AF_Form_66.pdf

PDF 40 KB Posted

Attached to
China Beach Pool Demolition Federal contract opportunity
Solicitation number
FA303019RA002
Issued by
Department of the Air Force Air Education and Training Command

About this file

Required Submittals

View the file

Other files for this federal contract opportunity

Other files attached to China Beach Pool Demolition, newest first.
File Type Posted
Record_of_Attendance.pdf PDF
Questions_and_Answers.pdf PDF
0001_-_Posting_Q&A.pdf PDF
Base_Access_Request.docx DOCX document
SOW.pdf PDF
TX180007_Heavy.pdf PDF
Drawings.pdf PDF
Solicitation_-_FA303019RA002.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER

1027119

PROJECT TITLE

Demolition of Swimming Pool and Infrastructure

SOLICITATION/CONTRACT NO.

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DA

TE

R

EC

EI

VE

D

IN

CO

NT

RA

CT

G

T

O

CI

VI

L E

NG

IN

EE

RI

NG

RE

TU

RN

S

US

PE

NS

E

FO

LL

OW

U

P

C

ON

TR

AC

TO

R

NO

TI

FI

ED

CO

NT

RA

CT

OR

R E-

SU

BM

IT

TA

L

FI

NA

L A

PP

RO

VA

L

RE

MA

RK

S LIN

E N U

M

BER

ITEM OR

DESCRIPTION OF

ITEM, CONTRACT

REFERENCE, TYPE

OF SUBMITTAL (Ref spec

& para)

CE

RT

IF

IC

AT

E O

F C

OM

PL

IA

NC

E

SH

OP

D

RA

W

GS

SA

MP

LE

S

CO

LO

R

SE

LE

CT

IO

N

MA

NU

FA

CT

UR

ER

'S R

EC

CO

ME

ND

AT

IO

NS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SE

E

P

AR

A

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

APPROVED DIS-APPROVED

Para 1.2 Demolition Plans 4 (e) FIO

Para 1.11 Toilet Facilities Approval 4 14 Days Prior

(e) GA

Para 1.12 As Builts

4 (b) FIO

Para 1.14 Safety Plan

4 (e) FIO

Para 1.17 Welding, Cutting, and Brazing AF Form 592

4 (c) GA

Para 1.20 Work Schedule 4

4 days prior

(c)

FIO

Para 2.2 Turf Sample Submittal 4 (e) GA

Para 2.3 Backfill Material Submittal 4 (e) GA

Para 3.2.1 Equipment Turn In Receipt 4 (b) FIO

(a) As soon as possible but in no case later than 45 calendar days after NTP. AF Form 66, SEP 86 Page 2 of 2

(b) Prior to Final Inspection.

(c) Prior to Use.

(d) As Required.

(e) Prior to start of Construction

Para 4.1 Base Civil Engineering Work Clearance Request AF Form 103

4 10 Days Prior

(e) FIO

Para 4.2 Utility Outage 4 14 days prior

(c) GA

Para 5.3 Hazardous and Special Wastes Generated by the Contractor

4 (d) FIO

Para 5.4 Contractor Encountered Hazardous Waste

4 (d) FIO

Para 5.6 Hazardous Material 4 (d) FIO

Para 5.10 Air Emission 4 (e) FIO

Para 5.12 Protection of Water Resources (Construction General Permit)

4 30 days prior

(e) FIO

Para 5.1.2.7 Construction Waste Management

4 (b) GA

File details come from the government source that posted it.