This Task Assignment (TA) document represents work performed under Contract Number HW684 between the State of Florida Department of Environmental Protection (FDEP) and GHD Services, Inc. The task assignment is identified as DC023B and authorizes well abandonment activities at the former Cachet Cleaners site located at 809 E Bloomingdale Avenue in Brandon, Hillsborough County, Florida. Kevin Kane serves as the Department Project Manager, while Brian Moore represents the Contractor as Project Manager. The document includes supporting attachments comprising cost estimates, level-of-effort worksheets, subcontractor quotes, equipment rental proposals, project schedules, and a detailed scope of work.

The task assignment authorizes GHD Services, Inc. to conduct well abandonment and SVE system removal activities at a fixed unit rate of $10,894.84, which represents the total task value. Work includes two subtasks: Subtask 1 involves project management calculated at 13 percent of direct labor costs, and Subtask 2 encompasses the physical well abandonment activities. The scope requires obtaining permits from Hillsborough County, abandoning eight monitor wells (MW001-MW008) and four piezometers using tremie grouting methods, removing five SVE wells and associated piping, transferring carbon filter contents to DOT-approved drums, removing equipment and restoration work, and preparing a well abandonment summary report with permits, site plans, and photographic documentation. The final deliverable is due March 29, 2023, with overall task completion by June 30, 2023. Cost breakdown includes $7,658.36 in labor with overhead and fringe, $480.00 in vehicle rental, $1,021.72 in subcontractor costs for disposal and equipment services, $202.00 in laboratory analytical services, and $765.82 in field expenses and equipment procurement.

View the file

Other files

File Type Posted
CN-370000-GC922.pdf PDF
CN-370000-HW684-BIL01A.pdf PDF
CN-370000-HW684-BIL02C.pdf PDF
CN-370000-HW684-BIL02E.pdf PDF
CN-370000-HW684-BIL1ACO1.pdf PDF
CN-370000-HW684-BIL2CCO2.pdf PDF
CN-370000-HW684-CSS03A.pdf PDF
CN-370000-HW684-DC001C.pdf PDF
CN-370000-HW684-DC001E.pdf PDF
CN-370000-HW684-DC003A.pdf PDF
CN-370000-HW684-DC003C.pdf PDF
CN-370000-HW684-DC004B.pdf PDF
CN-370000-HW684-DC005C.pdf PDF
CN-370000-HW684-DC007B.pdf PDF
CN-370000-HW684-DC009A.pdf PDF
CN-370000-HW684-DC010A.pdf PDF
CN-370000-HW684-DC010B.pdf PDF
CN-370000-HW684-DC010C.pdf PDF
CN-370000-HW684-DC012A.pdf PDF
CN-370000-HW684-DC012B.pdf PDF
CN-370000-HW684-DC014B.pdf PDF
CN-370000-HW684-DC014C.pdf PDF
CN-370000-HW684-DC015D.pdf PDF
CN-370000-HW684-DC018E.pdf PDF
CN-370000-HW684-DC020C.pdf PDF
CN-370000-HW684-DC021B.pdf PDF
CN-370000-HW684-DC021E.pdf PDF
CN-370000-HW684-DC024A.pdf PDF
CN-370000-HW684-DC024B.pdf PDF
CN-370000-HW684-DC025D.pdf PDF
CN-370000-HW684-DC026A.pdf PDF
CN-370000-HW684-DC026C.pdf PDF
CN-370000-HW684-DC027B.pdf PDF
CN-370000-HW684-DC028A.pdf PDF
CN-370000-HW684-DC028E.pdf PDF
CN-370000-HW684-DC029A.pdf PDF
CN-370000-HW684-DC02A.pdf PDF
CN-370000-HW684-DC030A.pdf PDF
CN-370000-HW684-DC030B.pdf PDF
CN-370000-HW684-DC031D.pdf PDF
CN-370000-HW684-DC033A.pdf PDF
CN-370000-HW684-DC033B.pdf PDF
CN-370000-HW684-DC033C.pdf PDF
CN-370000-HW684-DC034A.pdf PDF
CN-370000-HW684-DC036A.pdf PDF
CN-370000-HW684-DC037A.pdf PDF
CN-370000-HW684-DC039B.pdf PDF
CN-370000-HW684-DC042A.pdf PDF
CN-370000-HW684-DC043C.pdf PDF
CN-370000-HW684-DC044B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW684

DC023B Completion June 30, 2023

This Task Assignment authorizes GHD Services, Inc. to conduct well abandonment activities at the former Cachet Cleaners site located in Brandon, Florida. All work will be conducted in accordance with the scope of work and cost proposal submitted on January 22, 2023.

Kevin Kane 850-245-8971 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

GHD Services, Inc.

GHD Services, Inc.

Brian Moore 813-257-0658

ERIC_4762

809 E Bloomingdale Ave, Brandon, Hillsborough County

Cachet Cleaners

✔ $ 10,894.84

$ 10,894.84

Scope of Work

Brian Moore

Project Manager

Brian Moore Digitally signed by Brian Moore Date: 2023.01.26 16:46:34 -05'00'

Kelly Crain

Kelly Crain Digitally signed by Kelly Crain Date: 2023.01.26 12:29:42 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Well Abandonment Report + Project Management 03/29/2023

Subtasks 1 & 2: Upon completion of well abandonment activities and FDEP approval of the Well Abandonment Report + Project Management $ 10,894.84

$ 10,894.84

HW684

DC023B

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Interim Secretary

TO: HW684 Contract File Cachet Cleaners Brandon, Hillsborough County

ERIC_4762

FROM: Kevin Kane, Contract Manager

DATE:

January 24, 2023

SUBJECT:

Task Assignment Summary

HW684 DC023B

Deletion

This Task Assignment authorizes GHD Services, Inc. to conduct well abandonment activities at the former Cachet Cleaners site. Specific subtasks are detailed below:

Subtask 1: Project Management Project Management is calculated at 13% of the direct labor.

Subtask 2: Well Abandonment GHD personnel will obtain well abandonment permits from the local Health Department (Hillsborough County). The permitting will be conducted by GHDs licensed water well driller. Following permit receipt, GHD personnel will mobilize to the subject site and abandon eight monitor wells (MW001 through MW008) that were installed as part of the Site Assessment activities. The well abandonment will be conducted in accordance with applicable Water Management District guidelines. Wells will be grouted from bottom up using the tremie method. In addition to the monitor wells, all piezometers installed for MAGS (4 total) will also be removed and backfilled with grout/concrete. Following well abandonment, the concrete pads and manholes will be removed (for exterior locations) and the areas will be backfilled with asphalt, concrete, or sand to match the surrounding surface. All waste well material and concrete will be disposed off-site. During the same mobilization, GHD staff will remove/abandon the existing SVE wells (5 total) and remove accessible SVE piping. Following piping removal and SVE well abandonment, the equipment will be disconnected and loaded for off-site transport to GHD’s local office. In addition, the equipment compound fence will be removed and the area will be restored to its previous condition. Finally, the contents of the carbon filter will be transferred to a DOT approved 55-gallon drum and will be a characterized for offsite disposal. Following completion of the field activities, a brief well abandonment summary report will be prepared. The summary report will include copies of well permits, a site plan show the location of abandoned wells and detail photo documentation of the well abandonment activities.

GHD and the FDEP confirmed on January 24, 2023, that an Access Agreement with the current real property owner of the aforementioned site has been executed.

Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and the GHD proposal received on January 22, 2023. The final deliverable due date is March 29, 2023, and the completion date for the task assignment is June 30, 2023. The final cost total for Task Assignment DC023B is $10,894.84.

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 01/24/23

Task #: DC023B SubTask 1 Project Management SubTask 6

Site: Cachet Cleaners SubTask 2 Well Abandonment SubTask 7

Activity/Phase: Well Abandonment SubTask 3 SubTask 8

Project Manager: Brian Moore, PE SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$44.81 Project Manager JM 7.30 7.3 $54.52 Principal Engineer/Scien MC 4.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $44.81 Project Manager/ Engine JM 13.00 13.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.89 Senior Technician WM 37.00 37.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.25 Junior Technician WO 37.00 37.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.69 Drafting Technician PM 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $23.16 Administrative Assistant DA 3.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 102.30 7.30 95.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $2,862.24 $329.28 $2,532.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 129.80% $3,715.19 $427.41 $3,287.78 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.80% $1,081.93 $124.47 $957.46 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $7,659.36 $881.16 $6,778.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $480.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $480.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 Page 1

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 01/24/23

Task #: DC023B SubTask 1 Project Management SubTask 6

Site: Cachet Cleaners SubTask 2 Well Abandonment SubTask 7

Activity/Phase: Well Abandonment SubTask 3 SubTask 8

Project Manager: Brian Moore, PE SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Synergy $818.84 $818.84 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $928.84 $928.84 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $92.88 $92.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $1,021.72 $1,021.72 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $150.00 $150.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $52.00 $52.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $202.00 $202.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $160.00 $160.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $605.82 $605.82 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $765.82 $765.82 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $10,128.90 $881.16 $9,247.74 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $765.94 $88.12 $677.82 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $10,894.84 $969.28 $9,925.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Cachet Cleaners SUBTASK 2: Well Abandonment

DATE: 01/24/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager JM Field Work Preparation 1 Project Manager JM Site Visit with Owner to Discuss Decomissioning 4 Project Manager JM Prepare Well Abandonment Summary 8

Professional Geologist MC Well abandonment permitting 4

Senior Technician WM Mob/Demob (4 days) 4 Senior Technician WM Well Abandonment (8 wells) 8 Senior Technician WM Abandon SVE Wells and Piping (5 wells) 8 Senior Technician WM Transfer carbon to DOT drum 1 Senior Technician WM Remove Equipment and Compound (mobilize equipment to GHD office) 8 Senior Technician WM Remove pads and restore areas 8

Junior Technician WO Mob/Demob (4 days) 4 Junior Technician WO Well Abandonment (8 wells) 8 Junior Technician WO Abandon SVE Wells and Piping (5 wells) 8 Junior Technician WO Transfer carbon to DOT drum 1 Junior Technician WO Remove Equipment and Compound (mobilize equipment to GHD office) 8 Junior Technician WO Remove pads and restore areas 8

Drafting Technician PM Prepare site plan with wells abandoned 1

Staff Assistants DA Revise tables/upload pictures 1 Staff Assistants DA Document Preparation/Publishing/pdf 2

TOTAL LABOR 95

VEHICLE TYPE RATE UNIT USEAGE

Company Truck $120.00 day 4 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation Carbon IDW Disposal $110.00 drum 1 $110.00 Ring Power Bobcat with Forks $818.84 day 1 $818.84

TOTAL $928.84

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOCs (carbon) EPA Method 8260 $150.00 1 $150.00 Small Cooler (2 day) shipping $52.00 1 $52.00

TOTAL LAB $202.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

Expendables $40.00 day 4 $160.00

Equipment (Analytical Related)

$0.00

Equipment (Other)

Drum $100.00 drum 1 $100.00 Construction Supplies $300.00 week 1 $300.00 Portland Cement Grout (47lb) $11.99 bag 4 $47.96 Concrete (pad repair) 60lb $6.99 bag 14 $97.86 Peristaltic Pump $30.00 day 2 $60.00

TOTAL EQUIPMENT $765.82

FINAL --7/24/96

IDW

IDW Disposal

1 drum $110 $110 1 drum $150 $150 1 drum $80 $80 Transportation 1 drum $30 $30 Low Stop Fee 1 each $50 $50

$110 $150 $160

Equipment

Equipment 1 day 818.84 818.84 1 day 951.00 951.00 1 day 1,040.35 1040.35

818.84 951.00 1040.35

Erwin ClarkWhatever Waste

RingPower Synergy United

COST PROPOSAL FOR TASK DC023B

<Cachet Cleaners/FDEP ERIC_4762>

< Well Abandonment >

1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >

GHD Services Inc. (GHD) completed Site Assessment and rehabilitation activities for the Cachet Cleaners site located in Brandon, Hillsborough County. GHD recently submitted a revised Groundwater Monitoring and Site Rehabilitation Completion Report in December

022. In addition, a Site Rehabilitation Completion Order (SRCO) was issued in December 2022. Accordingly, Task DC023B proposes to properly abandon site monitor wells and remove the existing SVE system.

Subtask 1: Project Management Subtask 1 includes all tasks associated with project management of well abandonment and reporting for the Cachet Cleaners site.

Subtask 2: Well Abandonment GHD personnel will obtain well abandonment permits from the local Health Department (Hillsborough County). The permitting will be conducted by GHDs licensed water well driller.

Following permit receipt, GHD personnel will mobilize to the subject site and abandon eight monitor wells (MW001 through MW008) that were installed as part of the Site Assessment activities. The well abandonment will be conducted in accordance with applicable Water Management District guidelines. Wells will be grouted from bottom up using the tremie method. In addition to the monitor wells, all piezometers installed for MAGS (4 total) will also be removed and backfilled with grout/concrete. Following well abandonment, the concrete pads and manholes will be removed (for exterior locations) and the areas will be backfilled with asphalt, concrete, or sand to match the surrounding surface. All waste well material and concrete will be disposed off-site.

During the same mobilization, GHD staff will remove/abandon the existing SVE wells (5 total) and remove accessible SVE piping. Following piping removal and SVE well abandonment, the equipment will be disconnected and loaded for off-site transport to GHD’s local office. In addition, the equipment compound fence will be removed and the area will be restored to its previous condition. Finally, the contents of the carbon filter will be transferred to a DOT approved 55-gallon drum and will be a characterized for offsite disposal.

Following completion of the field activities, a brief well abandonment summary report will be prepared. The summary report will include copies of well permits, a site plan show the location of abandoned wells and detail photo documentation of the well abandonment activities.

Deliverables:

Deliverable Deliverable Due Date

Well Abandonment Report 3/29/23

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511

To: Mr. Brian Moore

GHD

5904 Hampton Oaks Parkway – Suite F

Tampa, FL 33610

May 23, 2022

Re: Transportation and Disposal of Non-Hazardous Soil and Water – Florida

Mr. Moore:

The price for disposal of drums of non-hazardous soil or groundwater located in the State of Florida will be $110.00 per drum, for both transportation and disposal.

This pricing is valid for all regions in the State of Florida except for the Florida Keys.

Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.

This quote is valid for 180 days.

Respectfully, Jonathan Erwin

Erwin Remediation, Inc.

Email: ErwinRemediation@Gmail.com

Office: (850) 292-6511 mailto:Remediation@Gmail.com

6/28/22, 10:23 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 1/2

Quote Number: 19644

QUOTE

QUOTED TO: Brian Moore

QUOTE DATE: 1/1/2022

COMPANY NAME: GHD - 2022 QUOTED BY: Craig Burns

PHONE NUMBER:

Ext.

FAX NUMBER:

PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS

CUSTOMER PO:

CONTACT EMAIL:

SITE ADDRESS: TBD

CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING

COST ESTIMATE FOR

THE SITE/ PROJECT LISTED ABOVE.

DESCRIPTION PRICE QTY. UNIT TOTAL

NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00

NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00

TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$30.00 DRUM $0.00

TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$40.00 DRUM $0.00

TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site

$50.00 DRUM $0.00

Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax

$0.00 . $0.00

HAZ Drums to be quoted case-by-case $0.00 . $0.00

OPTIONAL LINE ITEMS

***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00

TOTAL REQUIRED ITEMS $0.00

TOTAL OPTIONAL ITEMS $0.00

GRAND TOTAL $0.00

NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.

**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns

863.327.6289 - cburns@clarkenv.com

This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.

quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 2/2

Name (print) Title

Signature Date

CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854

WWW.ClarkEnvironmental.com

From: Craig Burns To: Brian Moore Subject: GHD_IDW Drum Rates FL Date: Tuesday, June 28, 2022 10:26:46 AM Attachments: image001.png image002.png image003.png image004.png image005.png GHD Drum Rates FL 2022.pdf

Here you go Brian. I do this for a lot of engineering/consulting firms.

Be aware of the low stop less than 6 drums at $50/flat Be aware of the 10% to the total cost for FSC (implemented April 15).

Pass around the GHD Florida offices

From: Brian Moore <Brian.Moore@ghd.com> Sent: Tuesday, June 28, 2022 10:05 AM To: Craig Burns <cburns@clarkenvironmental.com> Subject: IDW Drums

Craig, Is it possible to provide a generic quote for IDW water disposal.

Assumption is non-haz with necessary analytical Maybe provide a range of locations

South florida or central florida, or both?

Thanks in advance

We have many sites that we generate 1 gw drum of IDW and would like to streamline the vendor coordination

BRIAN MOORE PE

GHD

Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com

The Power of Commitment

Connect

Please consider our environment before printing this email

CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please mailto:cburns@clarkenvironmental.com mailto:Brian.Moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttp-253A-252F-252Fwww.ghd.com-252F-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093857306-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3DorO8Q-252BVqTyo6Ej-252F8ZwSbVyQzLpZtJywYELQonaQNZfo-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3DsMxOUn-szAtJTATQBUgjjDdI6e6b1jo5alN-ez9vKSM%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=K3MyGMhP6XEk1ApT%2FRIPjGR%2BUFJFG9ahCVCi8Z9R1n0%3D&reserved=0 mailto:brian.moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttps-253A-252F-252Fwww.linkedin.com-252Fcompany-252Fghd-252F-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093857306-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3D5HB99sCNyHUdh3ySqo-252BMbX9lHf94JW-252BuI1gRPH6qLGY-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3DBQdX3FW3jjZZNHH7wbXXUS30LUnS3GtU1HJ8G56Snwo%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=%2BQlcPM%2FGtFT%2FrIbbuGi0PnSgurtBD8yqWgV1hvkvk00%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttps-253A-252F-252Fwww.facebook.com-252FGHDGroup-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093867263-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3DKXDgOYLYSf-252BwLLtpvQNMpyPzR3DV5-252FDBogAW3HWif9Y-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3DdHZdva6F1f6cSXNf7WLXU9x5VBxbTV01G78hKDk-cSA%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=142JKLTMfwfz%2FAO%2FXHrz%2FUodXSRzYWWBygfbg7vBIWs%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttps-253A-252F-252Ftwitter.com-252FGHDspeaks-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093877221-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3Duwh4lLmvdNCQkyPoUgiL7r2l9-252BmFgEv2JbZPLM3ptM0-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3D6FLD5pJDe4zG94aUPcPkIB9mx5JTMUxrAOX-fjV9l3o%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=O7BUsLKToxyyPXzZcLcBA1z3Q7%2FKvVsiCNGMGHOzln0%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttps-253A-252F-252Fwww.youtube.com-252Fchannel-252FUCwUGfe6zgaddIXqA7entIwQ-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093877221-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3DVTPo9BdB-252FyUkff7ZLoE6J99Jt9f-252Fvtuta-252Fsm1KEOuNc-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3D9S3nI6ai6gtzPu1y34Kb_OuqwixCpq0TgIkmYlOz0gk%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=YX45%2BiFGXo7axCd4VDmEIFdcmHajQE6n8KvktA7llOs%3D&reserved=0 quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 1/2

Quote Number: 19644

QUOTE

QUOTED TO: Brian Moore

QUOTE DATE: 1/1/2022

COMPANY NAME: GHD - 2022 QUOTED BY: Craig Burns

PHONE NUMBER:

Ext.

FAX NUMBER:

PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS

CUSTOMER PO:

CONTACT EMAIL:

SITE ADDRESS: TBD

CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING

COST ESTIMATE FOR

THE SITE/ PROJECT LISTED ABOVE.

DESCRIPTION PRICE QTY. UNIT TOTAL

NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00

NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00

TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$30.00 DRUM $0.00

TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$40.00 DRUM $0.00

TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site

$50.00 DRUM $0.00

Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax

$0.00 . $0.00

HAZ Drums to be quoted case-by-case $0.00 . $0.00

OPTIONAL LINE ITEMS

***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00

TOTAL REQUIRED ITEMS $0.00

TOTAL OPTIONAL ITEMS $0.00

GRAND TOTAL $0.00

NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.

**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns

863.327.6289 - cburns@clarkenv.com

This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.

quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 2/2

Name (print) Title

Signature Date

CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854

WWW.ClarkEnvironmental.com delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.

Whatever Waste, LLC 3834 Mandarin Woods Dr. No.

Jacksonville, Florida 32223 United States 904.881.1957

Brian Moore PE

GHD

5904 Hampton Road Parkway Suite F Tampa, FL 33610

Estimate Number 062922.1

Notes Dry Cleaner Site Locations: Central and South Florida Regions excluding Florida Keys Required analytical data for non-haz disposal acceptance would be VOCs and includes waste profiling assistance if the IDW-GW drums don't fall under a blanket waste profile DOT shippable drums must be on a hard surface at each accessible location

Terms Non-hazardous IDW drum pickup, transport and disposal pricing is based on per service event No-load drum fee if unable to pickup drums on any site in Central FL is $150; in South FL is $200 Pricing is valid or subject to change on a monthly basis in part due to escalating fuel prices Payment required within 45 days after email receipt of invoice

Indemnification: Each party agrees to indemnify, defend and hold harmless each other for and from any loss

Estimate Date 06/29/2022

Description Rate Qty Line Total

IDW-GW Drum Transport & Disposal - Central FL Sites

(1) Regional Stop Fee $600 - then $150 per 55-gal drum < 10 drums

$150.00 1 $150.00

IDW-GW Drum Transport & Disposal - Central FL Sites

(1) Regional Stop Fee $300 - then $150 per 55-gal drum > 10 drums

$150.00 1 $150.00

IDW-GW Drum Transport & Disposal - South FL Sites

(1) Regional Stop Fee $850 - then $200 per 55-gal drum < 10 drums

$200.00 1 $200.00

IDW-GW Drum Transport & Disposal - South FL Sites

(1) Regional Stop Fee $425 - then $200 per 55-gal drum > 10 drums

$200.00 1 $200.00

Subtotal

Tax

700.00

0.00

Estimate Total (USD) $700.00 or liability arising out of the party's breach of this agreement, scope of work, except for gross negligence, willful misconduct or bad faith.

10421 Fern Hill Dr Riverview, FL 33578 Ph: (813) 671-3200 Fax: (813) 671-4344

January 20th, 2023

Machine Qty Daily Weekly Monthly Caterpillar 259D3 Skid Steer 1 412.00$ 1,168.00$ 3,064.00$

SS Forks 1 64.00$ 140.00$ 204.00$

476.00$ 1,308.00$ 3,268.00$ 300.00$ 300.00$ 300.00$

9.52$ 26.16$ 65.36$

33.32$ 91.56$ 228.76$ 818.84$ 1,725.72$ 3,862.12$

Surtax varies by county and is not included in quote.

Please contact me if you have any questions about the information listed above.

Thank You, Nicholas Gorman Rental Coordinator

Quote is valid for 30 days from date issued. Additional fees and charges such as overtime and customer damage may apply. FTV and Sales tax will be waived if exemption certificates are submitted. Month is based on a 28 day billing cycle.

Here is the quote you requested. I have listed daily, weekly & monthly rental prices for the items we discussed.

Estimated Rental Amount………………

Delivery/Pickup Service………………..

Environmental & Energy Fee (2%)….…

Fire Theft and Vandalism (14%)……….

Florida Sales Tax (7%)..………………..

General Rental Lakeland Branch 2702 Drane Field Rd, Lakeland, FL 33811 Phone: (863) 250-8761 Email: lkldrentcounter@synergyequip.com

Quotation Quote #: Q-221462-2 Delivery Date:

Date: 1/12/2023 Expires On:

PO Number:

Ship To Sasha Cobb Brandon, FL Office:(813) 971-3882 Mobile:(813) 860-7885 sasha.cobb@ghd.com

Bill To

GHD SERVICES INC.

5904 Hampton Oaks Pkwy

TAMPA, FL 33610

SALESPERSON PHONE EMAIL DELIVERY METHOD TERMS

Josh Christenson (813) 244-8548 jchristenson@synergyequip.com Site Delivery Net 30

Equipment Listing / Rental and Delivery Costs

Cat-Class Product Day Week 4 Week

405-1178 PALLET FORK-SKIDSTEER-36" $100 $150 $350

401-2770 TRAC LDR-WGT 7.8-8.6KLB,OPCAP 2.1-2.2KLB (Bocat T590, BOBCAT T62)

$393 $1,032 $2,073

$493 $1,182 $2,423

Total Rental with Applicable Charges

Day Week 4 Week Rental $493.00 $1,182.00 $2,423.00 Environmental Fee (3%) $14.79 $35.46 $72.69 Tax (Hillsborough 8.5%) $43.16 $103.48 $212.13 Loss Damage Waiver (15%) Total Freight $400 $400 $400

TOTAL $950.95 $1,720.94 $3,107.82

All Rates are based on a 8 Hour Day, 40 Hour Week & 160 Hour Month unless previously agreed upon in writing.

Quote valid for 30 Days & subject to availability. We look forward to earning your business!

Equipment Rental. Redefined.

This is not an invoice Please do not pay from this document

RENTAL QUOTE

Page: 1

RENTAL ITEMS:

_____ ___________ _______________________________________ _____________________________________________ _______________ Qty Equipment Description Minimum Day Week 4 Week Estimated Amt.

1 9030580 SKID STEER TRACK LOADER 2000-2399# 560.00 1,403.00 2,947.00 560.00

1 903/5073 SKID STEER BUCKET 72" SMOOTH N/C

1 903/5411 SKID STEER FORK ATTACHMENT HEAVY DUTY 58.00 180.00 367.00 58.00

Rental Subtotal: 618.00

SALES/MISCELLANEOUS ITEMS:

_______ ______________________________________________________________ _____________ _________________ _______________ Qty Item Price Unit of Measure Extended Amt.

1 DELIVERY CHARGE 188.000 EACH 188.00

1 PICKUP CHARGE 188.000 EACH 188.00

Sales/Misc Subtotal: 376.00

Agreement Subtotal: 994.00 Tax: 46.35 Estimated Total: 1,040.35

COMMENTS/NOTES:

CONTACT: SASHA COBB

CELL#: 812-860-7885

TO SCHEDULE EQUIPMENT FOR PICKUP, CALL 800-UR-RENTS (800-877-3687)

WE ARE AVAILABLE 24/7 TO SUPPLY YOU WITH A CONFIRMATION #

IN ORDER TO CLOSE THIS CONTRACT

JOBSITE

809 E BLOOMINGDALE AVE

BRANDON FL 33511-8113

Office: 813-257-0721 Cell: 812-860-7885

G H D SERVICES INC

5504 HAMPTON OAKS PARKWAY

SUITE F

TAMPA FL 33610

BRANCH 667

5711 E ADAMO DR

TAMPA FL 33619-3241

813-630-4889

# 215239654

J o b

S i t e

Customer # :

Quote Date :

Estimated Out :

Estimated In :

UR Job Loc :

UR Job # :

Customer Job ID:

P.O. # :

Ordered By :

Written By :

Salesperson :

6058366 01/20/23

02/06/23 09:00 AM

02/07/23 09:00 AM

809 E BLOOMINGDALE A

TBD

SASHA COBB

ROBERT COPE JR.

JOHN PAFF

This proposal may be withdrawn if not accepted within 30 days. The above referenced Rental Protection Plan, environmental, and tax charges are estimates and are subject to change.

NOTICE: This is not a rental agreement. The rental of equipment and any items listed above is subject to availability and subject to the terms and conditions of the Rental and Service Agreement, which are available at https://www.unitedrentals.com/legal/rental-service-terms-US and which are incorporated herein by reference. A COPY OF THE RENTAL AND SERVICE

AGREEMENT TERMS ARE AVAILABLE IN PAPER FORM UPON REQUEST.

ID Task Mode

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Mon 1/16/23Fri 1/27/23

2 Subtask 1: Project Manageme43 days Mon 1/30/23Wed 3/29/23

3 Subtask 2: Well Abandonmen43 days Mon 1/30/23Wed 3/29/23

4 Field Work Preparation 2 wks Mon 1/30/23Fri 2/10/23

5 Well Abandonment 4 days Mon 2/20/23Thu 2/23/23

6 Well Abandonment Report 4 wks Thu 3/2/23 Wed 3/29/23

J

1/8 1/15 1/22 1/29 2/5 February

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC023B at the Cachet Cleaners site located in Brandon, Hillsborough County

Project: TA_023B Date: Mon 1/16/23

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Mon 1/16/23Fri 1/27/23

2 Subtask 1: Project Manageme43 days Mon 1/30/23Wed 3/29/23

3 Subtask 2: Well Abandonmen43 days Mon 1/30/23Wed 3/29/23

4 Field Work Preparation 2 wks Mon 1/30/23Fri 2/10/23

5 Well Abandonment 4 days Mon 2/20/23Thu 2/23/23

6 Well Abandonment Report 4 wks Thu 3/2/23 Wed 3/29/23

Jenna Martin,Meeghan Casey

William McKinney,William Ouchie

2/12 2/19 2/26 3/5 3/12 March

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC023B at the Cachet Cleaners site located in Brandon, Hillsborough County

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Mon 1/16/23Fri 1/27/23

2 Subtask 1: Project Manageme43 days Mon 1/30/23Wed 3/29/23

3 Subtask 2: Well Abandonmen43 days Mon 1/30/23Wed 3/29/23

4 Field Work Preparation 2 wks Mon 1/30/23Fri 2/10/23

5 Well Abandonment 4 days Mon 2/20/23Thu 2/23/23

6 Well Abandonment Report 4 wks Thu 3/2/23 Wed 3/29/23 Jenna Martin,Peter McLean,Meeghan Case

3/19 3/26 4/2 4/9 4/16 April

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC023B at the Cachet Cleaners site located in Brandon, Hillsborough County