This is a Task Assignment (TA) executed between the State of Florida Department of Environmental Protection (FDEP) and Golder Associates USA Inc. for groundwater monitoring services at the Ormond Beach Cleaners site (ERIC_5511) located at 1482 West Granada Boulevard, Ormond Beach, Volusia County, Florida. The Task Assignment, numbered DC007A, operates under Contract HW685 and was effective through August 31, 2022. The parties designated Ben Grubbs as the FDEP Project Manager and Matt Crews as the Contractor's Project Manager.
The scope of work comprises three subtasks: (1) Project Management including coordination of field activities, budget tracking, and communications; (2) Annual Groundwater Monitoring involving collection of groundwater samples from seven monitoring wells (MW001-MW007), depth-to-water measurements, well purging, field parameter recording, and low-flow sampling with analysis for chlorinated volatile organic compounds (VOCs) using EPA Method 8260B; and (3) Reporting including preparation of an Annual Groundwater Monitoring Report, GIS table updates, and ADaPT data deliverables. The total Task Assignment value is $8,727.86, comprising 55 labor hours with a fixed unit rate structure. Invoicing was scheduled in two phases: $4,866.35 upon submittal and FDEP approval of groundwater monitoring field documentation and laboratory report by May 13, 2022, and $3,861.51 upon submittal and FDEP approval of the annual groundwater monitoring report and GIS updates by June 30, 2022. Investigation-derived waste disposal was subcontracted to Erwin Remediation at $100.00 per drum for non-hazardous chlorinated solvent T&D services.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW685
DC007A Completion August 31, 2022
This Task Assignment authorizes Golder to conduct groundwater monitoring activities in accordance with the March 16, 2022, Scope of Work, Cost Estimate, and Bid Documentation.
Ben Grubbs 850-245-8992 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Golder Associates USA Inc.
Golder Associates USA Inc.
Matt Crews 904-363-3430
ERIC_5511
1482 West Granada Boulevard, Ormond Beach, Volusia County
Ormond Beach Cleaners Inc
✔ $ 8,727.86
$ 8,727.86
Scope of Work
Donald Miller
Principal
Donald Miller Digitally signed by Donald Miller Date: 2022.03.29 10:48:06 -04'00'
William E. Burns, Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.03.29 09:49:48 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 2: Groundwater Monitoring Field Documentation and Laboratory Report;
IDW Disposal Documentation 05/13/2022
Subtasks 1 & 3: Annual Groundwater Monitoring Report; ADaPT/GIS Update; Project Management 06/30/2022
Subtask 2: Submittal and FDEP approval of the Groundwater Monitoring Field Documentation and Laboratory Report; IDW Disposal Documentation $ 4,866.35
Subtasks 1 & 3: Submittal and FDEP approval of the Annual Groundwater Monitoring Report; ADaPT/GIS Update; Project Management $ 3,861.51
$ 8,727.86
HW685
DC007A
Printed on recycled paper.
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
To: HW685 Contract Negotiation File Ormond Beach Cleaners Inc Ormond Beach, Volusia County
ERIC_5511
From: Ben Grubbs, Project Manager Date: March 29, 2022 Subject: Negotiation Summary
HW685 DC007A
This Task Assignment authorizes Golder to conduct groundwater monitoring activities in accordance with the March 16, 2022, Scope of Work, Cost Estimate, and Bid Documentation.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: Annual Groundwater Monitoring Golder will collect groundwater samples from monitoring wells MW001 – MW007. Prior to sampling, depth-to-water will be measured. The wells will then be purged, and field parameters will be recorded. The groundwater samples will be collected using low flow sampling methods and analyzed for chlorinated volatile organic compounds (VOCs). Investigation-derived waste (IDW) will be temporarily stored in a 55-gallon drum. Golder requested bids for IDW drum treatment and disposal from Clark, Erwin, Whatever Waste, and M & D Industrial Services.
Erwin was selected as the lowest responsive and responsible bidder.
Subtask 3: Reporting Golder will submit the Annual Groundwater Monitoring Report and ADaPT and GIS deliverables to FDEP.
Golder and the FDEP confirmed on March 16, 2022, that an Access Agreement with the current real property owner of the Ormond Beach Cleaners Inc (ERIC_5511) site has been executed.
The original Task Assignment totaled $9,326.96 with 56 labor hours but after negotiations and corrections with contractor costs are reflected as below:
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $8,727.86 with 55 labor hours.
Golder may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
FDEP COST ESTI MATEContractor: Golder Associates USA Inc.
Date: 3/23/2022
Task #: DC007A SubTask 1 Project Management SubTask 6
Site: Ormond Beach Cleaners SubTask 2 Annual GW Monitoring SubTask 7
Activity/Phase: Assessment SubTask 3 Reporting SubTask 8
Project Manager: Ben Grubbs SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$51.23 Project Manager (RFM) 5 5.4 $0.00 Program Leader - X-14 0 0 0 0 0 0 0 0 0 0
$63.65 Practice Leader - X-13 (JB) 2 0 2 0 0 0 0 0 0 0 $0.00 Senior Consultant - X-12 0 0 0 0 0 0 0 0 0 0
$51.23 Senior Sci/Eng - X-11 (RFM) 17 5 12 0 0 0 0 0 0 0 $45.42 Senior Project Sci/Eng - P-10 (BL) 3 0 3 0 0 0 0 0 0 0 $44.15 Project Sci/Eng - P-10 (JT) 2 0 1.5 0 0 0 0 0 0 0 $38.61 Staff Sci/Eng - P-8 (LS) 14 14 0 0 0 0 0 0 0 0 $33.32 Staff Sci/Eng - P-8 (JS) 10 10 0 0 0 0 0 0 0 0 $32.75 Staff Sci/Eng - P-8 (AS) 2 0 2 0 0 0 0 0 0 0
$0.00 Sci/Eng/Admin - P-7 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 55 5.4 29.0 20.5 0 0 0 0 0 0 0
Direct Labor $2,418.13 $278.19 $1,129.89 $1,010.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.50% $4,171.28 $479.88 $1,949.06 $1,742.34 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $6,589.41 $758.07 $3,078.95 $2,752.39 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 1
FDEP COST ESTI MATEContractor: Golder Associates USA Inc.
Date: 3/23/2022
Task #: DC007A SubTask 1 Project Management SubTask 6
Site: Ormond Beach Cleaners SubTask 2 Annual GW Monitoring SubTask 7
Activity/Phase: Assessment SubTask 3 Reporting SubTask 8
Project Manager: Ben Grubbs SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $10.00 $10.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $621.00 $621.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $731.00 $731.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $378.50 $378.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $518.50 $518.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $8,068.91 $758.07 $4,558.45 $2,752.39 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $658.95 $75.81 $307.90 $275.24 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $8,727.86 $833.88 $4,866.35 $3,027.63 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Ormond Beach Cleaners SUBTASK 2: Annual GW Monitoring
DATE: 3/23/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Sci/Eng (R Mongillo) 5
Staff Sci/Eng (L. Swindle) 14
Staff Sci/Eng (J. Spengler) 10
TOTAL LABOR 29
VEHICLE TYPE RATE UNIT USEAGE
Truck (GW sampling $120.00 Per Day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin IDW T&D - Liquids $100.00 Per Drum 1 $100.00
TOTAL $100.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Chlorinated VOCs - EPA Method 8260B Total VOHs EPA Method 8260B $73.00 7 $511.00 Total VOCs EPA Method 8260B $110.00 1 $110.00 Sample Shipping Small $110.00 1 $110.00
TOTAL LAB $731.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 1 $40.00 Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00 Tubing, Poly HDPE $0.30 Per Foot 225 $67.50 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 7 $21.00 Drum, 55-gallon $100.00 Per Drum 1 $100.00
TOTAL EQUIPMENT $518.50
Round trip travel (3 hours). Field event preparation (1 hr). Including development of Health and Safety Plan (3 hours). Instrument calibration, groundwater measure water levels (7 wells), and sample 7 wells MW001 through MW007 and measure field parameters (7 hours). .
Communication with RPO and verification of property ownership prior to site access, prepare and submit field notes, sample forms, laboratory report in an email deliverable to the DEP, and characterization and waste profile for transportation and disposal of IDW drum(s) (5 hours).
Round trip travel (3 hours). Instrument calibration, groundwater measure water levels (7 wells), and sample 7 wells MW001 through MW007 and measure field parameters (7 hours).
Contact property owner and DEP scheduling field work, collect groundwater samples from seven existing monitoring wells for chlorinated VOC analysis, collect depth to water measurements from 7 wells, and management of IDW for transportation and disposal.
FINAL --7/24/96
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Ormond Beach Cleaners SUBTASK 3: Reporting
DATE: 3/23/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Practice Leader (J. Brown) 2 Senior Sci/Eng (R Mongillo) 12 Senior Project Sci/Eng (J. Thomas) 1.5
Senior Project Sci/Eng (B. Lucero) 3
Staff Sci/Eng (A. Strayer) 2
TOTAL LABOR 20.5
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Reporting: Updating tables from another consultant to the Golder report format, document production, binding and shipping. Create pdf for OCULUS.
Develop conclusions and recommendations and prepare final Annual Monitoring Report.
Data entry, prepare tables and figures, and draft Annual Monitoring Report Update FDEP GIS Tables, run data checker, create and edit error report, and annotate error
CADD Update Figures (one groundwater flow and one CVOC detections) received from another consultant to the Golder report format.
FINAL --7/24/96
Golder Associates USA Inc.
9428 Baymeadows Road, Suite 400, Jacksonville, Florida, USA 32256
T: +1 904 363-3430 F: +1 904 363-3445 golder.com
March 16, 2022 Proposal No. 202208346
Mr. Ben Grubbs Florida Department of Environmental Protection Division of Waste Management Drycleaning Solvent Cleanup Program 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
RE: COST PROPOSAL FOR ORMOND BEACH CLEANERS
ANNUAL GROUNDWATER MONITORING
1482 WEST GRANADA BOULEVARD, SUITE 610
ORMOND BEACH, VOLUSIA COUNTY, FLORIDA
FACILITY ID NUMBER: ERIC_5511
PROPOSED TASK ASSIGNMENT: HW685_DC007A
Dear Mr. Grubbs:
Golder Associates USA Inc. (Golder) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for groundwater monitoring at the Ormond Beach Cleaners site, located in Ormond Beach, Volusia County, Florida. This proposal includes a description of the proposed scope of services, level of effort (LOE) sheets for each subtask, and a Cost Estimate Form (CEF) that summarizes the costs of the proposed services. The proposed scope of services is described below. The scope of work is based on the recommendations accepted by the DEP in the April 16, 2021, 2019 electronic mail correspondence to WSP.
SUBTASK 1 – PROJECT MANAGEMENT
To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Drycleaning Solvent Cleanup Program requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.
SUBTASK 2 – ANNUAL GROUNDWATER MONITORING
Golder will collect groundwater samples from seven monitoring wells (MW001 through MW007). The monitoring wells are screened within the shallow surficial aquifer zone (screen intervals at 2-12 or 4-14 feet below ground surface [bgs]) with the exception of MW003 (screen interval at 15-25 feet bgs) and MW007 (screen interval
Mr. Ben Grubbs Proposal No. 202208346
Florida Department of Environmental Protection March 16, 2022 at 30-40 feet bgs). The attached figures (Figures 3 and 4) from the March 2021 annual groundwater monitoring report showing the monitoring well locations, potentiometric map for the shallow of the surficial aquifer and chlorinated volatile organic compound (VOC) results for the shallow zone of the surficial aquifer.
Prior to groundwater sampling, the depth to groundwater will be measured at accessible monitoring well locations (MW001 through MW007) using an electronic water level indicator to determine groundwater elevations and flow direction. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced as necessary. Groundwater samples will be collected from the wells in accordance with DEP Standard Operating Procedures (SOPs) for Field Activities (DEP-SOP-001/01) dated January 2017 (effective April 16, 2018). Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation-reduction potential will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures.
Groundwater samples will be collected using low flow sampling methods. The groundwater samples will be placed in laboratory-supplied containers, labeled with a unique identification number attached to the outside of the sample container, preserved on ice in a laboratory-provided cooler at a maximum temperature of four degrees Celsius, and delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program-certified fixed-base laboratory along with the completed chain-of-custody documentation to be analyzed for chlorinated VOCs using EPA Method 8260B.
Golder will temporarily store the investigation derived waste (IDW) purge water generated from the groundwater sampling event in a 55-gallon steel drum(s). A waste characterization sample will be collected from the IDW drum(s) for analysis of total VOCs using EPA Method 8260. If the waste characterization sample is acceptable to the disposal subcontractor, the IDW drum(s) will be picked up and transported to a facility for proper disposal. A non-hazardous waste manifest will be provided by the disposal subcontractor upon delivery to the disposal facility.
Upon completion of Subtask 2, an e-mail deliverable will be submitted and include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report, and laboratory chain-of-custody documentation.
SUBTASK 3 – REPORTING
The annual groundwater monitoring report will include a description of sampling procedures, evaluation of analytical results, comparison of current to historical data, tabulated summary of the current and historical analytical data, a site map showing the groundwater analytical results, water level elevation information in tables and figures, laboratory analytical data, conclusions, and recommendations. Golder will update the DEP GIS tables with the new water level data, field parameter measurements, and VOC data; run the DEP data checker on the completed tables;
and submit the updated tables and error report. Additionally, Golder will forward Automated Data Processing Tool (ADaPT) data deliverables provided by the laboratory for each groundwater sampling event.
HEALTH AND SAFETY
Golder will prepare a site-specific Health and Safety Plan for the field work. The work will be completed in accordance with Golder’s safety policies and procedures. At a minimum, Golder will wear safety glasses, high visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.
Mr. Ben Grubbs Proposal No. 202208346
Florida Department of Environmental Protection March 16, 2022
COST AND SCHEDULE
The estimated cost to complete the monitoring is $9,326.96. Golder will tentatively schedule the annual sampling event for late March or middle April 2022. The LOE/CEF cost sheets and subcontractor bids are included in Attachment A. The following table summarizes the proposed costs and deliverable schedule.
Task Proposed Cost Proposed Schedule/Deliverables
Subtask 1 – Project Management $858.69 July 31, 2022
Subtask 2 – Annual Groundwater Monitoring
$5,420.14 May 13, 2022 (Field Documentation and Laboratory Report)
Subtask 3 – Reporting $3,048.13 June 30, 2022 (Groundwater Monitoring Report, GIS Tables, ADaPT Deliverables)
Total/Completion Date $9,326.96 August 31, 2022
Please be aware that Golder has been acquired by and is now a Member of the WSP family of companies. Golder remains as a legal entity and is the proposed contracting entity for this proposal. We are in the process of integrating the resources of our companies. Correspondence for this proposal should continue to be addressed to the undersigned.
Golder appreciates the opportunity to provide services under the Drycleaning Solvent Cleanup Program. Should you require additional information or clarifications, please contact us at (904) 363-3430.
Sincerely, Golder Associates USA Inc.
Ralph F. Mongillo, Jr., PG Jesse C. Brown, PE Lead Consultant / Senior Geologist Director, Environmental Engineer
RFM/JCB/as
Attachments: Figure 3 Groundwater Elevation Map (March 2, 2021)
Figure 4 Groundwater Analytical Map (March 2021)
Attachment A Level of Effort Sheets / Cost Estimate Form and Subcontractor Bids
G:\Projects\DEP-Drycleaning\Projects\Sebastian\Ormond Beach Cleaners - HW685\Proposal\HW685 Annual Groundwater Monitoring Proposal - ERIC_5511 .docx
From: Fred Portofe To: Mongillo, Ralph Cc: Madison Rogers; Roger Pragle; Crews, Matt Subject: RE: Investigative Derived Waste Drum Costs for Transportation and Disposal at a Regulated Facility Date: Wednesday, March 9, 2022 9:33:38 AM Attachments: F0152F28A2B5418EBC7A4FD870EC8D28.png
AD282F6C3391468088CDA42829B8E703.png A719914B10184314957B0CA910CA8D14.png F1DF3C4322764E8A9076F1ADFF76864A.png 3409DF389C3B4156BA232DDC85C60E09.png
EXTERNAL EMAIL
EXTERNAL EMAIL - We could not verify the authenticity of this message. Please be cautious when clicking on links or opening attachments.
Ralph
We are not going to provide annual Pricing for the Statewide Contract . After reviewing the scope with my partners and the variability with respect to disposal costing and ever changing fuel costs, we feel we can not bid this work given the current uncertainty in the market. We would be please to bid this work on a casa by case basis.
Fred G. Portofe, PG President of Environmental Services (Professional Geologist in FL, GA, AL, MS, TX, SC, NC, TN, IN, LA, WI and AK) M & D Industrial Services, LLC 5896 Azalea Street Port Orange, Florida 32127 Email: Fportofe@mdindustrialservices.com Website: mdindustrialservices.com Cell: 813-951-1012 Emergencies: 888-307-2790
Sent from Mail for Windows
From: Mongillo, Ralph Sent: Tuesday, March 8, 2022 12:46 PM To: Fred Portofe Cc: Madison Rogers; Roger Pragle; Eddy Mendoza; Crews, Matt mailto:fportofe@mdindustrialservices.com mailto:ralph.mongillo@wsp.com mailto:mrogers@mdindustrialservices.com mailto:rpragle@mdindustrialservices.com mailto:matt.crews@wsp.com mailto:Fportofe@mdindustrialservices.com https://nam10.safelinks.protection.outlook.com/?url=http%3A%2F%2Fmdindustrialservices.com%2F&data=04%7C01%7Cmculbreth%40ectinc.com%7Cbfdc4a6d2ce945e1eaf008d9dcf8eabf%7C911eb1cc54d34d8ca5773bf3ccc8105c%7C0%7C0%7C637783784008834159%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C2000&sdata=ntkZP1OGe7McYRA722JXtcGwkbgN9EEhQtSgBSKqC3E%3D&reserved=0 https://go.microsoft.com/fwlink/?LinkId=550986 mailto:Ralph_Mongillo@golder.com mailto:fportofe@mdindustrialservices.com mailto:mrogers@mdindustrialservices.com mailto:rpragle@mdindustrialservices.com mailto:emendoza@mdindustrialservices.com mailto:Matt_Crews@golder.com