Task Assignment Summary

This is a Task Assignment (TA) document entered into by the State of Florida Department of Environmental Protection (FDEP) and GHD Services, Inc. for operations and maintenance of a soil vapor extraction system at the Dixie Cleaners site located in Jacksonville, Florida (Duval County). The document is identified as TA Number DC033B, pursuant to underlying Contract Number HW684. The FDEP's project manager is Kevin Kane, and GHD's project manager is Brian Moore. The task assignment is effective through July 28, 2024.

The scope of work encompasses twelve months of operations and maintenance activities for the soil vapor extraction system, divided into five subtasks: (1) project management calculated at 13% of direct labor; (2) six months of O&M from March through August 2023 including monthly site visits, operational data collection, and preparation of a Remedial Action Status Report; (3) utility reimbursement for electricity at $600 per month plus $20 monthly handling fees for six months; (4) six months of O&M from September 2023 through February 2024 including monthly site visits, quarterly soil gas sampling, annual groundwater sampling at eight monitor wells, and preparation of a final Remedial Action Status Report; and (5) utilities for an additional six months at the same rates. The total TA value is $28,444.70, comprised of a fixed unit rate of $21,244.70 and cost reimbursement of $7,200.00. Invoicing is structured in five phases tied to completion milestones, with deliverables including Remedial Action Status Reports due August 31, 2023 and March 13, 2024, and utility documentation due September 29, 2023 and March 29, 2024. The cost estimate details labor at multiple classification levels, travel expenses, laboratory analytical costs for volatile organic compound testing, field equipment, and subcontractor costs for utilities and industrial waste disposal.

View the file

Other files

File Type Posted
CN-370000-HW684-BIL02B.pdf PDF
CN-370000-HW684-BIL02D.pdf PDF
CN-370000-HW684-BIL02G.pdf PDF
CN-370000-HW684-CSS01A.pdf PDF
CN-370000-HW684-CSS1ACO1.pdf PDF
CN-370000-HW684-CSS3BCO1.pdf PDF
CN-370000-HW684-DC001D.pdf PDF
CN-370000-HW684-DC003B.pdf PDF
CN-370000-HW684-DC004A.pdf PDF
CN-370000-HW684-DC004E.pdf PDF
CN-370000-HW684-DC005B.pdf PDF
CN-370000-HW684-DC005E.pdf PDF
CN-370000-HW684-DC006C.pdf PDF
CN-370000-HW684-DC007C.pdf PDF
CN-370000-HW684-DC008A.pdf PDF
CN-370000-HW684-DC008D.pdf PDF
CN-370000-HW684-DC010D.pdf PDF
CN-370000-HW684-DC011D.pdf PDF
CN-370000-HW684-DC012E.pdf PDF
CN-370000-HW684-DC013A.pdf PDF
CN-370000-HW684-DC014A.pdf PDF
CN-370000-HW684-DC017B.pdf PDF
CN-370000-HW684-DC018D.pdf PDF
CN-370000-HW684-DC019A.pdf PDF
CN-370000-HW684-DC019B.pdf PDF
CN-370000-HW684-DC01ACO1.pdf PDF
CN-370000-HW684-DC01ACO5.pdf PDF
CN-370000-HW684-DC01ACO6.pdf PDF
CN-370000-HW684-DC021D.pdf PDF
CN-370000-HW684-DC022B.pdf PDF
CN-370000-HW684-DC023A.pdf PDF
CN-370000-HW684-DC025B.pdf PDF
CN-370000-HW684-DC025C.pdf PDF
CN-370000-HW684-DC027A.pdf PDF
CN-370000-HW684-DC028B.pdf PDF
CN-370000-HW684-DC031B.pdf PDF
CN-370000-HW684-DC031C.pdf PDF
CN-370000-HW684-DC032A.pdf PDF
CN-370000-HW684-DC035B.pdf PDF
CN-370000-HW684-DC035C.pdf PDF
CN-370000-HW684-DC039A.pdf PDF
CN-370000-HW684-DC03ACO2.pdf PDF
CN-370000-HW684-DC040B.pdf PDF
CN-370000-HW684-DC040C.pdf PDF
CN-370000-HW684-DC041A.pdf PDF
CN-370000-HW684-DC043A.pdf PDF
CN-370000-HW684-DC044A.pdf PDF
CN-370000-HW684-DC045C.pdf PDF
CN-370000-HW684-DC04A.pdf PDF
CN-370000-HW684-DC053A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW684

DC033B Completion July 28, 2024

GHD Services, Inc. will conduct twelve months of operations & maintenance of the soil vapor extraction system staged at the Dixie Cleaners site located in Jacksonville, FL. All work will be conducted in accordance with the scope of work and cost proposal submitted on February 17, 2023.

The payment of utility invoices associated with O&M activities under this Task Assignment is the only portion of this Task Assignment which is Cost Reimbursement.

Kevin Kane 850-245-8971 Contractor GHD Services, Inc. Contractor

Contractor Brian Moore Contractor 813-257-0658

ERIC_4590

5711 Bowden Rd, Jacksonville, Duval County

Dixie Cleaners

Contractor Contractor

✔ $ 21,244.70 ✔ $ 7,200.00

$ 28,444.70

Scope of Work

GHD Services, Inc.

Contractor Brian Moore

Project Manager

Brian Moore Digitally signed by Brian Moore Date: 2023.02.20 15:43:35 -05'00'

Kelly Crain

Kelly Crain Digitally signed by Kelly Crain Date: 2023.02.20 15:14:00 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Remedial Action Status Report (Semi-Annual) 08/31/2023

Paid Utility Invoices 09/29/2023

Remedial Action Status Report (Annual) + Project Management 03/13/2024

Paid Utility Invoices 03/29/2024

Subtask 2: Upon completion of 6 months O&M activities and FDEP approval of Remedial Action Status Report $ 7,429.04

Subtask 3: Upon FDEP approval of Paid Utility Invoices:

Utilities (Cost Plus Fixed Fee) not to exceed $3,600.00 Utilities Handling Fee: $120.00

$ 3,720.00

Subtasks 1 & 4: Upon completion of 6 months O&M activities and FDEP approval of Remedial Action Status Report + Project Management $ 13,575.66

Subtask 5: Upon FDEP approval of Paid Utility Invoices:

Utilities (Cost Plus Fixed Fee) not to exceed $3,600.00 Utilities Handling Fee: $120.00

$ 3,720.00

$ 28,444.70

HW684

DC033B

FFLLORIDAA DDEEPARTMENTT OOFF

EEnvironmentall Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ronn DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawnn Hamilton Secretary

TO: HW684 Contract File Dixie Cleaners Jacksonville, Duval County

ERIC_4590

FROM: Kevin Kane, Contract Manager

DATE: February 20, 2023

SUBJECT: Task Assignment Summary

HW684 DC033B

Operations & Maintenance

GHD Services, Inc. (GHD) will conduct twelve months of operations & maintenance (O&M) of the soil vapor extraction (SVE) system staged at the subject site. Specific subtasks are detailed below:

Subtask 1: Project Management Project Management is calculated at 13% of the direct labor.

Subtasks 2: Six Months O&M GHD personnel will conduct six months of O&M activities from March 2023 through August 2023. Monthly site visits will be conducted to verify system operation and record operational data including vacuum, flows, and water levels. In addition, during monthly site visits, operation flow patterns in the subsurface will be adjusted to maximize mass recovery. OVA readings and vapor influent sampling will be conducted quarterly.

Groundwater depth to water measurements will also be gathered at monitor wells MW002, MW008, and MW016 on a monthly basis. At the end of 6 months of operations and upon receipt of soil gas data, GHD will prepare a Remedial Action Status Report (RASR). The RASR will include a summary of system operational details including run time and any troubleshooting. The RASR will also include an evaluation of system operating parameters and soil gas analytical data. Finally, the RASR will include recommendations for additional operations.

Subtask 3: Utilities Estimated utility costs for six months of SVE system operation are $3,600.00 for electricity. Costs for utility bill handling are $120.00 ($20.00 per month).

Subtask 4: Six Months O&M Subtask 4 includes O&M activities from September 2023 through February 2024. During subtask 4, monthly site visits will be conducted to verify system operation and record operational data including vacuum, flows, and water levels. In addition, during monthly site visits, operation flow patterns in the subsurface will be adjusted to maximize mass recovery. OVA readings and vapor influent sampling will be conducted quarterly.

Groundwater depth to water measurements will also be gathered at monitor wells MW001 and MW006 on a monthly basis. In October 2023, GHD will conduct annual groundwater sampling in accordance with the approved ISRP. Prior to sampling, depth to water measurements will be gathered from all available wells (16 total). Groundwater sampling will be conducted at monitor wells MW001, MW002, MW004, MW005, MW008, MW010, MW011, and MW016 in accordance with FDEP SOPs. Groundwater samples will be analyzed for the presence of volatile organic halocarbons by EPA Method 8260.

At the end of 12 months of operations GHD will prepare a RASR. The RASR will include a summary of operational data and groundwater sampling and results. The RASR will include a discussion of operational performance and recommendations for additional monitoring/remediation.

Subtask 5: Utilities Estimated utility costs for six months of SVE system operation are $3,600.00 for electricity. Costs for utility bill handling are $120.00 ($20.00 per month).

GHD and the FDEP confirmed on February 20, 2023, that an Access Agreement with the current real property owner of the aforementioned site has been executed.

Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and the GHD proposal. The final deliverable due date is March 29, 2024, and the completion date for the task assignment is July 28, 2024.

The final cost total for Task Assignment DC033B is $28,444.70.

FD

EP

C O

ST

E

ST

IM

A

TE

C on tra ct or

G H

D S er vi ce s

In c.

D at e:

/2

0/

Ta sk

D C

3B

S ub

Ta sk

P ro je ct M an ag em en t S ub Ta sk

S ite

D ix ie

C le an er s S ub Ta sk

O

M S ub Ta sk

A ct iv ity

/P ha se

O

M S ub Ta sk

U til iti es

S ub

Ta sk

P ro je ct

M an ag er

B ria n

M oo re , P

E S ub Ta sk

O

M S ub Ta sk

S ub

Ta sk

U til iti es S ub Ta sk

T T ot al s

La bo r R at e

C at eg or y $4

4.

PP

ro je ct

M an ag er

JM

.2

.2 $5

1.

S r P ro fe ss io na l E ng in ee r

JH

.0

.0

0.

.0

0.

0.

0.

0.

0.

0.

$4 4.

P ro je ct M an ag er / E ng in e

JM

2.

1.

0.

1.

0.

0.

0.

0.

0.

0.

$2 0.

S en io r T ec hn ic ia n

S A

.5

0.

0.

.5

0.

0.

0.

0.

0.

0.

$2 0.

S en io r T ec hn ic ia n

S C

.5

.0

0.

.5

0.

0.

0.

0.

0.

0.

$2

9.

D ra fti ng

T ec hn ic ia n

P M

2.

1.

0.

1.

0.

0.

0.

0.

0.

0.

$2 3.

Ad m in is tra tiv e

As si st an t D

A

.7

6.

0.

9.

0.

0.

0.

0.

0.

0.

T ot al H ou rs

9.

.2

.5

0.

.2

0.

0.

0.

0.

0.

0.

D ire ct L ab or

$5

,1

.2

$5

.7

$1 ,9

.2

$0

.0

$2 ,6

.2

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

O ve rh ea d

9.

$6

,6

.5

$7

.8

$2 ,4

.8

$0

.0

$3 ,4

.8

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

G en

A dm in 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fr in ge

.8

0% $1

,9

.1

$2

.3

$7

.3

$0 .0

$9

.4

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

L ab or

$1 3, 1.

$1

,5

.9

$5 ,1

.4

$0

.0

$7 ,0

.5

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ra ve l

V eh ic le

R en ta l

$9

.0

$1

.0

$0 .0

$8

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ile ag e C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

A ir

Fa re

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P er d ie m

H ot el $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $9

.0

$1

.0

$0

.0

$8

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (E qu ip m en t P ro cu re m en

t) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P ro cu re m en t F ee $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

RE

V:

2/

Pa ge

FD

EP

C O

ST

E

ST

IM

A

TE

C on tra ct or

G H

D S er vi ce s

In c.

D at e:

0/

Ta sk

D C

3B

S ub

Ta sk

P ro je ct M an ag em en t S ub Ta sk

S ite

D ix ie

C le an er s S ub Ta sk

O

M S ub Ta sk

A ct iv ity

/P ha se

O

M S ub Ta sk

U til iti es

S ub

Ta sk

P ro je ct

M an ag er

B ria n

M oo re , P

E S ub Ta sk

O

M S ub Ta sk

S ub

Ta sk

U til iti es S ub Ta sk

T T ot al s

S ub co nt ra ct or (S er vi ce s

P ro cu re m en

t) D ril lin g (C on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

D ril lin g

(N on

-c on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ob ile

L ab or at or y

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ur ve yi ng $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

ID

W $1

.0

$0

.0

$0 .0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

U til iti es $7

,2

.0

$0 .0

$3

,6

.0

$0 .0

$3

,6

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

S ub to ta l $7

,3

.0

$0 .0

$3

,6

.0

$1

.0

$3 ,6

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

H an dl in g Fe e $2

.0

$0

.0

$1

.0

$1 1.

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T ot al S ub co nt ra ct or

C os t $7

,5

.0

$0 .0

$3

,7

.0

$1

.0

$3 ,7

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

La bo ra to ry A na ly tic al

C os ts $1

,3

.0

$4

.0

$0 .0

$9

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fa st T ur na ro un d C ha rg es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S am pl e S hi pp in g

$4

.5

$2

.0

$0 .0

$2

.5

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

L ab or at or y

$1 ,8

.5

$6

.0

$0

.0

$1 ,2

.5

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fi el d

E xp en se s P er so na l P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E xp en da bl es $5

.0

$2

.0

$0

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

D ril lin g re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

A na ly tic al re la te

d) $2

,3

.2

$8

.0

$0 .0

$1

,4

.2

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

ID

W re la te d)

$1

.0

$0 .0

$0

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

O th er

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T ot al F ie ld

E xp en se s $2

,9

.2

$1 ,0

.0

$0

.0

$1 ,8

.2

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub to ta l $2

7, 0.

$1 ,5

.9

$6

,9

.4

$3 ,7

.0

$1

1, 1.

$3 ,7

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

C om pl et io n

Fe e

$1 ,3

.1

$1

.0

$5

.6

$0

.0

$7

.4

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T ot al E st im at ed

C os t $2

8, 4.

$1 ,7

.0

$7

,4

.0

$3 ,7

.0

$1

1, 6.

$3 ,7

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

RE

V:

2/

Pa ge

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Dixie Cleaners

SUBTASK 2: O&M

DATE: 02/20/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager JM Conclusions/Recommendations (RASR) 1

Sr. Professional Engineer JH Field Work Preparation (0.5 hr/month) 3 Sr. Professional Engineer JH Calculate flow rates and system optimization (1 hr/month) 6 Sr. Professional Engineer JH Prepare RASR - Background information and regulatory status 4 Sr. Professional Engineer JH O&M site visits and operational status (RASR) 2 Sr. Professional Engineer JH Operational dtails vac/flow vs. design (RASR) 2 Sr. Professional Engineer JH Soil Vapor Analytical Data Summary (RASR) 2 Sr. Professional Engineer JH Conclusions/Recommendations (RASR) 2

Senior Technician SC mob/demob (6 days) 6 Senior Technician SC Monthly O&M (6 months) 24

Drafting Technician PM SVE as-built figures 1

Administrative Assistant DA Data Entry (velocity/vacuum/influent/effluent) - 0.5 hr per month 3 Administrative Assistant DA Summary Tables for O&M 1.5 Administrative Assistant DA Publishing RASR 2

6.5

TOTAL LABOR 59.5

VEHICLE TYPE RATE UNIT USEAGE

Company Truck $120.00 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Volatiles TO-15 (Inf/Eff) $200.00 2 $400.00 small cooler overnight sample shipping $110.00 2 $220.00

TOTAL LAB $620.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

Expendables $40.00 day 6 $240.00

Equipment (Analytical Related) air sampling pump $27.00 day 2 $54.00 vacuum gauges $19.00 day 6 $114.00 summa canister $33.00 each 2 $66.00 anemometer $33.00 day 6 $198.00 Water Level $25.00 day 6 $150.00

OVA $125.00 day 2 $250.00

Equipment (Other) $0.00

TOTAL EQUIPMENT $1,072.00

FINAL --7/24/96

SUBTASK 3: Utilities

DATE: 02/20/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

TOTAL LABOR

VEHICLE TYPE RATE UNIT USEAGE

$0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

JEA Utilities $600 month 6 $3,600.00 handling fee $20 month 6 $120.00

TOTAL $3,720.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

$0.00 $0.00

Equipment (Analytical Related)

$0.00 $0.00

Equipment (Other) $0.00

TOTAL EQUIPMENT $0.00

SUBTASK 4: O&M

DATE: 02/20/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager JM Conclusions/Recommendations (RASR) 1

Sr. Professional Engineer JH Field work preparation - monthly O&M (0.5 hr/month) 3 Sr. Professional Engineer JH Field work preparation - GW sampliing 1 Sr. Professional Engineer JH Calculate flow rates and system optimization (1 hr/month) 6 Sr. Professional Engineer JH Prepare RASR - Background information and regulatory status 4 Sr. Professional Engineer JH Groundwater Sampling Methodology (RASR) 1 Sr. Professional Engineer JH Groundwater Flow Evaluation (RASR) 1 Sr. Professional Engineer JH Groundwater Analytical Data Summary (RASR) 1 Sr. Professional Engineer JH O&M site visits and operational status (RASR) 2 Sr. Professional Engineer JH Operational dtails vac/flow vs. design (RASR) 2 Sr. Professional Engineer JH Soil Vapor Analytical Data Summary (RASR) 2 Sr. Professional Engineer JH IDW Characterization 1 Sr. Professional Engineer JH Conclusions/Recommendations (RASR) 2

Senior Technician SC mob/demob (6 days) 6 Senior Technician SC depth to water measurements (16 wells) 2 Senior Technician SC Groundwater Sampling (5 wells) 7.5 Senior Technician SC Monthly O&M (6 months) 24

39.5

Senior Technician SA mob/demob (from Tampa) 6 Senior Technician SA Groundwater Sampling (3 wells) 4.5

10.5

Drafting Technician PM SVE as-built figures 1

Administrative Assistant DA Data Entry (velocity/vacuum/influent/effluent) - 0.5 hr per month 3 Administrative Assistant DA Data Entry (dtw measurements and gw (8 wells)) 1.25 Administrative Assistant DA Summary Tables for O&M 1.5 Administrative Assistant DA Summary Tables (elev, gw parameters, gw analytical) 1.5 Administrative Assistant DA Publishing RASR 2

9.25

TOTAL LABOR 87.25

VEHICLE TYPE RATE UNIT USEAGE

Company Truck $120.00 day 7 $840.00

TOTAL VEHICLE $840.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediaiton IDW Disposal $110 drum 1 $110.00

TOTAL $110.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Volatiles TO-15 (Inf/Eff) $200.00 2 $400.00 VOHs EPA 8260 $73.00 8 $584.00 small cooler overnight sample shipping $110.00 2 $220.00 small cooler two day sample shipping $52.00 1 $52.00

Ice $6.50 1 $6.50

TOTAL LAB $1,262.50

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

Expendables $40.00 day 7 $280.00

Equipment (Analytical Related)

Groundwater Sampling Kit $290.00 day 2 $580.00 Poly Tubing $0.30 ft 124 $37.20 Silicon Tubing $3.00 ft 8 $24.00 air sampling pump $27.00 day 2 $54.00 vacuum gauges $19.00 day 6 $114.00 summa canister $33.00 each 2 $66.00

Water Level $25.00 day 6 $150.00 anemometer $33.00 day 6 $198.00

OVA $125.00 day 2 $250.00

Equipment (IDW Related) Drum $100.00 drum 1 $100.00

TOTAL EQUIPMENT $1,853.20

SUBTASK 5: Utilities

DATE: 02/20/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

TOTAL LABOR

VEHICLE TYPE RATE UNIT USEAGE

$0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

JEA Utilities $600 month 6 $3,600.00 handling fee $20 month 6 $120.00

TOTAL $3,720.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

$0.00 $0.00

Equipment (Analytical Related)

$0.00 $0.00

Equipment (Other) $0.00

TOTAL EQUIPMENT $0.00

COST PROPOSAL FOR TASK DC033B

<Dixie Cleaners, ERIC_4590>

< SVE Startup >

1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >

GHD Services Inc. (GHD) prepared an Interim Source Removal Plan (ISRP) that was recently approved by the FDEP and the system was installed. The system was activated in early October 2022. Task DC033B includes labor and expenses for twelve (12) months of O&M of the SVE system in accordance with the approved ISRP.

Subtask 1: Project Management Subtask 1 includes all activities associated with management of the SVE O&M.

Subtask 2 O&M (6 months) As part of subtask 2, monthly site visits will be conducted to verify system operation and record operational data including vacuum, flows, and water levels. In addition, during monthly site visits, operation flow patterns in the subsurface will be adjusted to maximize mass recovery. OVA readings and vapor influent sampling will be conducted quarterly.

Groundwater depth to water measurements will also be gathered at monitor wells MW002, MW008, and MW016 on a monthly basis.

At the end of 6 months of operations and upon receipt of soil gas data, GHD will prepare a Remedial Action Status Report (RASR). The RASR will include a summary of system operational details including run time and any troubleshooting. The RASR will also include an evaluation of system operating parameters and soil gas analytical data. Finally, the RASR will include recommendations for additional operations.

Subtask 3: Utilities (6 months) March 2023 through August 2023 Subtask 3 includes utility reimbursement charges ($600/month) for electrical service for 6 months.

Subtask 4 O&M (6 months) As part of subtask 4, monthly site visits will be conducted to verify system operation and record operational data including vacuum, flows, and water levels. In addition, during monthly site visits, operation flow patterns in the subsurface will be adjusted to maximize mass recovery. OVA readings and vapor influent sampling will be conducted quarterly.

Groundwater depth to water measurements will also be gathered at monitor wells MW001 and MW006 on a monthly basis.

In October 2023, GHD will conduct annual groundwater sampling in accordance with the approved ISRP. Prior to sampling, depth to water measurements will be gathered from all available wells (16 total). Groundwater sampling will be conducted at monitor wells MW001, MW002, MW004, MW005, MW008, MW010, MW011, and MW016 in accordance with FDEP SOPs. Groundwater samples will be analyzed for the presence of volatile organic halocarbons by EPA Method 8260.

At the end of 12 months of operations GHD will prepare a RASR. The RASR will include a summary of operational data and groundwater sampling and results. The RASR will include a discussion of operational performance and recommendations for additional monitoring/remediation.

Subtask 5: Utilities (6 months) September 2023 through February 2024 Subtask 3 includes utility reimbursement charges ($600/month) for electrical service for 6 months.

UTILITIES INCLUDED IN SCOPE OF WORK: Yes No List (Electric, Phone, Sewer): _Electric, Phone, sewer___________________________ Number of months: _12_________ Estimated per month cost: $____$600_________ Handling fee: $____20__________ Hook up fees: $______________

REPORTING INCLUDED IN SCOPE OF WORK: Yes No Indicate number of each (i.e. Startup-1, Quarterly-2, Annual-1) Baseline/Startup: ________ Quarterly: ____________ Monthly: ___________ Semi-Annually: RASR Annual: _____RASR_______ Completion Report: ________________

Deliverables:

Deliverable Deliverable Due Date

Remedial Action Status Report 8/31/23

6 Month of utilities ($600 per month and $20 handling fee) 9/29/23

Remedial Action Status Report 3/13/24

6 Month of utilities ($600 per month and $20 handling fee) 3/29/24

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562 (850) 292-6511

To: Mr. Brian Moore

GHD

5904 Hampton Oaks Parkway – Suite F Tampa, FL 33610

May 23, 2022

Re: Transportation and Disposal of Non-Hazardous Soil and Water – Florida

Mr. Moore:

The price for disposal of drums of non-hazardous soil or groundwater located in the State of Florida will be $110.00 per drum, for both transportation and disposal.

This pricing is valid for all regions in the State of Florida except for the Florida Keys.

Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.

This quote is valid for 180 days.

Respectfully, Jonathan Erwin Erwin Remediation, Inc.

Email: ErwinRemediation@Gmail.com Office: (850) 292-6511

6/28/22, 10:23 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 1/2

Quote Number: 19644

QUOTE

QUOTED TO: Brian Moore QUOTE DATE: 1/1/2022

COMPANY NAME: GHD - 2022 QUOTED BY: Craig Burns

PHONE NUMBER: Ext.

FAX NUMBER:

PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS

CUSTOMER PO:

CONTACT EMAIL:

SITE ADDRESS: TBD

CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING

COST ESTIMATE FOR THE SITE/ PROJECT LISTED ABOVE.

DESCRIPTION PRICE QTY. UNIT TOTAL

NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00

NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00

TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$30.00 DRUM $0.00

TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$40.00 DRUM $0.00

TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site

$50.00 DRUM $0.00

Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax

$0.00 . $0.00

HAZ Drums to be quoted case-by-case $0.00 . $0.00

OPTIONAL LINE ITEMS

***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00

TOTAL REQUIRED ITEMS $0.00

TOTAL OPTIONAL ITEMS $0.00

GRAND TOTAL $0.00

NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups. **Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns

863.327.6289 - cburns@clarkenv.com

This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.

6/28/22, 10:23 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 2/2

Name (print) Title

Signature Date

CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854

WWW.ClarkEnvironmental.com

From: Craig Burns To: Brian Moore Subject: GHD_IDW Drum Rates FL Date: Tuesday, June 28, 2022 10:26:46 AM Attachments: image001.png image002.png image003.png image004.png image005.png GHD Drum Rates FL 2022.pdf

Here you go Brian. I do this for a lot of engineering/consulting firms.

Be aware of the low stop less than 6 drums at $50/flat Be aware of the 10% to the total cost for FSC (implemented April 15).

Pass around the GHD Florida offices

From: Brian Moore <Brian.Moore@ghd.com> Sent: Tuesday, June 28, 2022 10:05 AM To: Craig Burns <cburns@clarkenvironmental.com> Subject: IDW Drums

Craig, Is it possible to provide a generic quote for IDW water disposal.

Assumption is non-haz with necessary analytical Maybe provide a range of locations

South florida or central florida, or both?

Thanks in advance

We have many sites that we generate 1 gw drum of IDW and would like to streamline the vendor coordination

BRIAN MOORE PE

GHD

Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com

The Power of Commitment Connect

Please consider our environment before printing this email

CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.

Whatever Waste, LLC 3834 Mandarin Woods Dr. No.

Jacksonville, Florida 32223 United States 904.881.1957

Brian Moore PE

GHD

5904 Hampton Road Parkway Suite F Tampa, FL 33610

Estimate Number 062922.1

Notes Dry Cleaner Site Locations: Central and South Florida Regions excluding Florida Keys Required analytical data for non-haz disposal acceptance would be VOCs and includes waste profiling assistance if the IDW-GW drums don't fall under a blanket waste profile DOT shippable drums must be on a hard surface at each accessible location

Terms Non-hazardous IDW drum pickup, transport and disposal pricing is based on per service event No-load drum fee if unable to pickup drums on any site in Central FL is $150; in South FL is $200 Pricing is valid or subject to change on a monthly basis in part due to escalating fuel prices Payment required within 45 days after email receipt of invoice

Indemnification: Each party agrees to indemnify, defend and hold harmless each other for and from any loss

Estimate Date 06/29/2022

Description Rate Qty Line Total

IDW-GW Drum Transport & Disposal - Central FL Sites

(1) Regional Stop Fee $600 - then $150 per 55-gal drum < 10 drums

$150.00 1 $150.00

IDW-GW Drum Transport & Disposal - Central FL Sites

(1) Regional Stop Fee $300 - then $150 per 55-gal drum > 10 drums

$150.00 1 $150.00

IDW-GW Drum Transport & Disposal - South FL Sites

(1) Regional Stop Fee $850 - then $200 per 55-gal drum < 10 drums

$200.00 1 $200.00

IDW-GW Drum Transport & Disposal - South FL Sites

(1) Regional Stop Fee $425 - then $200 per 55-gal drum > 10 drums

$200.00 1 $200.00

Subtotal

Tax

700.00

0.00

Estimate Total (USD) $700.00 or liability arising out of the party's breach of this agreement, scope of work, except for gross negligence, willful misconduct or bad faith.

ID

M od e Ta sk N am e

Du ra tio n

St ar t Fi ni sh

LO

E Su bm itt al /A pp ro va l

.6 w ks

W ed

/9 /2

Fr i2 /2 4/

Su bt as k 1:

Pr oj ec t

M an ag em en t da ys

M on

2/

/2

Tu e 2/

/2

Su bt as k 2:

O M da ys M on

2/

/2

Th u 8/

/2

Fi el d w or k pr ep ar at io n w k

M on

2/

/2

Fr i3 /3 /2

M on th ly O M da y

Tu e 2/ /2

Tu e 2/

/2

M on th ly O M

(s oi lg as sa m pl in g) da y

M on

3/

/2

M on

3/

/2

M on th ly O M da y

Th u 4/

/2

Th u 4/

/2

M on th ly O M da y

Fr i5 /2 6/

Fr i5 /2 6/

M on th ly O M

(s oi lg as sa m pl in g) da y

Tu e 6/ /2

Tu e 6/

/2

M on th ly O M da y

Th u 7/

/2

Th u 7/

/2

Re m ed ia lA ct io n St at us

Re po rt w ks

Fr i8 /4 /2

Th u 8/

/2

Su bt as k 3:

Ut ili tie s 6.

m on s W ed

3/ 1/

W ed

8/

/2

Su bt as k 4:

O M da ys M on

8/

/2

W ed

3/

/2

Fi el d w or k pr ep ar at io n w ks

M on

8/

/2

Fr i8 /2 5/

M on th ly O M da y

M on

8/

/2

M on

8/

/2

M on th ly O M

(s oi lg as sa m pl in g) da y

Tu e 9/ /2

Tu e 9/

/2

M on th ly O M da y

Th u

/2 6/

Th u /2 6/

M on th ly O M da y

Fr i1 1/

/2

Fr i1 1/

/2

M on th ly O M

(s oi lg as sa m pl in g) da y

Fr i1 2/

/2

Fr i1 2/

/2

Gr ou nd w at er

Sa m pl in g da y

W ed

/4 /2

W ed

/4 /2

M on th ly O M da y

Tu e 1/ /2

Tu e 1/

/2

Re m ed ia lA ct io n St at us

Re po rt w ks

Th u 2/ 1/

W ed

3/

/2

Su bt as k 5:

Ut ili tie s 6.

m on s Fr i9 /1 /2

M on

3/ 4/

/3

/6

/1

/2

/2

/4

/1

/1

/2

1/

1/

1/

1/

1/

2/

2/

N ov em be r

De ce m be r Ja nu ar y Fe br ua ry

Ta sk

Sp lit

M ile st on e

Su m m ar y

Pr oj ec t S um m ar y

In ac tiv e

Ta sk

In ac tiv e

M ile st on e

In ac tiv e

Su m m ar y

M an ua l T as k

Du ra tio n-on ly

M an ua l S um m ar y

Ro llu p

M an ua l S um m ar y

St ar t-on ly

Fi ni sh -o nl y

Ex te rn al

T as ks

Ex te rn al

M ile st on e

De ad lin e

Pr og re ss

M an ua l P ro gr es s

Sc he du le fo r t he Im pl em en ta tio n of T as k

DC

3B a t t he

D ixi e Cl ea ne rs si te lo ca te d in

Ja ck so nv ill e, D uv al C ou nt y

Pa ge

Pr oj ec t:

TA

_0

B

Da te

: F ri

2/ e Ta sk N am e

Du ra tio n

St ar t Fi ni sh

LO

E Su bm itt al /A pp ro va l

.6 w ks

W ed

/9 /2

Fr i2 /2 4/

Su bt as k 1:

Pr oj ec t

M an ag em en t da ys

M on

2/

/2

Tu e 2/

/2

Su bt as k 2:

O M da ys M on

2/

/2

Th u 8/

/2

Fi el d w or k pr ep ar at io n w k

M on

2/

/2

Fr i3 /3 /2

M on th ly O M da y

Tu e 2/

/2

Tu e 2/

/2

M on th ly O M

(s oi lg as sa m pl in g) da y

M on

3/

/2

M on

3/

/2

M on th ly O M da y

Th u 4/

/2

Th u 4/

/2

M on th ly O M da y

Fr i5 /2 6/

Fr i5 /2 6/

M on th ly O M

(s oi lg as sa m pl in g) da y

Tu e 6/

/2

Tu e 6/

/2

M on th ly O M da y

Th u 7/

/2

Th u 7/

/2

Re m ed ia lA ct io n St at us

Re po rt w ks

Fr i8 /4 /2

Th u 8/

/2

Su bt as k 3:

Ut ili tie s 6.

m on s W ed

3/ 1/

W ed

8/ /2

Su bt as k 4:

O M da ys M on

8/

/2

W ed

3/

/2

Fi el d w or k pr ep ar at io n w ks

M on

8/

/2

Fr i8 /2 5/

M on th ly O M da y

M on

8/

/2

M on

8/

/2

M on th ly O M

(s oi lg as sa m pl in g) da y

Tu e 9/

/2

Tu e 9/

/2

M on th ly O M da y

Th u

/2 6/

Th u /2 6/

M on th ly O M da y

Fr i1 1/

/2

Fr i1 1/ /2

M on th ly O M

(s oi lg as sa m pl in g) da y

Fr i1 2/

/2

Fr i1 2/ /2

Gr ou nd w at er

Sa m pl in g da y

W ed

/4 /2

W ed

/4 /2

M on th ly O M da y

Tu e 1/

/2

Tu e 1/

/2

Re m ed ia lA ct io n St at us

Re po rt w ks

Th u 2/ 1/

W ed

3/ /2

Su bt as k 5:

Ut ili tie s 6.

m on s Fr i9 /1 /2

M on

3/ 4/

St ev en C us te r St ev en

C us te r

St ev en C us te r St e

2/

2/

2/

3/

3/

3/

3/

4/

4/

4/

4/

4/

5/

5/

5/

5/

M ar ch Ap ril M ay

Ta sk

Sp lit

M ile st on e

Su m m ar y

Pr oj ec t S um m ar y

In ac tiv e

Ta sk

In ac tiv e

M ile st on e

In ac tiv e

Su m m ar y

M an ua l T as k

Du ra tio n-on ly

M an ua l S um m ar y

Ro llu p

M an ua l S um m ar y

St ar t-on ly

Fi ni sh -o nl y

Ex te rn al

T as ks

Ex te rn al

M ile st on e

De ad lin e

Pr og re ss

M an ua l P ro gr es s

Sc he du le fo r t he Im pl em en ta tio n of T as k

DC

3B a t t he

D ixi e Cl ea ne rs si te lo ca te d in

Ja ck so nv ill e, D uv al C ou nt y

Pa ge

Pr oj ec t:

TA

_0

B

Da te

: F ri

2/ e Ta sk N am e

Du ra tio n

St ar t Fi ni sh

LO

E Su bm itt al /A pp ro va l

.6 w ks

W ed

/9 /2

Fr i2 /2 4/

Su bt as k 1:

Pr oj ec t

M an ag em en t da ys

M on

2/

/2

Tu e 2/

/2

Su bt as k 2:

O M da ys M on

2/

/2

Th u 8/

/2

Fi el d w or k pr ep ar at io n w k

M on

2/

/2

Fr i3 /3 /2

M on th ly O M da y

Tu e 2/

/2

Tu e 2/

/2

M on th ly O M

(s oi lg as sa m pl in g) da y

M on

3/

/2

M on

3/

/2

M on th ly O M da y

Th u 4/

/2

Th u 4/ /2

M on th ly O M da y

Fr i5 /2 6/

Fr i5 /2 6/

M on th ly O M

(s oi lg as sa m pl in g) da y

Tu e 6/

/2

Tu e 6/

/2

M on th ly O M da y

Th u 7/

/2

Th u 7/ /2

Re m ed ia lA ct io n St at us

Re po rt w ks

Fr i8 /4 /2

Th u 8/ /2

Su bt as k 3:

Ut ili tie s 6.

m on s W ed

3/ 1/

W ed

8/

/2

Su bt as k 4:

O M da ys M on

8/

/2

W ed

3/ /2

Fi el d w or k pr ep ar at io n w ks

M on

8/

/2

Fr i8 /2 5/

M on th ly O M da y

M on

8/

/2

M on

8/

/2

M on th ly O M

(s oi lg as sa m pl in g) da y

Tu e 9/

/2

Tu e 9/

/2

M on th ly O M da y

Th u /2 6/

Th u

/2 6/

M on th ly O M da y

Fr i1 1/ /2

Fr i1 1/

/2

M on th ly O M

(s oi lg as sa m pl in g) da y

Fr i1 2/ /2

Fr i1 2/

/2

Gr ou nd w at er

Sa m pl in g da y

W ed

/4 /2

W ed

/4 /2

M on th ly O M da y

Tu e 1/

/2

Tu e 1/

/2

Re m ed ia lA ct io n St at us

Re po rt w ks

Th u 2/ 1/

W ed

3/

/2

Su bt as k 5:

Ut ili tie s 6.

m on s Fr i9 /1 /2

M on

3/ 4/

St ev en C us te r St ev en

C us te r

St ev en C us te r Je re m y H es

Je re m y H es s

St ev en C us te r

5/

6/

6/

6/

6/

7/

7/

7/

7/

7/

8/

8/

8/

8/

9/

9/

Ju ne

Ju ly

Au gu st Se pt em be r

Ta sk

Sp lit

M ile st on e

Su m m ar y

Pr oj ec t S um m ar y

In ac tiv e

Ta sk

In ac tiv e

M ile st on e

In ac tiv e

Su m m ar y

M an ua l T as k

Du ra tio n-on ly

M an ua l S um m ar y

Ro llu p

M an ua l S um m ar y

St ar t-on ly

Fi ni sh -o nl y

Ex te rn al

T as ks

Ex te rn al

M ile st on e

De ad lin e

Pr og re ss

M an ua l P ro gr es s

Sc he du le fo r t he Im pl em en ta tio n of T as k

DC

3B a t t he

D ixi e Cl ea ne rs si te lo ca te d in

Ja ck so nv ill e, D uv al C ou nt y

Pa ge

Pr oj ec t:

TA

_0

B

Da te

: F ri

2/ e Ta sk N am e

Du ra tio n

St ar t Fi ni sh

LO

E Su bm itt al /A pp ro va l

.6 w ks

W ed

/9 /2

Fr i2 /2 4/

Su bt as k 1:

Pr oj ec t

M an ag em en t da ys

M on

2/

/2

Tu e 2/

/2

Su bt as k 2:

O M da ys M on

2/

/2

Th u 8/

/2

Fi el d w or k pr ep ar at io n w k

M on

2/

/2

Fr i3 /3 /2

M on th ly O M da y

Tu e 2/ /2

Tu e 2/

/2

M on th ly O M

(s oi lg as sa m pl in g) da y

M on

3/

/2

M on

3/ /2

M on th ly O M da y

Th u 4/

/2

Th u 4/

/2

M on th ly O M da y

Fr i5 /2 6/

Fr i5 /2 6/

M on th ly O M

(s oi lg as sa m pl in g) da y

Tu e 6/ /2

Tu e 6/

/2

M on th ly O M da y

Th u 7/

/2

Th u 7/

/2

Re m ed ia lA ct io n St at us

Re po rt w ks

Fr i8 /4 /2

Th u 8/

/2

Su bt as k 3:

Ut ili tie s 6.

m on s W ed

3/ 1/

W ed

8/

/2

Su bt as k 4:

O M da ys M on

8/

/2

W ed

3/

/2

Fi el d w or k pr ep ar at io n w ks

M on

8/

/2

Fr i8 /2 5/

M on th ly O M da y

M on

8/

/2

M on

8/ /2

M on th ly O M

(s oi lg as sa m pl in g) da y

Tu e 9/ /2

Tu e 9/

/2

M on th ly O M da y

Th u

/2 6/

Th u

/2 6/

M on th ly O M da y

Fr i1 1/

/2

Fr i1 1/

/2

M on th ly O M

(s oi lg as sa m pl in g) da y

Fr i1 2/

/2

Fr i1 2/

/2

Gr ou nd w at er

Sa m pl in g da y

W ed

/4 /2

W ed

/4 /2

M on th ly O M da y

Tu e 1/ /2

Tu e 1/

/2

Re m ed ia lA ct io n St at us

Re po rt w ks

Th u 2/ 1/

W ed

3/

/2

Su bt as k 5:

Ut ili tie s 6.

m on s Fr i9 /1 /2

M on

3/ 4/

He ss

,Je nn a M ar tin ,P et er

M cL ea n, De br a A nd re ws te r

St ev en C us te r

St ev en C us te r St ev en

C us te r

St e

St ev en C us te r,D er ek B ar ry

9/

9/

9/

/1

/8

/1

/2

/2

/5

/1

/1

/2

/3

/1

/1

O ct ob er

N ov em be r De ce m be r

Ta sk

Sp lit

M ile st on e

Su m m ar y

Pr oj ec t S um m ar y

In ac tiv e

Ta sk

In ac tiv e

M ile st on e

In ac tiv e

Su m m ar y

M an ua l T as k

Du ra tio n-on ly

M an ua l S um m ar y

Ro llu p

M an ua l S um m ar y

St ar t-on ly

Fi ni sh -o nl y

Ex te rn al

T as ks

Ex te rn al

M ile st on e

De ad lin e

Pr og re ss

M an ua l P ro gr es s

Sc he du le fo r t he Im pl em en ta tio n of T as k

DC

3B a t t he

D ixi e Cl ea ne rs si te lo ca te d in

Ja ck so nv ill e, D uv al C ou nt y

Pa ge

Pr oj ec t:

TA

_0

B

Da te

: F ri

2/ e Ta sk N am e

Du ra tio n

St ar t Fi ni sh

LO

E Su bm itt al /A pp ro va l

.6 w ks

W ed

/9 /2

Fr i2 /2 4/

Su bt as k 1:

Pr oj ec t

M an ag em en t da ys

M on

2/

/2

Tu e 2/

/2

Su bt as k 2:

O M da ys M on

2/

/2

Th u 8/

/2

Fi el d w or k pr ep ar at io n w k

M on

2/

/2

Fr i3 /3 /2

M on th ly O M da y

Tu e 2/ /2

Tu e 2/

/2

M on th ly O M

(s oi lg as sa m pl in g) da y

M on

3/

/2

M on

3/ /2

M on th ly O M da y

Th u 4/

/2

Th u 4/

/2

M on th ly O M da y

Fr i5 /2 6/

Fr i5 /2 6/

M on th ly O M

(s oi lg as sa m pl in g) da y

Tu e 6/ /2

Tu e 6/

/2

M on th ly O M da y

Th u 7/

/2

Th u 7/

/2

Re m ed ia lA ct io n St at us

Re po rt w ks

Fr i8 /4 /2

Th u 8/

/2

Su bt as k 3:

Ut ili tie s 6.

m on s W ed

3/ 1/

W ed

8/

/2

Su bt as k 4:

O M da ys M on

8/

/2

W ed

3/

/2

Fi el d w or k pr ep ar at io n w ks

M on

8/

/2

Fr i8 /2 5/

M on th ly O M da y

M on

8/

/2

M on

8/ /2

M on th ly O M

(s oi lg as sa m pl in g) da y

Tu e 9/ /2

Tu e 9/

/2

M on th ly O M da y

Th u

/2 6/

Th u

/2 6/

M on th ly O M da y

Fr i1 1/

/2

Fr i1 1/

/2

M on th ly O M

(s oi lg as sa m pl in g) da y

Fr i1 2/

/2

Fr i1 2/

/2

Gr ou nd w at er

Sa m pl in g da y

W ed

/4 /2

W ed

/4 /2

M on th ly O M da y

Tu e 1/ /2

Tu e 1/

/2

Re m ed ia lA ct io n St at us

Re po rt w ks

Th u 2/ 1/

W ed

3/

/2

Su bt as k 5:

Ut ili tie s 6.

m on s Fr i9 /1 /2

M on

3/ 4/

St ev en C us te r

St ev en C us te r Je nn a M ar tin

,Je re m y H es s,P

/2

/3

1/

1/

1/

1/

2/

2/

2/

2/

3/

3/

3/

3/

3/

4/ Ja nu ar y Fe br ua ry M ar ch

Ap ril

Ta sk

Sp lit

M ile st on e

Su m m ar y

Pr oj ec t S um m ar y

In ac tiv e

Ta sk

In ac tiv e

M ile st on e

In ac tiv e

Su m m ar y

M an ua l T as k

Du ra tio n-on ly

M an ua l S um m ar y

Ro llu p

M an ua l S um m ar y

St ar t-on ly

Fi ni sh -o nl y

Ex te rn al

T as ks

Ex te rn al

M ile st on e

De ad lin e

Pr og re ss

M an ua l P ro gr es s

Sc he du le fo r t he Im pl em en ta tio n of T as k

DC

3B a t t he

D ixi e Cl ea ne rs si te lo ca te d in

Ja ck so nv ill e, D uv al C ou nt y

Pa ge

Pr oj ec t:

TA

_0

B

Da te

: F ri

2/

File details come from the government source that posted it. Updated .