This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) to Aptim Environmental & Infrastructure, LLC (APTIM) for environmental remediation services at the former Spot Busters Cleaners facility located at 6750 North State Road 7, Coconut Creek, Broward County, Florida. The task assignment is executed pursuant to Contract Number HW689 and is assigned Task Number DC011C with Project Number ERIC_4244. Nicole Knutson serves as the FDEP Project Manager, while Eric Kramer is the contractor's project manager. The parties agree to comply with all terms and conditions of the underlying contract HW689.
APTIM will develop a Soil Vapor Extraction System (SVE) Interim Source Removal Plan (ISRP) based on a June 7, 2023 proposal. The scope of work comprises two subtasks: Subtask 1 covers project management activities, and Subtask 2 encompasses the interim source removal plan preparation, including site visits, review of existing testing data, system design, and submission to FDEP for review and approval. The total task value is $10,680.53 on a fixed unit rate basis, with direct labor costs of $4,036.86, overhead and administrative costs, fringe benefits, travel expenses of $120.00, field expendables of $40.00, and a completion fee of $956.41. The final deliverable—the ISR Report and Project Management documentation—is due August 25, 2023, with a task completion date of October 20, 2023. Invoicing is conditioned upon FDEP approval of the ISR report and project management deliverables.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW689
DC011C Completion October 20, 2023
APTIM will create a Soil Vapor Extraction System (SVE) Interim Source Removal Plan (ISRP) as detailed in the June 7, 2023 proposal
Nicole Knutson 850-245-8763 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Aptim Environmental & Infrastructure, LLC (APTIM)
Aptim Environmental & Infrastructure, LLC (APTIM)
Eric Kramer 407-287-3216
ERIC_4244
6750 North State Road 7, Coconut Creek, Broward County
Spot Busters Cleaners
✔ $ 10,680.53
$ 10,680.53
Scope of Work
Eric Kramer Digitally signed by Eric Kramer Date: 2023.06.28 10:50:55 -04'00' Kelly Crain Digitally signed by Kelly Crain
Date: 2023.06.28 10:10:22 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
ISR Report & Project Management- Subtasks 2 & 1 08/25/2023
FDEP Approval of ISR Report & Project Management- Subtasks 2 & 1 $ 10,680.53
$ 10,680.53
HW689
DC011C
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: ERIC_4244
Spot Busters Cleaners
FROM: Nicole Knutson, Project Manager
SUBJECT: Negotiation Summary
HW689 DC011C
DATE: June 27, 2023
APTIM will create a Soil Vapor Extraction System (SVE) Interim Source Removal Plan (ISRP) as detailed in the June 7, 2023 proposal
Total task amount is $10,680.53. APTIM's time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date is August 25, 2023. Task completion date is October 20, 2023.
FDEP COST ESTI MATE
Contractor: Aptim Environmental & Infrastructure, LLC
Date: 6/7/2023
Task #: HW689 - DC011C ERIC_4244 SubTask 1 Project Management
Site: Spot Busters Cleaners SubTask 2 2-ISR/RAP Preparation
Activity/Phase: ISR SubTask 3
Project Manager: Kelly Crain SubTask 4
SubTask 5
Totals 1 2 3 4 5 Labor Rate Category
$68.41 Project Manager E. Kramer 7 6.8 $68.41 Engineer/Scientist 5 E. Kramer 23 23 0 0 0 $25.12 Engineer/Scientist 1 R. Lindsay 68 68 0 0 0 $34.03 Designer 2 S. Ferianc 6 6 0 0 0 $28.89 Technical Publications Specialist 3 H. Vining 3 3 0 0 0
$0.00 0 0 0 0 0 Total Hours 107 7 100 0 0 0
Direct Labor $4,036.86 $464.42 $3,572.44 $0.00 $0.00 $0.00
Overhead 85.58% $3,454.74 $397.45 $3,057.29 $0.00 $0.00 $0.00 Gen & Admin 19.38% $782.34 $90.00 $692.34 $0.00 $0.00 $0.00 Fringe 31.96% $1,290.18 $148.43 $1,141.75 $0.00 $0.00 $0.00 Total Labor $9,564.12 $1,100.30 $8,463.82 $0.00 $0.00 $0.00
Travel Vehicle Rental $120.00 $120.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $120.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $40.00 $40.00 $0.00 $0.00 $0.00
Subtotal $9,724.12 $1,100.30 $8,623.82 $0.00 $0.00 $0.00 Completion Fee $956.41 $110.03 $846.38 $0.00 $0.00 $0.00
Total Estimated Cost $10,680.53 $1,210.33 $9,470.20 $0.00 $0.00 $0.00
REV: 02/03 CEF SHAW Page 1
SITE :
SUBTASK:
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 23
Engineer/Scientist 1 R. Lindsay
Designer 2 S. Ferianc 6 Technical Pub Specialist 3 H. Vining 3
TOTAL LABOR 100
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
Hotel 0 $110.00 Day 0 $0.00
Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00
Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00
Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00
Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$100.00 Drum 0 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EPA Method TO-15 (VOC Soil Vapor) $200.00 0 0 $0.00 EPA Method 8260 (Halos Only) $73.00 0 0 $0.00 EPA Method 8260 (Halos Only/IDW) $73.00 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 1 $40.00
Shallow GW Sampling Kit $290.00 Day 0 $0.00 MAGS Investigation Kit $500.00 Day 0 $0.00 Tedlar Bags $20.00 Each 0 $0.00
55-gallon Drum $100.00 Each 0 $0.00
TOTAL EQUIPMENT $40.00
Report formating, Electronic conversions and Assembly
Evaluate Results of SAR and SSAR data (2 hrs), Conduct Site Visit (8 hrs), Evaluate Conceptual layout (2 hrs), Conference Call with FDEP for Review of Layout (2 hrs), Revise Conceptual Layout Plans (1 hr), PE review of engineering calculations (2 hrs), equipment selection (2 hrs), and ISR Plan & Text (4 hrs)
2-ISR/RAP Preparation
Spot Busters Cleaners
6/7/2023
Preparation of ISR design layout, figures and details
Review assessment data (3 hrs), conduct site visit (8 hrs), Prepare Conceptual layout (6 hrs), Conference Call with FDEP for Review of Layout (2 hrs), optimize and modify conceptual layout as needed considering equipment selection/availability, surface & below grade utilities, impact to business, electrical connection & routing (6 hrs), Calculate headlosses (3 hrs), size equipment/check FDEP Lakeland storage for applicable units (5 hrs), draft plan & text (30 hrs), Complete RAP Checklist (2 hrs). Revise ISR as required (3 hrs.)
Proposed Scope of Work Spot Busters Cleaners 6750 North State Road 7, Coconut Creek, Broward County, FL 33073 Development of ISR Work Plan Task Assignment DC011C ERIC_4244 (Former Facility No. 069801109) Aptim Environmental & Infrastructure, LLC 6/7/23
The following proposed scope of work under Task Assignment (TA) DC011C has been prepared for the Former Spot Busters Cleaners located at 6750 North State Road 7 in Coconut Creek, Florida. The scope was prepared for the development of an Interim Source Removal Plan for SVE at the request of the FDEP. The following explains the scope of work included in the Task Assignment (TA).
Subtask - 1: Project Management This task includes project management activities associated with the completion of Task 2, as calculated in accordance with Contract HW689.
Subtask 2 – Interim Source Removal Plan (ISR):
Includes the estimated cost for the preparation of an Initial Source Removal Plan for the former Spot Busters Cleaners site. The costs include a site visit to determine system infrastructure layout, and electrical supply routing. In addition, the scope includes review of MAGS testing data, design of a SVE system specifically for the former Spot Busters Cleaners based on the site layout, estimated area of impact, probable remedial system footprint and owners/tenants’ preferences to reduce impact to site operations. The goal of the ISR is to remove the source of the soil contamination detected beneath the building and other areas of the subsurface. The ISR will be submitted to the FDEP for review and approval.
The ISR Preparation is estimated to require 4 weeks from approval of the task assignment, therefore the report submittal is estimated be July 28, 2023. The TA completion date should allow for FDEP review and approval of the ISR report, and therefore should be set around September 29, 2023.
APTIM proposes to perform this scope of work in accordance with the terms and conditions of the contract No. HW689 executed between Florida Department of Environmental Protection and APTIM Environmental & Infrastructure, LLC. APTIM will begin the proposed scope of work upon written authorization.
In the event you have any questions, please do not hesitate to call.
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_v2.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v1.pdf |
| Cost Estimate |
| Subtask 2 |
| Subtask 3 |
| Subtask 4 |
| Subtask 5 |
| Subtask 6 |
| 2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev1_12-12-22.pdf |
| Table 1 for SAWP |
| Monitoring Well Locations |
| Utility Locate Bids_Compiled.pdf |
| Geosyntec Utility-272_Geotek_1500 |
| Geoview Utility Quote_2000_COT FTF SIS |
| Tallahassee Fire Training Division_V1_Bloodhound_3700 |
| Drilling Bids_Compiled.pdf |
| PDS_Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (sonic) |
| Direct Push |
| City of Tallahassee Fire Training Site_GW Protection PFAS Free Water Estimate Email |
| Cascade_Geosyntec Consultants, Inc. - City of Tallahassee Fire Training Facility - PN221026-118844 |
| GW Protection_Geosyntec (T) 1022060 S.pdf |
| Invoice |
| Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (MOT).xlsx.pdf |
| Sheet1 |
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v1.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v2.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v2.pdf |
| Cost Estimate |
| Subtask 2 |
| Subtask 3 |
| Subtask 4 |
| Subtask 5 |
| Subtask 6 |
| 2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev2.pdf |
| Table 1 for SAWP |
| Monitoring Well Locations |
File details come from the government source that posted it. Updated .