This document is a Task Assignment Change Order (TACO) No. 2 entered into between the State of Florida Department of Environmental Protection (FDEP) and WSP USA Inc. under Contract Number HW685 for work on a preliminary assessment with sampling project at the Former Clark Pest Control site (ERIC_14705) located in Jacksonville, Duval County, Florida. The contract manager for FDEP is Claire Field, and the contractor's project manager is Jonathan Whipple. The change order was executed on October 13, 2025, following a TACO request received on October 10, 2025.

The change order authorizes an increase in task assignment cost from $14,854.70 to $17,815.24, representing a total cost increase of $2,960.54 due to changes in report requirements leading to increased WSP office personnel hours. Subtask 1 (Project Management) increased by $340.60, and Subtask 4 (Preliminary Assessment with Sampling Report) increased by $2,619.94 due to additional labor hours for preparing new data summary tables, figures, and updates to the PAWS Report per FDEP and EPA comments. No changes were made to Subtasks 2 and 3, and the final deliverable due dates and task assignment completion date remain unchanged. The deliverables include a Preliminary Assessment with Sampling Report and Project Management due September 15, 2025; a Field Sampling Plan/Quality Assurance Project Plan and HASP due July 11, 2025; and Preliminary Assessment Activities with field documentation due August 29, 2025, with corresponding invoice amounts of $8,664.81, $3,304.86, and $5,845.57, respectively.

View the file

Other files

File Type Posted
CN-370000-HW685-BF01A.pdf PDF
CN-370000-HW685-BF01CCO1.pdf PDF
CN-370000-HW685-BF02A.pdf PDF
CN-370000-HW685-BF05A.pdf PDF
CN-370000-HW685-BF05ACO1.pdf PDF
CN-370000-HW685-BF1BCO1.pdf PDF
CN-370000-HW685-BIL02C.pdf PDF
CN-370000-HW685-BIL1ACO4.pdf PDF
CN-370000-HW685-BIL2CCO1.pdf PDF
CN-370000-HW685-BIL3ACO1.pdf PDF
CN-370000-HW685-CSS01.pdf PDF
CN-370000-HW685-DC001C.pdf PDF
CN-370000-HW685-DC001E.pdf PDF
CN-370000-HW685-DC002B.pdf PDF
CN-370000-HW685-DC002C.pdf PDF
CN-370000-HW685-DC002E.pdf PDF
CN-370000-HW685-DC003C.pdf PDF
CN-370000-HW685-DC004A.pdf PDF
CN-370000-HW685-DC007A.pdf PDF
CN-370000-HW685-DC007B.pdf PDF
CN-370000-HW685-DC008B.pdf PDF
CN-370000-HW685-DC008D.pdf PDF
CN-370000-HW685-DC009A.pdf PDF
CN-370000-HW685-DC009D.pdf PDF
CN-370000-HW685-DC009E.pdf PDF
CN-370000-HW685-DC010C.pdf PDF
CN-370000-HW685-DC012A.pdf PDF
CN-370000-HW685-DC012D.pdf PDF
CN-370000-HW685-DC014B.pdf PDF
CN-370000-HW685-DC016D.pdf PDF
CN-370000-HW685-DC017A.pdf PDF
CN-370000-HW685-DC017B.pdf PDF
CN-370000-HW685-DC018B.pdf PDF
CN-370000-HW685-DC019A.pdf PDF
CN-370000-HW685-DC019C.pdf PDF
CN-370000-HW685-DC01ACO1.pdf PDF
CN-370000-HW685-DC01ECO1.pdf PDF
CN-370000-HW685-DC021A.pdf PDF
CN-370000-HW685-DC021B.pdf PDF
CN-370000-HW685-DC021C.pdf PDF
CN-370000-HW685-DC021E.pdf PDF
CN-370000-HW685-DC022C.pdf PDF
CN-370000-HW685-DC023A.pdf PDF
CN-370000-HW685-DC023D.pdf PDF
CN-370000-HW685-DC024C.pdf PDF
CN-370000-HW685-DC025A.pdf PDF
CN-370000-HW685-DC027D.pdf PDF
CN-370000-HW685-DC028A.pdf PDF
CN-370000-HW685-DC028D.pdf PDF
CN-370000-HW685-DC029A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

CSS2A 2 HW685

This Task Assignment Change Order (TACO) authorizes a change of hours resulting in a different cost. This is being executed per the TACO request from WSP received on October 10, 2025.

Claire Field 850-245-8970 WSP USA Inc.

Jonathan Whipple 904-363-3430

ERIC_14705

Former Clark Pest Control

$ 17,815.24 $ 14,854.70

$ 17,815.24 $ 14,854.70

1 1 1

WSP USA Inc.

Matthew Crews, P.E.

Environmental Engineer

10/13/2025

Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2025.10.13 10:18:15 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2025.10.13 09:32:35 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Memorandum

TO: WSP USA Inc., HW685 Contract File

FROM: Claire Field, Contract Manager

SUBJECT: Negotiation Summary – Change Order #2 CSS2A C2 Former Clark Pest Control - Site ID # ERIC_14705 Preliminary Assessment with Sampling Activities

DATE: October 10, 2025

This Task Assignment Change Order (TACO) authorizes an increase in cost due to changes in report requirements leading to increased WSP office personnel hours. Specific changes are detailed below:

Subtask 1: Project Management This subtask is a percentage of the overall project fees and has been negotiated as a contract rate. The increase in overall task hours produced a change associated with Project Management. This change resulted in a cost actual increase of $340.60.

Subtask 2: Field Sampling Plan/Quality Assurance Project Plan and Health and Safety Plan There are no scope or cost changes associated with this subtask.

Subtask 3: Preliminary Assessment Activities There are no scope or cost changes associated with this subtask.

Subtask 4: Preliminary Assessment with Sampling Report This subtask includes labor hours associated with the preparation of Data Summary Tables/Figures and the PAWS Report. Deliverable report requirement changes resulted in increased WSP office hours which include new tables and figures. Deliverables of this subtask will include both the Data Summary Tables/Figures and the PAWS Report. This change resulted in an actual cost increase of $2619.94.

www.FloridaDEP.gov

Negotiation Summary – Change Order TA CSS2A C2 Former Clark Pest Control ERIC_14705, Jacksonville, Duval County Preliminary Assessment and Sampling and Report October 10, 2025

Summary DEP’s CSS Project Manager and WSP’s Project Manager have both agreed to the scope of work, associated costs, and above changes. All changes noted above represent a total overall cost increase of $2,960.54, as shown in the Final LOE. The final cost associated with this TA increased from $14,854.70 to $17,815.24. Documentation of the changes is included in the attached TACO Request, the Delta LOE spreadsheet and the Final LOE spreadsheet, and the TACO form for CSS2A C2, prepared by the Department. The final deliverable due date and task assignment completion date have not changed.

www.FloridaDEP.gov

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Former Clark Pest Control SUBTASK 4: Reporting

DATE: 10/9/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Practice Leader (M. Crews) 4

Senior Sci/Eng (A. McCarthy) 3

Senior Sci/Eng (A. McCarthy) 7

Project Sci/Eng (J. Whipple) 24

Project Sci/Eng (J. Whipple) 6

Senior Sci/Eng (B. Lucero) 5

Staff Sci/Eng (A. Strayer) 2 Staff Sci/Eng (A. Strayer) 1

TOTAL LABOR 52

VEHICLE TYPE RATE UNIT USAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

TOTAL EQUIPMENT $0.00

Update conclusions and recommendations and update final Preliminary Assessment with Sampling (PAWS) Report per DEP and EPA comments.

Update draft Preliminary Assessment with Sampling (PAWS) Report per DEP and EPA

Update tables and figures based on DEP and EPA comments.

Reporting: Formatting tables, document production. Create pdf for OCULUS.

Develop conclusions and recommendations and prepare final Preliminary Assessment with Sampling (PAWS) Report

Review site history; data entry, prepare tables and figures for new site, and draft PAWS Report

Prepare figures for report using CAD.

Reporting: Formatting tables, document production. Create pdf for OCULUS.

FINAL --7/24/96

SUBTASK 4: Reporting

DATE: 10/9/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Practice Leader (M. Crews) 4

Senior Sci/Eng (A. McCarthy) 7

Project Sci/Eng (J. Whipple) 6

Staff Sci/Eng (A. Strayer) 1

TOTAL LABOR 18

VEHICLE TYPE RATE UNIT USAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

TOTAL EQUIPMENT $0.00

Update conclusions and recommendations and update final Preliminary Assessment with Sampling (PAWS) Report per DEP and EPA comments.

Update draft Preliminary Assessment with Sampling (PAWS) Report per DEP and EPA

Update tables and figures based on DEP and EPA comments.

Reporting: Formatting tables, document production. Create pdf for OCULUS.

SUBTASK 4: Reporting

DATE: 8/15/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Sci/Eng (A. McCarthy) 3

Project Sci/Eng (J. Whipple) 24

Senior Sci/Eng (B. Lucero) 5

Staff Sci/Eng (A. Strayer) 2

TOTAL LABOR 34

VEHICLE TYPE RATE UNIT USAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

TOTAL EQUIPMENT $0.00

Develop conclusions and recommendations and prepare final Preliminary Assessment with Sampling (PAWS) Report

Review site history; data entry, prepare tables and figures for new site, and draft PAWS Report

Prepare figures for report using CAD.

Reporting: Formatting tables, document production. Create pdf for OCULUS.

From: Whipple, Jonathan To: Field, Claire Cc: Sweeney, Scott L; Crews, Matt; Mccarthy Jr, Arthur Subject: CSS2A - Former Clark Pest Control: ERIC_14705 - WCD #1 Date: Wednesday, October 8, 2025 3:55:57 PM Attachments: Outlook-sukfbleh.png

CSS2A (WCD #1) - Former Clark Pest Control WCD - for DEP sig.pdf CSS2A (WCD #1) - Former Clark Pest Control PAWS WCD Back-up.xlsx

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Good afternoon, Claire, As we discussed over the telephone earlier today, WSP is requesting approval of the attached Work Change Directive for the Former Clark Pest Control PAWS Reporting Subtask 4 and associated Subtask 1 costs.

We have attached the Work Change Directive Form and the associated Excel LOECEF.

Thank you for your time on this, both earlier today and now.

Please reach out with any questions.

Sincerely, Jonathan Whipple Geologist, Consultant

GIT, ASP

T +1 904-363-3430 M +1 904-263-7858

WSP

9428 Baymeadows Road, Suite 400 Jacksonville, Florida

USA 32256

wsp.com

NOTICE: This communication and any attachments ("this message") may contain information which is privileged, confidential, proprietary or otherwise subject to restricted disclosure under applicable law. This message is for the sole use of the intended recipient(s). Any

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department�s Project Manager: Department�s Project Manager Phone:

Contractor Name: (Contractor ) ntractor�st �s Project Manager: ontractor�s t�s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

CSS2A 1 HW685

This Task Assignment Change Order (TACO) authorizes a reduction in cost due to changes in WSP field personnel. It is being executed per the

TACO request from WSP received on August 15, 2025.

Claire Field 850-245-8970 Contractor WSP USA Inc. Contractor

Contractor Jonathan Whipple Contractor 904-363-3430

ERIC_14705

Former Clark Pest Control

$ 14,854.70 $ 15,318.93

$ 14,854.70 $ 15,318.93

Completion Completion 0

1 1 1

WSP USA Inc.

Contractor

Matthew Crews, P.E.

Environmental Engineer

8/22/2025

Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2025.08.22 10:33:42 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2025.08.22 09:07:57 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW685

CSS2A

$ 14,854.70

Preliminary Assessment with Sampling Report and Project Management (Subtask 1 & 4).

Field Sampling Plan/Quality Assurance Project Plan and HASP (Subtask 2).

Preliminary Assessment Activities, Field documentation (Site access and utility locate, sampling, QA/QC control, IDW management, logs, field notes, and photographs) (Subtask 3).

FDEP approval of Project Management and Preliminary Assessment with Sampling Report (Subtask 1 & 4).

Upon completion and FDEP approval of Preliminary Assessment with Sampling activities and field documentation(Subtask 3).

Upon completion FDEP approval of Field Sampling Plan/Health & Safety Plan (Subtask 2).

09/15/2025

07/11/2025

08/29/2025

$ 3,304.86

$ 5,704.27

$ 5,845.57