Paint - Unit Price -
60 KB Posted
- Attached to
- Amendment 2 - Q&A Federal contract opportunity
- Solicitation number
- FA4800-12-B-0004
About this file
Bid Schedule - Blank
Text of this file
PAINT IDIQ BASE YEAR
CONTRACT LINE ITEM NO. DESCRIPTION EST QTY UNIT UNIT PRICE AMOUNT
| A001 |
| INTERIOR PAINT AND COVERINGS (not to exclude section 09900) |
| A001A | Prepare & Paint Doors, flush, including frame and trim | 50 | EA | $ - 0 |
| A001B | Prepare & Paint Doors, panel, including frame and trim | 50 | EA | $ - 0 |
| A001C | Prepare & Paint 1-8 lite windows | 50 | EA | $ - 0 |
| A001D | Prepare & Paint 7-10 lite windows | 50 | EA | $ - 0 |
| A001E | Prepare & Paint 12 lite windows | 50 | EA | $ - 0 |
| A001F | Prepare & Paint Walls and Ceilings, Plaster or Drywall | 6,000 | SF | $ - 0 |
| A001G | Prepare & Paint Wood Trim | 3,000 | LF | $ - 0 |
| A001H | Prepare and Paint Interior Ladders | 1,000 | LF | $ - 0 |
| A001I | Prepare and Paint Railings and Balustrades up to 6" diameter | 500 | LF | $ - 0 |
| A001J | Prepare and Paint Handrail | 500 | LF | $ - 0 |
| A001K | Install Wallpaper, basic matching pattern | 100 | SF | $ - 0 |
| A001L | Install Base Cove, rubber or vinyl, Standard Colors, 4-6" high | 100 | LF | $ - 0 |
| A001M | Install Base Cove Corners, rubber or vinyl, Standard Colors, 4-6" high | 100 | EA | $ - 0 |
| A001N | Prepare and Paint Concrete Floor, Epoxy Coating, Standard Colors | 1,000 | SF | $ - 0 |
| A001O | Remove Interior Base, cove, rubber or vinyl | 100 | LF | $ - 0 |
DIVISION 02 -- SITE WORK
| 02050--Demolition | ||||
| A001AA | Remove Joist, 2" x 6" | 272 | LF | $ - 0 |
| A001AB | Remove Joist, 2" x 8" | 272 | LF | $ - 0 |
| A001AC | Remove Joist, 2" x 10" | 272 | LF | $ - 0 |
| A001AD | Remove Blocking, 2 x (8" to 10") | 136 | LF | $ - 0 |
| A001AE | Remove 1 x Wood Fence | 6,250 | SF | $ - 0 |
| A001AF | Remove Wood Trim | 1,200 | LF | $ - 0 |
| A001AG | Remove Plywood | 640 | SF | $ - 0 |
| A001AH | Remove Metal Fascia | 96 | LF | $ - 0 |
| A001AJ | Remove Sheathing | 48 | SF | $ - 0 |
| A001AK | Remove Sealant and Backer Rod | 3,000 | LF | $ - 0 |
| A001AL | Remove Vines and Ivy | 2,500 | SF | $ - 0 |
| A001AM | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 02090--Lead-Based Paint (LBP) Abatement and Disposal | $ - 0 | |||
| Remove and Dispose of Lead-Based Paint (LBP) | $ - 0 | |||
| A001AN | Piping Up To 12" Diameter | 500 | LF | $ - 0 |
| A001AP | Piping 12" To 16" Diameter | 500 | LF | $ - 0 |
| A001AQ | Surface Prep Doors | 500 | SF | $ - 0 |
| A001AR | Surface Prep Walls | 1,257 | SF | $ - 0 |
| A001AS | Surface Prep Beams & Trusses | 280 | SF | $ - 0 |
| A001AT | All Others-To be Negotiated (Per Height, Accessiblity, Substar, etc.) | TBN | TBN | ERROR:#VALUE! |
| A001AU | Remove & dispose of asbestos containing sealant | 100 | LF | $ - 0 |
| A001AV | Lead Dust Wipe Sampling by IH | 50 | HRS | $ - 0 |
| A001AW | Lead Dust Wipe Sampling Read by CIH | 500 | EA | $ - 0 |
| A001AX | Soil Sampling by IH | 100 | HRS | $ - 0 |
| A001AY | Soil Sampling Read by CIH | 500 | EA | $ - 0 |
| A001AZ | Disposal of Hazardous Lead-Containing Mat'ls If No Reduction Is Req'd (i.e. Paint Chips) | 10 | Drums | $ - 0 |
| A001BA | If reduction of mat'ls is required (i.e. Paint Chips) | TBN | Drums | ERROR:#VALUE! |
| A001BB | Disposal of Non-hazardous Asbestor Material | 75 | Drums | $ - 0 |
| A001BC | Disposal of Non-hazardous Material in Dumpster | 3,500 | CF | $ - 0 |
| A001BD | If reduction of mat'ls if required (i.e., cutting up fence to fit into drums) | TBN | Drums | ERROR:#VALUE! |
| A001BE | Reserved | $ - 0 | ||
| $ - 0 | ||||
| DIVISION 06 -- WOOD & PLASTIC | $ - 0 | |||
| $ - 0 | ||||
| 06100--Rough Carpentry | $ - 0 | |||
| A001BF | Replace 2"x4" joist | 300 | LF | $ - 0 |
| A001BG | Replace 2"x8" joist | 300 | LF | $ - 0 |
| A001BH | Replace 2"x10" joist | 300 | LF | $ - 0 |
| A001BJ | Replace Blocking, 2x(8" to 10") | 170 | LF | $ - 0 |
| A001BK | Replace 1x Wood Fence | 6,250 | SF | $ - 0 |
| A001BL | Replace Sheathing | 820 | SF | $ - 0 |
| A001BM | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 06200--Finish Carpentry | $ - 0 | |||
| A001BN | Replace Exterior Wood Trim | 12 | OPNG | $ - 0 |
| A001BP | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 07600--Sheet Metalwork, General | $ - 0 | |||
| A001BQ | Replace Metal Fascia (.018 Break Metal) | 98 | LF | $ - 0 |
| A001BR | Replace Gutters & Downspout (3-1/2" to 4" Diameter) | 500 | LF | $ - 0 |
| A001BS | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 07920--Joint Sealant | $ - 0 | |||
| A001BT | Replace sealant and backer rod | 1,000 | LF | $ - 0 |
| A001BU | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 08810--Glass and Glazing | $ - 0 | |||
| A001BV | Replace Glazing (1/4" Non-Insulated) | 200 | SF | $ - 0 |
| A001BW | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 09900--Painting, General | $ - 0 | |||
| A001BX | Prepare & Paint Metal Doors (incl frame & trim) | 1,200 | EA | $ - 0 |
| A001BY | Prepare & Paint Wood Doors (incl frame & trim) | 1,200 | EA | $ - 0 |
| A001BZ | Prepare and paint 1-8 Lite windows | 15 | EA | $ - 0 |
| A001CA | Prepare and paint 7-10 Lite windows | 15 | EA | $ - 0 |
| A001CB | Prepare and paint 12 Lite windows | 15 | EA | $ - 0 |
| A001CC | Cut-In Preparations & Painting for Surfaces (Incl Masonry, Wood, Metal, Stucco, etc.) | 34,000 | EA | $ - 0 |
| A001CD | Prepare and paint wood surfaces, include sealing | 200,000 | SF | $ - 0 |
| A001CE | Prepare and paint stucco/EIFS/plaster surfaces | 20,000 | SF | $ - 0 |
| A001CF | Seal Stucco/EIFS/Plaster Surfaces | 6,000 | SF | $ - 0 |
| A001CG | Prepare & paint concrete masonry unit surfaces | 20,000 | SF | $ - 0 |
| A001CH | Seal concrete masonry unit (CMU) surfaces | 25,000 | SF | $ - 0 |
| A001CJ | Prepare and paint concrete surfaces | 10,000 | SF | $ - 0 |
| A001CK | Seal Concrete Surfaces | 2,500 | SF | $ - 0 |
| A001CL | Patch Concrete, CMU Surfaces (Patch Holes 1/2" or Skim Coat) | 1,000 | SF | $ - 0 |
| A001CM | Clean existing brick and provide water repellent | 20,000 | SF | $ - 0 |
| A001CN | Stucco repair | 1,000 | SF | $ - 0 |
| A001CP | Prepare and paint ferrous metal surfaces | 30 | SF | $ - 0 |
| A001CQ | Prepare and paint aluminum surfaces | 21,000 | SF | $ - 0 |
| A001CR | Seal Ferrous Metal/Galvanized/Alum. Surfaces | 5,000 | SF | $ - 0 |
| A001CS | Prepare and Paint New/Old Gutters & Downspouts | 15,000 | SF | $ - 0 |
| A001CT | Prepare and Paint Pipes Up To 4" Diameter | 10,000 | LF | $ - 0 |
| A001CU | Prepare and paint pipes Over 4" Diameter | 3,484 | LF | $ - 0 |
| A001CV | Water Blast Cleaning | 25,000 | SF | $ - 0 |
| $ - 0 | ||||
| Lift Rental, 20 - 40 Feet Heights | $ - 0 | |||
| A001CW | Daily Rental | 15 | DY | $ - 0 |
| A001CX | Weekly Rental | 8 | WK | $ - 0 |
| A001CY | Monthy Rental | 3 | MO | $ - 0 |
| $ - 0 | ||||
| Lift Rental, 40 - 60 Feet Heights | $ - 0 | |||
| A001CZ | Daily Rental | 10 | DY | $ - 0 |
| A001DA | Weekly Rental | 6 | WK | $ - 0 |
| A001DB | Monthy Rental | 1 | MO | $ - 0 |
| $ - 0 | ||||
| Lift Rental 60 - 80 Feet Heights | $ - 0 | |||
| A001DC | Daily Rental | 5 | DY | $ - 0 |
| A001DD | Weekly Rental | 1 | WK | $ - 0 |
| A001DE | Monthy Rental | 1 | MO | $ - 0 |
| A001DF | Lift Delivery/Pickup | 69 | JB | $ - 0 |
| $ - 0 | ||||
| Labor Rate Multiplier | $ - 0 | |||
| A001DG | Labor Rate Multiplier Over 20 FT 25% | TBD | $ - 0 | |
| A001DH | Labor Rate Multiplier Over 40 FT 50% | TBD | $ - 0 | |
| A001DI | Labor Rate Multiplier Over 60 FT 75% | TBD | $ - 0 | |
| A001DJ | Labor Rate Multiplier Evening/Weekend Requirement | TBD |
TOTAL ---------------->> A001 ERROR:#VALUE!
Note: Replace means to provide and install new materials where items are demolished.
&"Arial,Bold"UNIT PRICE LIST
MUHJ 12-XXXX
(Base Year)&"Arial,Regular"
&P
PAINT IDIQ OPTION YEAR 1
CONTRACT LINE ITEM NO. DESCRIPTION EST QTY UNIT UNIT PRICE AMOUNT
| A002 |
| INTERIOR PAINT AND COVERINGS (not to exclude section 09900) |
| A002A | Prepare & Paint Doors, flush, including frame and trim | 50 | EA | $ - 0 |
| A002B | Prepare & Paint Doors, panel, including frame and trim | 50 | EA | $ - 0 |
| A002C | Prepare & Paint 1-8 lite windows | 50 | EA | $ - 0 |
| A002D | Prepare & Paint 7-10 lite windows | 50 | EA | $ - 0 |
| A002E | Prepare & Paint 12 lite windows | 50 | EA | $ - 0 |
| A002F | Prepare & Paint Walls and Ceilings, Plaster or Drywall | 6,000 | SF | $ - 0 |
| A002G | Prepare & Paint Wood Trim | 3,000 | LF | $ - 0 |
| A002H | Prepare and Paint Interior Ladders | 1,000 | LF | $ - 0 |
| A002I | Prepare and Paint Railings and Balustrades up to 6" diameter | 500 | LF | $ - 0 |
| A002J | Prepare and Paint Handrail | 500 | LF | $ - 0 |
| A002K | Install Wallpaper, basic matching pattern | 100 | SF | $ - 0 |
| A002L | Install Base Cove, rubber or vinyl, Standard Colors, 4-6" high | 100 | LF | $ - 0 |
| A002M | Install Base Cove Corners, rubber or vinyl, Standard Colors, 4-6" high | 100 | EA | $ - 0 |
| A002N | Prepare and Paint Concrete Floor, Epoxy Coating, Standard Colors | 1,000 | SF | $ - 0 |
| A002O | Remove Interior Base, cove, rubber or vinyl | 100 | LF | $ - 0 |
DIVISION 02 -- SITE WORK
| 02050--Demolition | ||||
| A002AA | Remove Joist, 2" x 6" | 272 | LF | $ - 0 |
| A002AB | Remove Joist, 2" x 8" | 272 | LF | $ - 0 |
| A002AC | Remove Joist, 2" x 10" | 272 | LF | $ - 0 |
| A002AD | Remove Blocking, 2 x (8" to 10") | 136 | LF | $ - 0 |
| A002AE | Remove 1 x Wood Fence | 6,250 | SF | $ - 0 |
| A002AF | Remove Wood Trim | 1,200 | LF | $ - 0 |
| A002AG | Remove Plywood | 640 | SF | $ - 0 |
| A002AH | Remove Metal Fascia | 96 | LF | $ - 0 |
| A002AJ | Remove Sheathing | 48 | SF | $ - 0 |
| A002AK | Remove Sealant and Backer Rod | 3,000 | LF | $ - 0 |
| A002AL | Remove Vines and Ivy | 2,500 | SF | $ - 0 |
| A002AM | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 02090--Lead-Based Paint (LBP) Abatement and Disposal | $ - 0 | |||
| Remove and Dispose of Lead-Based Paint (LBP) | $ - 0 | |||
| A002AN | Piping Up To 12" Diameter | 500 | LF | $ - 0 |
| A002AP | Piping 12" To 16" Diameter | 500 | LF | $ - 0 |
| A002AQ | Surface Prep Doors | 500 | SF | $ - 0 |
| A002AR | Surface Prep Walls | 1,257 | SF | $ - 0 |
| A002AS | Surface Prep Beams & Trusses | 280 | SF | $ - 0 |
| A002AT | All Others-To be Negotiated (Per Height, Accessiblity, Substar, etc.) | TBN | TBN | ERROR:#VALUE! |
| A002AU | Remove & dispose of asbestos containing sealant | 100 | LF | $ - 0 |
| A002AV | Lead Dust Wipe Sampling by IH | 50 | HRS | $ - 0 |
| A002AW | Lead Dust Wipe Sampling Read by CIH | 500 | EA | $ - 0 |
| A002AX | Soil Sampling by IH | 100 | HRS | $ - 0 |
| A002AY | Soil Sampling Read by CIH | 500 | EA | $ - 0 |
| A002AZ | Disposal of Hazardous Lead-Containing Mat'ls If No Reduction Is Req'd (i.e. Paint Chips) | 10 | Drums | $ - 0 |
| A002BA | If reduction of mat'ls is required (i.e. Paint Chips) | TBN | Drums | ERROR:#VALUE! |
| A002BB | Disposal of Non-hazardous Asbestor Material | 75 | Drums | $ - 0 |
| A002BC | Disposal of Non-hazardous Material in Dumpster | 3,500 | CF | $ - 0 |
| A002BD | If reduction of mat'ls if required (i.e., cutting up fence to fit into drums) | TBN | Drums | ERROR:#VALUE! |
| A002BE | Reserved | $ - 0 | ||
| $ - 0 | ||||
| DIVISION 06 -- WOOD & PLASTIC | $ - 0 | |||
| $ - 0 | ||||
| 06100--Rough Carpentry | $ - 0 | |||
| A002BF | Replace 2"x4" joist | 300 | LF | $ - 0 |
| A002BG | Replace 2"x8" joist | 300 | LF | $ - 0 |
| A002BH | Replace 2"x10" joist | 300 | LF | $ - 0 |
| A002BJ | Replace Blocking, 2x(8" to 10") | 170 | LF | $ - 0 |
| A002BK | Replace 1x Wood Fence | 6,250 | SF | $ - 0 |
| A002BL | Replace Sheathing | 820 | SF | $ - 0 |
| A002BM | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 06200--Finish Carpentry | $ - 0 | |||
| A002BN | Replace Exterior Wood Trim | 12 | OPNG | $ - 0 |
| A002BP | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 07600--Sheet Metalwork, General | $ - 0 | |||
| A002BQ | Replace Metal Fascia (.018 Break Metal) | 98 | LF | $ - 0 |
| A002BR | Replace Gutters & Downspout (3-1/2" to 4" Diameter) | 500 | LF | $ - 0 |
| A002BS | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 07920--Joint Sealant | $ - 0 | |||
| A002BT | Replace sealant and backer rod | 1,000 | LF | $ - 0 |
| A002BU | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 08810--Glass and Glazing | $ - 0 | |||
| A002BV | Replace Glazing (1/4" Non-Insulated) | 200 | SF | $ - 0 |
| A002BW | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 09900--Painting, General | $ - 0 | |||
| A002BX | Prepare & Paint Metal Doors (incl frame & trim) | 1,200 | EA | $ - 0 |
| A002BY | Prepare & Paint Wood Doors (incl frame & trim) | 1,200 | EA | $ - 0 |
| A002BZ | Prepare and paint 1-8 Lite windows | 15 | EA | $ - 0 |
| A002CA | Prepare and paint 7-10 Lite windows | 15 | EA | $ - 0 |
| A002CB | Prepare and paint 12 Lite windows | 15 | EA | $ - 0 |
| A002CC | Cut-In Preparations & Painting for Surfaces (Incl Masonry, Wood, Metal, Stucco, etc.) | 34,000 | EA | $ - 0 |
| A002CD | Prepare and paint wood surfaces, include sealing | 200,000 | SF | $ - 0 |
| A002CE | Prepare and paint stucco/EIFS/plaster surfaces | 20,000 | SF | $ - 0 |
| A002CF | Seal Stucco/EIFS/Plaster Surfaces | 6,000 | SF | $ - 0 |
| A002CG | Prepare & paint concrete masonry unit surfaces | 20,000 | SF | $ - 0 |
| A002CH | Seal concrete masonry unit (CMU) surfaces | 25,000 | SF | $ - 0 |
| A002CJ | Prepare and paint concrete surfaces | 10,000 | SF | $ - 0 |
| A002CK | Seal Concrete Surfaces | 2,500 | SF | $ - 0 |
| A002CL | Patch Concrete, CMU Surfaces (Patch Holes 1/2" or Skim Coat) | 1,000 | SF | $ - 0 |
| A002CM | Clean existing brick and provide water repellent | 20,000 | SF | $ - 0 |
| A002CN | Stucco repair | 1,000 | SF | $ - 0 |
| A002CP | Prepare and paint ferrous metal surfaces | 30 | SF | $ - 0 |
| A002CQ | Prepare and paint aluminum surfaces | 21,000 | SF | $ - 0 |
| A002CR | Seal Ferrous Metal/Galvanized/Alum. Surfaces | 5,000 | SF | $ - 0 |
| A002CS | Prepare and Paint New/Old Gutters & Downspouts | 15,000 | SF | $ - 0 |
| A002CT | Prepare and Paint Pipes Up To 4" Diameter | 10,000 | LF | $ - 0 |
| A002CU | Prepare and paint pipes Over 4" Diameter | 3,484 | LF | $ - 0 |
| A002CV | Water Blast Cleaning | 25,000 | SF | $ - 0 |
| $ - 0 | ||||
| Lift Rental, 20 - 40 Feet Heights | $ - 0 | |||
| A002CW | Daily Rental | 15 | DY | $ - 0 |
| A002CX | Weekly Rental | 8 | WK | $ - 0 |
| A002CY | Monthy Rental | 3 | MO | $ - 0 |
| $ - 0 | ||||
| Lift Rental, 40 - 60 Feet Heights | $ - 0 | |||
| A002CZ | Daily Rental | 10 | DY | $ - 0 |
| A002DA | Weekly Rental | 6 | WK | $ - 0 |
| A002DB | Monthy Rental | 1 | MO | $ - 0 |
| $ - 0 | ||||
| Lift Rental 60 - 80 Feet Heights | $ - 0 | |||
| A002DC | Daily Rental | 5 | DY | $ - 0 |
| A002DD | Weekly Rental | 1 | WK | $ - 0 |
| A002DE | Monthy Rental | 1 | MO | $ - 0 |
| A002DF | Lift Delivery/Pickup | 69 | JB | $ - 0 |
| $ - 0 | ||||
| Labor Rate Multiplier | $ - 0 | |||
| A002DG | Labor Rate Multiplier Over 20 FT 25% | TBD | $ - 0 | |
| A002DH | Labor Rate Multiplier Over 40 FT 50% | TBD | $ - 0 | |
| A002DI | Labor Rate Multiplier Over 60 FT 75% | TBD | $ - 0 | |
| A002DJ | Labor Rate Multiplier Evening/Weekend Requirement | TBD |
TOTAL ---------------->> A002 ERROR:#VALUE!
Note: Replace means to provide and install new materials where items are demolished.
(Base Year)&"Arial,Regular"
&P
PAINT IDIQ OPTION YEAR 2
CONTRACT LINE ITEM NO. DESCRIPTION EST QTY UNIT UNIT PRICE AMOUNT
| A003 |
| INTERIOR PAINT AND COVERINGS (not to exclude section 09900) |
| A003A | Prepare & Paint Doors, flush, including frame and trim | 50 | EA | $ - 0 |
| A003B | Prepare & Paint Doors, panel, including frame and trim | 50 | EA | $ - 0 |
| A003C | Prepare & Paint 1-8 lite windows | 50 | EA | $ - 0 |
| A003D | Prepare & Paint 7-10 lite windows | 50 | EA | $ - 0 |
| A003E | Prepare & Paint 12 lite windows | 50 | EA | $ - 0 |
| A003F | Prepare & Paint Walls and Ceilings, Plaster or Drywall | 6,000 | SF | $ - 0 |
| A003G | Prepare & Paint Wood Trim | 3,000 | LF | $ - 0 |
| A003H | Prepare and Paint Interior Ladders | 1,000 | LF | $ - 0 |
| A003I | Prepare and Paint Railings and Balustrades up to 6" diameter | 500 | LF | $ - 0 |
| A003J | Prepare and Paint Handrail | 500 | LF | $ - 0 |
| A003K | Install Wallpaper, basic matching pattern | 100 | SF | $ - 0 |
| A003L | Install Base Cove, rubber or vinyl, Standard Colors, 4-6" high | 100 | LF | $ - 0 |
| A003M | Install Base Cove Corners, rubber or vinyl, Standard Colors, 4-6" high | 100 | EA | $ - 0 |
| A003N | Prepare and Paint Concrete Floor, Epoxy Coating, Standard Colors | 1,000 | SF | $ - 0 |
| A003O | Remove Interior Base, cove, rubber or vinyl | 100 | LF | $ - 0 |
DIVISION 02 -- SITE WORK
| 02050--Demolition | ||||
| A003AA | Remove Joist, 2" x 6" | 272 | LF | $ - 0 |
| A003AB | Remove Joist, 2" x 8" | 272 | LF | $ - 0 |
| A003AC | Remove Joist, 2" x 10" | 272 | LF | $ - 0 |
| A003AD | Remove Blocking, 2 x (8" to 10") | 136 | LF | $ - 0 |
| A003AE | Remove 1 x Wood Fence | 6,250 | SF | $ - 0 |
| A003AF | Remove Wood Trim | 1,200 | LF | $ - 0 |
| A003AG | Remove Plywood | 640 | SF | $ - 0 |
| A003AH | Remove Metal Fascia | 96 | LF | $ - 0 |
| A003AJ | Remove Sheathing | 48 | SF | $ - 0 |
| A003AK | Remove Sealant and Backer Rod | 3,000 | LF | $ - 0 |
| A003AL | Remove Vines and Ivy | 2,500 | SF | $ - 0 |
| A003AM | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 02090--Lead-Based Paint (LBP) Abatement and Disposal | $ - 0 | |||
| Remove and Dispose of Lead-Based Paint (LBP) | $ - 0 | |||
| A003AN | Piping Up To 12" Diameter | 500 | LF | $ - 0 |
| A003AP | Piping 12" To 16" Diameter | 500 | LF | $ - 0 |
| A003AQ | Surface Prep Doors | 500 | SF | $ - 0 |
| A003AR | Surface Prep Walls | 1,257 | SF | $ - 0 |
| A003AS | Surface Prep Beams & Trusses | 280 | SF | $ - 0 |
| A003AT | All Others-To be Negotiated (Per Height, Accessiblity, Substar, etc.) | TBN | TBN | |
| A003AU | Remove & dispose of asbestos containing sealant | 100 | LF | $ - 0 |
| A003AV | Lead Dust Wipe Sampling by IH | 50 | HRS | $ - 0 |
| A003AW | Lead Dust Wipe Sampling Read by CIH | 500 | EA | $ - 0 |
| A003AX | Soil Sampling by IH | 100 | HRS | $ - 0 |
| A003AY | Soil Sampling Read by CIH | 500 | EA | $ - 0 |
| A003AZ | Disposal of Hazardous Lead-Containing Mat'ls If No Reduction Is Req'd (i.e. Paint Chips) | 10 | Drums | $ - 0 |
| A003BA | If reduction of mat'ls is required (i.e. Paint Chips) | TBN | Drums | |
| A003BB | Disposal of Non-hazardous Asbestor Material | 75 | Drums | $ - 0 |
| A003BC | Disposal of Non-hazardous Material in Dumpster | 3,500 | CF | $ - 0 |
| A003BD | If reduction of mat'ls if required (i.e., cutting up fence to fit into drums) | TBN | Drums | |
| A003BE | Reserved | $ - 0 | ||
| $ - 0 | ||||
| DIVISION 06 -- WOOD & PLASTIC | $ - 0 | |||
| $ - 0 | ||||
| 06100--Rough Carpentry | $ - 0 | |||
| A003BF | Replace 2"x4" joist | 300 | LF | $ - 0 |
| A003BG | Replace 2"x8" joist | 300 | LF | $ - 0 |
| A003BH | Replace 2"x10" joist | 300 | LF | $ - 0 |
| A003BJ | Replace Blocking, 2x(8" to 10") | 170 | LF | $ - 0 |
| A003BK | Replace 1x Wood Fence | 6,250 | SF | $ - 0 |
| A003BL | Replace Sheathing | 820 | SF | $ - 0 |
| A003BM | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 06200--Finish Carpentry | $ - 0 | |||
| A003BN | Replace Exterior Wood Trim | 12 | OPNG | $ - 0 |
| A003BP | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 07600--Sheet Metalwork, General | $ - 0 | |||
| A003BQ | Replace Metal Fascia (.018 Break Metal) | 98 | LF | $ - 0 |
| A003BR | Replace Gutters & Downspout (3-1/2" to 4" Diameter) | 500 | LF | $ - 0 |
| A003BS | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 07920--Joint Sealant | $ - 0 | |||
| A003BT | Replace sealant and backer rod | 1,000 | LF | $ - 0 |
| A003BU | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 08810--Glass and Glazing | $ - 0 | |||
| A003BV | Replace Glazing (1/4" Non-Insulated) | 200 | SF | $ - 0 |
| A003BW | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 09900--Painting, General | $ - 0 | |||
| A003BX | Prepare & Paint Metal Doors (incl frame & trim) | 1,200 | EA | $ - 0 |
| A003BY | Prepare & Paint Wood Doors (incl frame & trim) | 1,200 | EA | $ - 0 |
| A003BZ | Prepare and paint 1-8 Lite windows | 15 | EA | $ - 0 |
| A003CA | Prepare and paint 7-10 Lite windows | 15 | EA | $ - 0 |
| A003CB | Prepare and paint 12 Lite windows | 15 | EA | $ - 0 |
| A003CC | Cut-In Preparations & Painting for Surfaces (Incl Masonry, Wood, Metal, Stucco, etc.) | 34,000 | EA | $ - 0 |
| A003CD | Prepare and paint wood surfaces, include sealing | 200,000 | SF | $ - 0 |
| A003CE | Prepare and paint stucco/EIFS/plaster surfaces | 20,000 | SF | $ - 0 |
| A003CF | Seal Stucco/EIFS/Plaster Surfaces | 6,000 | SF | $ - 0 |
| A003CG | Prepare & paint concrete masonry unit surfaces | 20,000 | SF | $ - 0 |
| A003CH | Seal concrete masonry unit (CMU) surfaces | 25,000 | SF | $ - 0 |
| A003CJ | Prepare and paint concrete surfaces | 10,000 | SF | $ - 0 |
| A003CK | Seal Concrete Surfaces | 2,500 | SF | $ - 0 |
| A003CL | Patch Concrete, CMU Surfaces (Patch Holes 1/2" or Skim Coat) | 1,000 | SF | $ - 0 |
| A003CM | Clean existing brick and provide water repellent | 20,000 | SF | $ - 0 |
| A003CN | Stucco repair | 1,000 | SF | $ - 0 |
| A003CP | Prepare and paint ferrous metal surfaces | 30 | SF | $ - 0 |
| A003CQ | Prepare and paint aluminum surfaces | 21,000 | SF | $ - 0 |
| A003CR | Seal Ferrous Metal/Galvanized/Alum. Surfaces | 5,000 | SF | $ - 0 |
| A003CS | Prepare and Paint New/Old Gutters & Downspouts | 15,000 | SF | $ - 0 |
| A003CT | Prepare and Paint Pipes Up To 4" Diameter | 10,000 | LF | $ - 0 |
| A003CU | Prepare and paint pipes Over 4" Diameter | 3,484 | LF | $ - 0 |
| A003CV | Water Blast Cleaning | 25,000 | SF | $ - 0 |
| $ - 0 | ||||
| Lift Rental, 20 - 40 Feet Heights | $ - 0 | |||
| A003CW | Daily Rental | 15 | DY | $ - 0 |
| A003CX | Weekly Rental | 8 | WK | $ - 0 |
| A003CY | Monthy Rental | 3 | MO | $ - 0 |
| $ - 0 | ||||
| Lift Rental, 40 - 60 Feet Heights | $ - 0 | |||
| A003CZ | Daily Rental | 10 | DY | $ - 0 |
| A003DA | Weekly Rental | 6 | WK | $ - 0 |
| A003DB | Monthy Rental | 1 | MO | $ - 0 |
| $ - 0 | ||||
| Lift Rental 60 - 80 Feet Heights | $ - 0 | |||
| A003DC | Daily Rental | 5 | DY | $ - 0 |
| A003DD | Weekly Rental | 1 | WK | $ - 0 |
| A003DE | Monthy Rental | 1 | MO | $ - 0 |
| A003DF | Lift Delivery/Pickup | 69 | JB | $ - 0 |
| $ - 0 | ||||
| Labor Rate Multiplier | $ - 0 | |||
| A003DG | Labor Rate Multiplier Over 20 FT 25% | TBD | $ - 0 | |
| A003DH | Labor Rate Multiplier Over 40 FT 50% | TBD | $ - 0 | |
| A003DI | Labor Rate Multiplier Over 60 FT 75% | TBD | $ - 0 | |
| A003DJ | Labor Rate Multiplier Evening/Weekend Requirement | TBD |
TOTAL ---------------->> A003 $ - 0
Note: Replace means to provide and install new materials where items are demolished.
(OPTION YEAR 2)
&"Arial,Regular"
&P
PAINT IDIQ OPTION YEAR 3
CONTRACT LINE ITEM NO. DESCRIPTION EST QTY UNIT UNIT PRICE AMOUNT
| A004 |
| INTERIOR PAINT AND COVERINGS (not to exclude section 09900) |
| A004A | Prepare & Paint Doors, flush, including frame and trim | 50 | EA | $ - 0 |
| A004B | Prepare & Paint Doors, panel, including frame and trim | 50 | EA | $ - 0 |
| A004C | Prepare & Paint 1-8 lite windows | 50 | EA | $ - 0 |
| A004D | Prepare & Paint 7-10 lite windows | 50 | EA | $ - 0 |
| A004E | Prepare & Paint 12 lite windows | 50 | EA | $ - 0 |
| A004F | Prepare & Paint Walls and Ceilings, Plaster or Drywall | 6,000 | SF | $ - 0 |
| A004G | Prepare & Paint Wood Trim | 3,000 | LF | $ - 0 |
| A004H | Prepare and Paint Interior Ladders | 1,000 | LF | $ - 0 |
| A004I | Prepare and Paint Railings and Balustrades up to 6" diameter | 500 | LF | $ - 0 |
| A004J | Prepare and Paint Handrail | 500 | LF | $ - 0 |
| A004K | Install Wallpaper, basic matching pattern | 100 | SF | $ - 0 |
| A004L | Install Base Cove, rubber or vinyl, Standard Colors, 4-6" high | 100 | LF | $ - 0 |
| A004M | Install Base Cove Corners, rubber or vinyl, Standard Colors, 4-6" high | 100 | EA | $ - 0 |
| A004N | Prepare and Paint Concrete Floor, Epoxy Coating, Standard Colors | 1,000 | SF | $ - 0 |
| A004O | Remove Interior Base, cove, rubber or vinyl | 100 | LF | $ - 0 |
DIVISION 02 -- SITE WORK
| 02050--Demolition | ||||
| A004AA | Remove Joist, 2" x 6" | 272 | LF | $ - 0 |
| A004AB | Remove Joist, 2" x 8" | 272 | LF | $ - 0 |
| A004AC | Remove Joist, 2" x 10" | 272 | LF | $ - 0 |
| A004AD | Remove Blocking, 2 x (8" to 10") | 136 | LF | $ - 0 |
| A004AE | Remove 1 x Wood Fence | 6,250 | SF | $ - 0 |
| A004AF | Remove Wood Trim | 1,200 | LF | $ - 0 |
| A004AG | Remove Plywood | 640 | SF | $ - 0 |
| A004AH | Remove Metal Fascia | 96 | LF | $ - 0 |
| A004AJ | Remove Sheathing | 48 | SF | $ - 0 |
| A004AK | Remove Sealant and Backer Rod | 3,000 | LF | $ - 0 |
| A004AL | Remove Vines and Ivy | 2,500 | SF | $ - 0 |
| A004AM | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 02090--Lead-Based Paint (LBP) Abatement and Disposal | $ - 0 | |||
| Remove and Dispose of Lead-Based Paint (LBP) | $ - 0 | |||
| A004AN | Piping Up To 12" Diameter | 500 | LF | $ - 0 |
| A004AP | Piping 12" To 16" Diameter | 500 | LF | $ - 0 |
| A004AQ | Surface Prep Doors | 500 | SF | $ - 0 |
| A004AR | Surface Prep Walls | 1,257 | SF | $ - 0 |
| A004AS | Surface Prep Beams & Trusses | 280 | SF | $ - 0 |
| A004AT | All Others-To be Negotiated (Per Height, Accessiblity, Substar, etc.) | TBN | TBN | ERROR:#VALUE! |
| A004AU | Remove & dispose of asbestos containing sealant | 100 | LF | $ - 0 |
| A004AV | Lead Dust Wipe Sampling by IH | 50 | HRS | $ - 0 |
| A004AW | Lead Dust Wipe Sampling Read by CIH | 500 | EA | $ - 0 |
| A004AX | Soil Sampling by IH | 100 | HRS | $ - 0 |
| A004AY | Soil Sampling Read by CIH | 500 | EA | $ - 0 |
| A004AZ | Disposal of Hazardous Lead-Containing Mat'ls If No Reduction Is Req'd (i.e. Paint Chips) | 10 | Drums | $ - 0 |
| A004BA | If reduction of mat'ls is required (i.e. Paint Chips) | TBN | Drums | ERROR:#VALUE! |
| A004BB | Disposal of Non-hazardous Asbestor Material | 75 | Drums | $ - 0 |
| A004BC | Disposal of Non-hazardous Material in Dumpster | 3,500 | CF | $ - 0 |
| A004BD | If reduction of mat'ls if required (i.e., cutting up fence to fit into drums) | TBN | Drums | ERROR:#VALUE! |
| A004BE | Reserved | $ - 0 | ||
| $ - 0 | ||||
| DIVISION 06 -- WOOD & PLASTIC | $ - 0 | |||
| $ - 0 | ||||
| 06100--Rough Carpentry | $ - 0 | |||
| A004BF | Replace 2"x4" joist | 300 | LF | $ - 0 |
| A004BG | Replace 2"x8" joist | 300 | LF | $ - 0 |
| A004BH | Replace 2"x10" joist | 300 | LF | $ - 0 |
| A004BJ | Replace Blocking, 2x(8" to 10") | 170 | LF | $ - 0 |
| A004BK | Replace 1x Wood Fence | 6,250 | SF | $ - 0 |
| A004BL | Replace Sheathing | 820 | SF | $ - 0 |
| A004BM | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 06200--Finish Carpentry | $ - 0 | |||
| A004BN | Replace Exterior Wood Trim | 12 | OPNG | $ - 0 |
| A004BP | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 07600--Sheet Metalwork, General | $ - 0 | |||
| A004BQ | Replace Metal Fascia (.018 Break Metal) | 98 | LF | $ - 0 |
| A004BR | Replace Gutters & Downspout (3-1/2" to 4" Diameter) | 500 | LF | $ - 0 |
| A004BS | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 07920--Joint Sealant | $ - 0 | |||
| A004BT | Replace sealant and backer rod | 1,000 | LF | $ - 0 |
| A004BU | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 08810--Glass and Glazing | $ - 0 | |||
| A004BV | Replace Glazing (1/4" Non-Insulated) | 200 | SF | $ - 0 |
| A004BW | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 09900--Painting, General | $ - 0 | |||
| A004BX | Prepare & Paint Metal Doors (incl frame & trim) | 1,200 | EA | $ - 0 |
| A004BY | Prepare & Paint Wood Doors (incl frame & trim) | 1,200 | EA | $ - 0 |
| A004BZ | Prepare and paint 1-8 Lite windows | 15 | EA | $ - 0 |
| A004CA | Prepare and paint 7-10 Lite windows | 15 | EA | $ - 0 |
| A004CB | Prepare and paint 12 Lite windows | 15 | EA | $ - 0 |
| A004CC | Cut-In Preparations & Painting for Surfaces (Incl Masonry, Wood, Metal, Stucco, etc.) | 34,000 | EA | $ - 0 |
| A004CD | Prepare and paint wood surfaces, include sealing | 200,000 | SF | $ - 0 |
| A004CE | Prepare and paint stucco/EIFS/plaster surfaces | 20,000 | SF | $ - 0 |
| A004CF | Seal Stucco/EIFS/Plaster Surfaces | 6,000 | SF | $ - 0 |
| A004CG | Prepare & paint concrete masonry unit surfaces | 20,000 | SF | $ - 0 |
| A004CH | Seal concrete masonry unit (CMU) surfaces | 25,000 | SF | $ - 0 |
| A004CJ | Prepare and paint concrete surfaces | 10,000 | SF | $ - 0 |
| A004CK | Seal Concrete Surfaces | 2,500 | SF | $ - 0 |
| A004CL | Patch Concrete, CMU Surfaces (Patch Holes 1/2" or Skim Coat) | 1,000 | SF | $ - 0 |
| A004CM | Clean existing brick and provide water repellent | 20,000 | SF | $ - 0 |
| A004CN | Stucco repair | 1,000 | SF | $ - 0 |
| A004CP | Prepare and paint ferrous metal surfaces | 30 | SF | $ - 0 |
| A004CQ | Prepare and paint aluminum surfaces | 21,000 | SF | $ - 0 |
| A004CR | Seal Ferrous Metal/Galvanized/Alum. Surfaces | 5,000 | SF | $ - 0 |
| A004CS | Prepare and Paint New/Old Gutters & Downspouts | 15,000 | SF | $ - 0 |
| A004CT | Prepare and Paint Pipes Up To 4" Diameter | 10,000 | LF | $ - 0 |
| A004CU | Prepare and paint pipes Over 4" Diameter | 3,484 | LF | $ - 0 |
| A004CV | Water Blast Cleaning | 25,000 | SF | $ - 0 |
| $ - 0 | ||||
| Lift Rental, 20 - 40 Feet Heights | $ - 0 | |||
| A004CW | Daily Rental | 15 | DY | $ - 0 |
| A004CX | Weekly Rental | 8 | WK | $ - 0 |
| A004CY | Monthy Rental | 3 | MO | $ - 0 |
| $ - 0 | ||||
| Lift Rental, 40 - 60 Feet Heights | $ - 0 | |||
| A004CZ | Daily Rental | 10 | DY | $ - 0 |
| A004DA | Weekly Rental | 6 | WK | $ - 0 |
| A004DB | Monthy Rental | 1 | MO | $ - 0 |
| $ - 0 | ||||
| Lift Rental 60 - 80 Feet Heights | $ - 0 | |||
| A004DC | Daily Rental | 5 | DY | $ - 0 |
| A004DD | Weekly Rental | 1 | WK | $ - 0 |
| A004DE | Monthy Rental | 1 | MO | $ - 0 |
| A004DF | Lift Delivery/Pickup | 69 | JB | $ - 0 |
| $ - 0 | ||||
| Labor Rate Multiplier | $ - 0 | |||
| A004DG | Labor Rate Multiplier Over 20 FT 25% | TBD | $ - 0 | |
| A004DH | Labor Rate Multiplier Over 40 FT 50% | TBD | $ - 0 | |
| A004DI | Labor Rate Multiplier Over 60 FT 75% | TBD | $ - 0 | |
| A004DJ | Labor Rate Multiplier Evening/Weekend Requirement | TBD |
TOTAL ---------------->> A004 ERROR:#VALUE!
Note: Replace means to provide and install new materials where items are demolished.
(OPTION YEAR 3)&"Arial,Regular"
&P
PAINT IDIQ OPTION YEAR 4
CONTRACT LINE ITEM NO. DESCRIPTION EST QTY UNIT UNIT PRICE AMOUNT
| A005 |
| INTERIOR PAINT AND COVERINGS (not to exclude section 09900) |
| A005A | Prepare & Paint Doors, flush, including frame and trim | 50 | EA | $ - 0 |
| A005B | Prepare & Paint Doors, panel, including frame and trim | 50 | EA | $ - 0 |
| A005C | Prepare & Paint 1-8 lite windows | 50 | EA | $ - 0 |
| A005D | Prepare & Paint 7-10 lite windows | 50 | EA | $ - 0 |
| A005E | Prepare & Paint 12 lite windows | 50 | EA | $ - 0 |
| A005F | Prepare & Paint Walls and Ceilings, Plaster or Drywall | 6,000 | SF | $ - 0 |
| A005G | Prepare & Paint Wood Trim | 3,000 | LF | $ - 0 |
| A005H | Prepare and Paint Interior Ladders | 1,000 | LF | $ - 0 |
| A005I | Prepare and Paint Railings and Balustrades up to 6" diameter | 500 | LF | $ - 0 |
| A005J | Prepare and Paint Handrail | 500 | LF | $ - 0 |
| A005K | Install Wallpaper, basic matching pattern | 100 | SF | $ - 0 |
| A005L | Install Base Cove, rubber or vinyl, Standard Colors, 4-6" high | 100 | LF | $ - 0 |
| A005M | Install Base Cove Corners, rubber or vinyl, Standard Colors, 4-6" high | 100 | EA | $ - 0 |
| A005N | Prepare and Paint Concrete Floor, Epoxy Coating, Standard Colors | 1,000 | SF | $ - 0 |
| A005O | Remove Interior Base, cove, rubber or vinyl | 100 | LF | $ - 0 |
DIVISION 02 -- SITE WORK
| 02050--Demolition | ||||
| A005AA | Remove Joist, 2" x 6" | 272 | LF | $ - 0 |
| A005AB | Remove Joist, 2" x 8" | 272 | LF | $ - 0 |
| A005AC | Remove Joist, 2" x 10" | 272 | LF | $ - 0 |
| A005AD | Remove Blocking, 2 x (8" to 10") | 136 | LF | $ - 0 |
| A005AE | Remove 1 x Wood Fence | 6,250 | SF | $ - 0 |
| A005AF | Remove Wood Trim | 1,200 | LF | $ - 0 |
| A005AG | Remove Plywood | 640 | SF | $ - 0 |
| A005AH | Remove Metal Fascia | 96 | LF | $ - 0 |
| A005AJ | Remove Sheathing | 48 | SF | $ - 0 |
| A005AK | Remove Sealant and Backer Rod | 3,000 | LF | $ - 0 |
| A005AL | Remove Vines and Ivy | 2,500 | SF | $ - 0 |
| A005AM | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 02090--Lead-Based Paint (LBP) Abatement and Disposal | $ - 0 | |||
| Remove and Dispose of Lead-Based Paint (LBP) | $ - 0 | |||
| A005AN | Piping Up To 12" Diameter | 500 | LF | $ - 0 |
| A005AP | Piping 12" To 16" Diameter | 500 | LF | $ - 0 |
| A005AQ | Surface Prep Doors | 500 | SF | $ - 0 |
| A005AR | Surface Prep Walls | 1,257 | SF | $ - 0 |
| A005AS | Surface Prep Beams & Trusses | 280 | SF | $ - 0 |
| A005AT | All Others-To be Negotiated (Per Height, Accessiblity, Substar, etc.) | TBN | TBN | |
| A005AU | Remove & dispose of asbestos containing sealant | 100 | LF | $ - 0 |
| A005AV | Lead Dust Wipe Sampling by IH | 50 | HRS | $ - 0 |
| A005AW | Lead Dust Wipe Sampling Read by CIH | 500 | EA | $ - 0 |
| A005AX | Soil Sampling by IH | 100 | HRS | $ - 0 |
| A005AY | Soil Sampling Read by CIH | 500 | EA | $ - 0 |
| A005AZ | Disposal of Hazardous Lead-Containing Mat'ls If No Reduction Is Req'd (i.e. Paint Chips) | 10 | Drums | $ - 0 |
| A005BA | If reduction of mat'ls is required (i.e. Paint Chips) | TBN | Drums | |
| A005BB | Disposal of Non-hazardous Asbestor Material | 75 | Drums | $ - 0 |
| A005BC | Disposal of Non-hazardous Material in Dumpster | 3,500 | CF | $ - 0 |
| A005BD | If reduction of mat'ls if required (i.e., cutting up fence to fit into drums) | TBN | Drums | |
| A005BE | Reserved | $ - 0 | ||
| $ - 0 | ||||
| DIVISION 06 -- WOOD & PLASTIC | $ - 0 | |||
| $ - 0 | ||||
| 06100--Rough Carpentry | $ - 0 | |||
| A005BF | Replace 2"x4" joist | 300 | LF | $ - 0 |
| A005BG | Replace 2"x8" joist | 300 | LF | $ - 0 |
| A005BH | Replace 2"x10" joist | 300 | LF | $ - 0 |
| A005BJ | Replace Blocking, 2x(8" to 10") | 170 | LF | $ - 0 |
| A005BK | Replace 1x Wood Fence | 6,250 | SF | $ - 0 |
| A005BL | Replace Sheathing | 820 | SF | $ - 0 |
| A005BM | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 06200--Finish Carpentry | $ - 0 | |||
| A005BN | Replace Exterior Wood Trim | 12 | OPNG | $ - 0 |
| A005BP | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 07600--Sheet Metalwork, General | $ - 0 | |||
| A005BQ | Replace Metal Fascia (.018 Break Metal) | 98 | LF | $ - 0 |
| A005BR | Replace Gutters & Downspout (3-1/2" to 4" Diameter) | 500 | LF | $ - 0 |
| A005BS | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 07920--Joint Sealant | $ - 0 | |||
| A005BT | Replace sealant and backer rod | 1,000 | LF | $ - 0 |
| A005BU | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 08810--Glass and Glazing | $ - 0 | |||
| A005BV | Replace Glazing (1/4" Non-Insulated) | 200 | SF | $ - 0 |
| A005BW | Reserved | $ - 0 | ||
| $ - 0 | ||||
| 09900--Painting, General | $ - 0 | |||
| A005BX | Prepare & Paint Metal Doors (incl frame & trim) | 1,200 | EA | $ - 0 |
| A005BY | Prepare & Paint Wood Doors (incl frame & trim) | 1,200 | EA | $ - 0 |
| A005BZ | Prepare and paint 1-8 Lite windows | 15 | EA | $ - 0 |
| A005CA | Prepare and paint 7-10 Lite windows | 15 | EA | $ - 0 |
| A005CB | Prepare and paint 12 Lite windows | 15 | EA | $ - 0 |
| A005CC | Cut-In Preparations & Painting for Surfaces (Incl Masonry, Wood, Metal, Stucco, etc.) | 34,000 | EA | $ - 0 |
| A005CD | Prepare and paint wood surfaces, include sealing | 200,000 | SF | $ - 0 |
| A005CE | Prepare and paint stucco/EIFS/plaster surfaces | 20,000 | SF | $ - 0 |
| A005CF | Seal Stucco/EIFS/Plaster Surfaces | 6,000 | SF | $ - 0 |
| A005CG | Prepare & paint concrete masonry unit surfaces | 20,000 | SF | $ - 0 |
| A005CH | Seal concrete masonry unit (CMU) surfaces | 25,000 | SF | $ - 0 |
| A005CJ | Prepare and paint concrete surfaces | 10,000 | SF | $ - 0 |
| A005CK | Seal Concrete Surfaces | 2,500 | SF | $ - 0 |
| A005CL | Patch Concrete, CMU Surfaces (Patch Holes 1/2" or Skim Coat) | 1,000 | SF | $ - 0 |
| A005CM | Clean existing brick and provide water repellent | 20,000 | SF | $ - 0 |
| A005CN | Stucco repair | 1,000 | SF | $ - 0 |
| A005CP | Prepare and paint ferrous metal surfaces | 30 | SF | $ - 0 |
| A005CQ | Prepare and paint aluminum surfaces | 21,000 | SF | $ - 0 |
| A005CR | Seal Ferrous Metal/Galvanized/Alum. Surfaces | 5,000 | SF | $ - 0 |
| A005CS | Prepare and Paint New/Old Gutters & Downspouts | 15,000 | SF | $ - 0 |
| A005CT | Prepare and Paint Pipes Up To 4" Diameter | 10,000 | LF | $ - 0 |
| A005CU | Prepare and paint pipes Over 4" Diameter | 3,484 | LF | $ - 0 |
| A005CV | Water Blast Cleaning | 25,000 | SF | $ - 0 |
| Lift Rental, 20 - 40 Feet Heights | $ - 0 | |||
| A005CW | Daily Rental | 15 | DY | $ - 0 |
| A005CX | Weekly Rental | 8 | WK | $ - 0 |
| A005CY | Monthy Rental | 3 | MO | $ - 0 |
| $ - 0 | ||||
| Lift Rental, 40 - 60 Feet Heights | $ - 0 | |||
| A005CZ | Daily Rental | 10 | DY | $ - 0 |
| A005DA | Weekly Rental | 6 | WK | $ - 0 |
| A005DB | Monthy Rental | 1 | MO | $ - 0 |
| $ - 0 | ||||
| Lift Rental 60 - 80 Feet Heights | $ - 0 | |||
| A005DC | Daily Rental | 5 | DY | $ - 0 |
| A005DD | Weekly Rental | 1 | WK | $ - 0 |
| A005DE | Monthy Rental | 1 | MO | $ - 0 |
| A005DF | Lift Delivery/Pickup | 69 | JB | $ - 0 |
| $ - 0 | ||||
| Labor Rate Multiplier | $ - 0 | |||
| A005DG | Labor Rate Multiplier Over 20 FT 25% | TBD | $ - 0 | |
| A005DH | Labor Rate Multiplier Over 40 FT 50% | TBD | $ - 0 | |
| A005DI | Labor Rate Multiplier Over 60 FT 75% | TBD | $ - 0 | |
| A005DJ | Labor Rate Multiplier Evening/Weekend Requirement | TBD |
TOTAL ---------------->> A005 $ - 0
| TOTAL ---------------->> | A001 thru A005 | ERROR:#VALUE! | |
| Note: Replace means to provide and install new materials where items are demolished. |
(OPTION YEAR 4)&"Arial,Regular"
&P
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 2.pdf | ||
| Paint - Unit Price - EUSTIS.xls | XLS spreadsheet | |
| Paint - Unit Price - LANGLEY.xls | XLS spreadsheet | |
| Amendment 1.pdf | ||
| FA4800-12-B-0004 - PAINT.doc | DOC document | |
| Specs.pdf | ||
| Paint IDIQ AF Form 66.pdf | ||
| Gen Decsion Number VA120112 - 6-15-12 - Building - Hampton.mht | MHT file | |
| Gen Decsion Number VA120118 - 6-15-12 - Building - NN.mht | MHT file | |
| Gen Decsion Number VA120033 - 1-06-12 - Residential - Hampton.mht | MHT file | |
| Gen Decsion Number VA120025 - 1-06-12 - Residential - NN.mht | MHT file |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .