Material_Submittal_(AF_Form_66).pdf

PDF 110 KB Posted

Attached to
Repair Base Water Lines and Hydrants Federal contract opportunity
Solicitation number
FA4418-19-R-A017
Issued by
Department of the Air Force Air Mobility Command

About this file

FA4418-19-R-A022 Material Submittal Form

View the file

Other files for this federal contract opportunity

Other files attached to Repair Base Water Lines and Hydrants, newest first.
File Type Posted
Site_Visit_Record_of_Attendance.pdf PDF
Site_Visit_Questions_DKFX_04-10607_Repair_Base_Water_Lines_Hydrants_01_MAY_19.pdf PDF
Solicitation_Amendment_FA441819RA0220001_SF_30.pdf PDF
Green_Procurement_Form.pdf PDF
Combined_Drawings.pdf PDF
Specs.pdf PDF
Solicitation_-_FA441819RA022.pdf PDF
Wage_Determination_(Charleston_County).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 11 PAGES

Repair Base water main and fire hydrants - AFB

01 14 00 SD-01 Preconstruction Submittals 1.2.1.1List of Contact Personnel

01 30 00 SD-01 Preconstruction Submittals

1.2 GView location map

1.3 GProgress and completion pictures

1.6.1 GResume for Superintendent

01 32 16.00 20 SD-01 Preconstruction Submittals

1.2 GQualifications

1.3 GProject schedule

1.4.1 GInitial Contract Progress Report

(AF IMT 3065)

1.4.2 GInitial Contract Progress

Schedule (AF IMT 3064) SD-07 Certificates

1.3.3 GProject Schedule Updates

1.4.1 GMonthly Contract Progress

Report (AF IMT 3065)

1.4.2 GMonthly Contract Progress

Schedule (AF IMT 3064) 01 33 00 SD-01 Preconstruction Submittals

1.7 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.6 GAccident Prevention Plan (APP)

1.7 GActivity Hazard Analysis (AHA)

1.6.1 GCrane Critical Lift Plan

1.5.1.2 GCrane Operators

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 11 PAGES

01 35 26 SD-06 Test Reports 1.11Notifications and Reports

1.11.2 GAccident Reports

1.11.3Crane Reports

SD-07 Certificates 1.8Confined Space Entry Permit 1.8Hot work permit 1.11.4License Certificates 1.13License Certificates

01 45 00.10 20 SD-01 Preconstruction Submittals

1.6 GQC Plan

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.4.1 GTraffic Control Plan

SD-06 Test Reports 2.2.5Backflow Preventer Tests

SD-07 Certificates 1.4.1Backflow Tester 1.4Backflow Preventers

01 54 00 SD-03 Product Data

1.5.1 GAFFIRMATIVE PROCUREMENT

REPORTING FORM

1.6 GAFFIRMATIVE PROCUREMENT

REPORTING FORM

01 57 19 SD-01 Preconstruction Submittals

1.7.1 GPreconstruction Survey

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 11 PAGES

01 57 19 1.7.6 GRegulatory Notifications

1.5 GEnvironmental Protection Plan

1.6Dirt and Dust Control Plan

SD-06 Test Reports 3.9.2Disposal Requirements 1.7.7Erosion and Sediment Control

Inspection Reports 3.4Erosion and Sediment Control

Inspection Reports 3.4Storm Water Inspection Reports for General Permit

1.7.8 GSolid Waste Disposal Report

SD-07 Certificates

1.7.5 GContractor 40 CFR Employee

Training Records SD-11 Closeout Submittals

3.4.2 GStorm Water Pollution Prevention

Plan compliance notebook

1.7.3Waste Determination Documentation

1.7.4Disposal Documentation for Hazardous and Regulated Waste

1.7.5Contractor 40 CFR Employee Training Records

1.7.8Solid Waste Disposal Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 11 PAGES

01 57 19 3.7.2Hazardous Waste/Debris Management

1.7.6Regulatory Notifications 01 74 19 SD-01 Preconstruction Submittals

1.6 GWaste Management Plan

SD-11 Closeout Submittals

1.7 SRecords

01 78 00 SD-03 Product Data

1.5.1Warranty Management Plan 1.5.4Warranty Tags 1.4Spare Parts Data

SD-08 Manufacturer’s Instructions 3.9Preventative Maintenance 3.9Condition Monitoring (Predictive

Testing) 3.9Inspection 1.5.1Instructions

SD-10 Operation and Maintenance Data

3.7 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.2.1 GRecord Drawings

3.3 GRecord Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 11 PAGES

01 78 00 3.6.1As-Built Record of Equipment and Materials

3.4FINAL APPROVED SHOP

DRAWINGS

3.5CONSTRUCTION CONTRACT

SPECIFICATIONS

3.10 GInterim DD FORM 1354

3.10 GChecklist for DD FORM 1354

02 82 16.00 20 SD-03 Product Data

3.1.4 GLocal Exhaust Equipment

3.1.5 GVacuums

3.1.1.1 GRespirators

3.1.4 GPressure Differential Automatic

Recording Instrument

1.2.2 GAmended Water

1.3.8 GMaterial Safety Data Sheets

(Msds) for all materials

2.1 GEncapsulants

SD-06 Test Reports

1.5.5 GAir Sampling Results

1.5.6 GPressure Differential Recordings

For Local Exhaust System

3.3.3.2 GAsbestos Disposal Quantity

Report

3.2.5.2 GClearance Sampling

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 11 PAGES

02 82 16.00 20 1.3.9 GAsbestos Hazard Abatement Plan

1.3.10 GTesting Laboratory

1.5.1 GPrivate Qualified Person

Documentation

1.5.4 GContractor's License

1.5.2 GCompetent Person

1.5.3 GWorker's License

1.3.11 GLandfill Approval

1.3.3 GEmployee Training

1.3.12 GMedical Certification

1.3.11 GWaste Shipment Records

1.3.6 GRespiratory Protection Program

1.3.11 GDelivery Tickets

3.1.5 GVacuums

3.1.2.3 GWater Filtration Equipment

3.1.5 GVentilation Systems

3.1 GEquipment Used To Contain

Airborne Asbestos Fibers

2.1 GEncapsulants

1.3.4Notifications

SD-11 Closeout Submittals

1.3.4 GNotifications

1.6.1 GRental Equipment

1.3.6.1 GRespirator Program Records

1.3.4 GPermits

31 00 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 11 PAGES

31 00 00 1.4.1.2 GDewatering Work Plan SD-03 Product Data

3.5 GUtilization of Excavated Materials

SD-06 Test Reports

3.11 GTesting;

2.1 GBorrow Site Testing;

SD-07 Certificates

3.11 GTesting;

31 32 11 SD-02 Shop Drawings

3.2.2 GLayout

3.2.4 GObstructions Below Ground

3.2.2 GErosion Control

2.5.3.1 GSeed Establishment Period;

3.6 GMaintenance Record

SD-03 Product Data

2.2.2 GGeosynthetic Binders

2.1 GRecycled Plastic

2.3.3 GWood Cellulose Fiber

2.3.4 GPaper Fiber

2.3.9 GMulch Control Netting and Filter

Fabric

2.3.10 GHydraulic Mulch

2.4 GGeotextile Fabrics

2.7 GAggregate

1.3 GEquipment

3.1.1 GFinished Grade

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 11 PAGES

31 32 11 SD-04 Samples

1.6 GMaterials

SD-06 Test Reports

2.2.2 GGeosynthetic Binders

2.3.10 GHydraulic Mulch

2.4 GGeotextile Fabrics

2.7 GSand

2.7 GGravel

SD-07 Certificates

2.3 GMulch

2.3.10 GHydraulic Mulch

2.4 GGeotextile Fabrics

2.2.2 GGeosynthetic Binders

2.2.1 GSynthetic Soil Binders

1.5.1 GInstaller's Qualification

2.1 GRecycled Plastic

2.5.3 GSeed

2.3.8 GAsphalt Adhesive

2.3.11 GTackifier

2.3.6 GWood By-Products

2.3.3 GWood Cellulose Fiber

SD-10 Operation and Maintenance Data

3.6.2 GMaintenance Instructions

2.7 GAggregate

32 11 23 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 11 PAGES

32 11 23 1.6Plant, Equipment, and Tools 1.7Waybills and Delivery Tickets

SD-06 Test Reports 1.4Sampling and Testing 1.4.2.4Field Density Tests

32 12 16 SD-03 Product Data 2.3Mix Design 3.10Contractor Quality Control 3.11Material Acceptance and Percent

Payment SD-04 Samples

2.2Asphalt Cement Binder 2.1Aggregates

SD-06 Test Reports 2.1Aggregates 3.10.3.10QC Monitoring

SD-07 Certificates 2.2Asphalt Cement Binder 3.6Testing Laboratory

32 16 13 SD-03 Product Data 2.1Concrete

SD-06 Test Reports 3.8Field Quality Control

32 92 19 SD-03 Product Data

2.5.3 GWood cellulose fiber mulch

2.4 GFertilizer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 11 PAGES

32 92 19 SD-06 Test Reports

2.2.3 GTopsoil composition tests

SD-07 Certificates

2.1 Gseed

SD-08 Manufacturer’s Instructions

2.7 GErosion Control Materials

33 11 00 SD-03 Product Data

2.2 GPipe, Fittings, Joints and

Couplings

2.3 GValves

2.3.2 GIndicator Posts

2.4.1 GHydrants

2.2.3 GPipe Anchorage

2.5.1 GTapping Sleeves

2.5.7 GFire Department Connections

SD-06 Test Reports 3.2.6Bacteriological Samples

SD-07 Certificates 2.2Pipe, Fittings, Joints and

Couplings 2.2.1.1Lining 2.2.2.1Lining for Fittings 2.3Valves 2.4.1Hydrants 3.2.6Disinfection Procedures

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 11 PAGES

33 11 00 3.2.1Manufacturer's Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR