)
Solicitation/Contract Number
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
MUHJ 12-5000
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
40 Mixer Uniformity 03 31 01.00 10 3.4.2.10
41 Tests and Inspections 03 31 01.00 10 3.4
42 Cementitious Materials 03 31 01.00 10 2.1.1
43 Air-Entraining Admixture 03 31 01.00 10 2.1.3.1
44 Other Chemical Admixtures 03 31 01.00 10 2.1.3.4
45 Epoxy Resin 03 31 01.00 10 2.1.8
46 Latex Bonding Compound 03 31 01.00 10 2.1.7
47 Nonshrink Grout 03 31 01.00 10 2.1.5
48 Detail Drawings 03 33 00 1.4.1
49 Materials 03 33 00 2.1
50 Panels 03 33 00 1.4.2
51 Detail Drawings 04 20 00 1.4.5
52 Local/Regional Materials 04 20 00 1.2.1
AF Form 66 (Computer Generated) Page 4 of 24
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
E S
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
Paint Exterior Metal Railings, F. 669
(Paint IDIQ)
Solicitation/Contract Number
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
MUHJ 12-5000
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
53 Environmental Data 04 20 00 1.2.2
54 Clay or Shale Brick 04 20 00 2.2
55 Cement 04 20 00 2.6.4
56 Insulation 04 20 00 2.13
56 Cold Weather Installation 04 20 00 1.6.2
57 Salvaged Brick 04 20 00
58 Water-Repellant Admixture 04 20 00 2.7
59 Concrete Masonry Units (CMU) 04 20 00 2.4
60 Concrete Brick 04 20 00 2.3
61 Clay or Shale Brick 04 20 00 2.2
62 Anchors, Ties, and Bar Positioners 04 20 00 2.9
63 Expansion-Joint Materials 04 20 00 2.14
64 Joint Reinforcement 04 20 00 2.10
AF Form 66 (Computer Generated) Page 5 of 24
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
E S
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
Paint Exterior Metal Railings, F. 669
(Paint IDIQ)
Solicitation/Contract Number
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
MUHJ 12-5000
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
65 Insulation 04 20 00 2.13
66 Portable Panel 04 20 00 1.4.3
67 Pre-mixed Mortar 04 20 00 2.6.5
68 Unit Strength Method 04 20 00 1.2.3.1
69 Efflorescence Test 04 20 00 3.22.3
70 Field Testing of Mortar 04 20 00 3.22.1
71 Field Testing of Grout 04 20 00 3.22.2
72 Prism tests 04 20 00 3.22.4
73 Masonry Cement 04 20 00 2.6.4
74 Fire-rated CMU 04 20 00 2.4.3
75 Masonry Inspector Qualifications 04 20 00 1.4.4
Single-Wythe Masonry Wall Water Penetration Test
04 20 00 3.22.5
77 Clay or Shale Brick 04 20 00 2.2
AF Form 66 (Computer Generated) Page 6 of 24
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
E S
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
Paint Exterior Metal Railings, F. 669
(Paint IDIQ)
Solicitation/Contract Number
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
MUHJ 12-5000
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
78 Concrete Brick 04 20 00 2.3
79 Concrete Masonry Units (CMU) 04 20 00 2.4
80 Anchors, Ties, and Bar Positioners 04 20 00 2.9
81 Expansion-Joint Materials 04 20 00 2.14
82 Joint Reinforcement 04 20 00 2.10
83 Masonry Cement 04 20 00 2.6.4
84 Insulation 04 20 00 2.13
85 Insulation 04 20 00 2.13
86 Admixtures for Masonry Mortar 04 20 00 2.6.1
87 Admixtures for Grout 04 20 00 2.8.1
88 Contamination 04 20 00 1.4.2
89 Masonry Cement 04 20 00 2.6.4
90 Plastic Identification 04 20 00
AF Form 66 (Computer Generated) Page 7 of 24
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
E S
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
Paint Exterior Metal Railings, F. 669
(Paint IDIQ)
Solicitation/Contract Number
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
MUHJ 12-5000
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
91 Take-Back Program 04 20 00 3.21.2
92 Structural glued laminated 06 10 00 2.2.3
93 Trussed rafters 06 10 00 2.5.7
94 Trussed joists 06 10 00 2.5.8
95 Fabricated structural members 06 10 00 1.9.1
96 Modifications of structural members 06 10 00 1.9.2
97 Nailing Strips 06 10 00 2.2.2
98 Underlayment 06 10 00 2.4
99 Plastic Lumber 06 10 00 2.1.3
100 Fiberboard Wall Sheathing 06 10 00 2.5.2
101 Cellulose Honeycomb Panels 06 10 00 2.5.5
102 Fire-retardant treatment 06 10 00 1.8
103 Engineered wood products 06 10 00 2.1.2
AF Form 66 (Computer Generated) Page 8 of 24
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
E S
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
Paint Exterior Metal Railings, F. 669
(Paint IDIQ)
Solicitation/Contract Number
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
MUHJ 12-5000
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
104 Structural-use and OSB panels 06 10 00 1.4.4
105 Structural-use and OSB panels 06 10 00 2.3.3.2
106 Oriented Strand Board 06 10 00 2.3
107 Adhesives 06 10 00 2.5.11
108 Modifications of structural members 06 10 00 1.9.2
109 Preservative-treated 06 10 00 1.4.5
110 Certificates of grade 06 10 00 1.9.3
111 Preservative treatment 06 10 00 1.7
112 Take-back program 06 10 00 3.6
113 Local/Regional Materials 06 10 00 1.10.1
114 Plastic Lumber 06 10 00 2.1.3
115 Fiberboard Wall Sheathing 06 10 00 2.5.2
116 Cellulose Honeycomb Panels 06 10 00 2.5.5
AF Form 66 (Computer Generated) Page 9 of 24
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
E S
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
Paint Exterior Metal Railings, F. 669
(Paint IDIQ)
Solicitation/Contract Number
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
MUHJ 12-5000
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
117 Adhesives 06 10 00 2.5.11
118 Oriented Strand Board 06 10 00 2.3
119 Engineered Wood Products 06 10 00 2.1.2
120 Structural-use and OSB Panels 06 10 00 1.4.4
121 Structural-use and OSB Panels 06 10 00 2.3.3.2
122 Certified Wood 06 10 00 1.10.2
123 Detail Drawings 06 20 00 1.3
124 Siding 06 20 00 2.1.13
125 Epoxy-Aggregate Panels 06 20 00 2.1.13.9
126 Wood 06 20 00 2.1.13.7
127 Siding 06 20 00 2.1.13
128 Wood Shingles 06 20 00 2.4
129 Moldings 06 20 00 2.1.13.9
AF Form 66 (Computer Generated) Page 10 of 24
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
E S
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
Paint Exterior Metal Railings, F. 669
(Paint IDIQ)
Solicitation/Contract Number
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
MUHJ 12-5000
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
130 Fascias and Trim 06 20 00 2.3
131 Certificates of grade 06 20 00 1.4
132 Certificates of compliance 06 20 00 1.4
133 Fluid-applied membrane 07 14 00 2.1
134 Membrane primer 07 14 00 2.2
135 Elastomeric sheet 07 14 00 2.8
Flexible foam-backed elastomeric sheet 07 14 00
2.10
137 Solvent 07 14 00 3.3
138 Moisture meter 07 14 00 3.4.1
139 Protection board 07 14 00 2.11
140 Bond breaker 07 14 00 2.7
141 Warranty 07 14 00 1.6
142 Information Card 07 14 00 3.6
AF Form 66 (Computer Generated) Page 11 of 24
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
E S
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
Paint Exterior Metal Railings, F. 669
(Paint IDIQ)
Solicitation/Contract Number
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
MUHJ 12-5000
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
143 Instructions To Government Personnel 07 14 00 3.5
144 Water repellents 07 19 00 2.2
145 Water absorption 07 19 00 1.3.2
146 Water absorption 07 19 00 2.3.1
147 Water absorption 07 19 00 2.3.2
148 Water absorption 07 19 00 2.3.3
149 Accelerated weathering 07 19 00 2.3.1
150 Accelerated weathering 07 19 00 2.3.2
151 Accelerated weathering 07 19 00 2.3.3
152 Accelerated weathering 07 19 00 2.3.4
Resistance to chloride ion penetration 07 19 00
2.3.1
Resistance to chloride ion penetration 07 19 00
2.3.2
Resistance to chloride ion penetration 07 19 00
2.3.3
AF Form 66 (Computer Generated) Page 12 of 24
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
E S
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
Paint Exterior Metal Railings, F. 669
(Paint IDIQ)
Solicitation/Contract Number
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
MUHJ 12-5000
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
Resistance to chloride ion penetration 07 19 00
2.3.4
157 Moisture vapor transmission 07 19 00 1.3.2
158 Moisture vapor transmission 07 19 00 2.3.1
159 Moisture vapor transmission 07 19 00 2.3.2
160 Moisture vapor transmission 07 19 00 2.3.3
161 Moisture vapor transmission 07 19 00 2.3.4
162 Scaling resistance 07 19 00 2.3.1
163 Scaling resistance 07 19 00 2.3.2
164 Scaling resistance 07 19 00 2.3.3
165 Scaling resistance 07 19 00 2.3.4
166 Water Penetration and Leakage 07 19 00 1.3.2
167 Manufacturer's qualifications 07 19 00 1.3.1
168 Applicator's qualifications 07 19 00 1.3.1
AF Form 66 (Computer Generated) Page 13 of 24
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
E S
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
Paint Exterior Metal Railings, F. 669
(Paint IDIQ)
Solicitation/Contract Number
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
MUHJ 12-5000
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
169 Evidence of acceptable variation 07 19 00 1.3.3
170 Warranty 07 19 00 1.12
171 Application 07 19 00 3.4
172 material safety data sheets 07 19 00 1.7.1
Covering on flat, sloped, or curved surfaces 07 60 00
3.1.25
174 Gutters 07 60 00 3.1.17
175 Downspouts 07 60 00 3.1.18
176 Expansion joints 07 60 00 3.1.26
177 Gravel stops and fascias 07 60 00 3.1.15
178 Splash pans 07 60 00 3.1.22
179 Flashing for roof drains 07 60 00 3.1.19
180 Base flashing 07 60 00 3.1.11
181 Counterflashing 07 60 00 3.1.12
AF Form 66 (Computer Generated) Page 14 of 24
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
E S
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
Paint Exterior Metal Railings, F. 669
(Paint IDIQ)
Solicitation/Contract Number
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
MUHJ 12-5000
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
182 Flashing at roof penetrations 07 60 00 3.1.27
183 Reglets 07 60 00 3.1.13
184 Scuppers 07 60 00 3.1.20
185 Copings 07 60 00 3.1.30
186 Drip edge 07 60 00 3.1.16
187 Conductor heads 07 60 00 3.1.21
188 Open valley flashing 07 60 00 3.1.23
189 Eave flashing 07 60 00 3.1.24
190 Quality Control Plan 07 60 00 3.5
191 Sealants 07 92 00 2.1
192 Primers 07 92 00 2.2
193 Bond breakers 07 92 00 2.3
194 Backstops 07 92 00 2.4
AF Form 66 (Computer Generated) Page 15 of 24
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
E S
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
Paint Exterior Metal Railings, F. 669
(Paint IDIQ)
Solicitation/Contract Number
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
MUHJ 12-5000
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
195 Sealant 07 92 00 3.3.6
196 Doors 08 14 00 2.1
197 Doors 08 14 00 2.1
198 Accessories 08 14 00 2.2
199 Water-resistant sealer 08 14 00 2.3.7
200 warranty 08 14 00 1.6
201 Sound transmission class rating 08 14 00 2.1.6
202 Fire resistance rating 08 14 00 2.1.7
203 Certification 08 14 00 1.3
204 Local/Regional Materials 08 14 00 1.4
205 Doors 08 14 00 2.1
206 Door finish colors 08 14 00 2.3.6.4
207 Cycle-slam 08 14 00 2.4
AF Form 66 (Computer Generated) Page 16 of 24
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
E S
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
Paint Exterior Metal Railings, F. 669
(Paint IDIQ)
Solicitation/Contract Number
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
MUHJ 12-5000
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
208 Hinge loading resistance 08 14 00 2.4
209 Hardware schedule 08 71 00 1.3
210 Keying system 08 71 00 2.3.8
211 Hardware items 08 71 00 2.3
212 Installation 08 71 00 3.1
213 Hardware Schedule 08 71 00 1.3
214 Key Bitting 08 71 00 1.4
215 Installation 08 81 00 3.3.1
216 Control Tower Insulating Glass 08 81 00 2.2.2.1
217 Control Tower Laminated Glass 08 81 00 2.2.2.4
218 Insulating Glass 08 81 00 1.7.1
219 Plastic Glazing 08 81 00 2.3
220 Glazing Accessories 08 81 00 1.3
AF Form 66 (Computer Generated) Page 17 of 24
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
E S
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
Paint Exterior Metal Railings, F. 669
(Paint IDIQ)
Solicitation/Contract Number
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
MUHJ 12-5000
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
221 Insulating Glass 08 81 00 1.7.1
222 Plastic Sheet 08 81 00 3.2.7
223 Glazing Compound 08 81 00 2.4.2
224 Tape 08 81 00 2.4.5
225 Sealant 08 81 00 2.4.3.1
226 Insulating Glass 08 81 00 1.7.1
227 Plastic Glazing 08 81 00 2.3
228 Control Tower Insulating Glass 08 81 00 2.2.2.1
229 Control Tower Laminated Glass 08 81 00 2.2.2.4
230 Glazing Accessories 08 81 00 1.3
231 Setting and sealing materials 08 81 00 2.4
232 Glass setting 08 81 00 3.2
233 Local/Regional Materials 08 81 00 1.6.1
AF Form 66 (Computer Generated) Page 18 of 24
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
E S
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
Paint Exterior Metal Railings, F. 669
(Paint IDIQ)
Solicitation/Contract Number
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
MUHJ 12-5000
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
234 Certification 09 23 00 1.3.2
235 Gypsum Plaster 09 23 00 1.5.1
236 Full Size Sample 09 23 00 1.6
237 ready-mix gypsum plaster 09 23 00 2.7
238 Acoustical Plaster Finish 09 23 00 2.7.2.7
239 Lath 09 24 23 3.3
240 Proportions and Mixing 09 24 23 3.6
241 Colored Stucco Finish Coat 09 24 23 2.2
242 Sample Panel 09 24 23 1.3
243 Flooring 09 67 23.14 2.1
244 Sealer and Resin 09 67 23.14 2.4
245 Floor Surfacing 09 67 23.14 3.3.2
246 Conductive Sparkproof Flooring 09 67 23.14 2.3
AF Form 66 (Computer Generated) Page 19 of 24
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
E S
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
Paint Exterior Metal Railings, F. 669
(Paint IDIQ)
Solicitation/Contract Number
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
MUHJ 12-5000
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
247 Mixing 09 67 23.14 3.2
248 Certification 09 67 23.14 1.3.2
249 Flooring Systems 09 67 23.14 2.2
250 Testing 09 67 23.14 3.4
251 Qualifications of Installer 09 67 23.14 1.3.1
252 Application 09 67 23.14 3.3
253 Flooring Systems 09 67 23.14 2.2
254 Piping identification 09 90 00 3.12
255 stencil 09 90 00 3.12
256 Certification 09 90 00 1.4.4
257 Coating 09 90 00 2.1
258 Manufacturer's Technical Data Sheets 09 90 00 2.1
259 [Sealant] 09 90 00 3.3.5
AF Form 66 (Computer Generated) Page 20 of 24
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
E S
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
Paint Exterior Metal Railings, F. 669
(Paint IDIQ)
Solicitation/Contract Number
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
MUHJ 12-5000
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
260 Color 09 90 00 1.10
261 Textured Wall Coating System 09 90 00 1.4.2
Sample Textured Wall Coating System Mock-Up 09
90 00 1.4.3
263 Applicator's qualifications 09 90 00 1.3
264 Qualification Testing 09 90 00 1.4.1.2
265 Application instructions 09 90 00 3.4.1
266 Mixing 09 90 00 3.8.2
Manufacturer's Material Safety Data Sheets 09 90 00
1.7.2
268 Coatings: 09 90 00 2.1
Material, Equipment, and Fixture Lists 09 97 13.00 40
1.4
270 Safety Plan 09 97 13.00 40 1.4
271 Abrasive Blasting Material 09 97 13.00 40 2.1
272 Sealant Compound 09 97 13.00 40 2.2
AF Form 66 (Computer Generated) Page 21 of 24
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
E S
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
Paint Exterior Metal Railings, F. 669
(Paint IDIQ)
Solicitation/Contract Number
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
MUHJ 12-5000
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
273 Inorganic Zinc 09 97 13.00 40 2.3.1
274 Inhibitive Polyamide Epoxy 09 97 13.00 40 2.3.1
275 Aliphatic Polyurethane 09 97 13.00 40 2.3.1
Manufacturer's Standard Color Charts 09 97 13.00 40
1.4
277 Inspection Forms 09 97 13.00 40 3.5
278 Mix Designs 09 97 13.00 40 1.4
279 Inorganic Zinc 09 97 13.00 40 2.3.1
280 Inhibitive Polyamide Epoxy 09 97 13.00 40 2.3.1
281 Aliphatic Polyurethane 09 97 13.00 40 2.3.1
282 Inspection reports 09 97 13.00 40 3.5
283 Abrasive Blasting Material 09 97 13.00 40 2.1
284 Sealant Compound 09 97 13.00 40 2.2
285 Inorganic Zinc Coating 09 97 13.00 40 3.2.1
AF Form 66 (Computer Generated) Page 22 of 24
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
E S
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
Paint Exterior Metal Railings, F. 669
(Paint IDIQ)
Solicitation/Contract Number
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
MUHJ 12-5000
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
286 Inhibitive Polyamide Epoxy 09 97 13.00 40 2.3.1
287 Aliphatic Polyurethane 09 97 13.00 40 2.3.1
288 Protective Coatings 09 97 13.00 40 2.3
289 Corner Guards 10 26 13 2.2
290 Wall Guards (Bumper Guards) 10 26 13 2.3
291 Door Protectors 10 26 13 2.4
292 Wall Covering/Panels 10 26 13 2.5
293 Certification 10 26 13 1.3
294 Finish 10 26 13 2.7
295 Corner Guards 10 26 13 2.2
296 Wall Guards (Bumper Guards) 10 26 13 2.3
297 Door Protectors 10 26 13 2.4
298 Wall Covering/Panels 10 26 13 2.5
AF Form 66 (Computer Generated) Page 23 of 24
DATE CONTRACTOR
NOTIFIED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
S T
R E
P O
R T
S
O T
H E
R
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C E
R T
IF
IC
A T
E S
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
S
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
NUMBER OF COPIES REQUIRED
Project Title
Paint Exterior Metal Railings, F. 669
(Paint IDIQ)
Solicitation/Contract Number
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER
Project No.
MUHJ 12-5000
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C A
T A
L O
G D
A T
A
299 Corner Guards 10 26 13 2.2
300 Wall Guards (Bumper Guards) 10 26 13 2.3
301 Door Protectors 10 26 13 2.4
302 Wall Covering/Panels 10 26 13 2.5
AF Form 66 (Computer Generated) Page 24 of 24