This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to APTIM Environmental & Infrastructure, LLC for environmental remediation work at the Gators One Hour Cleaners facility (ERIC_4908) located at 737 N.E. 36th Ave., Ocala, Marion County. The task assignment operates under Contract Number HW689, with TA Number DC007A. The Department Project Manager is Melissa Walsh, and the contractor's project manager is Eric Kramer. The task assignment became effective on May 26, 2022, with a completion date of October 28, 2022.

Under this task assignment, APTIM will conduct additional groundwater sampling and related environmental work in accordance with the scope of work dated May 2, 2022. The work comprises two subtasks: Subtask 1 involves project management as a negotiated percentage of overall project costs, and Subtask 2 involves annual groundwater reporting and passive diffusion bag (PDB) installation documentation. Specific deliverables include installation of replacement PDB samplers in eight monitoring wells and one deep well (MW-011), collection of groundwater samples for analysis by EPA Method 8260, preparation of an annual groundwater monitoring report, IDW disposal documentation, and project management activities. The total task assignment value is $9,144.02 on a fixed unit rate basis, with payment due upon submittal and approval of all required documentation. The final deliverable due date is August 26, 2022, with the task assignment expiration date of October 28, 2022. Cost components include direct labor ($2,754.80), overhead and administrative costs ($2,891.88), laboratory and analytical services ($840.00), field expenses and equipment ($754.00), subcontractor services including IDW disposal ($250.67), travel costs ($120.00), and a completion fee ($652.67).

View the file

Other files

File Type Posted
CN-370000-HW689-BF01B.pdf PDF
CN-370000-HW689-BF01E.pdf PDF
CN-370000-HW689-BF1ECO1.pdf PDF
CN-370000-HW689-BIL01B.pdf PDF
CN-370000-HW689-BIL01C.pdf PDF
CN-370000-HW689-BIL01F.pdf PDF
CN-370000-HW689-BIL1ECO1.pdf PDF
CN-370000-HW689-CSS1ACO1.pdf PDF
CN-370000-HW689-DC001E.pdf PDF
CN-370000-HW689-DC002B.pdf PDF
CN-370000-HW689-DC003C.pdf PDF
CN-370000-HW689-DC009B.pdf PDF
CN-370000-HW689-DC011A.pdf PDF
CN-370000-HW689-DC011C.pdf PDF
CN-370000-HW689-DC015A.pdf PDF
CN-370000-HW689-DC015C.pdf PDF
CN-370000-HW689-DC017A.pdf PDF
CN-370000-HW689-DC018A.pdf PDF
CN-370000-HW689-DC026B.pdf PDF
CN-370000-HW689-DC03A.pdf PDF
CN-370000-HW689-DC03BCO1.pdf PDF
CN-370000-HW689-DC04BCO1.pdf PDF
CN-370000-HW689-DC05CCO2.pdf PDF
CN-370000-HW689-DC08BCO1.pdf PDF
CN-370000-HW689-DC08CCO4.pdf PDF
CN-370000-HW689-DC09CCO1.pdf PDF
CN-370000-HW689-DC11BCO1.pdf PDF
CN-370000-HW689-DC11BCO2.pdf PDF
CN-370000-HW689-DC11CCO1.pdf PDF
CN-370000-HW689-DC12BCO3.pdf PDF
CN-370000-HW689-DC13BCO6.pdf PDF
CN-370000-HW689-DC14ACO1.pdf PDF
CN-370000-HW689-DC15ACO1.pdf PDF
CN-370000-HW689-DC15DCO3.pdf PDF
CN-370000-HW689-DC15DCO4.pdf PDF
CN-370000-HW689-DC15ECO1.pdf PDF
CN-370000-HW689-DC16CCO4.pdf PDF
CN-370000-HW689-DC17BCO2.pdf PDF
CN-370000-HW689-DC17BCO3.pdf PDF
CN-370000-HW689-DC19BCO1.pdf PDF
CN-370000-HW689-DC24BCO1.pdf PDF
CN-370000-HW689-DC28ACO1.pdf PDF
CN-370000-HW689-DC29ACO3.pdf PDF
CN-370000-HW689-DC29ACO4.pdf PDF
CN-370000-HW689-DC32ACO3.pdf PDF
CN-370000-HW689-FIL10.pdf PDF
CN-370000-HW689-FIL11.pdf PDF
CN-370000-HW689-FIL14.pdf PDF
CN-370000-HW689-FIL17.pdf PDF
CN-370000-HW689-FIL18.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW689

DC007A Completion October 28, 2022

Under this task assignment, APTIM will commence additional groundwater sampling.

Work will be done according to the attached scope of work dated May 2, 2022.

Melissa Walsh 407-287-3216 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

APTIM

APTIM

Eric Kramer 407-287-3216

ERIC_4908

737 N.E. 36th Ave., Ocala, Marion County

Gators One Hour Cleaners

✔ $ 9,144.02

$ 9,144.02

Scope of Work

Eric Kramer

APTIM Contract Manager

Eric Kramer Digitally signed by Eric Kramer Date: 2022.05.26 10:09:31 -04'00'

William E. Burns, Jr.

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2022.05.26 09:26:25 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Annual Groundwater andPDB Installation Documentation; Groundwater Monitoring Field Documentation and Laboratory Report; IDW Disposal Documentation, and project management. Subtask 2& 1

08/26/2022

Upon Submittal and approval of Annual Groundwater andPDB Installation Documentation; Groundwater Monitoring Field Documentation and Laboratory Report; IDW Disposal Documentation and project management. Subtask 2& 1

$ 9,144.02

$ 9,144.02

HW689

DC007A

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

Memorandum TO: APTIM Contract File

Contract No. HW689

FROM: Melissa A Walsh, Project Manager

SUBJECT: Gator One Hour Cleaner

FAC # ERIC_4908

DATE:

Task Assignment #DC007A Monitoring May 25,2022

Under this task assignment, APTIM will commence additional groundwater sampling.

Work will be done according to the attached scope of work dated May 2, 2022.

Subtask 1: Project Management Under this subtask is a percentage of the overall project and has been negotiated as a contract rate.

Subtask 2: Annual Groundwater Reporting and PDB Installation Documentation Under this subtask APTIM will complete the installation of replacement passive diffusion bag (PDB)samplers into the eight wells that contain PDBs and monitoring well MW-11. The PDBs will be obtained from ALS environmental, a licensed manufacturer of passive diffusion samplers. Since the well is 145 ft deep the harness assembly was $127, as opposed to the $30-40 cost. The PDB harness cost can change with the depth as they are made for a specific well.

APTIM is requesting reimbursement on the harness in addition to the PDB for MW-11. APTIM will submit an Annual Ground Water Monitoring Report and PDB Installation documentation.

This subtask allows for preparation of noticing documents, maps and completion of the associated forms, checklists and tables based on the inferred off-site contamination reported in and based on the analytical results.

Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and the APTM proposal. The final deliverable due date is June 26,2022 , and the completion date for the Task Assignment is October 28, 2022. The final cost total for DC007A is $ 9,144.02

FDEP COST ESTIMATE

Contractor: Aptim Environmental & Infrastructure, LLC

Date: 5/2/2022

Task #: HW689 - DC(TBD) A ERIC_4908 SubTask 1 Project Management SubTask 6

Site: Gators One Hour Cleaners SubTask 2 2-Annual Sampling Event SubTask 7

Activity/Phase: Monitoring SubTask 3 SubTask 8

Project Manager: Melissa Walsh (FDEP)/Eric Kramer (APTIM) SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$65.22 Project Manager E. Kramer 5 4.9 $65.22 Engineer/Scientist 5 E. Kramer 2 2 0 0 0 0 0 0 0 0 $61.98 Engineer/Scientist 5 G. Roberts 26 26 0 0 0 0 0 0 0 0 $36.20 Engineering Technician 4 A. Escobar 15 15 0 0 0 0 0 0 0 0 $32.56 Designer 2 S. Ferianc 3 3 0 0 0 0 0 0 0 0 $27.64 Technical Publications Specialist 3 H. Vining 2 2 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0 Total Hours 53 5 48 0 0 0 0 0 0 0 0

Direct Labor $2,754.80 $316.92 $2,437.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 85.58% $2,357.56 $271.22 $2,086.34 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 19.38% $533.88 $61.42 $472.46 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 31.96% $880.44 $101.29 $779.15 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $6,526.68 $750.85 $5,775.83 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ALS Supplies (Harness) $127.88 $127.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $227.88 $227.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $22.79 $22.79 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $250.67 $250.67 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $730.00 $730.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $840.00 $840.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $614.00 $614.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $754.00 $754.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $8,491.35 $750.85 $7,740.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $652.67 $75.09 $577.58 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF SHAW Page 1

FDEP COST ESTIMATE

Contractor: Aptim Environmental & Infrastructure, LLC

Date: 5/2/2022

Task #: HW689 - DC(TBD) A ERIC_4908 SubTask 1 Project Management SubTask 6

Site: Gators One Hour Cleaners SubTask 2 2-Annual Sampling Event SubTask 7

Activity/Phase: Monitoring SubTask 3 SubTask 8

Project Manager: Melissa Walsh (FDEP)/Eric Kramer (APTIM) SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Total Estimated Cost $9,144.02 $825.94 $8,318.08 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF SHAW Page 2

SITE :

SUBTASK: 2-Annual Sampling Event

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 2

Engineer/Scientist 5 G. Roberts

Engineering Technician 4 A. Escobar

Designer 2 S. Ferianc 3 Technical Pub Specialist 3 H. Vining 2

TOTAL LABOR 48

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noo 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation Non-Haz Soil/Water T&D $100.00 Drum 1 $100.00 ALS MW011 Hanger Assembly $127.88 each 1 $127.88

TOTAL $227.88

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method 8260 (VOHs Only) GW $73.00 9 0 $657.00 EPA Method 8260 (Halos Only/IDW) $73.00 1 $73.00 Sample Shipping (Small cooler) $110.00 1 $110.00 Sample Shipping (large cooler) $150.00 0 $0.00

TOTAL LAB $840.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 1 $40.00 Shallow GW Sampling Kit $290.00 Day 1 $290.00 Diffusion Sampler (2" well) $36.00 each 9 $324.00 55-gallon Drum $100.00 Each 1 $100.00

TOTAL EQUIPMENT $754.00

Gators One Hour Cleaners

5/2/2022

PDB’s from monitoring wells MW001, MW005, MW010, MW012, MW013, MW016, MW021 and MW022 by EPA Method 8260 for volatile organic halocarbons (VOHs).

Conventionlally sample MW011 by EPA Method 8260 (VOHs only).

Technical Review of Annual Report, Update Recommendations (2 hrs) Ordering Replacement Passive Sampling Bags, Notification of Owners and Tenants (1 hr), Order Sampling Laboratory Kits and Supplies (1 hr), Update of GW Elevation, Preparation of GW Flow Maps and GW Analytical Results Maps (3 hrs). Update of GW Elevation, Analytical Summary Tables (2 hrs), Letter Report Text and Preparation of Recommendations and conclusions (16 hrs). Preparation of IDW manifest and profile (1 hr), CD/Database Tables Update and ADaPT Laboratory Data Submittal (2 hrs).

Sampling Travel Preparation and Mobilization (1 hr), Round trip travel to site (3 hrs).

Collect Depth to Groundwater Measurements from all wells (2 hrs). Retrieve PDB's and collect 8 samples (4 hrs), sample MW-11 by convential means including Testing/Calibration of GW Sampling Field Equipment (2 hrs). Deploy new PDBs in nine wells (1 hrs). Collect IDW Sample and Purgewater Handling (1 hr), Prepare chain of custody preparation, sample packaging and delivery (1 hr).

Drafting GW Flow and Analytical Results Maps Report Document Production

Item Description Units Unit Price Total

Amount Units Unit Price Total

Amount Units Unit Price Total

Amount Transporation Disposal (soil) 0 $0.00 0 $0.00 0 $0.00 Disposal (liquid) 1 $90.00 $90.00 1 $380.00 $380.00 1 $100.00 $100.00 Additional Costs/Fees 1 $50.00 $50.00 1 $100.00 $100.00

Total $140.00 $480.00 $100.00

Clark Environmental Safety-Kleen

May 21, 2021

Included in Disposal

None

Erwin Remediation

Included in Disposal

IDW Pickup and Disposal Bid Summary Former Johnson's Cleaners

101 West North Boulevard Leesburg, Florida 34748

FDEP Site No. ERIC_4820 (Former FAC ID #359500984)

Included in Disposal

Roberts, Gregg

From: Bright, Thomas Gary <Thomas.Bright@safety-kleen.com> Sent: Wednesday, May 19, 2021 7:38 AM To: Roberts, Gregg Subject: RE: Request for Quotation for Non-Hazardous IDW T&D – Altamonte Springs Dry Cleaner

EXTERNAL SENDER

Good morning Greg. All of the locations you sent me would be handled out of the Sanford branch except the Jupiter location. But in all the cases this will cover them. This quote is just an estimate pending analysis and profile approval.

Profile fee ‐ $100.00 Per location Non haz disposal‐ $380.00 per drum

Again this is just an estimate pending analysis.

Thanks Thomas

Please visit our online store: www.store.safety‐kleen.com

Thomas Bright / Account Manager | Safety‐Kleen | Sanford Florida| A Clean Harbors Company| thomas.bright@safety‐kleen.com Direct Cell‐ 407‐212‐5152 |(f) 407‐321‐0065

Safety Starts with Me: Live It 3‐6‐5

From: Roberts, Gregg <Gregg.Roberts@aptim.com> Sent: Tuesday, May 18, 2021 7:29 PM To: Bright, Thomas Gary <Thomas.Bright@safety‐kleen.com> Subject: FW: Request for Quotation for Non‐Hazardous IDW T&D – Altamonte Springs Dry Cleaner

Hello Thomas, the below email is being forwarded to you based on Nicole’s email response.

GREGG ROBERTS, PG

Project Manager

APTIM | ENVIRONMENT & SUSTAINABILITY

O 813 612 3687 M 863 670 0215 E gregg.roberts@aptim.com

From: Roberts, Gregg Sent: Monday, May 17, 2021 7:13 PM To: Vitale, Nicole M <Nicole.Vitale@safety‐kleen.com> Subject: Request for Quotation for Non‐Hazardous IDW T&D – Altamonte Springs Dry Cleaner

Roberts, Gregg

From: Erwin Remediation <erwinremediation@gmail.com> Sent: Tuesday, May 18, 2021 8:02 AM To: Roberts, Gregg Subject: Re: Request for Quotation for Non-Hazardous IDW T&D – Johnson’s Cleaners

EXTERNAL SENDER

Gregg, This will be $100.00 per drum.

If possible, please take a composite sample of the entire drum.

Thank you, Jonathan Erwin Erwin Remediation, Inc.

Office: (850) 292‐6511|Email: ErwinRemediation@Gmail.com Erwin Remediation, Inc.|408 Ditmar Street Pensacola, FL 32503

On Mon, May 17, 2021 at 6:13 PM Roberts, Gregg <Gregg.Roberts@aptim.com> wrote:

Hello Jonathan:

I need an estimate to include in a proposal to pick‐up and dispose of non‐hazardous liquid which will be generated during upcoming groundwater sampling activities at the following site:

Here are the site specifics:

Johnson’s Cleaners

101 West North Boulevard

Leesburg, Florida 34748

ERIC_4820 (Former FAC ID #359500984)

Proposed Scope of Work Gators One Hour Cleaners Annual Sampling Task Assignment HW689 DC(TBD) A ERIC_4908, (Former Facility ID #429500902) Aptim Environmental & Infrastructure, LLC 5/2/22

The following proposed scope of work for Task Assignment DC(TBD) A is for the collection and sampling of eight passive diffusion bag (PDB) samplers and the collection of a conventional groundwater sample from deep well MW011. The proposed scope of work was developed based on the FDEP approved recommendations from the most recent Annual Groundwater Sampling Report for the Gators One Hour Cleaners, dated April 1, 2021.

The proposed scope of work includes the collection of depth-to-groundwater measurements from the existing 24 monitor wells (MW001 through MW024). Samples will be collected from the PDB’s harvested from monitoring wells MW001, MW005, MW010, MW012, MW013, MW016, MW021 and MW022. These bags were deployed on February 23, 2021. The water samples from the eight existing PDB’s will be submitted for analysis by EPA Method 8260 for volatile organic halocarbons (VOHs).

A groundwater sample will also be collected from deep well MW011 by the micro purge technique utilizing a peristaltic pump and a field-calibrated YSI multi-parameter instrument with a flow-through cell.

Historically, the depth to groundwater in this well has allowed for the collection of groundwater samples utilizing a peristaltic pump (24 to 25 ft bls). After conventionally sampling deep well MW011, a specially ordered PDB harness and hanging assembly will be deployed, along with a PDB into the 147 ft deep well.

Deployment of a harness and PDB will allow the well to be sampled without purging during future sampling events. The estimated cost to build the specialty harness assembly for this deep well has been provided by ALS (Attached) will be sole-sourced due to limited vendors that provide this service.

This scope of work includes installation of replacement passive diffusion bag (PDB) samplers into the eight wells that contain PDBs and monitoring well MW011. The PDBs will be obtained from ALS Environmental, a licensed manufacturer of passive diffusion samplers. The selected PDB samplers for 2” diameter monitoring wells MW001, MW011 MW012, MW013, MW016, MW021 and MW022 are 24” long, 1 ¼” in diameter and are manufactured from 4 Mil-thick, low-density polyethylene. For the 1” diameter monitoring wells MW005, the selected PDB samplers will be 48” long and ¾” in diameter. The ¾ inch diameter PDB sampler deployed into 1-inch diameter monitoring well MW010 will be 36 inches long to ensure full submersion of the PDB due to the shallow depth of this well. The samplers will be ordered pre-filled with certified, laboratory-grade, analyte-free, deionized water. The nine PDBs will be deployed to the following depths:

1. MW001, (2” well) total depth of approx. 31 ft bls (placement from 29 to 31 ft bls),

2. MW005, (1” well) total depth of approx. 31.5 ft bls (placement from 27.5 to 31.5 ft bls),

3. MW010, (1” well) total depth of approx. 28 ft bls (placement from 25 to 28 ft bls),

4. MW012, (2” well) total depth of approx. 99 ft bls (placement from 97 to 99 ft bls),

5. MW013, (2” well) total depth of approx. 62 ft bls (placement from 60 to 62 ft bls),

6. MW016, (2” well) total depth of approx. 56.5 ft bls (placement from 54.5 to 56.5 ft bls),

7. MW021, (2” well) total depth of approx. 61 ft bls (placement from 59 to 61 ft bls),

8. MW022, (2” well) total depth of approx. 60 ft bls (placement from 54 to 56 ft bls).

9. MW011, (2” well) total depth of approx. 147 ft bls (placement from 141 to 143 ft bls).

The purge water and decontamination fluids from the sampling event will be placed into a drum for storage onsite and future pickup and disposal. Erwin Remediation was selected to provide IDW transportation and disposal, based on bids procured recently at the Johnson’s Cleaners facility (attached), which is located nearby in Leesburg, Florida. An IDW sample will be analyzed by EPA Method 8260 for VOHs (only) to characterize the waste.

An Annual Sampling Report will be provided summarizing the collected groundwater measurements and analytical results in tables, figures and text.

Description Due Date

Collection of Samples and Deployment of PDBs 7/15/2022

Submit Annual Report 8/26/2022

Submit GIS/Data Base Update 8/26/2022

Task Expiration Date 10/28/2022

APTIM proposes to perform this scope of work in accordance with the terms and conditions of the contract executed between APTIM Environmental & Infrastructure, LLC and Florida Department of Environmental Protection No. HW689 signed December 21, 2021. APTIM will begin the proposed scope of work upon written authorization.

Please call should you have any questions.