Attachment 3 - AF Form 66 Design-Build Fire Alarm Panel Upgrade.xls

Air Force Form XLS spreadsheet 71 KB Posted

Attached to
RECOVERY - ACJP081096 - Repair Fire Alarm System, B/286, FItness Center.
Solicitation number
FA2816-09-R-0030
Issued by

About this file

Attachment 13 - AF Form 66

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

File Type Posted
Questions and Answers.docx DOCX document
fire_alarm_what_model.jpg JPG image
Fire Alarm Drawing 2.PDF PDF
Fire Alarm Drawing 1.PDF PDF
amendment 2.pdf PDF
ammendment 1.pdf PDF
Recovery Repair Fire Alarm SOLICITATION.pdf PDF
Design-Build SOW Replace Fire Alarm_Blg 286.doc DOC document
Appendix A - Detailed Scope of Work Fire Alarm Panel.doc DOC document
wagedetermination.doc DOC document
Drawing _286.pdf PDF
Attachment 4 - SECTION 01010 JAN09.pdf PDF
Fire panel photo.ppt PPT presentation
PerformanceQuestionnaire.doc DOC document
Attachment 6 -SECTION 02086 LAAFB Lead Specs Updated5Dec08.pdf PDF
Attachment 5 - SECTION 02085 Updated5Dec08.pdf PDF
Attachment 7 - Warranty Letter Example.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER:PROJECT TITLE:SOLICITATION / CONTRACT NO.:
ACJP081096REPLACE FIRE ALARM PANEL SYSTEM, FITNESS CENTER, BLG 286xxx
(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTSDRAWINGSCOST ESTIMATETECHNICAL DATATEST REPORTSFIELD REPORTSELECTRONIC VERSION (CD or DVD)REQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
1Project Manager and designated representatives contact information (SOW Sec 5.8.1)21At time of NTP
2Project Schedule (SOW Sec 5.2)21NTP plus 5 working days - Updated weekly
3Meeting Minutes (SOW Sec 5.5.1)215 working days after event
4A-E Design Professionals List (SOW Sec 6.1)21Prior to start of Design Phase
5Preliminary Design submittal (50 percent) (SOW Sec 6.3.2)222Per Project Schedule
6Issued for Construction Submittal (100 percent) (SOW Sec 6.3.5)332Per Project Schedule
7Site Safety Plan (SOW Sec 7.4.3215 working days prior to onsite work
8Work Phasing Plan (SOW Sec 7.2.1)215 working days after NTP
9Environmental Protection Plan (Spec Sec 01010 - Section 1.6)215 working days prior to onsite work
10List of Equipment Requiring Air Permit (Spec Sec 01010 - Section 1.7)215 working days prior to onsite work
11Hazardous Waste Certification & Hazardous Waste Transporter Documentation (Spec Sec 01010 - Section 1.8)21As required
12AF form 3952, MSDS Chemical/Hazardous Material Request Authorization (Spec Sec 01010 - Section 1.9)215 working days prior to use
13Hazardous Material Spill/Release Report (Spec Sec 01010 - Section 1.10)21As required
14Green Procurement Determination Form and Estimate/Certification Form (Spec Sec 01010 - Section 1.11)215 working days prior to onsite work
15Construction & Demolition Debris Report (Spec Sec 01010 - Section 1.13)21As required
16NPDES General Permit Notice of Intent, SWPPP and Draft Notice of Termination (Spec Sec 01010 - Section 1.14)215 working days prior to onsite work
17Lead-Based Paint Abatement Submittals (Spec Sec 01010 - Section 1.15)215 working days prior to onsite work
18Asbestos Abatement Submittals (Spec Sec 01010 - Section 1.16)215 working days prior to onsite work
19AST Technical Information and Site Specific Spill Plan (Spec Sec 01010 - Section 1.19)21As required
20Construction Material and Shop Drawing Submittals Schedule/Log (SOW Sec 7.2.2)21At start of Construction Phase - Updated weekly
21AF Form 3000, Material Submittals (SOW Sec 7.2.2)22222222222As required
22A-E Site Visit Report (SOW Sec 6.4.2)215 working days after meeting
23Operations and Maintenance Manuals (SOW Sec 8.3)2230 days after BOD
24Operations and Maintenance Training Video (SOW Sec 8.3)230 days after BOD
25Equipment/Workmanship Warranty Letter (SOW Sec 8.4)2230 days after BOD
26DD-1354 Transfer and Acceptance of Real Property (Draft / Interim) (SOW Sec 8.5)2120 days prior to BOD
27DD-1354 Transfer and Acceptance of Real Property (Final) (SOW Sec 8.5)2130 days after BOD
28Construction Record Drawings (SOW Sec 8.6 and 8.7)2130 days after BOD
29
30
31
32
33

&L&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) AF Form 66 (11-6-08)&C&"Arial,Bold"&8&P of &N&R&"Arial,Bold"&8Design-Build Attachment 3 (11/17/08) Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)

Enter any comments pertaining to the submittal