Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to RED HORSE Fire Detection, newest first.
File Type Posted
Attachment_2_-_Construction_Standards.docx DOCX document
Attachment_6_-_Steel_Framing_Drawings.pdf PDF
Attachment_4_-_7_CES_AF_Form_66_Submittal_Schedule.xls XLS spreadsheet
Attachment_5_-_7_CS_AF_Form_66_Submittal_Schedule.xls XLS spreadsheet
Attachment_7_-_Wage_Determination.pdf PDF
Attachment_3_-_Project_Report_with_Load_Calculations.pdf PDF
16-Q-0024_RED_HORSE_Fire_Detection_COMBO.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Install 7 CES Readiness Storage (FNWZ 15-0049) Install 7 CS Communication Storage (FNWZ 15-0048) K-Span Fire Detection/Alarm System Dyess Air Force Base, TX 21 March 2016

GENERAL REQUIREMENTS

General Scope The Contractor shall perform all services (to include installation), furnish all materials required, and deliver to the United States Air Force a fully designed, properly installed, and functional addressable fire detection/alarm system for the project titled “Install 7 CES Readiness Storage K-Span Fire Detection/Alarm System”, Project No. FNWZ 15-0049 and “Install 7 CS Communication Storage K-Span Fire Detection/Alarm System”, Project No. FNWZ 15-0048, in accordance with the requirements specified herein and those set forth under the Statement of Work for each type service.

Project Description The purpose of this project is to provide the design, installation, and certification of an addressable fire detection/alarm system for a new construction, military built K-Span (Steel Arch Building).

A. The new building will be a 45’ X 110’ open-bay warehouse with a 12’ eave height tapering upward to a ridge height of 28’. Framed openings include 1 roll-up door and 2xpersonnel doors. The facility will primarily be used for the storage of material with no permanent office space. See Attachment 1 for details on structural steel framing and insulated wall panel construction.

B. The facility is considered low occupancy, uninhabited and does not require a mass notification system.

C. Include designs/plans for an addressable fire detection/alarm system that can detect, notify, and signal to include heat detection, fire alarm panel to sync with the base system, and all other items that accompany an overall tested/certified fire detection/alarm system in IAW NFPA and UFC standards.

D. Design/install includes, but is not limited to, heat sensors/detectors, fire alarm horn strobes (no conventional bells), BT2/4 narrow band transmitter, manual pull stations, and Monaco panel or equivalent (must be compatible with base system) as required per section 1.02.

E. Heat detection devices installed along ridge of facility must have fixed temperature settings (rated at 194oF) to avoid activation from temperature shifts incurred when roll-up doors are opened.

F. Drawings and specifications will comply with current Air Force design standards, base standards, and referenced publications (Specifically, NFPA 72, NFPA 101, and UFC 3-600-01).

G. No Thermotech brand devices shall be used due to Air Force guidance.

Architectural and Structural Considerations The project shall be designed to minimize building/facility maintenance and maximize quality of life and quality of work. See Unified Facilities Criteria (UFC) Design Procedures, 2009, at www.wbdg.org.

Cost Limitation A. If unusual design features or conditions are included in the project which materially affects the cost, they must be justified. Attach backup information to the construction cost estimate, which explains the rationale, the cost information relative to the cost of a non-environmentally friendly item, the life cycle advantage, and the other sustainable reasons for using this material.

Design Policy and Criteria The project will conform to National codes and Regulations for building construction and safety in addition to Military Handbook 1190 and Unified Facilities Criteria 3-600-01. Modern construction techniques and architectural treatment should be incorporated in the project designs to obtain both quality and economy and to provide a functional, complete, and usable facility. Emphasis must be placed on investigative and preliminary design efforts to insure all ancillary and related work items are included in the design to eliminate any near future requirements for upgrade or repair. The project description and programming documents must be used as a preliminary, basic, and abbreviated outline of work to be performed. It is the Contractor’s responsibility to add to or modify the project content as necessary using sound professional observations, experience, and judgment. Plans and specifications must be of sufficient detail and quality to allow accurate bidding and minimize the potential for claims without the need for a site visit by potential bidders. Wherever products are specified by brand name, the Contractor will provide the Government with copies of descriptive literature. Any document referenced by the Contractor for inspection will be included as a required submittal to the Government. Provide dates for all documents referenced in specifications or drawings. All drawings will be AutoCAD Release 2010 or later, generated; word processing, spreadsheets, and all documents will be the most current version of Microsoft Office (conversion from other software not acceptable). If fonts or software other than standard AutoCAD Release 2007 or later, are used, the Contractor will provide a copy of the software with the bid documents. All specification sections, including mechanical and electrical, will be in the same font and style. Each final product drawing shall be functionally complete and include all layers, fonts, and menus. The Contractor is required to utilize AIA CAD layering guidelines.

A. Applicable Government Criteria and Standards:

Engineer Technical Letters (http://www.afcesa.af.mil/library/index.asp) MILHNDBK 1190 and UFC 3-600-01 Unified Facilities Criteria (check www.wbdg.org) Air Force Design Standards-Regulations, Manuals, Instructions (http://www.e-publishing.af.mil/) Base Design Standards User/Customer Requirements B. National Codes and Regulations (Latest Editions):

International Building Code National Fire Protection Code National Fire Protection Association Codes National Safety Code OSHA Regulations EPA Regulations International Mechanical Code SMACNA Standards ASHRAE Handbook National Electrical Code National Electrical Safety Code References Air Force Publications and Guide Specifications will not be furnished. They may be acquired from the Government Printing Office or other federal agencies. The Contractor shall specify products utilizing recycled material where feasible.

Government Furnished Information and Materials The following information and materials will be furnished to the Contractor for the execution of the project work: Existing Site Plans, Building Plans and Details of the project site as available for use as references.

Pre-Design Conference The pre-design conference between the Contractor and Government representatives involved with the project will be held to ascertain that the Contractor clearly comprehends and understands the various scopes of work to be performed under each type of service. During the conference, the Contractor may present his/her views as to how he/she proposes to accomplish the project and to review and discuss the program requirements. A site visit will be conducted following the design conference.

Instructions and Administrations During the course of project preparation, the Contractor may be called upon to attend conferences pertaining to the project. The Contractor shall prepare written minutes of all conferences, pertinent instructions, and information received verbally or otherwise. Copies of minutes shall be transmitted to the attendees within 5 working days. Data submittals shall be by dated letter, and when necessary, hand carried. All documents will be on recycled paper copied both sides. The Contractor shall note that all fire detection systems must be fully designed and stamped by a registered professional fire protection engineer with a minimum of three years’ experience and responsibility for design of such systems. No performance specifications are acceptable.

Visits The Contractor or the duly authorized representative will be required to perform an investigation of the project site (building interior) and will be required to make periodic visits to the project site as part of the contract, as necessary, to ensure design accuracy and timely completion of the project.

Security Information The Contractor and/or the duly authorized representative shall comply with pertinent Air Force security regulations while working on the project. Special security clearances such as confidential, secret, etc., are not required by the Contractor for the design of this project. Take all possible precautions and efforts to prevent the disclosure of any information that might provide prospective construction contractors, manufacturers, or suppliers as bidding advantage over others.

Scope Prior to negotiations a meeting/site visit will be conducted to establish a mutual understanding of the project’s scope and contents. The results of this visit will be expanded and modified as necessary under the investigative study.

Quality Control The Contractor is responsible for the accuracy and content of plans and specifications. The Government review does not relieve the Contractor from the responsibility of conducting thorough in-house reviews prior to submitting to the Government. With each submittal, the names of each reviewer along with the particular areas reviewed will be submitted by separate letter entitled Certification of Quality Control. The letter will also address the total number of hours spent by these individuals in the review process.

Surveys All surveying, where required, shall be the responsibility of the Contractor. The Contractor will be required to submit a copy of field notes and survey calculations as part of the design. Survey book identification numbers will be included on drawings.

Period of Service Only one Notice to Proceed (NTP) will be issued for this contract. The Contractor shall complete all work up to and including 50% design submittals within 14 calendar days after contract award. Design submittals and reviews are required at the completion of each design phase (50%, 100%). See Attachment 4 for submittal schedule. Should a resubmittal be required, it shall be accomplished within 7 calendar days and the final completion date will be extended the same amount. If the Government takes less than 4 days to review a submittal, no change to the final date will be made. If the Government takes longer than 4 days, the contract will be extended by that amount. The Period of Performance (PoP), to include all aspects of site surveying, design, install, and certification, shall be 45 calendar days.

Contract Drawings All contract drawings shall be prepared in accordance with the best professional practice. Notes on the drawings should be held to a minimum. Extensive explanatory notes on the drawings are not desirable and should be placed in the specifications. The use of fractions less than 1/8 inch for building dimensions should be avoided. Use standard building material indications and symbols for architectural items and for mechanical and electrical equipment. The Contractor shall prepare and furnish original drawings to clearly indicate the extent, type, and detailed requirements for all related work to be performed. Drawings shall clearly indicate all new construction and delineate between all new work and existing conditions. Drawings shall cover each phase of Architectural, Civil, Structural, Mechanical, and Electrical categories and such other categories of work as required and or as accepted good engineering practice to provide a complete design product. Repair and alteration work items on drawings shall be specifically identified to delineate the work. Original drawings shall be prepared on 11” x 17” sheets (also referred to in this document as Full Size). All drawings shall be prepared such that half size drawings are clear, sharp, and legible. An appropriate title block shall be prepared in accordance with the Air Force sample furnished. The Contractor shall include the full names of the designer and the reviewer and the firm(s) they represent in the appropriate blocks on each drawing. Each set of drawings shall be stamped by a licensed fire protection engineer in the state of Texas. Three hard copies and one PDF copy of each phase of the design drawings shall be submitted to the Government for review (See Attachment 4).