AF_Form_66.pdf

Air Force Form PDF 40 KB Posted

Attached to
China Beach Pool Demolition
Solicitation number
FA303019RA002
Issued by

About this file

Required Submittals

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

File Type Posted
Record_of_Attendance.pdf PDF
Questions_and_Answers.pdf PDF
0001_-_Posting_Q&A.pdf PDF
Base_Access_Request.docx DOCX document
Solicitation_-_FA303019RA002.pdf PDF
TX180007_Heavy.pdf PDF
Drawings.pdf PDF
SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER

1027119

PROJECT TITLE

Demolition of Swimming Pool and Infrastructure

SOLICITATION/CONTRACT NO.

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DA

TE

R

EC

EI

VE

D

IN

CO

NT

RA

CT

G

T

O

CI

VI

L E

NG

IN

EE

RI

NG

RE

TU

RN

S

US

PE

NS

E

FO

LL

OW

U

P

C

ON

TR

AC

TO

R

NO

TI

FI

ED

CO

NT

RA

CT

OR

R E-

SU

BM

IT

TA

L

FI

NA

L A

PP

RO

VA

L

RE

MA

RK

S LIN

E N U

M

BER

ITEM OR

DESCRIPTION OF

ITEM, CONTRACT

REFERENCE, TYPE

OF SUBMITTAL (Ref spec

& para)

CE

RT

IF

IC

AT

E O

F C

OM

PL

IA

NC

E

SH

OP

D

RA

W

GS

SA

MP

LE

S

CO

LO

R

SE

LE

CT

IO

N

MA

NU

FA

CT

UR

ER

'S R

EC

CO

ME

ND

AT

IO

NS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SE

E

P

AR

A

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

APPROVED DIS-APPROVED

Para 1.2 Demolition Plans 4 (e) FIO

Para 1.11 Toilet Facilities Approval 4 14 Days Prior

(e) GA

Para 1.12 As Builts

4 (b) FIO

Para 1.14 Safety Plan

4 (e) FIO

Para 1.17 Welding, Cutting, and Brazing AF Form 592

4 (c) GA

Para 1.20 Work Schedule 4

4 days prior

(c)

FIO

Para 2.2 Turf Sample Submittal 4 (e) GA

Para 2.3 Backfill Material Submittal 4 (e) GA

Para 3.2.1 Equipment Turn In Receipt 4 (b) FIO

(a) As soon as possible but in no case later than 45 calendar days after NTP. AF Form 66, SEP 86 Page 2 of 2

(b) Prior to Final Inspection.

(c) Prior to Use.

(d) As Required.

(e) Prior to start of Construction

Para 4.1 Base Civil Engineering Work Clearance Request AF Form 103

4 10 Days Prior

(e) FIO

Para 4.2 Utility Outage 4 14 days prior

(c) GA

Para 5.3 Hazardous and Special Wastes Generated by the Contractor

4 (d) FIO

Para 5.4 Contractor Encountered Hazardous Waste

4 (d) FIO

Para 5.6 Hazardous Material 4 (d) FIO

Para 5.10 Air Emission 4 (e) FIO

Para 5.12 Protection of Water Resources (Construction General Permit)

4 30 days prior

(e) FIO

Para 5.1.2.7 Construction Waste Management

4 (b) GA

File details come from the government source that posted it.