Attachment 3 - AF Form 66 Construction 01-12-09.xls

Air Force Form XLS spreadsheet 64 KB Posted

Attached to
RECOVERY - ACJP062051- Repair Perimeter Fencing, Photovoltaic Lighting, LAAFB
Solicitation number
FA2816-09-R-0029
Issued by

About this file

Attachment 12 - AF Form 66

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

File Type Posted
PV Security Lighting Q&A No. 3.doc DOC document
Questions and answers ver2.docx DOCX document
LED Solar Lighting Specs.pdf PDF
Questions and answers.pdf PDF
Southwest Corner and Douglas St Fence.zip ZIP file
ammendment 3.pdf PDF
Aviation and El Segundo Fence.pdf PDF
amendment2.pdf PDF
Appendix A.pptm PPTM file
amendment 1.pdf PDF
Solar_Panel-Pilaster_Detail.pdf PDF
Repair Perimeter Fence Soliciation.pdf PDF
Attachment 4 - SECTION 01010.pdf PDF
Attachment 5 - SECTION 02085.pdf PDF
Attachment 7 - Warranty Letter Example.pdf PDF
wagedetermination.doc DOC document
PerformanceQuestionnaire.doc DOC document
Design-Build SOW Solar Lighting Main Base 2-11-09.docm DOCM document
Attachment 6 - SECTION 02086.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER:PROJECT TITLE:SOLICITATION / CONTRACT NO.:
ACJP-062051Install Solar Lighting Around Base Perimeterxxx
(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTSDRAWINGSCOST ESTIMATETECHNICAL DATATEST REPORTSFIELD REPORTSELECTRONIC VERSION (CD or DVD)REQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
1Project Manager and designated representatives contact information (SOW Sec 5.8.1)21At time of NTP
2Project Schedule (SOW Sec 5.2)21NTP plus 5 working days - Updated weekly
3Meeting Minutes (SOW Sec 5.5.1)215 working days after event
4Site Safety Plan (SOW Sec 7.4.3)215 working days prior to onsite work
5Work Phasing Plan (SOW Sec 7.2.1)215 working days after NTP
6Environmental Protection Plan (Spec Sec 01010 - Section 1.6)215 working days prior to onsite work
7List of Equipment Requiring Air Permit (Spec Sec 01010 - Section 1.7)215 working days prior to onsite work
8Hazardous Waste Certification & Hazardous Waste Transporter Documentation (Spec Sec 01010 - Section 1.8)21As required
9AF form 3952, MSDS Chemical/Hazardous Material Request Authorization (Spec Sec 01010 - Section 1.9)215 working days prior to use
10Hazardous Material Spill/Release Report (Spec Sec 01010 - Section 1.10)21As required
11Green Procurement Determination Form and Estimate/Certification Form (Spec Sec 01010 - Section 1.11)215 working days prior to onsite work
12Construction & Demolition Debris Report (Spec Sec 01010 - Section 1.13)21As required
13NPDES General Permit Notice of Intent, SWPPP and Draft Notice of Termination (Spec Sec 01010 - Section 1.14)215 working days prior to onsite work
14Lead-Based Paint Abatement Submittals (Spec Sec 01010 - Section 1.15)215 working days prior to onsite work
15Asbestos Abatement Submittals (Spec Sec 01010 - Section 1.16)215 working days prior to onsite work
16AST Technical Information and Site Specific Spill Plan (Spec Sec 01010 - Section 1.19)21As required
17Construction Material and Shop Drawing Submittals Schedule/Log (SOW Sec 7.2.2)21At start of Construction Phase - Updated weekly
18AF Form 3000, Material Submittals (SOW Sec 7.2.2)22222222222As required
19Operations and Maintenance Manuals (SOW Sec 8.3)2230 days after BOD
20Operations and Maintenance Training Video (SOW Sec 8.3)230 days after BOD
21Equipment/Workmanship Warranty Letter (SOW Sec 8.4)2230 days after BOD
22DD-1354 Transfer and Acceptance of Real Property (Draft / Interim) (SOW Sec 8.5)2120 days prior to BOD
23DD-1354 Transfer and Acceptance of Real Property (Final) (SOW Sec 8.5)2130 days after BOD
24Construction Record Drawings (SOW Sec 8.6 and 8.7)2130 days after BOD
2535% Design Documintation, Estimate and Drawings22130 days after NTP
2690% Design Documintation, Estimate and Drawings22145 days after NTP
27100% Design Documintation, Estimate and Drawings2215 working days prior to onsite work

&L&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) AF Form 66 &C&"Arial,Bold"&8&P of &N&R&"Arial,Bold"&8Construction Attachment 3 (11/17/08) Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)

Enter any comments pertaining to the submittal