About this file

7 CS AF Form 66 Submittal Schedule

View the file

Other files for this federal contract opportunity

Other files attached to RED HORSE Fire Detection, newest first.
File Type Posted
Attachment_2_-_Construction_Standards.docx DOCX document
Attachment_6_-_Steel_Framing_Drawings.pdf PDF
Attachment_4_-_7_CES_AF_Form_66_Submittal_Schedule.xls XLS spreadsheet
Attachment_7_-_Wage_Determination.pdf PDF
Attachment_3_-_Project_Report_with_Load_Calculations.pdf PDF
Attachment_1_-_Statement_of_Work.docx DOCX document
16-Q-0024_RED_HORSE_Fire_Detection_COMBO.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions to Project Manager for Completing the AF 66
1Save this Template Form 66 in your project folder as "AF 66 - FTQW XX-XXXX."
2Enter project number and title/bldg number in the orange cells.
3Review the schedule items not highlighted in yellow. If any item is not applicable to your project, select the row number and right-click to delete it.
4Do not remove any of the yellow schedule items - these are required for every project.
5When you have removed all unneeded schedule items, click on the light green cell. Grab the bottom right corner and "drag" your cursor to the last schedule item. This will re-number the items.
6When you are finished, remove the highlighting from the sheet. (Hit Ctrl-A and then select "none" for Fill Color.)
7Save your changes and email the file to the CONS administrator when you submit your package.

AF 66

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBERPROJECT TITLESOLICITATION/ CONTRACT NUMBER
FNWZ15-00487 CS Communication Storage K-Span Fire Detection/Alarm System
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED =3REQUIRED SUBMISSION DATE
Line NumberITEMS OR DESCRIPTIONCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSMSDSOTHERPLANSDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERDATE CONTRACTORCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
OF ITEM, CONTRACT REFERENCE, TYPE OFNOTIFIED
SUBMITTALAPPROVEDDIS-APPROVED
130% DesignsXX7 Days after award
250% Designs w/PE StampXX14 Days after award
3Fire Alarm Control Panel + TransmitterXXXX14 Days after award
4Heat DetectorsXXXX14 Days after award
5Alarm Horn StrobsXXXX14 Days after award
6Pull StationsXXXX14 Days after award
7100% Designs w/PE StampXX21 Days after award
8Training/CertificationX45 Days after NTP
9As-Builts w/PE StampXX45 Days after NTP
10O&M ManualsXX45 Days after NTP
11
12
13
14
15
16
17
17
19x
18
19
20
21FA4661-16-Q-0024 – Attachment 5
Schedule of Material Submittals, MAR 05 (SAF/AQCP) / PREVIOUS FORM IS OBSOLETE