Task Assignment BF01B Summary

This document is a Task Assignment issued by the State of Florida Department of Environmental Protection (FDEP) to Aptim Environmental & Infrastructure, LLC for supplemental site assessment (SSA) activities at the U.S. 192 Solid Waste Management Facility (formerly Deseret Ranch) located in Melbourne, Brevard County, Florida. The work is being conducted under the overarching Contract HW689 and funded through the State & Tribal Response Program (SRP) cooperative agreement administered by FDEP on behalf of the U.S. Environmental Protection Agency (EPA). Justin Cross serves as the FDEP project manager, while Eric Kramer represents Aptim as the contractor's project manager.

The Task Assignment encompasses four subtasks with a total contract value of $9,060.31 on a fixed unit rate basis. Subtask 1 provides project management services at $947.53. Subtask 2 includes development of an SSA Work Plan, Quality Assurance Project Plan (QAPP), and Health and Safety Plan (HASP) at $1,893.53. Subtask 3 covers SSA field activities involving collection of groundwater samples from five monitoring wells (MW018, MW028, MW031, MW041, and MW042) plus one equipment blank, with laboratory analysis for total arsenic using EPA Method 6020, totaling $2,451.16. Subtask 4 provides preparation of a Supplemental Site Assessment Report incorporating field and laboratory results with conclusions and recommendations, costing $3,768.09. The Task Assignment is effective through March 31, 2023, with deliverables due by February 3, 2023. Funding is allocated from Organization Code 450206000, with Grant Number SRP18 and Project Number HW689.

View the file

Other files

File Type Posted
CN-370000-HW689-BF01A.pdf PDF
CN-370000-HW689-BF01C.pdf PDF
CN-370000-HW689-BF1ACO1.pdf PDF
CN-370000-HW689-BIL01CC1.pdf PDF
CN-370000-HW689-BIL01D.pdf PDF
CN-370000-HW689-BIL01E.pdf PDF
CN-370000-HW689-CSS2AC02.pdf PDF
CN-370000-HW689-DC005A.pdf PDF
CN-370000-HW689-DC007A.pdf PDF
CN-370000-HW689-DC008A.pdf PDF
CN-370000-HW689-DC012B.pdf PDF
CN-370000-HW689-DC013A.pdf PDF
CN-370000-HW689-DC015D.pdf PDF
CN-370000-HW689-DC016A.pdf PDF
CN-370000-HW689-DC016B.pdf PDF
CN-370000-HW689-DC020B.pdf PDF
CN-370000-HW689-DC020C.pdf PDF
CN-370000-HW689-DC021B.pdf PDF
CN-370000-HW689-DC022B.pdf PDF
CN-370000-HW689-DC023A.pdf PDF
CN-370000-HW689-DC024C.pdf PDF
CN-370000-HW689-DC024D.pdf PDF
CN-370000-HW689-DC030A.pdf PDF
CN-370000-HW689-DC033A.pdf PDF
CN-370000-HW689-DC03BCO2.pdf PDF
CN-370000-HW689-DC04CCO1.pdf PDF
CN-370000-HW689-DC05CCO3.pdf PDF
CN-370000-HW689-DC06BCO1.pdf PDF
CN-370000-HW689-DC10ACO1.pdf PDF
CN-370000-HW689-DC11CCO2.pdf PDF
CN-370000-HW689-DC11CCO3.pdf PDF
CN-370000-HW689-DC11CCO4.pdf PDF
CN-370000-HW689-DC11DCO1.pdf PDF
CN-370000-HW689-DC13BCO1.pdf PDF
CN-370000-HW689-DC13BCO3.pdf PDF
CN-370000-HW689-DC14BCO2.pdf PDF
CN-370000-HW689-DC15CCO1.pdf PDF
CN-370000-HW689-DC15CCO2.pdf PDF
CN-370000-HW689-DC15DCO1.pdf PDF
CN-370000-HW689-DC15DCO2.pdf PDF
CN-370000-HW689-DC17BCO4.pdf PDF
CN-370000-HW689-DC18BCO2.pdf PDF
CN-370000-HW689-DC20CCO1.pdf PDF
CN-370000-HW689-DC30ACO2.pdf PDF
CN-370000-HW689-DC32ACO1.pdf PDF
CN-370000-HW689-DC35ACO1.pdf PDF
CN-370000-HW689-FIL 3.pdf PDF
CN-370000-HW689-FIL12.pdf PDF
CN-370000-HW689-FIL19.pdf PDF
CN-370000-HW689-FIL20.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW689

BF01B Completion March 31, 2023

Per Aptim's 10/11/2022 Cost Proposal and Level of Effort, this Task Assignment covers the collecting of groundwater samples from five (5) monitoring wells as well as one equipment blank.

Justin Cross 850.245.8968 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Aptim Environmental & Infrastructure, LLC

Aptim Environmental & Infrastructure, LLC

Eric Kramer 407.287.3216

ERIC_7391

US Hwy 192 at Clayton Road, Melbourne, Brevard County, Florida

U.S. 192 Solid Waste Management Facility / Former Deseret Ranch

✔ $ 9,060.31

$ 9,060.31

Scope of Work

Eric Kramer Digitally signed by Eric Kramer Date: 2022.10.25 11:33:43 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2022.10.25 09:47:15 -04'00'

450206000 LF 131300 37450300 101494 SRP18 HW689 00 $ 9,060.31

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

SSA Workplan, QAPP, and Health and Safety Plan 11/04/2022

Field notes, MW installation logs, photos, GW sampling logs, COCs 12/30/2022

Final SSA Report; Project Management 02/03/2023

FDEP approval of SSA Workplan, QAPP, and Health and Safety Plan (Subtask 2) $ 1,893.53

FDEP approval of field notes, MW installation logs, photos, GW sampling logs, COCs (Subtask 3) $ 2,451.16

FDEP approval of Final SSA Report and Project Management (Subtasks 1 & 4) $ 4,715.62

$ 9,060.31

HW689

BF01B

www.FloridaDEP.gov

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: Aptim Environmental & Infrastructure, LLC, HW689 Contract File

FROM: Justin Cross, Contract Manager

DATE: October 24, 2022

SUBJECT: Negotiation Summary - SRP18, TA BF01B

Supplemental Site Assessment (SSA) Activities U.S. 192 Brevard Co. Solid Waste Management Facility (SWMF) aka: Deseret Ranch, COM_312749

This Task Assignment (TA) is intended for conducting additional SSA activities at the U.S. 192 Brevard Co. SWMF site, formerly referred to as Deseret Ranch. The scope of work builds upon the previous contamination assessment activities and was reviewed and approved by the Department’s District and Business Support Program (DBSP) for the eventual issuance of a Site Rehabilitation Completion Order (SRCO) as described in Rule 62-780.680, Florida Administrative Code (F.A.C). The services are being conducted using federal funds from the State & Tribal Response Program (SRP) cooperative agreement that is administered by DEP on behalf of EPA.

Subtask 1 Project Management This subtask is a percentage of the overall project and has been negotiated as a contract rate. It includes project management, overhead, general and administrative, fringe and other direct costs.

The cost of this subtask is $947.53

Subtask 2: SSA Work Plan/QAPP, and Health and Safety Plan In accordance with an EPA directive, this subtask includes the completion of a Work Plan/Quality Assurance Project Plan (QAPP), a Health and Safety Plan (HASP). The SSA QAPP Workplan will provide a brief summary of the scope of work and tables and figures showing the proposed sample locations. The agreed upon cost of this subtask is $1,893.53.

Subtask 3 SSA Activities Under this subtask, Aptim will collect groundwater samples from monitoring wells MW018, MW028, MW031, MW041, and MW042 with one equipment blank also being collected. All samples will be analyzed for arsenic using EPA Method 6020. The cost of this subtask is $2,451.16.

Subtask 4 SSA Report A Supplemental Site Assessment Report (SSAR) will be prepared detailing the field and laboratory results. This report will also include a summary of the previous contamination assessment results from the January 2018, March 2019, September 2019, February 2020, October 2020, and April 2022 sampling events, updated figures and tables, and will also include conclusions and http://www.floridadep.gov/

Negotiation Summary – Task Assignment (TA) BF01B US 192 Brevard Co. SWMF, aka Deseret Ranch

ERIC_7391

Western Brevard County SSA Activities October 24, 2022 www.FloridaDEP.gov recommendations for any future work needed to meet Chapter 62-780, F.A.C. closure requirements. The cost of this subtask is $3,768.09.

Summary DEP’s SRP Contract Manager and Aptim’s Contract Manager have both agreed to the scope of work and associated costs. The final cost associated with this TA is $9,060.31. Documentation of these costs is included in the Level of Effort/Cost Proposal (LOE-CP) Form and LOE-CP letter provided by Aptim on October 11, 2022, as well as the Task Assignment Form for BF01B prepared by DEP. The final deliverable must be received by FDEP no later than February 3, 2023.

FDEP COST ESTI MATE

Contractor: Aptim Environmental & Infrastructure, LLC

Date: 10/11/2022

Task #: HW689 BF01A ERIC_7391 SubTask 1 Project Management

Site: US192 Solid Waste Management Facility SubTask 2 2-SSA QAPP Workplan

Activity/Phase: Supplemental Site Assessment (SSA) SubTask 3 3-SSA Field Activities

Project Manager: Justin Cross (FDEP)/Eric Kramer (APTIM) SubTask 4 4-SSA Reporting

SubTask 5

Totals 1 2 3 4 5 Labor Rate Category

$65.22 Project Manager E. Kramer 6 5.6 $65.22 Engineer/Scientist 5 E. Kramer 3 0 0 3 0 $61.98 Engineer/Scientist 5 G. Roberts 19 3 0 16 0 $39.58 Engineer/Scientist 3 B. Dempsey 8 8 0 0 0 $34.53 Engineer/Scientist 2 K. Howard 19 3 12 4 0 $21.00 Engineering Technician 1 K. Gartland 10 0 10 0 0 $32.56 Designer 2 S. Ferianc 4 2 0 2 0 $27.64 Technical Publications Specialist 3 H. Vining 4 2 0 2 0

$0.00 0 0 0 0 0 Total Hours 73 6 18 22 27 0

Direct Labor $3,160.37 $363.58 $726.57 $624.36 $1,445.86 $0.00

Overhead 85.58% $2,704.65 $311.15 $621.80 $534.33 $1,237.37 $0.00 Gen & Admin 19.38% $612.48 $70.46 $140.81 $121.00 $280.21 $0.00 Fringe 31.96% $1,010.06 $116.20 $232.21 $199.55 $462.10 $0.00 Total Labor $7,487.56 $861.39 $1,721.39 $1,479.24 $3,425.54 $0.00

Travel Vehicle Rental $120.00 $0.00 $120.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $0.00 $120.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF SHAW Page 1

FDEP COST ESTI MATE

Contractor: Aptim Environmental & Infrastructure, LLC

Date: 10/11/2022

Task #: HW689 BF01A ERIC_7391 SubTask 1 Project Management

Site: US192 Solid Waste Management Facility SubTask 2 2-SSA QAPP Workplan

Activity/Phase: Supplemental Site Assessment (SSA) SubTask 3 3-SSA Field Activities

Project Manager: Justin Cross (FDEP)/Eric Kramer (APTIM) SubTask 4 4-SSA Reporting

SubTask 5

Totals 1 2 3 4 5 Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $84.00 $0.00 $84.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $84.00 $0.00 $84.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $0.00 $40.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $580.00 $0.00 $580.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $620.00 $0.00 $620.00 $0.00 $0.00

Subtotal $8,311.56 $861.39 $1,721.39 $2,303.24 $3,425.54 $0.00 Completion Fee $748.75 $86.14 $172.14 $147.92 $342.55 $0.00

Total Estimated Cost $9,060.31 $947.53 $1,893.53 $2,451.16 $3,768.09 $0.00

REV: 02/03 CEF SHAW Page 2

LEVEL OF EFFORT / EXPENSE WORKSHEET

SITE : US192 Solid Waste Management Facility

SUBTASK:

DATE: October 11, 2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts 3 Engineer/Scientist 3 B. Dempsey 8 Engineer/Scientist 2 K. Howard 3 Engineering Technician 1 K. Gartland Designer 2 S. Ferianc Drafting 2 Technical Pub Specialist 3 H. Vining 2

TOTAL LABOR 18

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method 6020 (As) Groundwater $14.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00 Shallow GW Sampling Kit $290.00 day 0 $0.00 Water Level Indicator $25.00 Day 0 $0.00 55-gallon Drum $100.00 each 0 $0.00

TOTAL EQUIPMENT $0.00

Development of Work Plan and QAPP Plan Report Update Site Specific Health and Safety Plan (HASP)

Report Document Production, Formating Text, Compilation into Adobe Format for Submittal

2-SSA QAPP Workplan

Prepare and Submit Updated Work Plan and QAPP Tables, Figures and Email Deliverable

2-Work Plan&QAPP Page 3 of 5 BF01B est.xlsx

LEVEL OF EFFORT / EXPENSE WORKSHEET

SUBTASK:

DATE: October 11, 2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer Engineer/Scientist 5 G. Roberts Engineer/Scientist 3 B. Dempsey

Engineer/Scientist 2 K. Howard

Engineering Technician 1 K. Gartland

Designer 2 S. Ferianc Technical Pub Specialist 3 H. Vining

TOTAL LABOR 22

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method 6020 (As) Groundwater $14.00 5 1 Equip(1) $84.00 Sample Shipping (large cooler) $104.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $84.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 1 $40.00 Shallow GW Sampling Kit $290.00 day 2 $580.00 Water Level Indicator $25.00 Day 0 $0.00 Total Survey Station $50.00 Day 0 $0.00 55-gallon Drum $100.00 each 0 $0.00

TOTAL EQUIPMENT $620.00

Mobilization for Groundwater Samling (1 hr), Round trip Travel to Site (4 hrs). Locate, Open, Collect Depth to Groundwater Measurements from the wells proposed to be sampled, clear surrounding area for Sampling (1 hr). Preparation and Testing/Calibration of GW Sampling Field Equipment (1 hr).

Collection of Groundwater Samples from 2 Monitoring Wells for EPA Method 6020, total arsenic (2 hrs). Site Restoration (1 hr).

Notes: Proposed sampling MW018, MW028, MW031, MW041 and MW042 (5 Total Wells), and equipment blank by EPA Method 6020

3-SSA Field Activities

Order Sampling Kits (1 hr)

Mobilization for Groundwater Samling (1 hr), Round trip Travel to Site (4 hrs). Locate, Open, Collect Depth to Groundwater Measurements from the wells proposed to be sampled, clear surrounding area for Sampling (1 hrs). Preparation and Testing/Calibration of GW Sampling Field Equipment (1 hr).

Collection of Groundwater Samples from 3 Monitoring Wells for EPA Method 6020, total arsenic (3 hrs). Chain of custody preparation, Sample Packaging, Delivery of Samples to Laboratory (2 hrs).

3-SSA Field Activities Page 4 of 5 BF01B est.xlsx

SUBTASK:

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 3 Engineer/Scientist 5 G. Roberts 16 Engineer/Scientist 3 B. Dempsey

Engineer/Scientist 2 K. Howard

Engineering Technician 1 K. Gartland Designer 2 S. Ferianc 2

Technical Pub Specialist 3 H. Vining 2

TOTAL LABOR 27

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method 6020 (As) Groundwater $14.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00 Shallow GW Sampling Kit $290.00 day 0 $0.00 Water Level Indicator $25.00 Day 0 $0.00 55-gallon Drum $100.00 each 0 $0.00

TOTAL EQUIPMENT $0.00

Preparation of Conclusions and Recommendations, Preparation of Final SSA Report Preparation of SSA Report and Maps

Preparation of SSA Tables (Analytical Results, Field Sample Parameters, Field GW Measurements)

4-SSA Reporting 10/11/2022

Report Document Production, Formating Tables and Text, Compilation into Adobe Format for Submittal

SSA Report Drafting

Proposed Scope of Work U.S. 192 Solid Waste Management Facility Former Deseret Ranch Supplemental Site Assessment Task Assignment BF01B ERIC_7391 (Former COM_312749) Aptim Environmental & Infrastructure, LLC October 11, 2022

The following Task Assignment (TA) scope of work for the former Deseret Ranch and future U.S. 192 Brevard County Solid Waste Management Facility, located in Melbourne, Brevard County, Florida has been prepared to continue supplemental site assessment activities in accordance with the FDEP Review and Recommendations Memorandum for the site dated July 8, 2022, and the scope of work discussion call on September 12, 2022.

Subtask 2 SSA Work Plan/WAPP, and Health and Safety Plan

As requested by the FDEP, Subtask 2 includes updating the Supplemental Site Assessment Work Plan and Quality Assurance Project Plan (QAPP), and Health and Safety Plan (HASP). In addition to the scoping changes, the report will be updated to include EPA review (Nichole Rodgers) and approval prior to commencement of the work.

Subtask 3: SSA Field Activities:

Subtask 3 includes the collection of groundwater samples from monitoring wells MW018, MW028, MW031, MW041 and MW042. One equipment blank will also be collected. All the samples will be analyzed for the presence of total arsenic by EPA Method 6020.

The groundwater sample from MW018 will be collected to confirm the previous results from 2020, which did not display an exceedance of the GCTL for arsenic in this well. Monitoring wells MW028 and MW031 were requested to be sampled to confirm the arsenic concentrations in these wells from 2020. The samples from monitoring wells MW041 and MW042, located north and south, respectively, from MW018 are to confirm the previous arsenic concentrations from the April 2022 groundwater sampling event.

IDW will not be captured during the groundwater sampling event.

Subtask 4: SSA Reporting:

A Supplemental Site Assessment Report (SSAR) will be prepared summarizing the field activities and laboratory results. The report will incorporate the recent data in figures and tables, include conclusions and note any future recommendations, for consideration by the FDEP.

Field activities will commence, upon approval of the task assignment with submittal of the Work Plan within 30 days, or around November 11, 2022. The field work will be scheduled for completion in November or December 2022. The completed SSA Report should be submitted by February 3, 2023. A Task Completion date should be set for March 31, 2023, to allow for review and approval of the SSA Report.

APTIM proposes to perform this scope of work in accordance with the terms and conditions of the contract executed between APTIM Environmental & Infrastructure, LLC and Florida Department of

Environmental Protection No. HW689. APTIM will begin the proposed scope of work upon issuance of the Task Assignment Notification.

If you have any questions, please do not hesitate to call.

US192 SWMF SSA Scope of Work 0122.pdf
1
2
3
4
5
Markouts Bid Summary 1221.pdf
UtilityBidSummary
Site Line
Site Lines Response
SITE: Former Deseret Ranch Site – Melbourne, Florida
Dear Mr. Roberts:
If you have any questions, please feel free to contact me. I look forward to working with you.
Sincerely,
Site Lines LLC
William L. Hardy II
Enclosure
SITE LOCATION
PROPOSED SCOPE OF WORK
RESULTS OF THE INVESTIGATION
PROJECT FEE
CLIENT REQUIREMENTS
DESCRIPTION OF COMPANY INVESTIGATION AND LIMITATIONS
SITE LINES PROPOSAL ACCEPTANCE
SIGNATURE PAGE
Site Lines Proposal Number: 01011p Proposal Date: December 18, 2021
Project Site: Former Deseret Ranch Site – Melbourne, FL
Project Fee: $700.00
Payment Terms: [PAYABLE WITHIN 30-DAYS OF INVOICE]
INVOICE TO:
Client: APTIM
Address: 725 U.S. 301 South, Tampa, FL 33619
Attention: Gregg Roberts, P.G.
Phone: 813-612-3687 Email: Gregg.roberts@aptim.com
Special Instructions:
In witness thereof, the parties hereto have made and executed this agreement
FOR [CLIENT] FOR SITE LINES LLC
geotec
GeoTek Reponse
gpr
Location Maps
Drilling Bid Summary 1221.pdf
Well Installations Bid Summary
gw
GW Protection
earth
Earth Tech Response
pref
ATI
DPT Drilling RFQ 1221
PDS Former Deseret Ranch1.pdf
Direct Push
IDW Bid Summary 1221.pdf
IDW Bid Summary
Clark
Clark Response
Safetykleen
Erwin
Erwin Remediation Response
usecology
REVISED_US192 SWMF Scope of Work 0122 V2.pdf
US192 SWMF Scope of Work 0122 V2
1
3
5
Markouts Bid Summary 1221
Site Line
Site Lines Response
SITE: Former Deseret Ranch Site – Melbourne, Florida
Dear Mr. Roberts:
If you have any questions, please feel free to contact me. I look forward to working with you.
Sincerely,
Site Lines LLC
William L. Hardy II
Enclosure
SITE LOCATION
PROPOSED SCOPE OF WORK
RESULTS OF THE INVESTIGATION
PROJECT FEE
CLIENT REQUIREMENTS
DESCRIPTION OF COMPANY INVESTIGATION AND LIMITATIONS
SITE LINES PROPOSAL ACCEPTANCE
SIGNATURE PAGE
Site Lines Proposal Number: 01011p Proposal Date: December 18, 2021
Project Site: Former Deseret Ranch Site – Melbourne, FL
Project Fee: $700.00
Payment Terms: [PAYABLE WITHIN 30-DAYS OF INVOICE]
INVOICE TO:
Client: APTIM
Address: 725 U.S. 301 South, Tampa, FL 33619
Attention: Gregg Roberts, P.G.
Phone: 813-612-3687 Email: Gregg.roberts@aptim.com
Special Instructions:
In witness thereof, the parties hereto have made and executed this agreement
FOR [CLIENT] FOR SITE LINES LLC
geotec
GeoTek Reponse
gpr
Location Maps
Well Installations Bid Summary V2
old.pdf
gw
GW Protection
earth
Earth Tech Response
pref
ATI
DPT Drilling RFQ 1221
PDS Former Deseret Ranch1.pdf
Direct Push
earth tech 1-19-2022.pdf
Direct Push
BF01B est.pdf
Cost Estimate
2-Work Plan&QAPP
3-SSA Field Activities
4-SSA Reporting
BF01B est.pdf
Cost Estimate
2-Work Plan&QAPP
3-SSA Field Activities
4-SSA Reporting