AF_Form_66.pdf
PDF 40 KB Posted
- Attached to
- China Beach Pool Demolition Federal contract opportunity
- Solicitation number
- FA303019RA002
About this file
Required Submittals
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Record_of_Attendance.pdf | ||
| Questions_and_Answers.pdf | ||
| 0001_-_Posting_Q&A.pdf | ||
| Base_Access_Request.docx | DOCX document | |
| SOW.pdf | ||
| TX180007_Heavy.pdf | ||
| Drawings.pdf | ||
| Solicitation_-_FA303019RA002.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER
1027119
PROJECT TITLE
Demolition of Swimming Pool and Infrastructure
SOLICITATION/CONTRACT NO.
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DA
TE
R
EC
EI
VE
D
IN
CO
NT
RA
CT
G
T
O
CI
VI
L E
NG
IN
EE
RI
NG
RE
TU
RN
S
US
PE
NS
E
FO
LL
OW
U
P
C
ON
TR
AC
TO
R
NO
TI
FI
ED
CO
NT
RA
CT
OR
R E-
SU
BM
IT
TA
L
FI
NA
L A
PP
RO
VA
L
RE
MA
RK
S LIN
E N U
M
BER
ITEM OR
DESCRIPTION OF
ITEM, CONTRACT
REFERENCE, TYPE
OF SUBMITTAL (Ref spec
& para)
CE
RT
IF
IC
AT
E O
F C
OM
PL
IA
NC
E
SH
OP
D
RA
W
GS
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
'S R
EC
CO
ME
ND
AT
IO
NS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SE
E
P
AR
A
OT
HE
RS
A
S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION
DATE
APPROVED DIS-APPROVED
Para 1.2 Demolition Plans 4 (e) FIO
Para 1.11 Toilet Facilities Approval 4 14 Days Prior
(e) GA
Para 1.12 As Builts
4 (b) FIO
Para 1.14 Safety Plan
4 (e) FIO
Para 1.17 Welding, Cutting, and Brazing AF Form 592
4 (c) GA
Para 1.20 Work Schedule 4
4 days prior
(c)
FIO
Para 2.2 Turf Sample Submittal 4 (e) GA
Para 2.3 Backfill Material Submittal 4 (e) GA
Para 3.2.1 Equipment Turn In Receipt 4 (b) FIO
(a) As soon as possible but in no case later than 45 calendar days after NTP. AF Form 66, SEP 86 Page 2 of 2
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
(e) Prior to start of Construction
Para 4.1 Base Civil Engineering Work Clearance Request AF Form 103
4 10 Days Prior
(e) FIO
Para 4.2 Utility Outage 4 14 days prior
(c) GA
Para 5.3 Hazardous and Special Wastes Generated by the Contractor
4 (d) FIO
Para 5.4 Contractor Encountered Hazardous Waste
4 (d) FIO
Para 5.6 Hazardous Material 4 (d) FIO
Para 5.10 Air Emission 4 (e) FIO
Para 5.12 Protection of Water Resources (Construction General Permit)
4 30 days prior
(e) FIO
Para 5.1.2.7 Construction Waste Management
4 (b) GA
File details come from the government source that posted it.