Construction AF Form 66.pdf
PDF 118 KB Posted
- Attached to
- BLDG 4868 Additional Electrical Panel for DMAFB
- Solicitation number
- 24QA026
About this file
This document is an AF Form 66, which is a Schedule of Material Submittals for a construction project. It outlines the various submittals required from the contractor, including documents such as traffic control plans, air quality permits, as-builts, warranties, and design submittals. The related federal contract opportunity is for the construction of an additional electrical panel at Building 4868 at Davis-Monthan AFB, to be performed on a design-build basis. The contractor shall furnish all labor, equipment, and materials to perform the site survey, design, and construction/installation of the new 200 Amp, 120/208-volt, three phase panel board. The solicitation number is 24QA026, and the site visit is scheduled for July 25, 2024. Proposals are due by July 10, 2024 at 1:00 PM Arizona local time. The contracting agency is the Department of the Air Force Air Combat Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 04868-001-001.PDF | ||
| WD - AZ20240040 - 17 May 24.pdf | ||
| AF Form 3052.xlsx | XLSX spreadsheet | |
| Contractor Environmental Guide .pdf | ||
| Contractor EAL Template.xlsx | XLSX spreadsheet | |
| DMAFB Design Compatibility Guidelines 2017.pdf | ||
| Solicitation - FA487724R0019.pdf | ||
| FBNV240023 - Statement of Work - Addl Elec Panel.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROJECT NUMBER : PROJECT TITLE: SOLICITATION/CONTRACT NO :
NO. OF COPIES REQUIRED
Awarded:
Pre-Con:
NTP:
Const. Start:
Const. End:
Finalled:
APPROVED DISAPPROVED
AF Form 103 Job Order Sec 01010, Para 1.3c 1
Affidavits Sec 01010, Para 1.6a 1
Traffic Control Sec 01010, Para 2.1 1
Air Quality Activity Permit Sec 01010, Para 2.5d Env Cont. Guide Sec 3.3 Air Quality
Waste Manifests Sec 01010, Para 2.5h Env Cont. Guide Sec 3.4 Regulated Hazardous Waste
8 Record As-Builts Sec 01010, Para 3.2.2.a 1
Record Disks Sec 01010, Para 3.2.2.b 1
DD 1354
Sec 01010, Para 3.2.2.c.1 1
Warranty / Guarantee Items Sec 01010, Para 3.2.2.c.3 1
AF Form 3064, Sec 01011, Para 1.5.1 1
Design Charrette Submittal Sec 01011, Para 2.12.1 1
50% Design Submittal Sec 01011, Para 2.12.3 1
100% Design Submittal Sec 01011, Para 2.12.5 1
EMS Most Significant Environmental Aspects Awareness Form Env Cont. Guide Sec 3.2 & Appendix E
EMS Awareness Training Env Cont. Guide Sec 3.3 & Appendix F 1
Notice of Termination Env Cont. Guide 3.5 SWPP Plan 1
Contractor to add Submittals required within specifications or as necessary.
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Add Electrical Panel at Building 4868 RescueFBNV 240023
RE
TU
RN
S
US
PE
NS
E
DA
TE
SU
BM
IT
TA
L
NU
MB
ER
S
CO
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
LI
NE
N
UM
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
M
AN
UF
AC
TU
RE
R'
S
FI
EL
D
RE
PO
RT
S
C
LO
SE
OU
T
SU
BM
IT
TA
L
O
PE
RA
TI
ON
A
ND
M
AI
NT
EN
AN
CE
M
AN
UA
L
REMARKS
P
RE
CO
NS
TR
UC
TI
ON
S
UB
MI
TT
AL
S
S
HO
P
DR
AW
IN
GS
P
RO
DU
CT
D
AT
A
S
AM
PL
ES
D
ES
IG
N
DA
TE
T
ES
T
RE
PO
RT
S
C
ER
TI
FI
CA
TE
S
M
AN
UF
AC
TU
RE
RS
IN
ST
RU
CT
IO
NS
O
TH
ER
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
FI
NA
L
AP
PR
OV
AL
DATE CONTRACTOR NOTIFIED
DA
TE
R
EC
EI
VE
D
IN
C
ON
TR
AC
TI
NG
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
AF FORM 66 (Computer Generated) PAGE 1 of 1
AF Form 66
File details come from the government source that posted it. Updated .