Schedule of Material Submittals Project DKFX 06-1003D Repair Taxiway Delta 12 pages
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NUMBER
DKFX 06-1003D
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
1 01 11 00, Para 1.8.1, "Utility Outage Requests" 5
2 01 11 00, Para 1.8.1, "Utility Connection Requests" 5
3 01 14 00, Para 1.3.1.1, "List of Contact Personnel"; G 5
4 01 32 17.00 20, Para 1.5, "Qualifications"; G 5
01 32 17.00 20, Para 1.3, "Baseline Network Analysis Schedule"; G
01 32 17.00 20, Para 1.7.1, "Monthly Network Analysis";
G
7 01 32 17.00 20, Para 1.7.2, "As-Built Schedule"; G 5
8 01 33 00, Para 1.7, "Submittal Register"; G 5
9 01 35 13, Para 3.1.2, "Heavy Equipment and Vehicle List" 5
10 01 35 13, Para 3.1.2, "Existing Conditions Survey" 5
01 35 13, Para 3.1.2, "Construction Operations Plan"
12 01 35 13, Para 3.1.2, "Safety Plan" 5
13 01 35 13, Para 3.1.2, "Schedule of Work" 5
01 35 23, Para 1.4, "Safety Plan Compliance Document
(SPCD)"; G
01 35 26, Para 1.6, "Accident Prevention Plan
(APP)"; G
16 01 35 26, Para 1.7, "Activity Hazard Analysis (AHA)"; G 5
PROJECT TITLE
REPAIR TAXIWAY DELTA
SOLICITATION/CONTRACT NO.
REMARKSDATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
SD
-1
0 O
PE
RA
TI
ON
M
AI
NT
EN
AN
CE
DA
TA
SD
-0
9 M
AN
UF
AC
TU
RE
R' S
FI
EL
D
RE
PO
RT
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
SD
-0
4 S
AM
PL
ES
SD
-0
5 D
ES
IG
N
DA
TA
SD
-0
7 C
ER
TI
FI
CA
TE
S
SD
-0
8 M
AN
UF
AC
TU
RE
R' S
IN
ST
RU
CT
IO
NS
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
SD
-0 1 P
RE
CO
NS
TR
UC
TI
ON
SU
BM
IT
TA
LS
SD
-0
2 S
HO
P
DR
AW
IN
GS
SD
-0
3 P
RO
DU
CT
D
AT
A
OT
HE
RS
A
S
SP
EC
IF
IE
D
SD
-0
6 T
ES
T
RE
PO
RT
S
SD
-1
1 C
LO
SE
OU
T
SU
BM
IT
TA
LS
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
DKFX 06-1003D
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
REPAIR TAXIWAY DELTA
SOLICITATION/CONTRACT NO.
REMARKSDATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
SD
-1
0 O
PE
RA
TI
ON
M
AI
NT
EN
SD
-0
9 M
AN
UF
AC
TU
RE
R' S
FI
EL
D
RE
PO
RT
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
SD
-0
4 S
AM
PL
ES
SD
-0
5 D
ES
IG
N
DA
TA
SD
-0
7 C
ER
TI
FI
CA
TE
S
SD
-0
8 M
AN
UF
AC
TU
RE
R' S
IN
ST
RU
CT
IO
NS
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
SD
-0 1 P
RE
CO
NS
TR
UC
IT
TA
LS
SD
-0
2 S
HO
P
DR
AW
IN
GS
SD
-0
3 P
RO
DU
CT
D
AT
A
OT
HE
RS
A
S
SP
EC
IF
IE
D
SD
-0
6 T
ES
T
RE
PO
RT
S
SD
-1
1 C
LO
SE
OU
T
SU
BM
IT
TA
LS
01 35 26, Para 3.1.1, "Hazardous Communication (HAZCOM) Plan"; G
01 35 26, Para 3.1.1, "JBC- AB Transient Organization Hazardous Material Inventory Form"; G
19 01 35 26, Para 1.11, "Notifications and Reports" 5
20 01 35 26, Para 1.11.2, "Accident Reports"; G 5
01 35 26, Para 1.8, "Confined Space Entry Permit"
22 01 35 26, Para 1.8, "Hot work permit" 5
23 01 35 26, Para 1.15, "Energized work permit" 5
24 01 35 26, Para 1.11.3, "Certificate of Compliance" 5
01 45 00.00 10, Para 3.2, "Contractor Quality Control (CQC) Plan"; G
26 01 50 00, Para 1.3, "Construction site plan"; G 5
27 01 50 00, Para 3.4.1, "Traffic control plan"; G 5
28 01 50 00, Para 1.4, "Backflow preventers"; G 5
01 50 00, Para 2.2.4, "Backflow Preventer Tests";
G
30 01 50 00, Para 1.4.1, "Backflow Tester"; G 5
31 01 50 00, Para 1.4, "Backflow Preventers" 5
32 01 50 10, Para 1.4.1, "Safety Data Sheet (SDS)" 5
33 01 50 10, Para 1.8, "Affirmative Procurement" 5
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 06-1003D
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
REPAIR TAXIWAY DELTA
SOLICITATION/CONTRACT NO.
REMARKSDATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
SD
-1
0 O
PE
RA
TI
ON
M
AI
NT
EN
SD
-0
9 M
AN
UF
AC
TU
RE
R' S
FI
EL
D
RE
PO
RT
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
SD
-0
4 S
AM
PL
ES
SD
-0
5 D
ES
IG
N
DA
TA
SD
-0
7 C
ER
TI
FI
CA
TE
S
SD
-0
8 M
AN
UF
AC
TU
RE
R' S
IN
ST
RU
CT
IO
NS
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
SD
-0 1 P
RE
CO
NS
TR
UC
IT
TA
LS
SD
-0
2 S
HO
P
DR
AW
IN
GS
SD
-0
3 P
RO
DU
CT
D
AT
A
OT
HE
RS
A
S
SP
EC
IF
IE
D
SD
-0
6 T
ES
T
RE
PO
RT
S
SD
-1
1 C
LO
SE
OU
T
SU
BM
IT
TA
LS
34 01 50 10, Para 1.3, "Recycling Report" 5
01 54 00, Para 1.5.2.1, "Affirmative Procurement Reporting Form"; G
01 57 20, Para 1.3.3, "Construction Waste Management Plan"; G
37 01 57 50, Para 1.7.1, "Preconstruction Survey"; G 5
38 01 57 50, Para 1.8.3, "Regulatory Notifications"; G 5
01 57 50, Para 1.5, "Environmental Protection Plan"; G
40 01 57 50, Para 1.6, "Dirt and Dust Control Plan"; G 5
41 01 57 50, Para 3.9.2, "Disposal Requirements" 5
01 57 50, Para 1.8.4, "Erosion and Sediment Control Inspection Reports"
01 57 50, Para 3.4, "Erosion and Sediment Control Inspection Reports"
44 01 57 50, Para 1.8.5, "Solid Waste Disposal Report"; G 5
01 57 50, Para 1.8.2, "Contractor 40 CFR employee training records";
G
01 57 50, Para 3.4.2, "Storm Water Pollution Prevention Plan compliance notebook";
G
01 57 50, Para 1.8, "Waste Determination Documentation"
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 06-1003D
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
REPAIR TAXIWAY DELTA
SOLICITATION/CONTRACT NO.
REMARKSDATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
SD
-1
0 O
PE
RA
TI
ON
M
AI
NT
EN
SD
-0
9 M
AN
UF
AC
TU
RE
R' S
FI
EL
D
RE
PO
RT
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
SD
-0
4 S
AM
PL
ES
SD
-0
5 D
ES
IG
N
DA
TA
SD
-0
7 C
ER
TI
FI
CA
TE
S
SD
-0
8 M
AN
UF
AC
TU
RE
R' S
IN
ST
RU
CT
IO
NS
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
SD
-0 1 P
RE
CO
NS
TR
UC
IT
TA
LS
SD
-0
2 S
HO
P
DR
AW
IN
GS
SD
-0
3 P
RO
DU
CT
D
AT
A
OT
HE
RS
A
S
SP
EC
IF
IE
D
SD
-0
6 T
ES
T
RE
PO
RT
S
SD
-1
1 C
LO
SE
OU
T
SU
BM
IT
TA
LS
01 57 50, Para 3.7.2, "Waste Determination Documentation"
01 57 50, Para 1.8.1, "Disposal Documentation for Hazardous and Regulated Waste"
01 57 50, Para 1.8.2, "Contractor 40 CFR Employee Training Records"
51 01 57 50, Para 1.7.2, "Solid Waste Disposal Permit" 5
52 01 57 50, Para 1.8.5, "Solid Waste Disposal Report" 5
01 57 50, Para 3.7.2, "Hazardous Waste/Debris Management"
54 01 57 50, Para 1.8.3, "Regulatory Notifications" 5
55 01 62 35, Para 1.7, "Biobased Products"; G 5
56 01 78 02.00 20, Para 2.1, "Record Drawings"; G 5
57 01 78 02.00 20, Para 2.2, "Record GIS Data"; G 5
58 01 78 02.00 20, Para 2.3, "Record Product Data"; G 5
59 02 41 00, Para 1.10, "Existing Conditions"; G 5
60 02 41 00, Para 1.2.1, "Demolition Plan"; G 5
61 02 41 00, Para 1.6, "Notification"; G 5
62 03 30 53, Para 1.4, "Installation Drawings"; G 5
63 03 30 53, Para 2.2.3.1, "Air- Entraining Admixture" 5
03 30 53, Para 2.2.3.2, "Water-Reducing or Retarding Admixture"
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 06-1003D
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
REPAIR TAXIWAY DELTA
SOLICITATION/CONTRACT NO.
REMARKSDATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
SD
-1
0 O
PE
RA
TI
ON
M
AI
NT
EN
SD
-0
9 M
AN
UF
AC
TU
RE
R' S
FI
EL
D
RE
PO
RT
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
SD
-0
4 S
AM
PL
ES
SD
-0
5 D
ES
IG
N
DA
TA
SD
-0
7 C
ER
TI
FI
CA
TE
S
SD
-0
8 M
AN
UF
AC
TU
RE
R' S
IN
ST
RU
CT
IO
NS
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
SD
-0 1 P
RE
CO
NS
TR
UC
IT
TA
LS
SD
-0
2 S
HO
P
DR
AW
IN
GS
SD
-0
3 P
RO
DU
CT
D
AT
A
OT
HE
RS
A
S
SP
EC
IF
IE
D
SD
-0
6 T
ES
T
RE
PO
RT
S
SD
-1
1 C
LO
SE
OU
T
SU
BM
IT
TA
LS
65 03 30 53, Para 2.2.9, "Curing Materials" 5
03 30 53, Para 2.2.6, "Expansion Joint Filler Strips Premolded"
03 30 53, Para 3.1.3.3, "Batching and Mixing Equipment"
03 30 53, Para 3.2, "Conveying and Placing Concrete"
69 03 30 53, Para 2.2.7, "Formwork" 5
70 03 30 53, Para 2.3, "Mix Design Data"; G 5
71 03 30 53, Para 2.3, "Ready- Mix Concrete" 5
03 30 53, Para 2.2.5, "Mechanical Reinforcing Bar Connectors"
73 03 30 53, Para 2.2.2, "Aggregates" 5
03 30 53, Para 2.1.3, "Concrete Mixture Proportions"; G
03 30 53, Para 3.8.3, "Compressive Strength Testing"; G
76 03 30 53, Para 3.8.3, "Slump"; G 5
77 03 30 53, Para 3.8.3, "Air Content" 5
78 03 30 53, Para 2.2.4, "Water" 5
79 03 30 53, Para 2.2.1, "Cementitious Materials" 5
80 03 30 53, Para 2.2.1.2, "Pozzolan" 5
81 03 30 53, Para 2.2.2, "Aggregates" 5
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 06-1003D
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
REPAIR TAXIWAY DELTA
SOLICITATION/CONTRACT NO.
REMARKSDATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
SD
-1
0 O
PE
RA
TI
ON
M
AI
NT
EN
SD
-0
9 M
AN
UF
AC
TU
RE
R' S
FI
EL
D
RE
PO
RT
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
SD
-0
4 S
AM
PL
ES
SD
-0
5 D
ES
IG
N
DA
TA
SD
-0
7 C
ER
TI
FI
CA
TE
S
SD
-0
8 M
AN
UF
AC
TU
RE
R' S
IN
ST
RU
CT
IO
NS
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
SD
-0 1 P
RE
CO
NS
TR
UC
IT
TA
LS
SD
-0
2 S
HO
P
DR
AW
IN
GS
SD
-0
3 P
RO
DU
CT
D
AT
A
OT
HE
RS
A
S
SP
EC
IF
IE
D
SD
-0
6 T
ES
T
RE
PO
RT
S
SD
-1
1 C
LO
SE
OU
T
SU
BM
IT
TA
LS
82 03 30 53, Para 2.3, "Delivery Tickets" 5
83 22 05 83, Para 3.3, "Final Inspection"; G 5
26 56 20.00 10, Para 2.1, "Lighting and Visual Navigation Aids"; G
85 26 56 20.00 10, Para 1.3.5, "As-Built Drawings" 5
26 56 20.00 10, Para 2.2, "Materials and Equipment";
G
87 26 56 20.00 10, Para 1.3.3, "Protection Plan" 5
88 26 56 20.00 10, Para 3.14, "Field Quality Control" 5
89 26 56 20.00 10, Para 3.14.3, "Visual Inspection" 5
90 26 56 20.00 10, Para 1.3.2, "Qualifications" 5
91 26 56 20.00 10, Para 2.2, "Materials and Equipment" 5
92 31 00 00, Para 3.4, "Shoring"; G 5
93 31 00 00, Para 1.4.2, "Dewatering Work Plan"; G 5
31 00 00, Para 3.7, "Utilization of Excavated Materials"; G
95 31 00 00, Para 3.14, "Testing" 5
96 31 00 00, Para 3.14, "Testing" 5
97 32 01 19, Para 3.1, "Equipment" 5
98 32 01 19, Para 1.3.1, "Materials"; G 2
32 01 19, Para 1.3.1, "Certified copies of the test reports"; G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 06-1003D
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
REPAIR TAXIWAY DELTA
SOLICITATION/CONTRACT NO.
REMARKSDATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
SD
-1
0 O
PE
RA
TI
ON
M
AI
NT
EN
SD
-0
9 M
AN
UF
AC
TU
RE
R' S
FI
EL
D
RE
PO
RT
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
SD
-0
4 S
AM
PL
ES
SD
-0
5 D
ES
IG
N
DA
TA
SD
-0
7 C
ER
TI
FI
CA
TE
S
SD
-0
8 M
AN
UF
AC
TU
RE
R' S
IN
ST
RU
CT
IO
NS
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
SD
-0 1 P
RE
CO
NS
TR
UC
IT
TA
LS
SD
-0
2 S
HO
P
DR
AW
IN
GS
SD
-0
3 P
RO
DU
CT
D
AT
A
OT
HE
RS
A
S
SP
EC
IF
IE
D
SD
-0
6 T
ES
T
RE
PO
RT
S
SD
-1
1 C
LO
SE
OU
T
SU
BM
IT
TA
LS
100 32 01 29.61, Para 2.1.4.1, "Mix Design"; G 5
32 01 29.61, Para 2.1.10, "Proprietary Cementitious Products"; G
32 01 29.61, Para 2.1.5.2, "Pigmented Liquid Membrane-Forming Compound"; G
32 01 29.61, Para 2.1.5.2, "Pigmented Liquid Membrane-Forming Compound"; G
32 01 29.61, Para 3.6.3, "Absorbent curing material";
G
105 32 01 29.61, Para 2.1.8, "Joint filler"; G 2
106 32 01 29.61, Para 2.1.7, "Joint sealant"; G 2
107 32 01 29.61, Para 1.3.1, "Concrete Mix Design"; G 5
108 32 01 29.61, Para 1.3.1, "Test Results" 5
109 32 01 29.61, Para 1.3.1.2, "gradation" 5
110 32 01 29.61, Para 2.1.1.4, "gradation" 5
111 32 01 29.61, Para 1.3.1.1, "Cement" 5
112 32 01 29.61, Para 2.1.4.1, "slump" 5
113 32 01 29.61, Para 2.1.4.1, "air content" 5
114 32 01 29.61, Para 3.4.2, "strength" 5
32 01 29.61, Para 1.3.2, "Mixer Calibration and Efficiency"
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 06-1003D
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
REPAIR TAXIWAY DELTA
SOLICITATION/CONTRACT NO.
REMARKSDATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
SD
-1
0 O
PE
RA
TI
ON
M
AI
NT
EN
SD
-0
9 M
AN
UF
AC
TU
RE
R' S
FI
EL
D
RE
PO
RT
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
SD
-0
4 S
AM
PL
ES
SD
-0
5 D
ES
IG
N
DA
TA
SD
-0
7 C
ER
TI
FI
CA
TE
S
SD
-0
8 M
AN
UF
AC
TU
RE
R' S
IN
ST
RU
CT
IO
NS
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
SD
-0 1 P
RE
CO
NS
TR
UC
IT
TA
LS
SD
-0
2 S
HO
P
DR
AW
IN
GS
SD
-0
3 P
RO
DU
CT
D
AT
A
OT
HE
RS
A
S
SP
EC
IF
IE
D
SD
-0
6 T
ES
T
RE
PO
RT
S
SD
-1
1 C
LO
SE
OU
T
SU
BM
IT
TA
LS
116 32 01 29.61, Para 1.3.1.1, "Cement" 5
117 32 01 29.61, Para 1.3.1.2, "Aggregate" 5
118 32 01 29.61, Para 2.1.3, "Admixtures" 5
119 32 01 29.61, Para 3.6.3, "Absorbent curing material" 5
32 01 29.61, Para 2.1.5.2, "Pigmented Liquid Membrane-Forming Compound"
32 01 29.61, Para 2.1.5.2, "Pigmented Liquid Membrane-Forming Compound"
122 32 01 29.61, Para 2.1.5.3, "Waterproof Sheet" 5
123 32 01 29.61, Para 2.1.8, "Joint Filler" 5
124 32 01 29.61, Para 2.1.7, "Joint Sealant" 5
125 32 11 10, Para 1.4.1, "Sampling and Testing" 5
126 32 11 10, Para 1.4.6, "Approval of Materials"; G 5
127 32 11 10, Para 3.2.7, "Evaluation" 5
128 32 11 16, Para 1.3, "Equipment" 5
129 32 11 16, Para 1.5, "Sampling and Testing" 5
130 32 11 16, Para 1.5.2.4, "Field Density Tests" 5
131 32 11 23, Para 2.1, "Plant Equipment and Tools" 5
132 32 11 23, Para 1.4, "Sampling and Testing"; G 5
133 32 11 23, Para 1.4.2.4, "Field Density Tests"; G 5
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 06-1003D
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
REPAIR TAXIWAY DELTA
SOLICITATION/CONTRACT NO.
REMARKSDATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
SD
-1
0 O
PE
RA
TI
ON
M
AI
NT
EN
SD
-0
9 M
AN
UF
AC
TU
RE
R' S
FI
EL
D
RE
PO
RT
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
SD
-0
4 S
AM
PL
ES
SD
-0
5 D
ES
IG
N
DA
TA
SD
-0
7 C
ER
TI
FI
CA
TE
S
SD
-0
8 M
AN
UF
AC
TU
RE
R' S
IN
ST
RU
CT
IO
NS
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
SD
-0 1 P
RE
CO
NS
TR
UC
IT
TA
LS
SD
-0
2 S
HO
P
DR
AW
IN
GS
SD
-0
3 P
RO
DU
CT
D
AT
A
OT
HE
RS
A
S
SP
EC
IF
IE
D
SD
-0
6 T
ES
T
RE
PO
RT
S
SD
-1
1 C
LO
SE
OU
T
SU
BM
IT
TA
LS
134 32 12 10, Para 3.7, "Sampling and Testing" 5
135 32 12 15.13, Para 1.4, "Placement Plan"; G 5
136 32 12 15.13, Para 2.3, "Mix Design"; G 5
32 12 15.13, Para 3.1, "Contractor Quality Control";
G
138 32 12 15.13, Para 2.2, "Asphalt Cement Binder" 2
139 32 12 15.13, Para 2.1, "Aggregates" 2
140 32 12 15.13, Para 2.1, "Aggregates"; G 5
141 32 12 15.13, Para 3.1.3.10, "QC Monitoring" 5
142 32 12 15.13, Para 2.2, "Asphalt Cement Binder"; G 5
143 32 12 15.13, Para 3.7, "Testing Laboratory" 5
144 32 13 11, Para 2.1, "Equipment" 5
145 32 13 11, Para 3.1.2, "Proposed Techniques"; G 5
146 32 13 11, Para 2.8.1, "Dowels"; G 5
147 32 13 11, Para 2.8.2, "Dowel Bar Assemblies"; G 5
148 32 13 11, Para 2.12.2, "Proportioning Studies"; G 5
149 32 13 11, Para 1.3.4, "Sampling and Testing"; G 5
32 13 11, Para 1.5.1, "Contractor Quality Control Staff"; G
151 32 13 11, Para 1.5.3, "Laboratory Accreditation"; G 5
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 06-1003D
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
REPAIR TAXIWAY DELTA
SOLICITATION/CONTRACT NO.
REMARKSDATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
SD
-1
0 O
PE
RA
TI
ON
M
AI
NT
EN
SD
-0
9 M
AN
UF
AC
TU
RE
R' S
FI
EL
D
RE
PO
RT
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
SD
-0
4 S
AM
PL
ES
SD
-0
5 D
ES
IG
N
DA
TA
SD
-0
7 C
ER
TI
FI
CA
TE
S
SD
-0
8 M
AN
UF
AC
TU
RE
R' S
IN
ST
RU
CT
IO
NS
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
SD
-0 1 P
RE
CO
NS
TR
UC
IT
TA
LS
SD
-0
2 S
HO
P
DR
AW
IN
GS
SD
-0
3 P
RO
DU
CT
D
AT
A
OT
HE
RS
A
S
SP
EC
IF
IE
D
SD
-0
6 T
ES
T
RE
PO
RT
S
SD
-1
1 C
LO
SE
OU
T
SU
BM
IT
TA
LS
32 13 11, Para 2.1, "NRMCA Certificate of Conformance";
G
153 32 13 11, Para 1.5.3, "Commercial Laboratory"; G 5
154 32 13 73, Para 1.2, "Equipment" 5
155 32 13 73, Para 3.1.1, "Manufacturer's Instructions" 5
156 32 13 73, Para 2.1, "Compression Seals"; G 2
157 32 13 73, Para 1.2.3, "Test Requirements" 5
158 32 17 24.00 10, Para 1.2, "Equipment"; G 5
159 32 17 24.00 10, Para 1.4.1, "Qualifications" 5
32 17 24.00 10, Para 2.3, "Manufacturer's Certified Test Reports"
161 32 92 19, Para 2.5.3, "Wood cellulose fiber mulch" 5
162 32 92 19, Para 2.4, "Fertilizer" 5
163 32 92 19, Para 2.2.3, "Topsoil composition tests" 5
164 32 92 19, Para 2.1, "seed" 5
165 32 92 23, Para 2.4, "Fertilizer" 5
166 32 92 23, Para 2.1, "sods" 5
167 33 40 00, Para 3.2, "Placing Pipe" 5
168 33 40 00, Para 3.7, "Pipeline Testing" 5
33 40 00, Para 2.5, "Hydrostatic Test on Watertight Joints"
170 33 40 00, Para 2.3.4, "Frame and Cover for Gratings" 5
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 06-1003D
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
REPAIR TAXIWAY DELTA
SOLICITATION/CONTRACT NO.
REMARKSDATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
SD
-1
0 O
PE
RA
TI
ON
M
AI
NT
EN
SD
-0
9 M
AN
UF
AC
TU
RE
R' S
FI
EL
D
RE
PO
RT
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
SD
-0
4 S
AM
PL
ES
SD
-0
5 D
ES
IG
N
DA
TA
SD
-0
7 C
ER
TI
FI
CA
TE
S
SD
-0
8 M
AN
UF
AC
TU
RE
R' S
IN
ST
RU
CT
IO
NS
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
SD
-0 1 P
RE
CO
NS
TR
UC
IT
TA
LS
SD
-0
2 S
HO
P
DR
AW
IN
GS
SD
-0
3 P
RO
DU
CT
D
AT
A
OT
HE
RS
A
S
SP
EC
IF
IE
D
SD
-0
6 T
ES
T
RE
PO
RT
S
SD
-1
1 C
LO
SE
OU
T
SU
BM
IT
TA
LS
171 33 46 16, Para 2.2, "Filter Fabric" 2
172 33 46 16, Para 2.1, "Pipe for Subdrains" 2
173 33 46 16, Para 2.2, "Filter Fabric" 5
174 33 46 16, Para 2.1, "Pipe for Subdrains" 5
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.