This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) to GHD Services, Inc., a consulting engineering firm. The task assignment is designated as TA Number DC014B and is issued under Contract Number HW684. The work is being performed at the former Plant City Laundry and Cleaners site located at 401 E Reynolds Street in Plant City, Hillsborough County, Florida (ERIC_4722). Kevin Kane serves as the FDEP Department Project Manager, while Brian Moore is the Contractor's Project Manager.
The task assignment authorizes GHD Services, Inc. to conduct standard penetration test borings and update the Interim Source Removal Plan (ISRP) at the site. The scope of work consists of three subtasks: Subtask 1 includes project management calculated at 13% of direct labor; Subtask 2 encompasses conducting two standard penetration testing (SPT) borings to depths of 30 feet below land surface, a double ring infiltration (DRI) test, and preparation of a geotechnical summary report with a deliverable due date of April 6, 2023; and Subtask 3 involves updating the ISRP to incorporate shoring design (sheet pile and dewatering) with a deliverable due date of April 14, 2023. The total task assignment value is $15,396.85, with payment made on a fixed unit rate basis. Payment for Subtask 2 ($6,894.14) is due upon submittal and FDEP approval of the Standard Penetration Test Boring Summary Letter, and payment for Subtasks 1 and 3 ($8,502.71) is due upon submittal and FDEP approval of the Updated Interim Source Removal Plan and Project Management deliverables. The task assignment completion date is July 14, 2023. Cost estimates include labor (totaling $13,432.13 with overhead and fringe benefits), travel expenses of $240.00, subcontractor costs for investigation derived waste disposal of $110.00, laboratory costs of $131.50, and field expenses of $140.00.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW684
DC014B Completion July 14, 2023
This Task Assignment authorizes GHD Services, Inc. to conduct standard penetration test borings at the former Plant City Laundry and Cleaners site located in Plant City, FL. All work will be conducted in accordance with the scope of work and cost proposal submitted on February 6, 2023.
Kevin Kane 850-245-8971 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
GHD Services, Inc.
GHD Services, Inc.
Brian Moore 813-257-0658
ERIC_4722
401 E Reynolds St, Plant City, Hillsborough County
Plant City Laundry and Cleaners
✔ $ 15,396.85
$ 15,396.85
Scope of Work
Brian Moore
Project Manager
Brian Moore Digitally signed by Brian Moore Date: 2023.02.22 17:25:52 -05'00'
Kelly Crain
Kelly Crain Digitally signed by Kelly Crain Date: 2023.02.22 15:08:14 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Standard Penetration Test Boring Summary Letter 04/06/2023
Updated Interim Source Removal Plan + Project Management 04/14/2023
Subtask 2: Upon submittal and FDEP approval of the Standard Penetration Test Boring Summary Letter $ 6,894.14
Subtask 1 & 3: Upon submittal and FDEP approval of the Updated Interim Source Removal Plan + Project Management $ 8,502.71
$ 15,396.85
HW684
DC014B
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
TO: HW684 Contract File
FROM: Kevin Kane, Contract Manager
DATE: February 22, 2023
SUBJECT: Task Assignment DC014B Plant City Laundry and Cleaners
ERIC_4722
Monitoring
GHD Services, Inc. (GHD) will conduct standard penetration test borings at the subject site. Specific subtasks are detailed below:
Subtask 1: Project Management Project Management is calculated at 13% of the direct labor.
Subtask 2: Standard Penetration Test Borings In order to obtain subsurface soil information in support of the design for the proposed shoring, the completion of two (2) standard penetration testing (SPT) borings at the site (see locations on site plan). The SPT borings will be advanced using a drill rig equipped with mud rotary technology to depths of 30 feet bls. The SPT borings will be completed in accordance with ASTM 1586. Following completion of the SPT borings a summary of the SPT results will be prepared. The results of the SPT borings will be incorporated into the ISRP to be used for specifying shoring design (sheet pile and dewatering). In order to further evaluate infiltration of treated groundwater, GHD will also conduct a double ring infiltration (DRI) test. The test will be conducted at a constant head within the DRI cylinders. The DRI will conducted at a depth of 2 feet bls. The DRI results will be used to calculate an infiltration rate. Investigation derived waste (IDW) disposal is anticipated and has been accounted for under this subtask. Subcontractors for IDW disposal were chosen on a lowest-cost basis.
Subtask 3: Interim Source Removal Plan Update Following completion of the SPT borings, GHD will update the ISRP in order to incorporate shoring for the deeper excavation area. The shoring will likely include the use of steel sheet piles and either internal or external dewatering. The excavation and backfill volumes will be updated.
GHD and the FDEP confirmed on February 22, 2023, that an Access Agreement with the current real property owner of the aforementioned site has been executed.
This work will be conducted in line with the scope of work included with GHD’s proposal, received February 6, 2023. Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and proposal letter. The final deliverable due date is April 14, 2023, and the completion date for the task assignment is July 14, 2023.
The final cost total for Task Assignment DC014B is $15,396.85.
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 02/22/23
Task #: DC014B SubTask 1 Project Management SubTask 6
Site: Plant City Laundry SubTask 2 Standard Penetration Test Borings SubTask 7
Activity/Phase: Design SubTask 3 Updated ISRP SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$44.81 Project Manager JM 12.90 12.9 $51.08 Sr Professional Engineer JH 24.00 0.00 24.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $56.85 Professional Engineer/Sc JP 22.00 14.00 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $44.81 Project Manager/ Engine JM 16.50 4.50 12.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $35.16 Staff Engineer/Scientist DB 9.50 9.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $28.00 Senior Technician BJ 9.50 9.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $22.71 Driller DD 9.50 9.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $26.12 Driller TM 9.50 9.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $23.16 Administrative Assistant DA 7.00 3.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 120.40 12.90 59.50 48.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $5,019.48 $577.46 $2,130.94 $2,311.08 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 129.80% $6,515.28 $749.54 $2,765.96 $2,999.78 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.80% $1,897.37 $218.28 $805.50 $873.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $13,432.13 $1,545.28 $5,702.40 $6,184.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle Rental $240.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $240.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 Page 1
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 02/22/23
Task #: DC014B SubTask 1 Project Management SubTask 6
Site: Plant City Laundry SubTask 2 Standard Penetration Test Borings SubTask 7
Activity/Phase: Design SubTask 3 Updated ISRP SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $10.00 $10.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $73.00 $73.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $58.50 $58.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $131.50 $131.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $140.00 $140.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $14,053.63 $1,545.28 $6,323.90 $6,184.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,343.22 $154.53 $570.24 $618.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $15,396.85 $1,699.81 $6,894.14 $6,802.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Plant City Laundry SUBTASK 2: Standard Penetration Test Borings
DATE: 02/22/23
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager JM Geotechnical Summary Report 2 Project Manager JM Characterize IDW 1.5 Project Manager JM Site Access 1
4.5
Professional Engineer JP Field work preparation 2 Professional Engineer JP Geotechnical Summary Report 12
Staff Engineer/Scientist DB mob/demob 1.5 Staff Engineer/Scientist DB Log SPT borings 8
9.5
Administrative Assistant DA Geotechnical Report 3
Sr Technician BJ mob/demob 1.5 Sr Technician BJ Complete DRI Test 8
9.5
Driller TM mob/demob 1.5 Driller TM Complete SPT borings 8
9.5
Driller DD mob/demob 1.5 Driller DD Complete SPT borings 8
9.5
TOTAL LABOR 59.5
VEHICLE TYPE RATE UNIT USEAGE
Company Truck $120.00 day 2 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation IDW Disposal $100 drum 1 $100.00
TOTAL $100.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOHs EPA 8260 $73.00 1 $73.00 small coooler (2 day) $52.00 1 $52.00 Ice $6.50 1 $6.50
TOTAL LAB $131.50
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables
Expendables $40.00 day 1 $40.00
Equipment (Analytical Related)
$0.00 $0.00
Equipment (Other)
Drum $100.00 drum 1 $100.00
TOTAL EQUIPMENT $140.00
FINAL --7/24/96
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Plant City Laundry SUBTASK 3: Updated ISRP
DATE: 02/22/23
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr Professional Engineer JH Sheet Pile Design 6 Sr Professional Engineer JH Soil Volume Calculations 6 Sr Professional Engineer JH Dewatering Layout 6 Sr Professional Engineer JH Dewatering Calculations 6
Project Manager JM Source Removal Cost Estimate 4 Project Manager JM Source Removal Sequence and Schedule 4 Project Manager JM Update RAP Checklist 4
Professional Engineer JP Geotechnical Considerations for shoring 4 Professional Engineer JP Infiltration Rates based on DRI 4
Administrative Assistant DA Finalize revised ISRP 4
TOTAL LABOR 48
VEHICLE TYPE RATE UNIT USEAGE
$0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00 $0.00 $0.00 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables
$0.00 $0.00
Equipment (Analytical Related)
$0.00 $0.00
Equipment (Other) $0.00
TOTAL EQUIPMENT $0.00
FINAL --7/24/96
COST PROPOSAL FOR TASK DC014B
<Plant City Laundry / FDEP ERIC_4722>
< Standard Penetration Test Borings and Interim Source Removal Plan >
1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >
GHD previous completed preparation of a draft Interim Source Removal Plan (ISRP) that was submitted to the Department and reviewed. Based on discussions with the Department regarding the draft ISRP, additional investigations were recommended to evaluate and incorporate shoring into the proposed excavation plan. Task DC014B includes completing two
(2) standard penetration test (SPT) borings and revising the ISRP to incorporate shoring.
Subtask 1: Project Management Subtask 1 includes all tasks associated with project management of the SPT borings and ISRP update at the former Plant City Laundry site.
Subtask 2: Standard Penetration Test Borings (2 total) In order to obtain subsurface soil information in support of the design for the proposed shoring, the completion of two (2) standard penetration testing (SPT) borings at the site (see locations on site plan). The SPT borings will be advanced using a drill rig equipped with mud rotary technology to depths of 30 feet bls. The SPT borings will be completed in accordance with ASTM 1586. Following completion of the SPT borings a summary of the SPT results will be prepared. The results of the SPT borings will be incorporated into the ISRP to be used for specifying shoring design (sheet pile and dewatering).
In order to further evaluate infiltration of treated groundwater, GHD recommends the completion of a double ring infiltration (DRI) test. The test will be conducted an constant head within the DRI cylinders. The DRI will conducted at a depth of 2 feet bls. The DRI results will be used to calculate an infiltration rate.
Subtask 3: ISRP Update Following completion of the SPT borings, GHD will update the ISRP in order to incorporate shoring for the deeper excavation area. The shoring will likely include the use of steel sheet piles and either internal or external dewatering. The excavation and backfill volumes will be updated.
Deliverables:
Deliverable Deliverable Due Date
SPT Boring Summary Letter 4/6/23
Updated ISRP 4/14/23
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Brian Moore
GHD
5904 Hampton Oaks Parkway – Suite F
Tampa, FL 33610
May 23, 2022
Re: Transportation and Disposal of Non-Hazardous Soil and Water – Florida
Mr. Moore:
The price for disposal of drums of non-hazardous soil or groundwater located in the State of Florida will be $110.00 per drum, for both transportation and disposal.
This pricing is valid for all regions in the State of Florida except for the Florida Keys.
Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.
This quote is valid for 180 days.
Respectfully, Jonathan Erwin
Erwin Remediation, Inc.
Email: ErwinRemediation@Gmail.com
Office: (850) 292-6511 mailto:Remediation@Gmail.com
6/28/22, 10:23 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 1/2
Quote Number: 19644
QUOTE
QUOTED TO: Brian Moore
QUOTE DATE: 1/1/2022
COMPANY NAME: GHD - 2022 QUOTED BY: Craig Burns
PHONE NUMBER:
Ext.
FAX NUMBER:
PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS
CUSTOMER PO:
CONTACT EMAIL:
SITE ADDRESS: TBD
CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING
COST ESTIMATE FOR
THE SITE/ PROJECT LISTED ABOVE.
DESCRIPTION PRICE QTY. UNIT TOTAL
NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00
NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00
TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$30.00 DRUM $0.00
TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$40.00 DRUM $0.00
TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site
$50.00 DRUM $0.00
Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax
$0.00 . $0.00
HAZ Drums to be quoted case-by-case $0.00 . $0.00
OPTIONAL LINE ITEMS
***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00
TOTAL REQUIRED ITEMS $0.00
TOTAL OPTIONAL ITEMS $0.00
GRAND TOTAL $0.00
NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.
**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns
863.327.6289 - cburns@clarkenv.com
This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.
quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 2/2
Name (print) Title
Signature Date
CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854
WWW.ClarkEnvironmental.com
From: Craig Burns To: Brian Moore Subject: GHD_IDW Drum Rates FL Date: Tuesday, June 28, 2022 10:26:46 AM Attachments: image001.png image002.png image003.png image004.png image005.png GHD Drum Rates FL 2022.pdf
Here you go Brian. I do this for a lot of engineering/consulting firms.
Be aware of the low stop less than 6 drums at $50/flat Be aware of the 10% to the total cost for FSC (implemented April 15).
Pass around the GHD Florida offices
From: Brian Moore <Brian.Moore@ghd.com> Sent: Tuesday, June 28, 2022 10:05 AM To: Craig Burns <cburns@clarkenvironmental.com> Subject: IDW Drums
Craig, Is it possible to provide a generic quote for IDW water disposal.
Assumption is non-haz with necessary analytical Maybe provide a range of locations
South florida or central florida, or both?
Thanks in advance
We have many sites that we generate 1 gw drum of IDW and would like to streamline the vendor coordination
BRIAN MOORE PE
GHD
Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com
The Power of Commitment
Connect
Please consider our environment before printing this email
CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please mailto:cburns@clarkenvironmental.com mailto:Brian.Moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttp-253A-252F-252Fwww.ghd.com-252F-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093857306-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3DorO8Q-252BVqTyo6Ej-252F8ZwSbVyQzLpZtJywYELQonaQNZfo-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3DsMxOUn-szAtJTATQBUgjjDdI6e6b1jo5alN-ez9vKSM%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=K3MyGMhP6XEk1ApT%2FRIPjGR%2BUFJFG9ahCVCi8Z9R1n0%3D&reserved=0 mailto:brian.moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttps-253A-252F-252Fwww.linkedin.com-252Fcompany-252Fghd-252F-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093857306-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3D5HB99sCNyHUdh3ySqo-252BMbX9lHf94JW-252BuI1gRPH6qLGY-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3DBQdX3FW3jjZZNHH7wbXXUS30LUnS3GtU1HJ8G56Snwo%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=%2BQlcPM%2FGtFT%2FrIbbuGi0PnSgurtBD8yqWgV1hvkvk00%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttps-253A-252F-252Fwww.facebook.com-252FGHDGroup-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093867263-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3DKXDgOYLYSf-252BwLLtpvQNMpyPzR3DV5-252FDBogAW3HWif9Y-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3DdHZdva6F1f6cSXNf7WLXU9x5VBxbTV01G78hKDk-cSA%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=142JKLTMfwfz%2FAO%2FXHrz%2FUodXSRzYWWBygfbg7vBIWs%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttps-253A-252F-252Ftwitter.com-252FGHDspeaks-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093877221-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3Duwh4lLmvdNCQkyPoUgiL7r2l9-252BmFgEv2JbZPLM3ptM0-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3D6FLD5pJDe4zG94aUPcPkIB9mx5JTMUxrAOX-fjV9l3o%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=O7BUsLKToxyyPXzZcLcBA1z3Q7%2FKvVsiCNGMGHOzln0%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttps-253A-252F-252Fwww.youtube.com-252Fchannel-252FUCwUGfe6zgaddIXqA7entIwQ-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093877221-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3DVTPo9BdB-252FyUkff7ZLoE6J99Jt9f-252Fvtuta-252Fsm1KEOuNc-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3D9S3nI6ai6gtzPu1y34Kb_OuqwixCpq0TgIkmYlOz0gk%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=YX45%2BiFGXo7axCd4VDmEIFdcmHajQE6n8KvktA7llOs%3D&reserved=0 quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 1/2
Quote Number: 19644
QUOTE
QUOTED TO: Brian Moore
QUOTE DATE: 1/1/2022
COMPANY NAME: GHD - 2022 QUOTED BY: Craig Burns
PHONE NUMBER:
Ext.
FAX NUMBER:
PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS
CUSTOMER PO:
CONTACT EMAIL:
SITE ADDRESS: TBD
CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING
COST ESTIMATE FOR
THE SITE/ PROJECT LISTED ABOVE.
DESCRIPTION PRICE QTY. UNIT TOTAL
NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00
NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00
TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$30.00 DRUM $0.00
TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$40.00 DRUM $0.00
TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site
$50.00 DRUM $0.00
Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax
$0.00 . $0.00
HAZ Drums to be quoted case-by-case $0.00 . $0.00
OPTIONAL LINE ITEMS
***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00
TOTAL REQUIRED ITEMS $0.00
TOTAL OPTIONAL ITEMS $0.00
GRAND TOTAL $0.00
NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.
**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns
863.327.6289 - cburns@clarkenv.com
This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.
quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 2/2
Name (print) Title
Signature Date
CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854
WWW.ClarkEnvironmental.com delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.
Whatever Waste, LLC 3834 Mandarin Woods Dr. No.
Jacksonville, Florida 32223 United States 904.881.1957
Brian Moore PE
GHD
5904 Hampton Road Parkway Suite F Tampa, FL 33610
Estimate Number 062922.1
Notes Dry Cleaner Site Locations: Central and South Florida Regions excluding Florida Keys Required analytical data for non-haz disposal acceptance would be VOCs and includes waste profiling assistance if the IDW-GW drums don't fall under a blanket waste profile DOT shippable drums must be on a hard surface at each accessible location
Terms Non-hazardous IDW drum pickup, transport and disposal pricing is based on per service event No-load drum fee if unable to pickup drums on any site in Central FL is $150; in South FL is $200 Pricing is valid or subject to change on a monthly basis in part due to escalating fuel prices Payment required within 45 days after email receipt of invoice
Indemnification: Each party agrees to indemnify, defend and hold harmless each other for and from any loss
Estimate Date 06/29/2022
Description Rate Qty Line Total
IDW-GW Drum Transport & Disposal - Central FL Sites
(1) Regional Stop Fee $600 - then $150 per 55-gal drum < 10 drums
$150.00 1 $150.00
IDW-GW Drum Transport & Disposal - Central FL Sites
(1) Regional Stop Fee $300 - then $150 per 55-gal drum > 10 drums
$150.00 1 $150.00
IDW-GW Drum Transport & Disposal - South FL Sites
(1) Regional Stop Fee $850 - then $200 per 55-gal drum < 10 drums
$200.00 1 $200.00
IDW-GW Drum Transport & Disposal - South FL Sites
(1) Regional Stop Fee $425 - then $200 per 55-gal drum > 10 drums
$200.00 1 $200.00
Subtotal
Tax
700.00
0.00
Estimate Total (USD) $700.00 or liability arising out of the party's breach of this agreement, scope of work, except for gross negligence, willful misconduct or bad faith.
ID Task Mode
Task Name Duration Start Finish
1 LOE Submittal/Approva 2 wks Mon 2/6/23 Fri 2/17/23
2 Subtask 1: Project Management
35 days Mon 2/20/23
Fri 4/7/23
3 Subtask 2:
Geotechnical Testing
34 days Mon 2/20/23
Thu 4/6/23
4 Field Work Preparatio2 wks Mon 2/20/23Fri 3/3/23
5 SPT Boring 1 day Tue 3/7/23 Tue 3/7/23
6 DRI 1 day Wed 3/8/23 Wed 3/8/23
7 Summary Letter Preperation
4 wks Fri 3/10/23 Thu 4/6/23
8 Subtask 3: Revised ISRP10 days Fri 3/31/23 Thu 4/13/23
9 Sheet Pile Design 1 wk Fri 3/31/23 Thu 4/6/23
10 Cacluations for excavation
1 wk Fri 4/7/23 Thu 4/13/23
11 Fill calculations 1 wk Fri 4/7/23 Thu 4/13/23
12 Update RAP Checklist1 day Fri 4/7/23 Fri 4/7/23
S M T W T F S S M T W T F S S M T W Feb 5, '23 Feb 12, '23 Feb 19, '23
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC014B at the Plant City Laundry site located in Plant City, Hillsborough County
Project: TA_014B Date: Mon 2/6/23
Task Name Duration Start Finish
1 LOE Submittal/Approva 2 wks Mon 2/6/23 Fri 2/17/23
2 Subtask 1: Project Management
35 days Mon 2/20/23
Fri 4/7/23
3 Subtask 2:
Geotechnical Testing
34 days Mon 2/20/23
Thu 4/6/23
4 Field Work Preparatio2 wks Mon 2/20/23Fri 3/3/23
5 SPT Boring 1 day Tue 3/7/23 Tue 3/7/23
6 DRI 1 day Wed 3/8/23 Wed 3/8/23
7 Summary Letter Preperation
4 wks Fri 3/10/23 Thu 4/6/23
8 Subtask 3: Revised ISRP10 days Fri 3/31/23 Thu 4/13/23
9 Sheet Pile Design 1 wk Fri 3/31/23 Thu 4/6/23
10 Cacluations for excavation
1 wk Fri 4/7/23 Thu 4/13/23
11 Fill calculations 1 wk Fri 4/7/23 Thu 4/13/23
12 Update RAP Checklist1 day Fri 4/7/23 Fri 4/7/23
Jenna Martin,John Phillips
Derek Barry,Darry
Brent Jones
T F S S M T W T F S S M T W T F S S Feb 26, '23 Mar 5, '23 Mar 1
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC014B at the Plant City Laundry site located in Plant City, Hillsborough County
Task Name Duration Start Finish
1 LOE Submittal/Approva 2 wks Mon 2/6/23 Fri 2/17/23
2 Subtask 1: Project Management
35 days Mon 2/20/23
Fri 4/7/23
3 Subtask 2:
Geotechnical Testing
34 days Mon 2/20/23
Thu 4/6/23
4 Field Work Preparatio2 wks Mon 2/20/23Fri 3/3/23
5 SPT Boring 1 day Tue 3/7/23 Tue 3/7/23
6 DRI 1 day Wed 3/8/23 Wed 3/8/23
7 Summary Letter Preperation
4 wks Fri 3/10/23 Thu 4/6/23
8 Subtask 3: Revised ISRP10 days Fri 3/31/23 Thu 4/13/23
9 Sheet Pile Design 1 wk Fri 3/31/23 Thu 4/6/23
10 Cacluations for excavation
1 wk Fri 4/7/23 Thu 4/13/23
11 Fill calculations 1 wk Fri 4/7/23 Thu 4/13/23
12 Update RAP Checklist1 day Fri 4/7/23 Fri 4/7/23 yl Dorman,Tim Martini
M T W T F S S M T W T F S S M T W T 12, '23 Mar 19, '23 Mar 26, '23
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC014B at the Plant City Laundry site located in Plant City, Hillsborough County
Task Name Duration Start Finish
1 LOE Submittal/Approva 2 wks Mon 2/6/23 Fri 2/17/23
2 Subtask 1: Project Management
35 days Mon 2/20/23
Fri 4/7/23
3 Subtask 2:
Geotechnical Testing
34 days Mon 2/20/23
Thu 4/6/23
4 Field Work Preparatio2 wks Mon 2/20/23Fri 3/3/23
5 SPT Boring 1 day Tue 3/7/23 Tue 3/7/23
6 DRI 1 day Wed 3/8/23 Wed 3/8/23
7 Summary Letter Preperation
4 wks Fri 3/10/23 Thu 4/6/23
8 Subtask 3: Revised ISRP10 days Fri 3/31/23 Thu 4/13/23
9 Sheet Pile Design 1 wk Fri 3/31/23 Thu 4/6/23
10 Cacluations for excavation
1 wk Fri 4/7/23 Thu 4/13/23
11 Fill calculations 1 wk Fri 4/7/23 Thu 4/13/23
12 Update RAP Checklist1 day Fri 4/7/23 Fri 4/7/23
Jenna Martin,John Phillips,Debra Andrew
Jeremy Hess
Jeremy Hess
Jeremy Hess,J
Jenna Martin
F S S M T W T F S S M T W T F S S M Apr 2, '23 Apr 9, '23 Apr 16, '23
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC014B at the Plant City Laundry site located in Plant City, Hillsborough County