Task Assignment DC039B Summary
This Task Assignment is issued by the State of Florida Department of Environmental Protection to GHD Services, Inc. for site assessment activities at the China Boy Cleaners property located at 1602 Missouri Avenue North in Largo, Pinellas County, Florida. The task assignment is entered pursuant to Contract Number HW684 with a completion date of January 26, 2024, and is authorized under Project Number ERIC_5271. The Department Project Manager is Kevin Kane (850-245-8971), and the Contractor's Project Manager is Brian Moore (813-257-0658).
The scope of work authorizes GHD Services, Inc. to conduct site assessment activities including soil and groundwater sampling, Modified Active Gas Sampling (MAGS), direct push technology profiling, monitor well installation, groundwater sampling, surveying, and investigation-derived waste disposal. The work is organized into four subtasks: Project Management (calculated at 13% of direct labor), Soil and Groundwater Sampling, Surveying and IDW Disposal, and Site Assessment Report preparation. The total contract value is $68,729.88 on a fixed unit rate basis. Invoicing is structured in three installments: $45,482.62 upon approval of the Soil and Groundwater Sampling Summary (due 9/19/2023), $9,618.73 upon approval of IDW Manifests and Subcontractor Receipts (due 10/27/2023), and $13,628.53 upon approval of the Site Assessment Report plus Project Management (due 10/30/2023). The final deliverable due date is October 30, 2023, with task completion by January 26, 2024.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW684
DC039B Completion January 26, 2024
This Task Assignment authorizes GHD Services, Inc. to conduct site assessment activities at the China Boy Cleaners site located in Largo, Florida. All work will be conducted in accordance with the scope of work and cost proposal submitted on June 9, 2023.
Kevin Kane 850-245-8971 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
GHD Services, Inc.
GHD Services, Inc.
Brian Moore 813-257-0658
ERIC_5271
1602 Missouri Ave N, Largo, Pinellas County
China Boy Cleaners
✔ $ 68,729.88
$ 68,729.88
Scope of Work
Brian Moore
Project Manager
Brian Moore Digitally signed by Brian Moore Date: 2023.06.28 19:50:25 -04'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2023.06.28 14:49:45 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Soil and Groundwater Sampling Summary 09/19/2023
IDW Manifests and Subcontractor Receipts 10/27/2023
Site Assessment Report + Project Management 10/30/2023
Subtask 2: Upon submittal and FDEP approval of the Soil and Groundwater Sampling Summary $ 45,482.62
Subtask 3: Upon submittal and FDEP approval of the IDW Manifests and Subcontractor Receipts $ 9,618.73
Subtasks 1 & 4: Upon submittal and FDEP approval of the Site Assessment Report + Project Management $ 13,628.53
$ 68,729.88
HW684
DC039B
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
TO: HW684 Contract File
FROM: Kevin Kane, Contract Manager
DATE: June 26, 2023
SUBJECT: Task Assignment DC039B
China Boy Cleaners
ERIC_5271
Assessment
This Task Assignment authorizes GHD Services, Inc. to conduct site assessment activities. Specific subtasks are detailed below:
Subtask 1: Project Management Project Management is calculated at 13% of the direct labor.
Subtask 2: Soil and Groundwater Sampling Soil sampling and groundwater profiling will be conducted in order to establish the extent of soil and groundwater impacts both vertically and horizontally. Soil sampling will include advancement of soil borings within and in the immediate vicinity of the former drycleaner with hand operated equipment and through the use of direct-push technology (DPT). Modified Active Gas Sampling (MAGS) will also be conducted as part of the soil assessment. One continuous soil boring will be completed to establish site lithologic conditions. The initial scope of work includes groundwater profiling at eight (8) exterior locations. All groundwater samples will be submitted to a Florida-certified laboratory for volatile organic analysis by EPA Method 8260. The initial soil sampling will involve the advancement of seven (7) shallow soil borings within and near the former drycleaner facility. All soil samples will be submitted to a fixed laboratory for analysis for the presence of volatile organic compounds (VOCs). Following soil sampling, piezometers will be installed at seven (7) locations. The piezometers will be constructed with 2-inch PVC well screens across the vadose zone. Following installation, MAGS will be conducted and soil gas samples will be gathered for field screening and fixed laboratory analysis for the presence of VOCs by Method TO-15. During the same mobilization, permanent monitor wells will be installed. At this time, six (6) shallow wells and one deep well are planned for installation. One of the shallow wells will be installed within the facility using hand operated equipment. Well locations and construction details will be provided to the Department for approval prior to installation. Following installation, the wells will be surveyed and sampled in accordance with FDEP SOPs. Groundwater samples will be submitted to a fixed laboratory for VOC analysis by EPA Method 8260.
Subtask 3: Surveying/IDW Disposal Following all field activities, a surveyor will be subcontracted to develop a site plan and survey elevations of all sample locations. Investigation derived waste (IDW) disposal is anticipated and has been accounted for under this subtask. Subcontractors for IDW disposal were chosen on a lowest-cost basis.
Subtask 4: Site Assessment Report Upon receipt of analytical data, a Site Assessment Report (SAR) will be prepared. The SAR will include a summary of field methodology, field screening data, and laboratory analytical results. The SAR will also include conclusions and recommendations. The recommendations may include the use of active remediation to mitigate identified impacts.
GHD and the FDEP confirmed on June 26, 2023, that an Access Agreement with the current real property owner of the aforementioned site has been executed.
This work will be conducted in line with the scope of work included with GHD’s proposal, received on June 9, 2023. Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and proposal letter. The final deliverable due date is October 30, 2023, and the completion date for the task assignment is January 26, 2024.
The final cost total for Task Assignment DC039B is $68,729.88.
FDEP COST ESTIMATE
Contractor: GHD Services Inc.
Date: 6/27/2023
Task #: DC039B SubTask 1 Project Management SubTask 6
Site: China Boy Cleaners SubTask 2 Soil and Groundwater Sampling SubTask 7
Activity/Phase: Assessment SubTask 3 IDW Management and Surveying SubTask 8
Project Manager: Brian Moore, PE SubTask 4 Site Assessment Report SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$44.81 Project Manager JM 23.50 23.5 $51.08 Sr Professional Engineer JH 8.00 0.00 0.00 8.00 0.00 0.00 0.00 0.00 0.00 0.00 $43.28 Professional Engineer/Sc GE 95.00 40.00 0.00 55.00 0.00 0.00 0.00 0.00 0.00 0.00 $44.81 Project Manager/ Enginee JM 16.50 8.50 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.53 Senior Technician SA 45.50 45.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.89 Senior Technician WM 45.50 45.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.69 Drafting Technician PM 14.00 0.00 0.00 14.00 0.00 0.00 0.00 0.00 0.00 0.00 $23.16 Administrative Assistant DA 16.00 0.00 0.00 16.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 264.00 23.50 139.50 8.00 93.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $9,167.07 $1,054.62 $4,178.71 $358.48 $3,575.26 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 129.80% $11,898.87 $1,368.90 $5,423.97 $465.31 $4,640.69 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.80% $3,465.16 $398.65 $1,579.55 $135.51 $1,351.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $24,531.10 $2,822.17 $11,182.23 $959.30 $9,567.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle Rental $1,080.00 $960.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,080.00 $960.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) Atlantic Supply $824.43 $824.43 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subcontractor Subtotal $824.43 $824.43 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $82.44 $82.44 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $906.87 $906.87 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Non-conventional) $12,588.00 $12,588.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $6,800.00 $0.00 $6,800.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $550.00 $0.00 $550.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $19,938.00 $12,588.00 $7,350.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $1,993.80 $1,258.80 $735.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $21,931.80 $13,846.80 $8,085.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $14,220.00 $13,920.00 $300.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $941.50 $883.00 $58.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $15,161.50 $14,803.00 $358.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Expendables $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $2,305.50 $2,305.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $2,665.50 $2,665.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $66,276.77 $2,822.17 $44,364.40 $9,522.80 $9,567.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $2,453.11 $282.22 $1,118.22 $95.93 $956.74 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $68,729.88 $3,104.39 $45,482.62 $9,618.73 $10,524.14 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : China Boy Cleaners SUBTASK 2: Soil and Groundwater Sampling
DATE: 6/26/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager JM Arrange for Site Access with owner 2 Project Manager JM Utility Locate 1 Project Manager JM Prepare field scope of work (DP, soil, MAGS) 1.5 Project Manager JM Prepare daily summary reports of assessment results (1 hour per day) 4
8.5
Senior Geologist GE Mob/demob (4 days) 8 Senior Geologist GE direct push sampling oversight (2 days) 16 Senior Geologist GE Well Installation (2 days) 16
Senior Technician WM Mob/demob (5 days) 7.5 Senior Technician WM Concrete Coring/Soil Boring Advancement and Screening (7 locations) 10 Senior Technician WM Install 7 piezometers for MAGS (1.5 hr each) 10.5 Senior Technician WM Install interior monitor well (3 hours) 3 Senior Technician WM Conduct MAGS (7 locations) 9 Senior Technician WM Round of Water Levels (6 total) 1 Senior Technician WM Groundwater Sampling (3 wells) 4.5
45.5
Senior Technician SA Mob/demob (5 days) 7.5 Senior Technician SA Concrete Coring/Soil Boring Advancement and Screening (7 locations) 10 Senior Technician SA Install 7 piezometers for MAGS (1.5 hr each) 10.5 Senior Technician SA Install interior monitor well (3 hours) 3 Senior Technician SA Conduct MAGS (7 locations) 9 Senior Technician SA Round of Water Levels (6 total) 1 Senior Technician SA Groundwater Sampling (3 wells) 4.5
45.5
TOTAL LABOR 139.5
VEHICLE TYPE RATE UNIT USEAGE
Geologist 4 days Company Truck $480.00 week 1 $480.00 Sr Techs 1 week Company Truck $480.00 week 1 $480.00
TOTAL VEHICLE $960.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
FINAL --7/24/96
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Groundwater Protection Mobilization 1 each 750.00$ $750.00 Groundwater Protection Per Diem (2 man crew) 4 night 300.00$ $1,200.00 Groundwater Protection DPT Rig and Crew 4 day 1,750.00$ $7,000.00 Groundwater Protection Materials: Soil Sample Liners 16 each 3.00$ $48.00 Groundwater Protection Materials: GW Sampling Points 40 each 3.00$ $120.00 Groundwater Protection Materials: HDPE Tubing (per 500' Roll) 4 each 100.00$ $400.00 Groundwater Protection Materials: Borehole Grouting w/Concrete Patch 8 each 15.00$ $120.00 Groundwater Protection Materials: 1" PVC Well Installation 125 ft 4.00$ $500.00 Groundwater Protection Materials: 1" x 5' PVC .010 Slot Prepack Screen, 3" E 1 each 100.00$ $100.00 Groundwater Protection Materials: (2) 1" x 5' PVC .010 Slot Prepack Screen, 3 5 each 175.00$ $875.00 Groundwater Protection 2' x 2' Concrete Pad w/8" BD Completion 6 each 150.00$ $900.00 Groundwater Protection Well Development (up to 1/2 hour w/Pump) 6 each 75.00$ $0.00 Groundwater Protection 55 gallon drums (Soil) 2 each 65.00$ $130.00 Groundwater Protection 55 gallon drums (Water) 3 each 65.00$ $195.00 Groundwater Protection Decon Pad 1 each 250.00$ $250.00 Groundwater Protection Permits 6 each -$ $0.00 Atlantic Supply Well Screen (5 feet, 2-inch, 0.010-slot) 7 each 38.20$ $267.40 Atlantic Supply Well Point (2-inch) 7 each 8.30$ $58.10 Atlantic Supply Well Riser (2-inch - 5 ft) 7 each 23.59$ $165.13 Atlantic Supply Well Riser (1-inch - 5 ft) 1 each 15.35$ $15.35 Atlantic Supply 20/30 silica sand 3 bag 6.80$ $20.40 Atlantic Supply 30/65 silica sand 1 bag 6.05$ $6.05 Atlantic Supply Prepack (1-inch 5 ft) 1 each 76.00$ $76.00 Atlantic Supply Boltdown Manhole (6") 8 Each 27.00$ $216.00
TOTAL $13,412.43
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Volatile Organics (full ra Soil $150.00 40 $6,000.00 Volatile Organics (full ra Groundwater $150.00 41 $6,150.00 TO-15 (VOCs) Soil Gas $200.00 7 $1,400.00 TOC walkley black soil $36.00 5 $180.00 density soil $25.00 5 $125.00 moisture soil $13.00 5 $65.00 Shipping (large cooler) overnight - soil $150.00 2 $300.00 Shipping (small cooler)2 day - soil TOC $52.00 1 $52.00 Shipping (large cooler) 2 day - DP GW $70.00 2 $140.00 Shipping (large cooler) vernight - soil gas $150.00 2 $300.00 Shipping (small cooler)2 day - MW GW $52.00 1 $52.00
Ice $6.50 6 $39.00
TOTAL LAB $14,803.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 9 $360.00
Air Sampling Pump $27.00 Day 1 $27.00 Regenerative Blower $180.00 Day 1 $180.00 Portable generator $70.00 Day 1 $70.00 Vacuum Gages $19.00 Day 1 $19.00 anemometer $33.00 Day 1 $33.00 Summa Canisters $33.00 Each 7 $231.00 Encore (for SPLP) $16.00 Each 40 $640.00 Soil sampling kit (through concrete) $235.00 Day 2 $470.00 Groundwater Sampling Kit $290.00 Day 2 $580.00 Poly Tubing $0.30 Ft 125 $37.50 Silicon Tubing $3.00 Ft 6 $18.00
TOTAL EQUIPMEN $2,665.50
SUBTASK 3: IDW Management and Surveying
DATE: 6/26/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager JM Complete waste profile, transmit waste manifest 4 Project Manager JM IDW Pickup and sign manifest 4
TOTAL LABOR 8
VEHICLE TYPE RATE UNIT USEAGE
Company Truck $120.00 day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation IDW Drum Dispos 5 drum $110.00 $550.00 Colliers Engineering Design Site Survey 1 each $6,800.00 $6,800.00
TOTAL $7,350.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Volatile Organics ( Soil $150.00 1 $150.00 Volatile Organics ( Groundwater $150.00 1 $150.00 shipping small cooler (2 day) $52.00 1 $52.00
Ice $6.50 1 $6.50
TOTAL LAB $358.50
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
SUBTASK 4: Site Assessment Report
DATE: 6/26/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Professional Scientist GE Site History (SAR) 4 Professional Scientist GE Regional Geology - Site Specific Lithology (SAR) 2 Professional Scientist GE Site Assessment Workplan Summary (SAR) 4 Professional Scientist GE Soil Sampling Methods (SAR) 3 Professional Scientist GE Soil Sampling Results (SAR) 3 Professional Scientist GE MAGS point installation methods (SAR) 2 Professional Scientist GE MAGS Procedures (SAR) 2 Professional Scientist GE MAGS Results (SAR) 2 Professional Scientist GE Direct Push Profiling Methods (SAR) 3 Professional Scientist GE Direct Push Profiling Results (SAR) 3 Professional Scientist GE Monitor well installation methods (SAR) 3 Professional Scientist GE Groundwater sampling methods (SAR) 2 Professional Scientist GE Groundwater flow evaluation (SAR) 2 Professional Scientist GE Groundwater water quality parameter results (SAR) 3 Professional Scientist GE Groundwater analytical data results (SAR) 4 Professional Scientist GE Conceptual Site Model (SAR) 4 Professional Scientist GE Findings (SAR) 3 Professional Scientist GE Laboratory Data Validation (SAR) 2 Professional Scientist GE Conclusions and Recommendations (SAR) 4
Sr. Professional Engineer JH Conlusions and recommendations (SAR) 4 Sr. Professional Engineer JH Remedial Action recommendations 4
Drafting Technician PM Draft Figures (site location/layout/site plan) 4 Drafting Technician PM Prepare DP groundwater analytical figure 2 Drafting Technician PM Prepare soil analytical figure 2 Drafting Technician PM Prepare MAGS analytical figure 2 Drafting Technician PM Prepare groundwater flow figures 2 Drafting Technician PM Prepare groundwater monitor well results figure 2
Staff Assistant DA Data Entry (field data to report tables) 8 Staff Assistant DA Prepare Summary Tables from lab EDDs 4 Staff Assistant DA Prepare final SAR (pdf) 4
TOTAL LABOR 93
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
COST PROPOSAL FOR TASK DC039B
<China Boy Cleaners/FDEP ERIC_5271>
< Site Assessment >
1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >
GHD Services Inc. (GHD) submitted a Site Assessment Workplan for the China Boy Cleaners site located in Largo, Pinellas County, in April 2023. The Site Assessment Workplan detailed an approach to determining the extent of contamination in soil and groundwater both vertically and horizontally. Task DC039B includes initial site assessment activities including soil sampling, modified active gas sampling (MAGS), discrete groundwater profiling using direct push technology (DPT), monitor well installation, and groundwater sampling
Subtask 1: Project Management
Subtask 1 includes all tasks associated with project management of the site assessment activities at the Ideal Cleaners Laundry & Shoe site.
Subtask 2: Soil and Groundwater Sampling
Upon Department approval, GHD will mobilize with the selected direct-push contractor. Soil sampling and groundwater profiling will be conducted in order to establish the extent of soil and groundwater impacts both vertically and horizontally. Soil sampling will include advancement of soil borings within and in the immediate vicinity of the drycleaner with hand operated equipment and through the use of direct-push technology (DPT). Modified Active Gas Sampling (MAGS) will also be conducted as part of the soil assessment. One continuous soil boring will also be completed to establish site lithologic conditions.
The initial scope of work includes groundwater profiling at eight (8) exterior locations. At each location, direct-push tooling will be advanced to the desired depths and discrete groundwater samples will be gathered for fixed laboratory analysis. For planning purposes, it is assumed that discrete groundwater samples will be gathered from the surface of the groundwater, 10, 20 feet, 30 feet, 40 feet, and 50 feet below land surface. All groundwater samples will be submitted to a Florida-certified laboratory for volatile organic analysis by EPA Method 8260.
The initial soil sampling will involve the advancement of seven (7) shallow soil borings within and in close proximity to the former drycleaner facility. Soil borings will be advanced with a stainless steel hand auger and soil samples will be collected from 0-0.5’, 0.5-2.0’, and 2’ intervals until refusal or the water table. All soil samples will be submitted to a fixed laboratory for analysis for the presence of volatile organics (VOCs).
Following soil sampling, piezometers will be installed at seven (7) locations. The piezometers will be constructed with 2-inch PVC well screens across the vadose zone. Following installation, MAGS will be conducted and soil gas samples will be gathered for field screening and fixed laboratory analysis for the presence of VOCs by Method TO-15.
During the same mobilization, permanent monitor wells will be installed. At this time, up to six (6) shallow and one deep well are planned for installation. The 6 shallow wells will be installed to approximate depths of 15 ft bls. One of the shallow wells will be installed within the facility using hand operated equipment. The wells will be screened to straddle the water table. The deep well is proposed for a total depth of 50 feet and will be screened between 45 and 50 feet, depending on site lithology. Well locations and construction details will be provided to the Department for approval prior to installation. Following installation, the wells will be surveyed and sampled in accordance with FDEP SOPs. All of the groundwater samples will be submitted to a fixed laboratory for VOC analysis by EPA Method 8260.
Subtask 3: Surveying/IDW Disposal Following all field activities, a surveyor will be subcontracted to develop a site plan and survey elevations of all sample locations. Investigative Derived Waste (IDW) will be disposed of at an appropriate off-site facility. GHD will coordinate manifest generation and IDW pickup.
Subtask 4: Site Assessment Report Upon receipt of analytical data, a Site Assessment Report (SAR) will be prepared. The SAR will include a summary of field methodology, field screening data, and laboratory analytical results. The SAR will also include conclusions and recommendations. The recommendations may include the use of active remediation to mitigate identified impacts.
Deliverables:
Deliverable Deliverable Due Date Field notes, soil and groundwater data, MAGS data, and subcontractor receipts 9/19/23
IDW Manifests and subcontractor receipts 10/27/23
Site Assessment Report 10/30/23
Drilling
$700.00 each 1 $700.00 $750.00 each 1 $750.00 $2,590.00 each 1 $2,590.00 $300.00 night 4 $1,200.00
$1,750.00 day 4 $7,000.00 $3.00 each 16 $48.00 $3.00 each 40 $120.00
Materials: HDPE Tubing (per 500' Roll) $100.00 each 4 $400.00 Materials: Borehole Grouting w/Concrete Patch $15.00 each 8 $120.00
$4.00 ft 125 $500.00 $100.00 each 1 $100.00 $175.00 each 5 $875.00 $150.00 each 6 $900.00 $75.00 each 6 $0.00
55 gallon drums (Estimated) $70.00 each 2 $140.00 $65.00 each 2 $130.00 $0.00 each 2 $0.00 55 gallon drums (Estimated) $70.00 each 3 $210.00 $65.00 each 3 $195.00 $0.00 each 5 $0.00 Decon Pad $250.00 each 1 $250.00 Litho Boring $700.00 each 1 $700.00 $1,500.00 each 1 $1,500.00 DP Profile $750.00 each 8 $6,000.00 $945.00 each 8 $7,560.00 Shallow Well $750.00 well 5 $3,750.00 $1,520.00 well 5 $7,600.00 Deep Well $1,500.00 well 1 $1,500.00 $3,025.00 well 1 $3,025.00 Permits: SWFLWMD (N/A for FDEP Sites $75.00 each 1 $75.00 $0.00 each 6 $0.00 $210.00 each 1 $210.00
$13,075.00 $12,588.00 $22,485.00
IDW Disposal
$110.00 drum 2 $220.00 $120.00 drum 2 $240.00 $160.00 drum 2 $320.00 $110.00 drum 3 $330.00 $120.00 drum 3 $360.00 $160.00 drum 3 $480.00
$60.00 $135.00 hr 1 $135.00
$550.00 $660.00 $935.00
Colliers Professional service Survey
$6,800
IDW Soil
IDW GW
10% of Fee
Stop Fee
Envirosafe
Preferred Groundwater Protection Cascade
Erwin Hepaco
Mobilization
Per Diem (2 man crew)
DPT Rig and Crew
Materials: Soil Sample Liners
Materials: GW Sampling Points
Materials: 1" PVC Well Installation
Materials: 1" x 5' PVC .010 Slot Prepack Screen, 3" Exp Point
Materials: (2) 1" x 5' PVC .010 Slot Prepack Screen, 3" Exp Point
2' x 2' Concrete Pad w/8" BD Completion
Well Development (up to 1/2 hour w/Pump)
Sonic Auger DPT Injection Well Abandonment
REVISED DATE: 6/5/2023
ESTIMATE #: 523038-1
Project Description:
ID QTY Unit Rate TOTAL
1 1 ls 750.00$ 750.00$
2 4 night 300.00$ 1,200.00$
3 4 day 1,750.00$ 7,000.00$
3a <1/2 day 800.00$ -$
4 16 each 3.00$ 48.00$
5 40 each 3.00$ 120.00$
6 Materials: HDPE Tubing (per 500' Roll) 4 each 100.00$ 400.00$
7 Materials: Borehole Grouting w/Concrete Patch 8 each 15.00$ 120.00$
8 125 foot 4.00$ 500.00$
9 1 each 100.00$ 100.00$
10 5 each 175.00$ 875.00$
9 6 each 150.00$ 900.00$
10 6 each 75.00$ Included
11 55 gallon drums (Soil) (Estimated) 2 each 65.00$ 130.00$
12 55 gallon drums (Water) (Estimated) 3 each 65.00$ 195.00$
13 Decon Pad 1 each 250.00$ 250.00$
13 Permits: SWFLWMD (N/A for FDEP Sites -$
Completion: Subtotal 12,588.00$
Todd Hodgson
TOTAL 12,588.00$
Partner
PROJECT
China Boy Cleaners 1602 Missouri Avenue N
Damages to utilities on private property during borehole clearance are the responsibility of the client
5904 Hampton Oaks Pkwy Suite F
CUSTOMER
GHD
Brian Moore
Tampa, Florida 33610 Largo, Florida
DPT Soil and GW Sampling w/Well Installation
2' x 2' Concrete Pad w/8" BD Completion
(813) 971-3882
(5) 1" x 15' PVC Well w/10' of .010 Prepack Screen, 2' x 2' Pad w/8" BD Completion, No Soil Sampling
(1) DPT Litho Boring to 50' bls w/Continuous Macrocores to Depth. Borehole Grout and Patch to Surface
(1) 1" x 50' PVC Well w/5' of .010 Slot Prepack Screen, 2' x 2' Pad w/8" BD Completion, No Soil Sampling
Materials: (2) 1" x 5' PVC .010 Slot Prepack Screen, 3" Exp Point
Materials: Soil Sample Liners
(8) DPT GW Profiling Borings to 50' w/Sampling at 5 Intervals from GWT (6-10', 20-24', 30-34', 40-44' and 50-54').
Soil Sampling to ~6' (to GWT). Borehole Grouting and Patch to Surface.
Materials: GW Sampling Points
Locations must be accessible with track mounted DPT Rig
If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 or Todd@drillprollc.com.
THANK YOU FOR YOUR BUSINESS!
Todd Hodgson
Daily Rate: DPT Rig w/ 2-man Crew
"Actual quantities used and days on site will be invoiced"
4 to 4 1/2 Days
DESCRIPTION
Mobilization
Utility Locates on Private Property is the responsibility of the client
Daily Rate: DPT Rig w/ 2-man Crew (If Needed)
Borehole Clearance to 5’ bgs beyond 20 minutes may require a change order for additional time and cost.
Per Diem (2 man crew)
Materials: 1" PVC Well Installation
Materials: 1" x 5' PVC .010 Slot Prepack Screen, 3" Exp Point
Well Development (up to 1/2 hour w/Pump)
2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586
GHD BID FORM
China Boy Cleaners
1602 Missouri Avenue N., Largo, Pinellas County, Florida
ITEM 1 Mobilization Lump Sum Cost Per Mobilization: $
ITEM 2 Advance one (1) exterior lithology boring to 50 ft bls. Drum all wastes.
Lump Sum Cost per exterior lithology boring (est @ 50’) $ /Boring
ITEM 3 Advance eight (8) exterior direct-push profile borings with continuous soils above water table and groundwater profiling at app. 10 ft intervals to 50 ft bls. Drum all wastes.
Lump Sum Cost per exterior DP profile (est @ 50’) $ /Profile
ITEM 4 Install five (5) exterior shallow monitoring wells. Develop wells. Drum all wastes.
Lump Sum Cost per exterior Shallow Well (est @ 15’) $ /Well
ITEM 5 Install one (1) exterior deep monitoring well. Develop wells. Drum all wastes.
Lump Sum Cost per exterior Deep Well (est @ 50’) $ /Well
REQUIRED ADDITIONAL INFORMATION
Number of days required to complete DP Profiling: days
Number of days required to complete well network: days
Cost to supply, fill, and stage drums at central area: per drum
Number of drums required drums
Cost for well installation permits: each Total for permits austin_pdsflorida.co Typewritten Text 700.00 austin_pdsflorida.co Typewritten Text 700.00 austin_pdsflorida.co Typewritten Text 750.00 austin_pdsflorida.co Typewritten Text 750.00 austin_pdsflorida.co Typewritten Text 1500.00 austin_pdsflorida.co Typewritten Text 2.5 austin_pdsflorida.co Typewritten Text 2.0 austin_pdsflorida.co Typewritten Text $70.00 austin_pdsflorida.co Typewritten Text austin_pdsflorida.co Typewritten Text $75.00 austin_pdsflorida.co
$75.00
Quote
Bidder agrees that the proposed costs for the work specified in this bid package will be good for a period of 180 days from the bid opening.
Name of Bidder Authorizing Signature and Title
Address Date austin_pdsflorida.co Typewritten Text $13,075.00 austin_pdsflorida.co Typewritten Text Austin Bonacum austin_pdsflorida.co Typewritten Text Project Estimator austin_pdsflorida.co Typewritten Text 8820 66th St North, Pinellas Park, FL 33782 austin_pdsflorida.co
6/6/2023
GHD BID FORM
China Boy Cleaners
1602 Missouri Avenue N., Largo, Pinellas County, Florida
ITEM 1 Mobilization $Lump Sum Cost Per Mobilization:
ITEM 2 Advance one (1) exterior lithology boring to 50 ft bls. Drum all wastes.
Lump Sum Cost per exterior lithology boring (est @ 50’)
/ProfileLump Sum Cost per exterior DP profile (est @ 50’) $
ITEM 4 Install five (5) exterior shallow monitoring wells. Develop wells. Drum all wastes.
/WellLump Sum Cost per exterior Shallow Well (est @ 15’) $
ITEM 5 Install one (1) exterior deep monitoring well. Develop wells. Drum all wastes.
/WellLump Sum Cost per exterior Deep Well (est @ 50’) $
REQUIRED ADDITIONAL INFORMATION
Number of days required to complete DP Profiling: days daysNumber of days required to complete well network:
perCost to supply, fill, and stage drums at central area:
drum
Number of drums required drums
Cost for well installation permits: each for permits
2,590.00
$ /Boring1,500.00
945.00
1,520.00
3,025.00
$100.00
$210.00
ITEM 3 Advance seven (8) exterior direct-push profile borings with continuous soils above water table and groundwater profiling at app. 10 ft intervals to 50 ft bls. Drum all wastes.
Quote
Bidder agrees that the proposed costs for the work specified in this bid package will be good for a period of 180 days from the bid opening.
Authorizing Signature and TitleName of Bidder
DateAddress
Cascade Remediation Services
3020 Avondale Mill Road Macon, GA 31216 5/18/2023
Zachary Fordley /
$22,485.00
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Brian Moore 5904 Hampton Oaks Parkway, Suite F Tampa, FL 33610
April 18, 2023
Re: Non-Hazardous Drum Transport and Disposal – China Boy Cleaners - Largo, FL
Mr. Moore:
The price for transport and disposal of 55-gallon drums of non-hazardous soil, mud, and/or water located in Largo, FL will be $110.00 per drum.
Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc.
Please feel free to contact me if you have any questions.
Respectfully, Robert Donado Erwin Remediation, Inc.
Email: robert@erwinremediation.com
From: Craig Burns To: Brian Moore Subject: GHD_IDW Drums Date: Tuesday, April 18, 2023 10:31:07 AM Attachments: image001.png image002.png image003.png image004.png image005.png image473297.png image092477.png image268420.png image857886.png image891466.png image120998.png
See bold font below for rates Brian www.enviroserve.com
24/7 Emergency Response
(800) 488‑0910
Craig Burns Account Manager 755 Prairie Industrial Pkwy Mulberry, FL 33860 M 863 327 6289 craigburns@enviroserve.com
From: Brian Moore <Brian.Moore@ghd.com> Sent: Tuesday, April 18, 2023 10:10 AM To: Craig Burns <craigburns@enviroserve.com> Subject: IDW Drums ZjQcmQRYFpfptBannerEnd
Craig, Can you provide a quote for IDW drum (soil or water) disposal at the below sites
Courtesy Cleaners – Sarasota $120/per drum plus $50 low stop plus 10% to total invoice Ideal Cleaners – Clearwater $120/per drum plus $50 low stop plus 10% to total invoice China Boy Cleaners – Largo $120/per drum plus $50 low stop plus 10% to total invoice
Assume non haz water/soil
Estimate is 1 soil/2 water per site
Thank you
BRIAN MOORE PE
GHD
Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com
The Power of Commitment mailto:craigburns@enviroserve.com mailto:Brian.Moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.enviroserve.com%2F&data=05%7C01%7CBrian.Moore%40ghd.com%7C017dfef90fe74cdfe03c08db4019844b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638174250663182323%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=BgjSajEeeMmVZMQgXqC7g6WfjR3igvuB1cwd2R9Zxcw%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2Fenviroserveusa%2F&data=05%7C01%7CBrian.Moore%40ghd.com%7C017dfef90fe74cdfe03c08db4019844b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638174250663182323%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=K4TJHxzUZt3%2BdBrVz2GCZ00VCZD007dSfBaB2Djm6D4%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Ftwitter.com%2FEnviroServe_USA&data=05%7C01%7CBrian.Moore%40ghd.com%7C017dfef90fe74cdfe03c08db4019844b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638174250663182323%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=v4c32L%2B8Vpo609sV22O41u19lSXR9e4GU0Cgh8eZ5VM%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fenviroserve-j-v-%2Fabout%2F&data=05%7C01%7CBrian.Moore%40ghd.com%7C017dfef90fe74cdfe03c08db4019844b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638174250663182323%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=Y%2By99X4GatqlV6kdIszbDEyHSFtwZcfOWLTQaXLCWG0%3D&reserved=0 tel:863%20327%206289 mailto:craigburns@enviroserve.com https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.com%2Fv3%2F__http%3A%2Fwww.ghd.com%2F__%3B!!G052VHZeXWgjmJM!ugX_VAcAB2FL1Rmm6DH0lhE59U8rTbFaUWUkcb8k6DUf69c1YQPUBi9QERd4NpNKPhJ9G9YK0U0YpIpygW1TgrNZ%24&data=05%7C01%7CBrian.Moore%40ghd.com%7C017dfef90fe74cdfe03c08db4019844b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638174250663182323%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=5YPQNVnwL%2F8j5pT0NcWHG223BA%2FFv8Rmnl0eILUQPZM%3D&reserved=0 mailto:brian.moore@ghd.com
Connect
Please consider our environment before printing this email
CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.
https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.com%2Fv3%2F__https%3A%2Fwww.linkedin.com%2Fcompany%2Fghd%2F__%3B!!G052VHZeXWgjmJM!ugX_VAcAB2FL1Rmm6DH0lhE59U8rTbFaUWUkcb8k6DUf69c1YQPUBi9QERd4NpNKPhJ9G9YK0U0YpIpygaipIXOo%24&data=05%7C01%7CBrian.Moore%40ghd.com%7C017dfef90fe74cdfe03c08db4019844b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638174250663182323%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=c2qi2MxhLGBQNCdWinTaXLFMkE8jhKwiLzZtvPWQ6fg%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.com%2Fv3%2F__https%3A%2Fwww.facebook.com%2FGHDGroup__%3B!!G052VHZeXWgjmJM!ugX_VAcAB2FL1Rmm6DH0lhE59U8rTbFaUWUkcb8k6DUf69c1YQPUBi9QERd4NpNKPhJ9G9YK0U0YpIpygVdsDzgK%24&data=05%7C01%7CBrian.Moore%40ghd.com%7C017dfef90fe74cdfe03c08db4019844b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638174250663182323%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=uPDkeuIrYRESs47Vyc0ll%2Bi3Ay5blLXkNervk9zc3go%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.com%2Fv3%2F__https%3A%2Ftwitter.com%2FGHDspeaks__%3B!!G052VHZeXWgjmJM!ugX_VAcAB2FL1Rmm6DH0lhE59U8rTbFaUWUkcb8k6DUf69c1YQPUBi9QERd4NpNKPhJ9G9YK0U0YpIpygTkNAoGt%24&data=05%7C01%7CBrian.Moore%40ghd.com%7C017dfef90fe74cdfe03c08db4019844b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638174250663182323%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=zJT1ClBd4sCHMTXEBKgsRlxA0wU9VH8CVScldSZiO1Y%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.com%2Fv3%2F__https%3A%2Fwww.youtube.com%2Fchannel%2FUCwUGfe6zgaddIXqA7entIwQ__%3B!!G052VHZeXWgjmJM!ugX_VAcAB2FL1Rmm6DH0lhE59U8rTbFaUWUkcb8k6DUf69c1YQPUBi9QERd4NpNKPhJ9G9YK0U0YpIpygfiK2mam%24&data=05%7C01%7CBrian.Moore%40ghd.com%7C017dfef90fe74cdfe03c08db4019844b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638174250663182323%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=RQOCP%2FUhKIsiydESow10L%2BKE%2BQZ9ayre2tkEXJv6qOU%3D&reserved=0
From: Andrew Skirpan To: Brian Moore Cc: Scott Pearce Subject: RE: HEPACO/Services Date: Wednesday, April 19, 2023 9:43:09 AM Attachments: image001.png image002.png image003.png image004.png image005.png image006.png
Hello Brian, Thank you for the opportunity. I did speak with Operations, Assuming it is Non/Haz we would charge $160 a Drum, and $135 an hour for T&D.
If you have any questions, please contact me directly.
Thanks, Andy
Andrew Skirpan Territory Account Manager M (904) 864-8127 E askirpan@hepaco.com HEPACO.com 5371 Hartford Street Suite 204 Tampa FL,33619
1-800-888-7689 24/7 EMERGENCY RESPONSE
From: Brian Moore <brian.moore@ghd.com> Sent: Tuesday, April 18, 2023 10:10 AM To: Andrew Skirpan <askirpan@hepaco.com> Cc: Scott Pearce <jpearce@hepaco.com> Subject: RE: HEPACO/Services
HEPACO Notice: This communication is from an [EXTERNAL] sender.
If this email looks suspicious, do NOT click or open any links or attachments in the email. To report a suspicious email, click on the Phish Alert Report icon located on the Outlook menu mailto:askirpan@hepaco.com mailto:Brian.Moore@ghd.com mailto:jpearce@hepaco.com
You don't often get email from askirpan@hepaco.com. Learn why this is important ribbon.
Andrew, Can you provide a quote for IDW drum (soil or water) disposal at the below sites
Courtesy Cleaners – Sarasota Ideal Cleaners – Clearwater China Boy Cleaners – Largo
Assume non haz water/soil
Estimate is 1 soil/2 water per site
Thank you
BRIAN MOORE PE
GHD
Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com
The Power of Commitment
Connect
Please consider our environment before printing this email
From: Andrew Skirpan <askirpan@hepaco.com> Sent: Friday, February 24, 2023 12:04 PM To: Brian Moore <brian.moore@ghd.com> Cc: Scott Pearce <jpearce@hepaco.com> Subject: HEPACO/Services
Hello Brian, Thank you for taking time out of your busy day on Wednesday morning to talk with Scott Pearce and myself.
I am providing you with additional information about HEPACO’s services as discussed with Jeremy Hess.
Please keep us in mind for any future projects. We would love the opportunity to prove our value and become a trusted partner.
If you have any questions or opportunities, please don’t hesitate to reach out.
mailto:askirpan@hepaco.com https://aka.ms/LearnAboutSenderIdentification https://aus01.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.ghd.com%2F&data=05%7C01%7Cbrian.moore%40ghd.com%7Ce303fb39a2a6434769bd08db40dbfcca%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638175085882703179%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=TwZgukeonvcwcAlxbxl7DLcK4OVuKCHfbVvP21vL%2FS0%3D&reserved=0 mailto:brian.moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fghd%2F&data=05%7C01%7Cbrian.moore%40ghd.com%7Ce303fb39a2a6434769bd08db40dbfcca%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638175085882703179%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=BneHrXTtEhIdAAmIOj55SElYt2Tb2Vlt7u%2BxyrdSF4s%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2FGHDGroup&data=05%7C01%7Cbrian.moore%40ghd.com%7Ce303fb39a2a6434769bd08db40dbfcca%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638175085882703179%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=Gw6J88EmWMRkPKrJryjKdtPKGj6sh9c04f0GSyySArY%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Ftwitter.com%2FGHDspeaks&data=05%7C01%7Cbrian.moore%40ghd.com%7Ce303fb39a2a6434769bd08db40dbfcca%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638175085882703179%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=rZWx6AZD2J8AimLIP3n6ieiLZtcCN34AwEZt8bICYuI%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.youtube.com%2Fchannel%2FUCwUGfe6zgaddIXqA7entIwQ&data=05%7C01%7Cbrian.moore%40ghd.com%7Ce303fb39a2a6434769bd08db40dbfcca%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638175085882703179%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=VIURRAtztJKef9otmxHNg9Tf%2F1Upzoz6P79IsFfXckM%3D&reserved=0 mailto:askirpan@hepaco.com mailto:brian.moore@ghd.com mailto:jpearce@hepaco.com
Thanks, Andy
Andrew Skirpan Territory Account Manager M (904) 864-8127 E askirpan@hepaco.com HEPACO.com 5371 Hartford Street Suite 204 Tampa FL,33619
1-800-888-7689 24/7 EMERGENCY RESPONSE
This e-mail and any attachments to it contain confidential and proprietary material of HEPACO, LLC, its affiliates or agents, and is solely for the use of the intended recipient. Any review, use, disclosure, distribution or copying of this transmittal is prohibited except by or on behalf of the intended recipient. If you have received this transmittal in error, please notify the sender and destroy this e-mail and any attachments and all copies, whether electronic or printed.
Please consider the environment before printing this email.
CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.
This e-mail and any attachments to it contain confidential and proprietary material of HEPACO, LLC, its affiliates or agents, and is solely for the use of the intended recipient. Any review, use, disclosure, distribution or copying of this transmittal is prohibited except by or on behalf of the intended recipient. If you have received this transmittal in error, please notify the sender and destroy this e-mail and any attachments and all copies, whether electronic or printed.
Please consider the environment before printing this email.
mailto:askirpan@hepaco.com
5471 W. Waters Avenue Suite 100 Tampa Florida 33634 Main: 877 627 3772
VIA Brian.Moore@ghd.com May 23, 2023
GHD Services Inc 5904 Hampton Oakds Parkway, Suite F Tampa, Florida 33610
Proposal for Professional Services China Boy Cleaners 1602 Missouri Avenue North
15 - 20 Marlowe Heights Subdivision PB 46 PG 62 Largo, Pinellas County, Florida Colliers Engineering & Design Proposal No.: 23007555P
Dear Brian Moore, Colliers Engineering & Design, Inc. (DBA Maser Consulting) is pleased to submit this proposal to provide professional services for a Boundary & Partial Topographic Survey in Largo, Pinellas County, Florida. The property in question is located at the Northeast quadrant of Missouri Avenue North and Jasper Street. The overall property consists of approximately 3.2 acres of land and currently an active strip shopping center.
This proposal is divided into four sections as follows:
Section I – Scope of Services Section II – Business Terms and Conditions Section III – Technical Staff Hourly Rate Schedule and Reimbursable Expenses Section IV – Client Contract Authorization
The order in which the following scope of services are presented generally follows the sequence in which the project will be accomplished; however, depending on the project, the various authorized services contained in this proposal may be performed in a sequence as deemed appropriate by Colliers Engineering & Design to meet project schedules.
Section I – Scope of Services
Based on our conversations and information noted above, we propose to complete the following:
Boundary Survey
Colliers Engineering & Design will prepare a Boundary Survey of Lots 15 though 20, as per map or plat thereof Marlowe Heights Subdivision as recorded in Plat Book 46, Page 62 of the Public Records of Pinellas County, Florida in accordance with the Standards of Practice as established by the Florida Board of Surveyors and Mappers.
Proposal No. 23007555P May 23, 2023 Page 2 | 14
Included in this task of service are the following tasks:
Public records research and pre-field records review;
Field traverse, location survey and data collection;
Field survey data reduction and computation;
Boundary analysis and survey calculations;
Preparation of legal description of the subject property’s boundary.
Unless provided by the client, the boundary survey will be subject to such facts that a current and accurate title report would disclose.
The client should furnish the surveyor with the following information/documents before we initiate services on the project:
A copy of the property deed(s) of record;
A copy of the property title binder;
A copy of all adjoining deeds and reference filed maps. (Colliers Engineering & Design can obtain this information for you if you are unable to through our subcontractor. This fee will be passed onto you as a reimbursable expense);
A corner marker waiver form (unless corner markers are desired to be set) (form enclosed);
A statement in writing of the person or persons to be named in the certification of survey (form enclosed).
Final Deliverable. The final deliverable will be a maximum of three (3) hardcopies signed and sealed by a Florida Surveyor and Mapper, and an electronic file copy in Adobe pdf format. Draft deliverables will be in form of electronic file Adobe pdf format.
Delivery of hard copy maps will be limited to one (1) package sent to one (1) address, one (1) time.
Additional delivery of hard copy maps will be billed as a reimbursable expense in accordance with Section III of this agreement.
The fee for this task is based upon the assumption that the deed mathematically closes, that there are no title problems, that there are no overlaps or gores with adjoining properties and that extraordinary research or analysis is not required. If any of the items cited in this paragraph do become issues during our survey efforts, we will discuss the necessary additional services and related costs with you prior to proceeding with the additional services.
Lump Sum Fee $ 6,400.00
Partial Location & Topographic Survey
Colliers Engineering & Design will perform a Partial Topographic Survey of applicable state and local jurisdictional requirements and standards of practice.
The limits of the survey are as per Parcel Identification 27-29-15-55368-000-0160 as depicted in the Survey Limits image below:
Proposal No. 23007555P May 23, 2023 Page 3 | 14
SURVEY LIMITS
Our office will prepare a Partial Topographic Survey map that is a graphic pictorial representation of existing site features observed at the time of the field survey such as buildings, curbs, sidewalks, roadways, driveways, retaining walls, fences, and utility hardware. Limits of wooded areas will be depicted based on the approximate dripline, but individual trees within wooded areas will not be surveyed. The topographic map will depict existing spot elevations and contours at 0.50-foot contour intervals. GPS surveying techniques will be used to control the survey with the resulting horizontal datum being Florida West State Plane Coordinate System NAD83 and the vertical datum being North American Vertical Datum NAVD88.
Visible and accessible utilities and/or utility structures within the survey limits as described above will be surveyed and shown on the plan to include rim, grate and invert elevations, and pipe sizes entering and/or exiting the structures. For the purposes of this contract, accessible utilities shall be defined as those utilities that are visible to the naked eye at ground level and are safely accessible by foot by Colliers Engineering & Design field survey personnel without the need for additional safety measures and/or assistance with making pipes visible, open, and clear for inspection and measuring.
We will survey visible evidence of existing utilities within the survey limits, but may not be able to confirm the existence, or actual position of all underground utilities which may be running through or servicing the subject property. The Florida 811 One Call System prohibits the use of its service for surveying and mapping of subsurface utilities for engineering design purposes. If requested, we can enlist the services of our in-house subsurface utility engineers to investigate and mark the