CN-370000-HW684-BIL2CCO2.pdf

PDF 1 MB Posted

Attached to
Master Agreement FL|HW684|68b160b8827755ddf560142dd2a41e53
Contract number
HW684
Issued by
Florida

About this file

Task Assignment Change Order Summary

This document package consists of Task Assignment Change Orders (TACO) for Contract HW684 between the State of Florida Department of Environmental Protection (FDEP) and GHD Services, Inc. The contract pertains to targeted brownfield site assessment activities at the Former Polk County Fertilizer site (Site ID ERIC_13343). The primary parties involved are the FDEP's Division of Waste Management, represented by Contract Manager Allison Hankins, and GHD Services, Inc., represented by Vice President Brian Moore. The changes documented span from January 22, 2024, through February 26, 2024.

The contract involves soil and groundwater assessment services, site assessment report preparation, and project management activities conducted across seven subtasks. The original Task Assignment total value was $66,078.42, which was increased through TACO #1 (dated February 1, 2024) to $91,567.51 to accommodate additional work including soil and groundwater data collection, field notes documentation, SPLP analysis on soil samples, and further delineation activities. TACO #2 (dated February 27, 2024) subsequently decreased the total by $221.00 to $91,346.51 due to a reduction in Investigation Derived Waste disposal costs resulting from fewer drums required. Deliverables include soil and groundwater field data with due dates of January 17 and March 29, 2024, respectively, and a site assessment report addendum due April 25, 2024. Invoice payments are structured upon DEP approval of specific deliverables, with the task completion date extended to May 20, 2024. The contract is funded through state appropriations with no grant funding identified.

View the file

Other files

File Type Posted
CN-370000-HW684-BIL02F.pdf PDF
CN-370000-HW684-BIL2CC03.pdf PDF
CN-370000-HW684-BIL2ECO1.pdf PDF
CN-370000-HW684-BIL2FCO1.pdf PDF
CN-370000-HW684-BIL2GCO1.pdf PDF
CN-370000-HW684-CSS02A.pdf PDF
CN-370000-HW684-CSS03B.pdf PDF
CN-370000-HW684-D033CCO1.pdf PDF
CN-370000-HW684-DC001A.pdf PDF
CN-370000-HW684-DC001F.pdf PDF
CN-370000-HW684-DC002B.pdf PDF
CN-370000-HW684-DC002C.pdf PDF
CN-370000-HW684-DC002D.pdf PDF
CN-370000-HW684-DC003D.pdf PDF
CN-370000-HW684-DC004D.pdf PDF
CN-370000-HW684-DC005A.pdf PDF
CN-370000-HW684-DC005D.pdf PDF
CN-370000-HW684-DC006B.pdf PDF
CN-370000-HW684-DC009C.pdf PDF
CN-370000-HW684-DC009D.pdf PDF
CN-370000-HW684-DC009E.pdf PDF
CN-370000-HW684-DC011A.pdf PDF
CN-370000-HW684-DC011C.pdf PDF
CN-370000-HW684-DC012D.pdf PDF
CN-370000-HW684-DC013B.pdf PDF
CN-370000-HW684-DC014D.pdf PDF
CN-370000-HW684-DC014F.pdf PDF
CN-370000-HW684-DC015A.pdf PDF
CN-370000-HW684-DC015C.pdf PDF
CN-370000-HW684-DC016B.pdf PDF
CN-370000-HW684-DC016C.pdf PDF
CN-370000-HW684-DC017C.pdf PDF
CN-370000-HW684-DC018C.pdf PDF
CN-370000-HW684-DC019C.pdf PDF
CN-370000-HW684-DC019D.pdf PDF
CN-370000-HW684-DC01ACO2.pdf PDF
CN-370000-HW684-DC020B.pdf PDF
CN-370000-HW684-DC025A.pdf PDF
CN-370000-HW684-DC026B.pdf PDF
CN-370000-HW684-DC026D.pdf PDF
CN-370000-HW684-DC027C.pdf PDF
CN-370000-HW684-DC028C.pdf PDF
CN-370000-HW684-DC029C.pdf PDF
CN-370000-HW684-DC031A.pdf PDF
CN-370000-HW684-DC034B.pdf PDF
CN-370000-HW684-DC03ACO1.pdf PDF
CN-370000-HW684-DC03CCO1.pdf PDF
CN-370000-HW684-DC03CCO2.pdf PDF
CN-370000-HW684-DC040A.pdf PDF
CN-370000-HW684-DC045B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

BIL02C 2 HW684

Allison Hankins 850 245 8990 Contractor GHD Services, Inc. Contractor

Contractor Brian Moore Contractor 813 971 3882

ERIC_13343

Former Polk County Fertilizer

✔ $ 91,346.51 $ 91,567.51

$ 91,346.51 $ 91,567.51 ✔ Completion

Completion 05/20/2024 05/20/2024 0

✔ 1 1 2

GHD Services, Inc.

Contractor Brian Moore

Vice President

Brian Moore Digitally signed by Brian Moore Date: 2024.02.27 10:05:24 -05'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2024.02.27 09:23:07 -05'00'

The Department approves this Task Assignment Change Order (TACO) for changes in cost associated with the Cost Proposal/Level of Effort submitted by GHD Services, Inc. on February 26, 2024. For details, see negotiation summary.

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW684

BIL02C

$ 91,346.51

Soil and Groundwater Data and Field Notes

Soil Data and Field Notes

Site Assessment Report Addendum and Project Management

Upon DEP approval of Soil and Groundwater Data and Field Notes (Subtask 2)

Upon DEP approval of additional soil SPLP analysis data (Subtask 4)

Upon DEP approval of additional soil SPLP analysis data (Subtask 5)

Upon DEP approval of additional Soil Data and Field Notes for further delineation (Subtask 7)

Upon DEP approval of additional soil SPLP analysis data (Subtask 6)

Upon DEP approval of Site Assessment Report Addendum and Project Management (Subtasks 1 & 3)

01/17/2024

03/29/2024

04/25/2024

$ 13,438.07

$ 54,199.62

$ 2,550.00

$ 1,800.00

$ 1,800.00

$ 17,558.82 www.FloridaDEP.gov

FFLORIDAA DEPARTMENTT OF

EEnvironmentall Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ronn DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawnn Hamilton Secretary

Memorandum

TO: GHD Services Inc. HW684 Contract File

FROM: Allison Hankins, Contract Manager

DATE: February 26, 2024

SUBJECT: Negotiation Summary – BIL22, Change Order #2 - TA BIL02C2 Former Polk County Fertilizer - Site ID # ERIC_13343 Targeted Brownfield Site Assessment Activities

This Task Assignment Change Order (TACO) is for a decrease in costs associated with the collection and disposal of Investigation Derived Waste (IDW). Specific changes are detailed below:

Subtask 1: Project Management There are no changes in cost associated with this Subtask.

Subtask 2: Soil and Groundwater Assessment Changes in cost associated with this Subtask are due to a reduction in the number of drums required to dispose of IDW as a result of site activities. The change in cost of this Subtask is ($221.00).

Subtask 3: Site Assessment Report Addendum There are no changes in cost associated with this Subtask.

Subtask 4: Work Change Directive #1 There are no changes in cost associated with this Subtask.

Subtask 5: Work Change Directive #2 There are no changes in cost associated with this Subtask.

Subtask 6: Work Change Directive #3 There are no changes in cost associated with this Subtask.

Subtask 7: Additional Soil Analysis to Further Delineation There are no changes in cost associated with this Subtask.

Summary The Department’s SRP Contract Manager and GHD’s Contract Manager have both agreed to the above changes. All changes noted above represent a total overall cost decrease of $221.00, as shown in the Cost Actual LOE. The changes were noted in the TACO Request received from GHD on February 26, 2024. The final costs associated with this TA decreased from $91,567.51

Negotiation Summary – Task Assignment (TA) BIL02C2 Former Polk County Fertilizer Targeted Brownfield Site Assessment Activities February 26, 2024 www.FloridaDEP.gov to $91,346.51. Documentation of the changes is included in the attached TACO Request, the Delta LOE spreadsheet and the Cost Actual LOE spreadsheet, and the TACO form for BIL02C2 prepared by the Department.

FD

EP

C O

ST

E

ST

IM

A

TE

C on tra ct or

G H

D S er vi ce s

In c.

D at e:

2/

/2

Ta sk

B

IL

2C

S ub Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

W

C D

#3

S ite

Fo rm er

P ol k Fe rti liz er

Ta sk

S oi l &

G ro un dw at er

A ss es sm en t

S ub

Ta sk

A ct iv ity

/P ha se

A ss es sm en t

Ta sk

S ite

A ss es sm en t R ep or t A dd en du m S ub Ta sk

P ro je ct

M an ag er

B ria n

M oo re , P

E

Ta sk

W

C D

#1 S ub Ta sk

S ub

Ta sk

W

C D

#2 S ub Ta sk

TTo ta ls

La bo r

R at e C at eg or y

$4 9.

P P ro je ct M an ag

JM

.2

.2

$0

.0

P rin ci pa l E ng in ee r/S ci en tis t 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

Te ch ni ca l D ire ct or

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$5 6.

S r P ro fe ss io na l E ng in ee r

JH

4.

0.

4.

0.

0.

0.

0.

0.

0.

0.

$0 .0

S en io r P ro je ct

M an ag er

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4 5.

P ro fe ss io na l E ng in ee r/S c G

E 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3

9.

P ro je ct

E ng in ee r/S ci en tis

C H

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4 9.

P ro je ct M an ag er / E ng in e

JM

.0

.0

.0

0.

0.

0.

.0

0.

0.

0.

$2 5.

S ta ff

E ng in ee r/S ci en tis t R

S

3.

.7

0.

0.

0.

0.

.0

0.

0.

0.

$3 2.

D at a

A na ly st

JL

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4

3.

Fi el d M an ag er O

T 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2

2.

S en io r T ec hn ic ia n S

A

8.

.2

0.

0.

0.

0.

.0

0.

0.

0.

$2 6.

S en io r T ec hn ic ia n

W M

.7

.7

0.

0.

0.

0.

0.

0.

0.

0.

$2 4.

S en io r T ec hn ic ia n

D C

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2 0.

Ju ni or

T ec hn ic ia n

W O

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$1 9.

Ju ni or

T ec hn ic ia n

JM

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2

9.

D ra fti ng

T ec hn ic ia n

P M

.0

0.

.0

0.

0.

0.

0.

0.

0.

0.

$2 1.

Ad m in is tra tiv e

As si st an t

JJ

.0

0.

.0

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

To ta l H ou rs

8.

.2

8.

.0

0.

0.

0.

1.

0.

0.

0.

D ire ct L ab or

$1

4, 2.

$1 ,6

.7

$6

,6

.1

$2 ,9

.4

$0

.0

$0 .0

$0

.0

$3 ,1

.5

$0

.0

$0 .0

$0

.0

O ve rh ea d

9.

$1

8, 1.

$2 ,1

.8

$8

,5

.9

$3 ,7

.8

$0

.0

$0 .0

$0

.0

$4 ,0

.6

$0

.0

$0 .0

$0

.0

G en

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge

.8 0%

$5 ,4

.0

$6

.8

$2

,4

.0

$1 ,1

.7

$0

.0

$0 .0

$0

.0

$1 ,1

.4

$0

.0

$0 .0

$0

.0

To ta l L

$3 8, 8.

$4

,4

.4

$1 7, 0.

$7

,8

.9

$0 .0

$0

.0

$0 .0

$8

,4

.6

$0 .0

$0

.0

$0 .0

Tr av el V eh ic le R en ta l $1

,8

.0

$1 ,3

.0

$0

.0

$0 .0

$0

.0

$0 .0

$4

.0

$0

.0

$0 .0

$0

.0

M ile ag e

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

A ir Fa re $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P er d ie m

H ot el

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l T ra ve l

$1 ,8

.0

$1

,3

.0

$0 .0

$0

.0

$0 .0

$0

.0

$4

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

(E qu ip m en t P ro cu re m t)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P ro cu re m en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (S er vi ce s

P ro cu re m ril lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ur ve yi ng

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$1

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til iti es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til ity L oc at io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pa ge

C O

ST

E

ST

IM

A

TE

C on tra ct or

G H

D S er vi ce s

/2

B

IL

Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

W

C D

#3

S ite

Fo rm er

P ol k Fe rti

Ta sk

S oi l &

G ro un dw at er

A ss es sm en t

S ub

Ta sk

A ct iv ity

/P ha se

A ss es sm

Ta sk

S ite

A ss es sm en t R ep or t A dd en du m S ub Ta sk

P ro je ct

M an ag er

B ria n

M oo re

Ta sk

W

C D

#1 S ub Ta sk

S ub

Ta sk

W

C D

#2 S ub Ta sk

TTo ta ls

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

S ub to ta l $1

.0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

H an dl in g

Fe e

$1 1.

$1

1.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T To ta l S ub co nt ra ct or C os t

$1

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

La bo ra to ry

A na ly tic al C os ts

$4 1, 2.

$2

9, 2.

$0 .0

$2

,5

.0

$1 ,8

.0

$1

,8

.0

$5 ,8

.0

$0

.0

$0 .0

$0

.0

Fa st

T ur na ro un d

C ha rg es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S am pl e

S hi pp in g $1

,1

.5

$8

.5

$0 .0

$0

.0

$0 .0

$0

.0

$3

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or at or y $4

2, 6.

$3 0, 3.

$0

.0

$2 ,5

.0

$1

,8

.0

$1 ,8

.0

$6

,1

.0

$0 .0

$0

.0

$0 .0

Fi el d

E xp en se s

P so na l P ro te ct io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E xp en da bl es

$4

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

$2

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( D ril lin g re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( A na ly tic al re la te d)

$2 ,5

.0

$1

,8

.0

$0 .0

$0

.0

$0 .0

$0

.0

$7

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t (

ID

W re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( O th er

$1

,6

.0

$9

.0

$0 .0

$0

.0

$0 .0

$0

.0

$7

.0

$0 .0

$0

.0

$0 .0

To ta l F ie ld

E xp en se s $4

,6

.0

$3 ,0

.0

$0

.0

$0 .0

$0

.0

$0 .0

$1

,6

.0

$0 .0

$0

.0

$0 .0

S ub to ta l $8

7, 3.

$4 ,4

.4

$5

2, 2.

$7 ,8

.9

$2

,5

.0

$1 ,8

.0

$1

,8

.0

$1 6, 4.

$0

.0

$0 .0

$0

.0

C om pl et io n

Fe e

$3 ,8

.8

$4

.9

$1

,7

.0

$7

.7

$0 .0

$0

.0

$0 .0

$8

.1

$0

.0

$0 .0

$0

.0

To ta l E st im at ed C os t

$9 1, 6.

$4

,8

.3

$5 4, 9.

$8

,5

.6

$2 ,5

.0

$1

,8

.0

$1 ,8

.0

$1

7, 8.

$0 .0

$0

.0

$0 .0

C os t f ro m P rio r C

E F:

$9 1, 7.

M an ua l E nt ry C os t f ro m

D el ta C

E F;

1.

M an ua l E nt ry C os t (

P rio r + D el ta

$9

1, 6.

A ut o- C al cu la te d R ou nd in g

E rr or

$0 .0

A ut o-

C al cu la te d

Fi na l T ot al C os t:

$9 1, 6.

A ut o-

C al cu la te d

Pa

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Former Polk County Fertilizer SUBTASK 2: Soil & Groundwater Assessment

DATE: 2/26/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager JM Contact Property Owner 4 Project Manager JM Field Work Preparation 4 Project Manager JM Evaluate Data and Determine additional SPLP analysis 6 Project Manager JM Data Summary 4

Staff Engineer/Scientist RS Mob/demob (7 days) 12 Staff Engineer/Scientist RS Soil Borings (49 total - 1.25 hr per boring) 61.25 Staff Engineer/Scientist RS Depth to Water Measurements (8 total) 1 Staff Engineer/Scientist RS Groundwater Sampling (4 wells) 4.5

78.75

Sr Technician WM Mob/demob (7 days) 12 Sr Technician WM Soil Borings (49 total - 1.25 hr per boring) 61.25 Sr Technician WM Depth to Water Measurements (8 total) 1 Sr Technician WM Groundwater Sampling (3 wells) 4.5

78.75

Sr Technician SA Mob/demob (6 days) 12 Sr Technician SA Soil Borings (49 total - 1.25 hr per boring) 61.25

73.25

TOTAL LABOR 248.75

VEHICLE TYPE RATE UNIT USEAGE

staff scientist and sr tech Company Truck $480.00 week 1 $480.00 staff scientist and sr tech Company Truck $120.00 day 2 $240.00 sr tech Company Truck $480.00 week 1 $480.00 sr tech Company Truck $120.00 day 1 $120.00

TOTAL VEHICLE $1,320.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW Disposal $110 drum 1 $110.00

TOTAL $110.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

OCPs Soil EPA 8081 $105.00 200 $21,000.00 PAHs Soil EPA 8270 SIM $110.00 56 $6,160.00 Nitrate SM4500 $23.00 56 $1,288.00 OCPs GW EPA 8081 $105.00 8 $840.00 Nitrate SM 353 $23.00 8 $184.00 Sample Shipping - soil overnight - large cooler $150.00 5 $750.00 Sample Shipping - gw overnight - large cooler $6.50 5 $32.50 Ice $6.50 6 $39.00

TOTAL LAB $30,293.50

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 day 6 $240.00

Soil Assessment Kit $700.00 week 1 $700.00 Soil Assessment Kit $175.00 day 1 $175.00 Deep Groundwater Sampling Kit $415.00 day 2 $830.00 Poly Tubing $0.30 ft 360 $108.00

GPS (Trimble) $700.00 week 1 $700.00 GPS (Trimble) $175.00 day 1 $175.00 Drum $100.00 drum 1 $100.00

TOTAL EQUIPMENT $3,028.00

FINAL --7/24/96

SUBTASK 3: Site Assessment Report Addendum

DATE: 2/26/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr. Professional Engineer JH Conclusion and Recommendations 4

Project Manager JM Background Summary for Pok Fertilizer (SARA) 6 Project Manager JM Soil Sampling Methods (SARA) 6 Project Manager JM Soil Sampling Results (SARA) 6 Project Manager JM Groundwater Sampling Methods (SARA) 4 Project Manager JM Groundwater Flow Evaluation (SARA) 4 Project Manager JM Groundwater Analytical Results (SARA) 4 Project Manager JM Laboratory Data Validation (soil and water) 4 Project Manager JM Conclusions and Recommendations 4

Drafting Technician PM Soil Analytical Results Figures 8 Drafting Technician PM Groundwater Flow Figure 2 Drafting Technician PM Groundwater Analytical Results Figure 2

Administrative Assistant JJ Data Entry (49 borings and 8 wells) 12 Administrative Assistant JJ Summary Tables (soil, groundwater) 6 Administrative Assistant JJ Finalize SARA (pdf) 3

TOTAL LABOR 75

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

SUBTASK 4: WCD#1

DATE: 2/26/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

OCPs Soil EPA 8081 $105.00 17 $1,785.00 TCLP/SPLP Bottle Extraction 1311/1312 $45.00 17 $765.00

TOTAL LAB $2,550.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

SUBTASK 5: WCD#2

DATE: 2/26/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

OCPs Soil EPA 8081 $105.00 12 $1,260.00 TCLP/SPLP Bottle Extraction 1311/1312 $45.00 12 $540.00

TOTAL LAB $1,800.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

SUBTASK 6: WCD#3

DATE: 2/26/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

OCPs Soil EPA 8081 $105.00 12 $1,260.00 TCLP/SPLP Bottle Extraction 1311/1312 $45.00 12 $540.00

TOTAL LAB $1,800.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

SUBTASK 7: Additional Soil Assessment

DATE: 2/26/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager JM Field Work Preparation 1 Project Manager JM Evaluate Data and Determine additional SPLP analysis 4 Project Manager JM Data Summary 6

Staff Engineer/Scientist RS Mob/demob (5 days) 10 Staff Engineer/Scientist RS Soil Borings (36 total - 1.25 hr per boring) 45

Sr Technician SA Mob/demob (5 days) 10 Sr Technician SA Soil Borings (36 total - 1.25 hr per boring) 45

TOTAL LABOR 121

VEHICLE TYPE RATE UNIT USEAGE

staff scientist and sr tech Company Truck $480.00 week 1 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

OCPs Soil EPA 8081 $105.00 56 $5,880.00 Sample Shipping - soil overnight - large cooler $150.00 2 $300.00 Ice $6.50 2 $13.00

TOTAL LAB $6,193.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 day 5 $200.00

Soil Assessment Kit $700.00 week 1 $700.00

GPS (Trimble) $700.00 week 1 $700.00

TOTAL EQUIPMENT $1,600.00

C O

ST

E

ST

IM

A

TE

C on tra ct or

G H

D S er vi ce s

/2

B

IL

Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

S ite

Fo rm er

P ol k Fe rti

Ta sk

S oi l &

G ro un dw at er

A ss es sm en t

S ub

Ta sk

A ct iv ity

/P ha se

A ss es sm

Ta sk

S ub

Ta sk

P ro je ct

M an ag er

B ria n

M oo re

Ta sk

S ub Ta sk

S ub

Ta sk

S ub Ta sk

TTo ta ls

La bo r

R at e C at eg or y

$4 9.

P P ro je ct M an

0.

0.

$0

.0

P rin ci pa l E ng in ee r/S ci en tis t 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

Te ch ni ca l D ire ct or

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$5 6.

S r P ro fe ss io na l E ng in ee r

JH

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

S en io r P ro je ct

M an ag er

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4 5.

P ro fe ss io na l E ng in ee r/S c G

E 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3

9.

P ro je ct

E ng in ee r/S ci en tis

C H

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4 9.

P ro je ct M an ag er / E ng in e

JM

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2 5.

S ta ff

E ng in ee r/S ci en tis t R

S 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3

2.

D at a A na ly st

JL

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4 3.

Fi el d

M an ag er

O T

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2 2.

S en io r T ec hn ic ia n

S A

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2 6.

S en io r T ec hn ic ia n

W M

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2 4.

S en io r T ec hn ic ia n

D C

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2 0.

Ju ni or

T ec hn ic ia n

W O

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$1 9.

Ju ni or

T ec hn ic ia n

JM

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2

9.

D ra fti ng

T ec hn ic ia n

P M

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2 1.

Ad m in is tra tiv e

As si st an t

JJ

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

To ta l H ou rs

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

D ire ct L

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

O ve rh ea d

9.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

G en

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge

.8 0%

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Tr av el V eh ic le R en ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ile ag e C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

A ir

Fa re

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P er d ie m

H ot el $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

(E qu ip m en t P ro cu re m

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P ro cu re m en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (S er vi ce s

P ro cu re m lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ur ve yi ng

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

0.

0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til iti es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til ity L oc at io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pa

C O

ST

E

ST

IM

A

TE

C on tra ct or

G H

D S er vi ce s

/2

B

IL

Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

S ite

Fo rm er

P ol k Fe rti

Ta sk

S oi l &

G ro un dw at er

A ss es sm en t

S ub

Ta sk

A ct iv ity

/P ha se

A ss es sm

Ta sk

S ub

Ta sk

P ro je ct

M an ag er

B ria n

M oo re

Ta sk

S ub Ta sk

S ub

Ta sk

S ub Ta sk

TTo ta ls

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

S ub to ta l

0.

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

H an dl in g

Fe e

.0 0)

.0 0)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

1.

1.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

La bo ra ly tic al C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fa st

T ur na ro un d

C ha rg es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S am pl e

S hi pp in g $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fi el d

E xp en so na l P ro te ct io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E xp en da bl es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

D ril lin g re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

A na ly tic al re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t (

ID

W re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( O th er

0.

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l F ie ld

E xp en se s

0.

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub to ta l

1.

$0 .0

1.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

C om pl et io n

Fe e

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l E st im at ed C os t

1.

$0

.0

1.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

C os t f ro m P rio r C

E F:

$6 6, 8.

M an ua l E nt ry C os t f ro m

D el ta C

E F;

$2 5, 9.

M an ua l E nt ry C os t (

P rio r + D el ta

$9

1, 7.

A ut o- C al cu la te d R ou nd in g

E rr or

,7

.5 0)

A ut o- C al cu la te d Fi na l T ot al

C os t:

1.

A ut o- C al cu la te d

Pa

SUBTASK 2: Soil & Groundwater Assessment

DATE: 2/26/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager JM Contact Property Owner 0 Project Manager JM Field Work Preparation 0 Project Manager JM Evaluate Data and Determine additional SPLP analysis 0 Project Manager JM Data Summary 0

Staff Engineer/Scientist RS Mob/demob (7 days) 0 Staff Engineer/Scientist RS Soil Borings (49 total - 1.25 hr per boring) 0 Staff Engineer/Scientist RS Depth to Water Measurements (8 total) 0 Staff Engineer/Scientist RS Groundwater Sampling (4 wells) 0

Sr Technician WM Mob/demob (7 days) 0 Sr Technician WM Soil Borings (49 total - 1.25 hr per boring) 0 Sr Technician WM Depth to Water Measurements (8 total) 0 Sr Technician WM Groundwater Sampling (3 wells) 0

Sr Technician SA Mob/demob (6 days) 0 Sr Technician SA Soil Borings (49 total - 1.25 hr per boring) 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

staff scientist and sr tech Company Truck $480.00 week 0 $0.00 staff scientist and sr tech Company Truck $120.00 day 0 $0.00 sr tech Company Truck $480.00 week 0 $0.00 sr tech Company Truck $120.00 day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW Disposal $110 drum -1 ($110.00)

TOTAL ($110.00)

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

OCPs Soil EPA 8081 $105.00 0 $0.00 PAHs Soil EPA 8270 SIM $110.00 0 $0.00 Nitrate SM4500 $23.00 0 $0.00 OCPs GW EPA 8081 $105.00 0 $0.00 Nitrate SM 353 $23.00 0 $0.00 Sample Shipping - soil overnight - large cooler $150.00 0 $0.00 Sample Shipping - gw overnight - large cooler $6.50 0 $0.00 Ice $6.50 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 day 0 $0.00

Soil Assessment Kit $700.00 week 0 $0.00 Soil Assessment Kit $175.00 day 0 $0.00 Deep Groundwater Sampling Kit $415.00 day 0 $0.00 Poly Tubing $0.30 ft 0 $0.00

GPS (Trimble) $700.00 week 0 $0.00 GPS (Trimble) $175.00 day 0 $0.00 Drum $100.00 drum -1 ($100.00)

TOTAL EQUIPMENT ($100.00)

C

OS

T

ES

TI

MA

TE

C on tra ct or

G

H D

S er vi ce s

/2

B

IL

Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

W

C D

#3

S ite

Fo rm er

P ol k Fe rti

Ta sk

S oi l &

G ro un dw at er

A ss es sm en t

S ub

Ta sk

A ct iv ity

/P ha se

A ss es sm

Ta sk

S ite

A ss es sm en t R ep or t A dd en du m S ub Ta sk

P ro je ct

M an ag er

B ria n

M oo re

Ta sk

W

C D

#1 S ub Ta sk

S ub

Ta sk

W

C D

#2 S ub Ta sk

TTo ta ls

La bo r

R at e C at eg or y

$4 9.

P P ro je ct M an

.2

.2

$0

.0

P rin ci pa l E ng in ee r/S ci en tis t 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

Te ch ni ca l D ire ct or

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$5 6.

S r P ro fe ss io na l E ng in ee r

JH

4.

0.

4.

0.

0.

0.

0.

0.

0.

0.

$0 .0

S en io r P ro je ct

M an ag er

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4 5.

P ro fe ss io na l E ng in ee r/S c G

E 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3

9.

P ro je ct

E ng in ee r/S ci en tis

C H

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4 9.

P ro je ct M an ag er / E ng in e

JM

.0

.0

.0

0.

0.

0.

.0

0.

0.

0.

$2 5.

S ta ff

E ng in ee r/S ci en tis t R

S

3.

.7

0.

0.

0.

0.

.0

0.

0.

0.

$3 2.

D at a

A na ly st

JL

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4

3.

Fi el d M an ag er O

T 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2

2.

S en io r T ec hn ic ia n S

A

8.

.2

0.

0.

0.

0.

.0

0.

0.

0.

$2 6.

S en io r T ec hn ic ia n

W M

.7

.7

0.

0.

0.

0.

0.

0.

0.

0.

$2 4.

S en io r T ec hn ic ia n

D C

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2 0.

Ju ni or

T ec hn ic ia n

W O

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$1 9.

Ju ni or

T ec hn ic ia n

JM

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2

9.

D ra fti ng

T ec hn ic ia n

P M

.0

0.

.0

0.

0.

0.

0.

0.

0.

0.

$2 1.

Ad m in is tra tiv e

As si st an t

JJ

.0

0.

.0

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

To ta l H ou rs

8.

.2

8.

.0

0.

0.

0.

1.

0.

0.

0.

D ire ct L

$1

4, 2.

$1 ,6

.7

$6

,6

.1

$2 ,9

.4

$0

.0

$0 .0

$0

.0

$3 ,1

.5

$0

.0

$0 .0

$0

.0

O ve rh ea d

9.

$1

8, 1.

$2 ,1

.8

$8

,5

.9

$3 ,7

.8

$0

.0

$0 .0

$0

.0

$4 ,0

.6

$0

.0

$0 .0

$0

.0

G en

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge

.8 0%

$5 ,4

.0

$6

.8

$2

,4

.0

$1 ,1

.7

$0

.0

$0 .0

$0

.0

$1 ,1

.4

$0

.0

$0 .0

$0

.0

To ta l L

$3 8, 8.

$4

,4

.4

$1 7, 0.

$7

,8

.9

$0 .0

$0

.0

$0 .0

$8

,4

.6

$0 .0

$0

.0

$0 .0

Tr av el V eh ic le R en ta l $1

,8

.0

$1 ,3

.0

$0

.0

$0 .0

$0

.0

$0 .0

$4

.0

$0

.0

$0 .0

$0

.0

M ile ag e

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

A ir Fa re $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P er d ie m

H ot el

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l T ra ve l

$1 ,8

.0

$1

,3

.0

$0 .0

$0

.0

$0 .0

$0

.0

$4

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

(E qu ip m en t P ro cu re m

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P ro cu re m en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (S er vi ce s

P ro cu re m lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ur ve yi ng

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$2

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til iti es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til ity L oc at io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pa

C

OS

T

ES

TI

MA

TE

C on tra ct or

G

H D

S er vi ce s

/2

B

IL

Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

W

C D

#3

S ite

Fo rm er

P ol k Fe rti

Ta sk

S oi l &

G ro un dw at er

A ss es sm en t

S ub

Ta sk

A ct iv ity

/P ha se

A ss es sm

Ta sk

S ite

A ss es sm en t R ep or t A dd en du m S ub Ta sk

P ro je ct

M an ag er

B ria n

M oo re

Ta sk

W

C D

#1 S ub Ta sk

S ub

Ta sk

W

C D

#2 S ub Ta sk

TTo ta ls

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

S ub to ta l $2

.0

$2

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

H an dl in g

Fe e

$2 2.

$2

2.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T To ta l S ub co nt ra ct or C os t

$2

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

La bo ra ly tic al C os ts

$4 1, 2.

$2

9, 2.

$0 .0

$2

,5

.0

$1 ,8

.0

$1

,8

.0

$5 ,8

.0

$0

.0

$0 .0

$0

.0

Fa st

T ur na ro un d

C ha rg es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S am pl e

S hi pp in g $1

,1

.5

$8

.5

$0 .0

$0

.0

$0 .0

$0

.0

$3

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or at or y $4

2, 6.

$3 0, 3.

$0

.0

$2 ,5

.0

$1

,8

.0

$1 ,8

.0

$6

,1

.0

$0 .0

$0

.0

$0 .0

Fi el d

E xp en so na l P ro te ct io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E xp en da bl es

$4

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

$2

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( D ril lin g re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( A na ly tic al re la te d)

$2 ,5

.0

$1

,8

.0

$0 .0

$0

.0

$0 .0

$0

.0

$7

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t (

ID

W re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( O th er

$1

,7

.0

$1 ,0

.0

$0

.0

$0 .0

$0

.0

$0 .0

$7

.0

$0

.0

$0 .0

$0

.0

To ta l F ie ld E xp en se s

$4 ,7

.0

$3

,1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$1 ,6

.0

$0

.0

$0 .0

$0

.0

S ub to ta l $8

7, 4.

$4 ,4

.4

$5

2, 3.

$7 ,8

.9

$2

,5

.0

$1 ,8

.0

$1

,8

.0

$1 6, 4.

$0

.0

$0 .0

$0

.0

C om pl et io n

Fe e

$3 ,8

.8

$4

.9

$1

,7

.0

$7

.7

$0 .0

$0

.0

$0 .0

$8

.1

$0

.0

$0 .0

$0

.0

To ta l E st im at ed C os t

$9 1, 7.

$4

,8

.3

$5 4, 0.

$8

,5

.6

$2 ,5

.0

$1

,8

.0

$1 ,8

.0

$1

7, 8.

$0 .0

$0

.0

$0 .0

C os t f ro m P rio r C

E F:

$6 6, 8.

M an ua l E nt ry C os t f ro m

D el ta C

E F;

$2 5, 9.

M an ua l E nt ry C os t (

P rio r + D el ta

$9

1, 7.

A ut o- C al cu la te d R ou nd in g

E rr or

$0 .0

A ut o-

C al cu la te d

Fi na l T ot al C os t:

$9 1, 7.

A ut o-

C al cu la te d

Pa

From: Brian Moore To: Hankins, Allison Cc: Cheryl Tidwell; Jenna Martin Subject: RE: Former Polk Fertilizer BIL02C ERIC_9970 Date: Monday, February 26, 2024 9:54:22 AM Attachments: image001.png image002.png image003.png image004.png image005.png image007.png TA_002C Final CO1.xlsx TA_002C Delta CO2.xlsx TA_002C Final CO2.xlsx

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Allison, I apologize, but there was a reduction in IDW that I didn’t catch on CO1. Please find attached a proposed change order to reduce the number of IDW drums by 1.

Thank you

BRIAN MOORE PE

GHD

Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com

The Power of Commitment Connect

Please consider our environment before printing this email

From: Hankins, Allison <Allison.Hankins@FloridaDEP.gov> Sent: Friday, February 2, 2024 8:04 AM To: Brian Moore <Brian.Moore@ghd.com> Cc: Cheryl Tidwell <Cheryl.Tidwell@ghd.com>; Jenna Martin <Jenna.Martin@ghd.com> Subject: RE: Former Polk Fertilizer BIL02C ERIC_9970

Brian, Please find the TACO attached for your signature.

Thanks, Allison

Allison Hankins CERCLA Site Manager CERCLA Site Screening Section

Division of Waste Management Florida Department of Environmental Protection Allison.Hankins@FloridaDEP.gov 850.245.8990

From: Brian Moore <Brian.Moore@ghd.com> Sent: Monday, January 22, 2024 4:10 PM To: Hankins, Allison <Allison.Hankins@FloridaDEP.gov> Cc: Cheryl Tidwell <Cheryl.Tidwell@ghd.com>; Jenna Martin <Jenna.Martin@ghd.com> Subject: RE: Former Polk Fertilizer BIL02C ERIC_9970

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Allison, A proposed change order is attached for consideration to adjust expenses on Subtask 2 (1 well was blocked and could not be sample – MW-8) Rectify WCD#1 through 3 Subtask 3: add data entry and table/fig labor for extra samples Subtask 7: additional soil testing to further delineation.

Thank you

BRIAN MOORE PE

GHD

Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com

The Power of Commitment Connect

Please consider our environment before printing this email

From: Hankins, Allison <Allison.Hankins@FloridaDEP.gov> Sent: Monday, January 22, 2024 1:54 PM To: Brian Moore <Brian.Moore@ghd.com> Subject: RE: Former Polk Fertilizer BIL02C ERIC_9970

Brian, This looks good to me, agreed.

Thanks, Allison

Allison Hankins CERCLA Site Manager CERCLA Site Screening Section Division of Waste Management Florida Department of Environmental Protection Allison.Hankins@FloridaDEP.gov 850.245.8990

From: Brian Moore <Brian.Moore@ghd.com> Sent: Monday, January 22, 2024 12:13 PM To: Hankins, Allison <Allison.Hankins@FloridaDEP.gov> Subject: RE: Former Polk Fertilizer BIL02C ERIC_9970

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Allison, See attached for proposed additional borings and recommended testing depths for consideration.

Once we agree, I can add the additional borings into the Change Order

Thank you

BRIAN MOORE PE

GHD

Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com

The Power of Commitment Connect

Please consider our environment before printing this email

From: Hankins, Allison <Allison.Hankins@FloridaDEP.gov> Sent: Friday, January 19, 2024 9:40 AM To: Brian Moore <Brian.Moore@ghd.com> Cc: Cheryl Tidwell <Cheryl.Tidwell@ghd.com>; Jenna Martin <Jenna.Martin@ghd.com> Subject: RE: Former Polk Fertilizer BIL02C ERIC_9970

Brian, I jumped the gun a little and forgot about the Work Change Directives for this TA, we need to settle those and get a TACO going before you can invoice.

Allison Hankins

CERCLA Site Screening Section Division of Waste Management Florida Department of Environmental Protection Allison.Hankins@FloridaDEP.gov 850.245.8990

From: Hankins, Allison Sent: Thursday, January 18, 2024 9:03 AM To: Brian Moore <Brian.Moore@ghd.com> Cc: Cheryl Tidwell <Cheryl.Tidwell@ghd.com>; Jenna Martin <Jenna.Martin@ghd.com> Subject: RE: Former Polk Fertilizer BIL02C ERIC_9970

Brian, Please see attached the Approval to Invoice Form for the Former Polk County Fertilizer. Please include the attached form in your invoice submittal.

Allison Hankins

CERCLA Site Screening Section Division of Waste Management Florida Department of Environmental Protection Allison.Hankins@FloridaDEP.gov 850.245.8990

From: Brian Moore <Brian.Moore@ghd.com> Sent: Wednesday, January 17, 2024 3:56 PM To: Hankins, Allison <Allison.Hankins@FloridaDEP.gov> Cc: Cheryl Tidwell <Cheryl.Tidwell@ghd.com>; Jenna Martin <Jenna.Martin@ghd.com> Subject: Former Polk Fertilizer BIL02C ERIC_9970

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Allison, Our field notes and laboratory data are included at the below link for the Former Polk Fertilizer.

Based on the results, additional soil sampling is recommended to further define the extent of dieldrin impacts. I am working on proposed locations and will send soon.

Contact me with any questions

Former Polk Fertilizer

Regards, BRIAN MOORE PE

GHD

Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com

The Power of Commitment Connect

Please consider our environment before printing this email

CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.

Dep Customer Survey

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

BIL02C 1 HW684

The Department approves this Task Assignment Change Order (TACO) for changes in cost associated with the Cost Proposal/Level of Effort submitted by GHD Services, Inc. on January 22, 2024. For details, see negotiation summary.

Allison Hankins 850 245 8990 Contractor GHD Services, Inc. Contractor

Contractor Brian Moore Contractor 813 971 3882

ERIC_13343

Former Polk County Fertilizer

✔ $ 91,567.51 $ 66,078.42

$ 91,567.51 $ 66,078.42 Completion

✔ Completion 03/15/2024 05/20/2024 66

✔ 1 1 1

GHD Services, Inc.

Contractor Brian Moore

Vice President

Brian Moore Digitally signed by Brian Moore Date: 2024.02.02 08:59:29 -05'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2024.02.01 12:55:43 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW684

BIL02C

$ 91,567.51

Soil and Groundwater Data and Field Notes

Soil Data and Field Notes

Site Assessment Report Addendum and Project Management

Upon DEP approval of Soil and Groundwater Data and Field Notes (Subtask 2)

Upon DEP approval of additional soil SPLP analysis data (Subtask 4)

Upon DEP approval of additional soil SPLP analysis data (Subtask 5)

Upon DEP approval of additional Soil Data and Field Notes for further delineation (Subtask 7)

Upon DEP approval of additional soil SPLP analysis data (Subtask 6)

Upon DEP approval of Site Assessment Report Addendum and Project Management (Subtasks 1 & 3)

01/17/2024

03/29/2024

04/25/2024

$ 13,438.07

$ 54,420.62

$ 2,550.00

$ 1,800.00

$ 1,800.00

$ 17,558.82

File details come from the government source that posted it. Updated .