Appendix A - Detailed Scope of Work Fire Alarm Panel.doc

DOC document 38 KB Posted

Attached to
RECOVERY - ACJP081096 - Repair Fire Alarm System, B/286, FItness Center.
Solicitation number
FA2816-09-R-0030
Issued by

About this file

Attachment 2 - Scope of Work

View the file

Other files

File Type Posted
Questions and Answers.docx DOCX document
fire_alarm_what_model.jpg JPG image
Fire Alarm Drawing 2.PDF PDF
Fire Alarm Drawing 1.PDF PDF
Attachment 3 - AF Form 66 Design-Build Fire Alarm Panel Upgrade.xls XLS spreadsheet
amendment 2.pdf PDF
ammendment 1.pdf PDF
Recovery Repair Fire Alarm SOLICITATION.pdf PDF
Design-Build SOW Replace Fire Alarm_Blg 286.doc DOC document
wagedetermination.doc DOC document
Drawing _286.pdf PDF
Attachment 4 - SECTION 01010 JAN09.pdf PDF
Fire panel photo.ppt PPT presentation
PerformanceQuestionnaire.doc DOC document
Attachment 6 -SECTION 02086 LAAFB Lead Specs Updated5Dec08.pdf PDF
Attachment 5 - SECTION 02085 Updated5Dec08.pdf PDF
Attachment 7 - Warranty Letter Example.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX A

NOTE: Few manufacturers regularly produce prefinished panels meeting these low gloss requirements and such sheets are available only in limited colors. Standard 70 percent PVF2 finish, for example, has a medium gloss. Low gloss paint formulations result in reduced weathering properties. The project program shall dentify individual facilities requiring low gloss finish.

For roof of structures at airfields where glare would be objectionable and may be an operational hazard, the specular gloss value should be limited to 10 or less at an angle of 85 degrees.

D40 FIRE PROTECTION

SYSTEMS REQUIREMENTS

FIRE PROTECTION TEMPLATE 8/06

Instructions for using this template: There are template files for each UNIFORMAT Level 2 Group Elements. This template is for Group Element D40-FIRE PROTECTION. Text such as this is hidden text that will not print when the hidden text box in “Print/Options” is un-checked.

The Fire Protection Team Member should edit this template for the requirements of the project. The SYSTEMS REQUIREMENTS are intended to define items that are required throughout the facility or on a system wide basis that is common to several rooms. Room-specific requirements are defined in the ROOM REQUIREMENTS section. Coordinate with the lead programmer for ROOM REQUIREMENTS. Editing is required where brackets [ ] appear. Delete all building elements that are not required for the project. If additional elements or sub-elements are required for the project that do not appear in the template, refer to the NAVFAC DB RFP Web Site Uniformat II/ WBS publication for additional building element numbers and descriptions. Coordinate with the PERFORMANCE TECHNICAL SPECIFICATION SECTIONS D40 to ensure that performance requirements are provided for all of the Building Elements listed here and that paragraph numbering matches.

NOTE: Edit the following paragraphs to suit the project, or create your own, to describe the FIRE PROTECTION for the project. Coordinate this section carefully with other portions of the RFP.

SYSTEM DESCRIPTION

NOTE: Edit the following for the specific project requirements.

Upgrade existing fire alarm system so that it will be capable of mass notification to the building occupants in the case of a fire inside the facility. This notification shall be accomplished via horn strobes.

GENERAL SYSTEM REQUIREMENTS

Provide working space around all equipment. Provide concrete pads under all equipment. Provide all required fittings, connections and accessories required for a complete and usable system. All equipment shall be installed per all applicable codes, and per the manufacturer’s recommendations. Where the word “should” is used in the manufacturer’s recommendations, substitute the word “shall”.

All Design Documents, (i.e. Building Code/Life Safety Analysis, plans, specifications, calculations, etc.) shall be prepared by, or reviewed and certified by the design/build contractor’s Qualified Fire Protection Engineer or equivalent.

Provide training for the active systems consisting of a maximum of three (2)-hour sessions to accommodate all shifts of the base fire department and allow for rescheduling for unforeseen fire department responses.

D4010

FIRE ALARM AND DETECTION SYSTEMS

The end result shall be a complete, electrically supervised, addressable intelligent, manual and automatic, annunciated fire alarm and detection system throughout the facility. The system shall be a horn strobe evacuation type system, and shall also serve as a mass notification system. If applicable, the fire reporting portion of the system shall be compatible with the existing base fire reporting system.

NOTE: Edit the following as applicable when more than one emergency circuit is required. Identify circuits requiring emergency power such as FACP, ESS, etc. Include voltage and amp requirements.

E1040 GOVERNMENT FURNISHED EQUIPMENT

NOTE: Choose second bracketed option and edit appropriately when Government Furnished Contractor Installed equipment is part of RFP. Include building number and approximate distance from site in bracketed spaces. When equipment is furnished by the Government, include Shop Drawings and Product Data sheets with information defining equipment and requirements in Part 5 of the RFP documents. Choose first option for all other projects.

There is no Government Furnished equipment in this project.

CONSTRUCTION SUBMITTALS

Submit any revisions or deviations caused by discontinued items to the Contracting Officer.

Operation and Maintenance Data

List Operation and Maintenance Manuals.

************************************************************************************** NOTE: Above - Insert the most stringent requirements for the levels of groundwater contaminants for the application. Coordinate with local environmental disciplines to ensure the appropriate levels are indicated.

ACJP081096