About this file

This is a Task Assignment (TA) document executed between the State of Florida Department of Environmental Protection (FDEP) and GHD Services, Inc. for site assessment activities at the former Michael the Cleaner drycleaner facility located at 6513 14th Street West, Bradenton, Manatee County, Florida. The task assignment is identified as DC027B under Contract HW684 and is associated with FDEP project number ERIC_4899. Kevin Kane serves as the FDEP Project Manager, while Brian Moore, PE, represents GHD Services, Inc. as the contractor's project manager. The work completion date is April 14, 2023.

The task assignment authorizes GHD Services, Inc. to conduct comprehensive site assessment activities including soil and groundwater sampling, modified active gas sampling (MAGS), direct-push technology (DPT) profiling, monitor well installation and development, surveying, investigation-derived waste (IDW) disposal, and preparation of a site assessment report. The work is structured in four subtasks: Project Management (13 percent of direct labor), Soil and Groundwater Sampling, Surveying/IDW Disposal, and Site Assessment Report preparation. The total task assignment value is $60,666.29, with payment on a fixed unit rate basis contingent upon FDEP approval of deliverables. Invoicing is structured in three phases tied to deliverable submission and approval: $44,136.88 upon approval of the Soil and Groundwater Sampling Summary (due November 24, 2022); $4,369.78 upon approval of IDW Manifests and Subcontractor Receipts (due December 16, 2022); and $12,159.63 upon approval of the Site Assessment Report and Project Management deliverables (due January 13, 2023). Subcontractors for drilling, surveying, and IDW disposal were selected on a lowest-cost basis, with major subcontract costs including $10,721.00 for drilling services, $2,495.00 for surveying, and $220.00 for IDW disposal.

View the file

Other files

File Type Posted
CN-370000-GC922.pdf PDF
CN-370000-HW684-BIL01A.pdf PDF
CN-370000-HW684-BIL02C.pdf PDF
CN-370000-HW684-BIL02E.pdf PDF
CN-370000-HW684-BIL1ACO1.pdf PDF
CN-370000-HW684-BIL2CCO2.pdf PDF
CN-370000-HW684-CSS03A.pdf PDF
CN-370000-HW684-DC001C.pdf PDF
CN-370000-HW684-DC001E.pdf PDF
CN-370000-HW684-DC003A.pdf PDF
CN-370000-HW684-DC003C.pdf PDF
CN-370000-HW684-DC004B.pdf PDF
CN-370000-HW684-DC005C.pdf PDF
CN-370000-HW684-DC007B.pdf PDF
CN-370000-HW684-DC009A.pdf PDF
CN-370000-HW684-DC010A.pdf PDF
CN-370000-HW684-DC010B.pdf PDF
CN-370000-HW684-DC010C.pdf PDF
CN-370000-HW684-DC012A.pdf PDF
CN-370000-HW684-DC012B.pdf PDF
CN-370000-HW684-DC014B.pdf PDF
CN-370000-HW684-DC014C.pdf PDF
CN-370000-HW684-DC015D.pdf PDF
CN-370000-HW684-DC018E.pdf PDF
CN-370000-HW684-DC020C.pdf PDF
CN-370000-HW684-DC021B.pdf PDF
CN-370000-HW684-DC021E.pdf PDF
CN-370000-HW684-DC024A.pdf PDF
CN-370000-HW684-DC024B.pdf PDF
CN-370000-HW684-DC025D.pdf PDF
CN-370000-HW684-DC026A.pdf PDF
CN-370000-HW684-DC026C.pdf PDF
CN-370000-HW684-DC028A.pdf PDF
CN-370000-HW684-DC028E.pdf PDF
CN-370000-HW684-DC029A.pdf PDF
CN-370000-HW684-DC02A.pdf PDF
CN-370000-HW684-DC030A.pdf PDF
CN-370000-HW684-DC030B.pdf PDF
CN-370000-HW684-DC031D.pdf PDF
CN-370000-HW684-DC033A.pdf PDF
CN-370000-HW684-DC033B.pdf PDF
CN-370000-HW684-DC033C.pdf PDF
CN-370000-HW684-DC034A.pdf PDF
CN-370000-HW684-DC036A.pdf PDF
CN-370000-HW684-DC037A.pdf PDF
CN-370000-HW684-DC039B.pdf PDF
CN-370000-HW684-DC042A.pdf PDF
CN-370000-HW684-DC043C.pdf PDF
CN-370000-HW684-DC044B.pdf PDF
CN-370000-HW684-DC045A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW684

DC027B Completion April 14, 2023

This Task Assignment authorizes GHD Services, Inc. to conduct site assessment activities at the former Michael the Cleaner site located in Bradenton, Florida. All work will be conducted in accordance with the scope of work and cost proposal submitted on September 19, 2022.

Kevin Kane (850) 245-8971 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

GHD Services, Inc.

GHD Services, Inc.

Brian Moore (813) 257-0658

ERIC_4899

6513 14th St W, Bradenton, Manatee County

Michael the Cleaner

✔ $ 60,666.29

$ 60,666.29

Scope of Work

Brian Moore

Project Manager

Brian Moore Digitally signed by Brian Moore Date: 2022.09.21 17:19:07 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2022.09.21 16:17:00 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Soil and Groundwater Sampling Summary 11/24/2022

IDW Manifests and Subcontractor Receipts 12/16/2022

Site Assessment Report + Project Management 01/13/2023

Subtask 2: Upon submittal and FDEP approval of the Soil and Groundwater Sampling Summary $ 44,136.88

Subtask 3: Upon submittal and FDEP approval of the IDW Manifests and Subcontractor Receipts $ 4,369.78

Subtasks 1 & 4: Upon submittal and FDEP approval of the Site Assessment Report + Project Management $ 12,159.63

$ 60,666.29

HW684

DC027B

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

TO: HW684 Contract File

FROM: Kevin Kane, Contract Manager

DATE: September 20, 2022

SUBJECT: Task Assignment DC027B

Michael the Cleaner

ERIC_4899

Assessment

This Task Assignment authorizes GHD Services, Inc. to conduct site assessment activities. Specific subtasks are detailed below:

Subtask 1: Project Management Project Management is calculated at 13% of the direct labor.

Subtask 2: Soil and Groundwater Sampling Soil sampling and groundwater profiling will be conducted in order to establish the extent of soil and groundwater impacts both vertically and horizontally. Soil sampling will include advancement of soil borings within and in the immediate vicinity of the former drycleaner with hand operated equipment and through the use of direct-push technology (DPT). Modified Active Gas Sampling (MAGS) will also be conducted as part of the soil assessment. One continuous soil boring will be completed to establish site lithologic conditions. The initial scope of work includes groundwater profiling at eight (8) exterior locations. GHD will also sample two (2) existing monitor wells and irrigation well on-site.

All groundwater samples will be submitted to a Florida-certified laboratory for volatile organic analysis by EPA Method 8260. The initial soil sampling will involve the advancement of twelve (12) shallow soil borings within and near the former drycleaner facility. All soil samples will be submitted to a fixed laboratory for analysis for the presence of volatile organic compounds (VOCs). Following soil sampling, piezometers will be installed at five (5) locations. The piezometers will be constructed with 2-inch PVC well screens across the vadose zone. Following installation, MAGS will be conducted and soil gas samples will be gathered for field screening and fixed laboratory analysis for the presence of VOCs by Method TO-15.

During the same mobilization, permanent monitor wells will be installed. At this time, up to five (5) shallow and one deep well are planned for installation. One of the shallow wells will be installed within the facility using hand operated equipment. Well locations and construction details will be provided to the Department for approval prior to installation. Following installation, the wells will be surveyed and sampled in accordance with FDEP SOPs. Groundwater samples will be submitted to a fixed laboratory for VOC analysis by EPA Method 8260.

Subtask 3: Surveying/IDW Disposal Following all field activities, a surveyor will be subcontracted to develop a site plan and survey elevations of all sample locations. Investigation derived waste (IDW) disposal is anticipated and has been accounted for under this subtask. Subcontractors for IDW disposal were chosen on a lowest-cost basis.

Subtask 4: Site Assessment Report Upon receipt of analytical data, a Site Assessment Report (SAR) will be prepared. The SAR will include a summary of field methodology, field screening data, and laboratory analytical results. The SAR will also include conclusions and recommendations. The recommendations may include the use of active remediation to mitigate identified impacts.

GHD and the FDEP confirmed on September 1, 2022, that an Access Agreement with the current real property owner of the aforementioned site has been executed.

This work will be conducted in line with the scope of work included with GHD’s proposal, received September 19, 2022. Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and proposal letter. The final deliverable due date is January 13, 2023, and the completion date for the task assignment is April 14, 2023.

The final cost total for Task Assignment DC027B is $60,666.29.

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 09/20/22

Task #: DC027B SubTask 1 Project Management SubTask 6

Site: Michael the Cleaner SubTask 2 Soil and Groundwater Sampling SubTask 7

Activity/Phase: Assessment SubTask 3 IDW Management and Surveying SubTask 8

Project Manager: Brian Moore, PE SubTask 4 Site Assessment Report SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$40.12 Project Manager JM 24.80 24.8 $46.33 Sr Professional Engineer JH 8.00 0.00 0.00 8.00 0.00 0.00 0.00 0.00 0.00 0.00 $43.28 Professional Engineer/Sc GE 89.00 43.00 0.00 46.00 0.00 0.00 0.00 0.00 0.00 0.00 $40.12 Project Manager/ Engine JM 21.50 13.50 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.76 Senior Technician SA 38.50 38.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $23.69 Senior Technician WM 43.50 43.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.69 Drafting Technician PM 14.00 0.00 0.00 14.00 0.00 0.00 0.00 0.00 0.00 0.00 $22.44 Administrative Assistant DA 16.00 0.00 0.00 16.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 255.30 24.80 138.50 8.00 84.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $8,645.77 $994.65 $4,193.94 $320.96 $3,136.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 129.80% $11,222.21 $1,291.06 $5,443.73 $416.61 $4,070.81 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.80% $3,268.10 $375.98 $1,585.31 $121.32 $1,185.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $23,136.08 $2,661.69 $11,222.98 $858.89 $8,392.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $1,160.00 $1,080.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,160.00 $1,080.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 Page 1

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 09/20/22

Task #: DC027B SubTask 1 Project Management SubTask 6

Site: Michael the Cleaner SubTask 2 Soil and Groundwater Sampling SubTask 7

Activity/Phase: Assessment SubTask 3 IDW Management and Surveying SubTask 8

Project Manager: Brian Moore, PE SubTask 4 Site Assessment Report SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $10,721.00 $10,721.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $2,495.00 $0.00 $2,495.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $220.00 $0.00 $220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $13,436.00 $10,721.00 $2,715.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $1,343.60 $1,072.10 $271.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $14,779.60 $11,793.10 $2,986.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $15,320.00 $15,020.00 $300.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $617.00 $558.50 $58.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $15,937.00 $15,578.50 $358.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $2,365.00 $2,365.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $615.00 $615.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $3,340.00 $3,340.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $58,352.68 $2,661.69 $43,014.58 $4,283.89 $8,392.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $2,313.61 $266.17 $1,122.30 $85.89 $839.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $60,666.29 $2,927.86 $44,136.88 $4,369.78 $9,231.77 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Michael the Cleaner SUBTASK 2: Soil and Groundwater Sampling

DATE: 09/20/22

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager JM Arrange for Site Access with owner 2 Project Manager JM Utility Locate 1 Project Manager JM Prepare Site HASP 3 Project Manager JM Prepare field scope of work (DP, soil, MAGS) 2 Project Manager JM Prepare sample kit request (soil, groundwater, soil gas) 1.5 Project Manager JM Prepare summary report for initial groundwater sampling results and recommendations 1 Project Manager JM Prepare daily summary reports of assessment results (1 hour per day) 3

13.5

Senior Geologist GE Mob/demob (4 days) 6 Senior Geologist GE direct push sampling oversight (2.5 days) 23.5 Senior Geologist GE Well Installation (1.5 days) 13.5

Senior Technician WM Mob/demob (5 days) 7.5 Senior Technician WM Initial sampling of MW-1, MW-2, and irrigation well 3.5 Senior Technician WM Concrete Coring/Soil Boring Advancement and Screening (12 locations) 12 Senior Technician WM Install 5 piezometers for MAGS (1 hr each) 5 Senior Technician WM Install interior monitor well (3 hours) 3 Senior Technician WM Conduct MAGS (5 locations) 5 Senior Technician WM Backfill/Restoration (4 locations) 2 Senior Technician WM Round of Water Levels (8 total) 1 Senior Technician WM Groundwater Sampling (3 wells) 4.5

43.5

Senior Technician SA Mob/demob (4 days) 6 Senior Technician SA Concrete Coring/Soil Boring Advancement and Screening (12 locations) 12 Senior Technician SA Install 5 piezometers for MAGS (1 hr each) 5 Senior Technician SA Install interior monitor well (3 hours) 3 Senior Technician SA Conduct MAGS (5 locations) 5 Senior Technician SA Backfill/Restoration (3 locations) 2 Senior Technician SA Round of Water Levels (8 total) 1 Senior Technician SA Groundwater Sampling (3 wells) 4.5

38.5

TOTAL LABOR 138.5

VEHICLE TYPE RATE UNIT USEAGE

Geologist Company Truck $480.00 week 1 $480.00 Sr Tech Company Truck $120.00 day 5 $600.00

TOTAL VEHICLE $1,080.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Groundwater Protection Mobilization 1 each $700.00 $700.00 Groundwater Protection Per Diem 3 night $225.00 $675.00 Groundwater Protection DPT Rig 4 day $1,600.00 $6,400.00 Groundwater Protection Macrocore Liners 17 each $3.00 $51.00 Groundwater Protection Water sample exp 40 each $12.00 $480.00 Groundwater Protection Borehole grouting 9 each $15.00 $135.00 Groundwater Protection 1" PVC Well 100 ft $4.00 $400.00 Groundwater Protection Preack screen 5 each $175.00 $875.00 Groundwater Protection Completion 5 each $125.00 $625.00 Groundwater Protection well development 5 each $50.00 $250.00 Groundwater Protection Drums 2 each $65.00 $130.00

TOTAL $10,721.00

FINAL --7/24/96

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Volatile Organics (full range) Soil $150.00 42 $6,300.00 Volatile Organics (full range) Groundwater $150.00 49 $7,350.00 TO-15 (VOCs) Soil Gas $200.00 5 $1,000.00 TOC walkley black soil $36.00 5 $180.00 density soil $25.00 5 $125.00 moisture soil $13.00 5 $65.00 Shipping (large cooler) overnight - soil $150.00 1 $150.00 Shipping (small cooler) 2 day - soil TOC $52.00 1 $52.00 Shipping (large cooler) 2 day - DP GW $70.00 1 $70.00 Shipping (large cooler) overnight - soil gas $150.00 1 $150.00 Shipping (small cooler) 2 day - MW GW $52.00 2 $104.00

Ice $6.50 5 $32.50

TOTAL LAB $15,578.50

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

Expendables $40.00 day 9 $360.00

Equipment (Analytical Related)

Air Sampling Pump $27.00 Day 1 $27.00 Regenerative Blower $180.00 Day 1 $180.00 Portable generator $70.00 Day 1 $70.00 Vacuum Gages $19.00 Day 1 $19.00 anemometer $33.00 Day 1 $33.00 Tedlar Bags $20.00 Each 5 $100.00 Encore (for SPLP) $16.00 Each 42 $672.00 Soil sampling kit (through concrete) $235.00 Day 2 $470.00 Groundwater Sampling Kit $290.00 Day 2.5 $725.00 Poly Tubing $0.30 Ft 150 $45.00 Silicon Tubing $3.00 Ft 8 $24.00

Equipment (Other)

Total GPS Station $175.00 Day 1 $175.00 Well Screen (5 feet, 2-inch, 0.010-slo $31.85 each 5 $159.25 Well Point (2-inch) $7.55 each 5 $37.75 Well Riser (1-inch - 5 ft) $12.80 each 1 $12.80 Prepack (1-inch 5 ft) $76.00 each 1 $76.00 Boltdown Manhole (6") $25.70 Each 6 $154.20

TOTAL EQUIPMENT $3,340.00

SUBTASK 3: IDW Management and Surveying

DATE: 09/20/22

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager JM Complete waste profile, transmit waste manifest 4 Project Manager JM IDW Pickup and sign manifest 4

TOTAL LABOR 8

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 day 1 $80.00

TOTAL VEHICLE $80.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW Drum Dispos 2 drum $110.00 $220.00 Survtech Site Survey 1 each $2,495.00 $2,495.00

TOTAL $2,715.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Volatile Organics (full range) Soil $150.00 1 $150.00 Volatile Organics (full range) Groundwater $150.00 1 $150.00 shipping small cooler (2 day) $52.00 1 $52.00

Ice $6.50 1 $6.50

TOTAL LAB $358.50

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

Equipment (Analytical Related)

$0.00

Equipment (Other) $0.00

TOTAL EQUIPMENT $0.00

SUBTASK 2: Site Assessment Report

DATE: 09/20/22

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Professional Scientist GE Site History (SAR) 4 Professional Scientist GE Regional Geology - Site Specific Lithology (SAR) 2 Professional Scientist GE Soil Sampling Methods (SAR) 2 Professional Scientist GE Soil Sampling Results (SAR) 2 Professional Scientist GE MAGS point installation methods (SAR) 2 Professional Scientist GE MAGS Procedures (SAR) 2 Professional Scientist GE MAGS Results (SAR) 2 Professional Scientist GE Direct Push Profiling Methods (SAR) 2 Professional Scientist GE Direct Push Profiling Results (SAR) 2 Professional Scientist GE Monitor well installation methods (SAR) 3 Professional Scientist GE Groundwater sampling methods (SAR) 2 Professional Scientist GE Groundwater flow evaluation (SAR) 2 Professional Scientist GE Groundwater water quality parameter results (SAR) 2 Professional Scientist GE Groundwater analytical data results (SAR) 4 Professional Scientist GE Conceptual Site Model (SAR) 4 Professional Scientist GE Findings (SAR) 3 Professional Scientist GE Laboratory Data Validation (SAR) 2 Professional Scientist GE Conclusions and Recommendations (SAR) 4

Sr. Professional Engineer JH Conlusions and recommendations (SAR) 4 Sr. Professional Engineer JH Natural Attenuation Results (SAR) 4

Drafting Technician PM Draft Figures (site location/layout/site plan) 4 Drafting Technician PM Prepare DP groundwater analytical figure 2 Drafting Technician PM Prepare soil analytical figure 2 Drafting Technician PM Prepare MAGS analytical figure 2 Drafting Technician PM Prepare groundwater flow figures 2 Drafting Technician PM Prepare groundwater monitor well results figure 2

Staff Assistant DA Data Entry (field data to report tables) 8 Staff Assistant DA Prepare Summary Tables from lab EDDs 4 Staff Assistant DA Prepare final SAR (pdf) 4

TOTAL LABOR 84

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

Equipment (Analytical Related)

$0.00 $0.00

Equipment (Other) $0.00 $0.00

TOTAL EQUIPMENT $0.00

COST PROPOSAL FOR TASK DC027B

<Michael the Cleaner/FDEP ERIC_4899>

< Site Assessment>

1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >

GHD Services Inc. (GHD) submitted a Site Assessment Workplan for the Village Cleaners site located in Ellenton, Manatee County, in July 2022. The Site Assessment Workplan detailed an approach to determining the extent of contamination in soil and groundwater both vertically and horizontally. Task DC027B includes initial site assessment activities including soil sampling, modified active gas sampling (MAGS), discrete groundwater profiling using direct push technology (DPT), monitor well installation, and groundwater sampling

Subtask 1: Project Management Subtask 1 includes all tasks associated with project management of the site assessment activities at the Michael the Cleaner site.

Subtask 2: Soil and Groundwater Sampling Initially, GHD will coordinate site access with the current property owner. Additionally, GHD will negotiate subcontract agreements for drilling waste disposal services.

Following initial contracting activities, GHD will mobilize to the subject site and sample the two (2) existing monitor wells and on-site irrigation well. The sampling will be conducted in general accordance with FDEP SOPs and the samples will be analyzed for the presence of volatile organics by EPA Method 8260. Upon receipt, the analytical data will be evaluated and DEP will be provided a summary with any recommendations for changes to the proposed scope.

Upon Department approval, GHD will mobilize with the selected direct-push contractor. Soil sampling and groundwater profiling will be conducted in order to establish the extent of soil and groundwater impacts both vertically and horizontally. Soil sampling will include advancement of soil borings within and in the immediate vicinity of the former drycleaner with hand operated equipment and through the use of direct-push technology (DPT). Modified Active Gas Sampling (MAGS) will also be conducted as part of the soil assessment. One continuous soil boring will also be completed to establish site lithologic conditions.

The initial scope of work includes groundwater profiling at eight (8) exterior locations. At each location, direct-push tooling will be advanced to the desired depths and discrete groundwater samples will be gathered for fixed laboratory analysis. For planning purposes, it is assumed that discrete groundwater samples will be gathered from the surface of the groundwater, 10, 20 feet, 30 feet, 40 feet, and 50 feet below land surface. All groundwater samples will be submitted to a Florida-certified laboratory for volatile organic analysis by EPA Method 8260.

The initial soil sampling will involve the advancement of twelve (12) shallow soil borings within and in close proximity to the former drycleaner facility. Soil borings will be advanced with a stainless steel hand auger and soil samples will be collected from 0-0.5’, 0.5-2.0’, and 2’ intervals until refusal or the water table. All soil samples will be submitted to a fixed laboratory for analysis for the presence of volatile organics (VOCs).

Following soil sampling, piezometers will be installed at five (5) locations. The piezometers will be constructed with 2-inch PVC well screens across the vadose zone. Following installation, MAGS will be conducted and soil gas samples will be gathered for field screening and fixed laboratory analysis for the presence of VOCs by Method TO-15.

During the same mobilization, permanent monitor wells will be installed. At this time, up to five (5) shallow and one deep well are planned for installation. The 5 shallow wells will be installed to approximate depths of 15 ft bls. One of the shallow wells will be installed within the facility using hand operated equipment. The wells will be screened to straddle the water table. The deep well is proposed for a total depth of 40 feet and will be screened between 35 and 40 feet, depending on site lithology. Well locations and construction details will be provided to the Department for approval prior to installation. Following installation, the wells will be surveyed and sampled in accordance with FDEP SOPs. All of the groundwater samples will be submitted to a fixed laboratory for VOC analysis by EPA Method 8260.

Subtask 3: Surveying/IDW Disposal Following all field activities, a surveyor will be subcontracted to develop a site plan and survey elevations of all sample locations. Investigative Derived Waste (IDW) will be disposed of at an appropriate off-site facility. GHD will coordinate manifest generation and IDW pickup.

Subtask 4: Site Assessment Report Upon receipt of analytical data, a Site Assessment Report (SAR) will be prepared. The SAR will include a summary of field methodology, field screening data, and laboratory analytical results. The SAR will also include conclusions and recommendations. The recommendations may include the use of active remediation to mitigate identified impacts.

Deliverables:

Deliverable Deliverable Due Date

Field notes, soil and groundwater data, MAGS data, and subcontractor receipts 11/24/22

IDW Manifests and subcontractor receipts 12/16/22

Site Assessment Report 12/29/22

Drilling

Mobilization 1 each $700.00 $700.00 1 each $1,000.00 $1,000.00 1 each $500.00 $500.00 Exterior Boring 0 each $65.00 $0.00 1 each $575.00 $575.00 1 each $625.00 $625.00 Per Diem 3 night $225.00 $675.00 Daily Rate 4 day $1,600.00 $6,400.00 Liners 17 each $3.00 $51.00 Water Sample 40 each $12.00 $480.00 Grout Borehole 9 each $15.00 $135.00 Well Install 100 ft $4.00 $400.00 Prepack screen 5 each $175.00 $875.00 Manhole 5 each $125.00 $625.00 Development 5 each $50.00 $250.00 DP Profile 0 each $365.15 $0.00 8 each $600.00 $4,800.00 8 each $365.15 $2,921.20 Shallow Well 0 well $1,305.00 $0.00 4 well $675.00 $2,700.00 4 well $1,305.00 $5,220.00 Deep Well 0 well $2,500.00 $0.00 1 well $1,175.00 $1,175.00 1 well $2,500.00 $2,500.00 Drum 2 drum $65.00 $130.00 5 drum $75.00 $375.00 5 drum $50.00 $250.00 Permit 0 each $175.00 $0.00 1 each $150.00 $150.00 6 each $175.00 $1,050.00

$10,721.00 $10,775.00 $13,066.20

IDW

Soil IDW Drum 1 drum $110.00 $110.00 1 drum $80.00 $80.00 1 drum $150.00 $150.00 GW IDW Drum 1 drum $110.00 $110.00 1 drum $60.00 $60.00 1 drum $150.00 $150.00 Transportation 2 drum $0.00 $0.00 2 drum $30.00 $60.00 2 drum $0.00 $0.00 Stop Fee 1 each $0.00 $0.00 1 each $50.00 $50.00 1 each $0.00 $0.00

$220.00 $250.00 $300.00

Surveying SurvTech 1 each $2,495.00 $2,495.00

Groundwater Protection Preferred GHD

Erwin Clark Whatever Waste

Sonic Auger DPT Injection Well Abandonment

DATE: 8/19/2022

ESTIMATE #: 822065

PROJECT DESCRIPTION:

ID QTY Unit Rate TOTAL

1 1 ls 700.00$ 700.00$

2 3 night 225.00$ 675.00$

3 DPT Rig and Crew 4 day 1,600.00$ 6,400.00$

3a DPT Rig and Crew 1/2 day 1,100.00$ -$

4 Materials: Macrocore Liners 17 each 3.00$ 51.00$

5 Materials: Water Sample Expendables 40 each 12.00$ 480.00$

6 Materials: Borehole Grouting w/Concrete Patch 9 each 15.00$ 135.00$

7 Materials: 1" PVC Well Installation 100 foot 4.00$ 400.00$

8 Materials: (2) 1" x 5' PVC .010 Prepack Screen, 3" Exp Point 5 each 175.00$ 875.00$

9 Materials: 1" x 5' PVC .010 Prepack Screen, 3" Exp Point each 100.00$ -$

10 8" Bolt Down Completion w/2' x 2' Pad 5 each 125.00$ 625.00$

11 Well Development (Includes 1/2 Hour w/ Pump) 5 each 50.00$ 250.00$

12 Additional Well Development 0 1/2 hour 75.00$ -$

13 55 gallon drums: (Soil) (Estimated) 1 each 65.00$ 65.00$

14 55 gallon drums: (Water) (Estimated) 1 each 65.00$ 65.00$

15 -$

Subtotal 10,721.00$

Todd Hodgson

Todd Hodgson TOTAL 10,721.00$ Partner

DPT Soil Sampling/GW Sampling w/Well Installation

CUSTOMER

Bradenton, Manatee County, Florida

PROJECT

GHD

Tampa, Florida 33610

Michael the Cleaners 6513 14th Street West

Brian Moore, PE

5904 Hampton Oaks Circle, Suite F

(813) 257-0658

If you have any questions concerning this proposal contact Todd at (407) 426-7885 or Todd@drillprollc.com.

"Actual Quantities & Days onsite will be invoiced"

Completion: 4 Days

DESCRIPTION

Permits: SWFLWMD-Not Applicable for FDEP Projects)

THANK YOU FOR YOUR BUSINESS!

Per Diem

Mobilization

"Borehole clearance beyond 20 minutes per boring may result in a change order for more time and other costs" ***Damages to utilities on private property during borehole clearance are the responsibility of the client***

****Utility Locates on Private Property are the Responsibility of the Client*****

Drum All Soils and Development Water

Locations must be Accessible with Track Mounted DPT Rig

(4) 1" x 15' MW w/10' of .010" Prepack Screen, 2' x 2' Pad w/8" BD Completion - No Soil Sampling

(1) DPT Litho Soil Boring to 50' bls with Soil Screening to Depth (macrocores), Lab Sample at 40', grout up

(8) DPT Soil Sampling to ~7' (or GW Table) w/GW Grabs at 10', 20', 30', 40' & 50' bls (5 Intervals per hole), grout up

(1) 1" x 40' MW w/10' of .010" Prepack Screen, 2' x 2' Pad w/8" BD Completion - No Soil Sampling

2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586

GHD BID FORM

Michael the Cleaner

6513 14th Street West, Bradenton, Manatee County, Florida

ITEM 1 Mobilization Lump Sum Cost Per Mobilization: $

ITEM 2 Advance one (1) exterior lithology boring to 50 ft bls. Drum all wastes.

Lump Sum Cost per exterior lithology boring (est @ 50’) $ /Boring

ITEM 3 Advance eight (8) exterior direct-push profile borings with continuous soils above water table and groundwater profiling at app. 10 ft intervals to 50 ft bls. Drum all wastes.

Lump Sum Cost per exterior DP profile (est @ 50’) $ /Profile

ITEM 4 Install four (4) exterior shallow monitoring wells. Develop wells. Drum all wastes.

Lump Sum Cost per exterior Shallow Well (est @ 15’) $ /Well

ITEM 5 Install one (1) exterior deep monitoring well. Develop wells. Drum all wastes.

Lump Sum Cost per exterior Deep Well (est @ 40’) $ /Well

REQUIRED ADDITIONAL INFORMATION

Number of days required to complete DP Profiling: days

Number of days required to complete well network: days

Cost to supply, fill, and stage drums at central area: per drum

Number of drums required drums

Cost for well installation permits: each total austin_pdsflorida.co Typewritten Text 1,000.00 austin_pdsflorida.co Typewritten Text 575.00 austin_pdsflorida.co Typewritten Text 600.00 austin_pdsflorida.co Typewritten Text 675.00 austin_pdsflorida.co Typewritten Text 1,175.00 austin_pdsflorida.co Typewritten Text 2.5 austin_pdsflorida.co Typewritten Text 1.5 austin_pdsflorida.co Typewritten Text $75.00 austin_pdsflorida.co Typewritten Text austin_pdsflorida.co Typewritten Text $150.00 austin_pdsflorida.co Typewritten Text $10,775.00

Bidder agrees that the proposed costs for the work specified in this bid package will be good for a period of 180 days from the bid opening.

Name of Bidder Authorizing Signature and Title

Address Date

Preferred Drilling Solutions

8820 66th Street North, Pinellas Park, FL 33782 9/15/22

/ Estimator

GHD BID FORM

Michael the Cleaner

6513 14th Street West, Bradenton, Manatee County, Florida

ITEM 1 Mobilization Lump Sum Cost Per Mobilization: $

ITEM 2 Advance one (1) exterior lithology boring to 50 ft bls. Drum all wastes.

Lump Sum Cost per exterior lithology boring (est @ 50’) $ /Boring

ITEM 3 Advance eight (8) exterior direct-push profile borings with continuous soils above water table and groundwater profiling at app. 10 ft intervals to 50 ft bls. Drum all wastes.

Lump Sum Cost per exterior DP profile (est @ 50’) $ /Profile

ITEM 4 Install four (4) exterior shallow monitoring wells. Develop wells. Drum all wastes.

Lump Sum Cost per exterior Shallow Well (est @ 15’) $ /Well

ITEM 5 Install one (1) exterior deep monitoring well. Develop wells. Drum all wastes.

Lump Sum Cost per exterior Deep Well (est @ 40’) $ /Well

REQUIRED ADDITIONAL INFORMATION

Number of days required to complete DP Profiling: days

Number of days required to complete well network: days

Cost to supply, fill, and stage drums at central area: per drum

Number of drums required drums

Cost for well installation permits: each total

$500

365.15

$1305.00

$2,500

175.00 $12,866.20 mcasey Pencil mcasey Typewritten Text 13,066.20 mcasey Typewritten Text

MC 9/12/22

mcasey Pencil mcasey Typewritten Text 625.00 mcasey Typewritten Text

MC 9/14/2022

Bidder agrees that the proposed costs for the work specified in this bid package will be good for a period of 180 days from the bid opening.

Name of Bidder Authorizing Signature and Title

Address Date

Meeghan Casey Executive Vice President

5904 Hampton Oaks Parkway, Suite F Tampa, Florida 33610 8/15/2022

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511

To: Mr. Brian Moore

GHD

5904 Hampton Oaks Parkway – Suite F

Tampa, FL 33610

May 23, 2022

Re: Transportation and Disposal of Non-Hazardous Soil and Water – Florida

Mr. Moore:

The price for disposal of drums of non-hazardous soil or groundwater located in the State of Florida will be $110.00 per drum, for both transportation and disposal.

This pricing is valid for all regions in the State of Florida except for the Florida Keys.

Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.

This quote is valid for 180 days.

Respectfully, Jonathan Erwin

Erwin Remediation, Inc.

Email: ErwinRemediation@Gmail.com

Office: (850) 292-6511 mailto:Remediation@Gmail.com

6/28/22, 10:23 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 1/2

Quote Number: 19644

QUOTE

QUOTED TO: Brian Moore

QUOTE DATE: 1/1/2022

COMPANY NAME: GHD - 2022 QUOTED BY: Craig Burns

PHONE NUMBER:

Ext.

FAX NUMBER:

PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS

CUSTOMER PO:

CONTACT EMAIL:

SITE ADDRESS: TBD

CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING

COST ESTIMATE FOR

THE SITE/ PROJECT LISTED ABOVE.

DESCRIPTION PRICE QTY. UNIT TOTAL

NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00

NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00

TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$30.00 DRUM $0.00

TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$40.00 DRUM $0.00

TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site

$50.00 DRUM $0.00

Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax

$0.00 . $0.00

HAZ Drums to be quoted case-by-case $0.00 . $0.00

OPTIONAL LINE ITEMS

***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00

TOTAL REQUIRED ITEMS $0.00

TOTAL OPTIONAL ITEMS $0.00

GRAND TOTAL $0.00

NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.

**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns

863.327.6289 - cburns@clarkenv.com

This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.

quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 2/2

Name (print) Title

Signature Date

CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854

WWW.ClarkEnvironmental.com

From: Craig Burns To: Brian Moore Subject: GHD_IDW Drum Rates FL Date: Tuesday, June 28, 2022 10:26:46 AM Attachments: image001.png image002.png image003.png image004.png image005.png GHD Drum Rates FL 2022.pdf

Here you go Brian. I do this for a lot of engineering/consulting firms.

Be aware of the low stop less than 6 drums at $50/flat Be aware of the 10% to the total cost for FSC (implemented April 15).

Pass around the GHD Florida offices

From: Brian Moore <Brian.Moore@ghd.com> Sent: Tuesday, June 28, 2022 10:05 AM To: Craig Burns <cburns@clarkenvironmental.com> Subject: IDW Drums

Craig, Is it possible to provide a generic quote for IDW water disposal.

Assumption is non-haz with necessary analytical Maybe provide a range of locations

South florida or central florida, or both?

Thanks in advance

We have many sites that we generate 1 gw drum of IDW and would like to streamline the vendor coordination

BRIAN MOORE PE

GHD

Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com

The Power of Commitment

Connect

Please consider our environment before printing this email

CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please mailto:cburns@clarkenvironmental.com mailto:Brian.Moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttp-253A-252F-252Fwww.ghd.com-252F-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093857306-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3DorO8Q-252BVqTyo6Ej-252F8ZwSbVyQzLpZtJywYELQonaQNZfo-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3DsMxOUn-szAtJTATQBUgjjDdI6e6b1jo5alN-ez9vKSM%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=K3MyGMhP6XEk1ApT%2FRIPjGR%2BUFJFG9ahCVCi8Z9R1n0%3D&reserved=0 mailto:brian.moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttps-253A-252F-252Fwww.linkedin.com-252Fcompany-252Fghd-252F-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093857306-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3D5HB99sCNyHUdh3ySqo-252BMbX9lHf94JW-252BuI1gRPH6qLGY-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3DBQdX3FW3jjZZNHH7wbXXUS30LUnS3GtU1HJ8G56Snwo%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=%2BQlcPM%2FGtFT%2FrIbbuGi0PnSgurtBD8yqWgV1hvkvk00%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttps-253A-252F-252Fwww.facebook.com-252FGHDGroup-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093867263-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3DKXDgOYLYSf-252BwLLtpvQNMpyPzR3DV5-252FDBogAW3HWif9Y-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3DdHZdva6F1f6cSXNf7WLXU9x5VBxbTV01G78hKDk-cSA%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=142JKLTMfwfz%2FAO%2FXHrz%2FUodXSRzYWWBygfbg7vBIWs%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttps-253A-252F-252Ftwitter.com-252FGHDspeaks-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093877221-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3Duwh4lLmvdNCQkyPoUgiL7r2l9-252BmFgEv2JbZPLM3ptM0-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3D6FLD5pJDe4zG94aUPcPkIB9mx5JTMUxrAOX-fjV9l3o%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=O7BUsLKToxyyPXzZcLcBA1z3Q7%2FKvVsiCNGMGHOzln0%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttps-253A-252F-252Fwww.youtube.com-252Fchannel-252FUCwUGfe6zgaddIXqA7entIwQ-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093877221-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3DVTPo9BdB-252FyUkff7ZLoE6J99Jt9f-252Fvtuta-252Fsm1KEOuNc-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3D9S3nI6ai6gtzPu1y34Kb_OuqwixCpq0TgIkmYlOz0gk%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=YX45%2BiFGXo7axCd4VDmEIFdcmHajQE6n8KvktA7llOs%3D&reserved=0 quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 1/2

Quote Number: 19644

QUOTE

QUOTED TO: Brian Moore

QUOTE DATE: 1/1/2022

COMPANY NAME: GHD - 2022 QUOTED BY: Craig Burns

PHONE NUMBER:

Ext.

FAX NUMBER:

PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS

CUSTOMER PO:

CONTACT EMAIL:

SITE ADDRESS: TBD

CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING

COST ESTIMATE FOR

THE SITE/ PROJECT LISTED ABOVE.

DESCRIPTION PRICE QTY. UNIT TOTAL

NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00

NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00

TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$30.00 DRUM $0.00

TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$40.00 DRUM $0.00

TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site

$50.00 DRUM $0.00

Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax

$0.00 . $0.00

HAZ Drums to be quoted case-by-case $0.00 . $0.00

OPTIONAL LINE ITEMS

***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00

TOTAL REQUIRED ITEMS $0.00

TOTAL OPTIONAL ITEMS $0.00

GRAND TOTAL $0.00

NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.

**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns

863.327.6289 - cburns@clarkenv.com

This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.

quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 2/2

Name (print) Title

Signature Date

CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854

WWW.ClarkEnvironmental.com delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.

Whatever Waste, LLC 3834 Mandarin Woods Dr. No.

Jacksonville, Florida 32223 United States 904.881.1957

Brian Moore PE

GHD

5904 Hampton Road Parkway Suite F Tampa, FL 33610

Estimate Number 062922.1

Notes Dry Cleaner Site Locations: Central and South Florida Regions excluding Florida Keys Required analytical data for non-haz disposal acceptance would be VOCs and includes waste profiling assistance if the IDW-GW drums don't fall under a blanket waste profile DOT shippable drums must be on a hard surface at each accessible location

Terms Non-hazardous IDW drum pickup, transport and disposal pricing is based on per service event No-load drum fee if unable to pickup drums on any site in Central FL is $150; in South FL is $200 Pricing is valid or subject to change on a monthly basis in part due to escalating fuel prices Payment required within 45 days after email receipt of invoice

Indemnification: Each party agrees to indemnify, defend and hold harmless each other for and from any loss

Estimate Date 06/29/2022

Description Rate Qty Line Total

IDW-GW Drum Transport & Disposal - Central FL Sites

(1) Regional Stop Fee $600 - then $150 per 55-gal drum < 10 drums

$150.00 1 $150.00

IDW-GW Drum Transport & Disposal - Central FL Sites

(1) Regional Stop Fee $300 - then $150 per 55-gal drum > 10 drums

$150.00 1 $150.00

IDW-GW Drum Transport & Disposal - South FL Sites

(1) Regional Stop Fee $850 - then $200 per 55-gal drum < 10 drums

$200.00 1 $200.00

IDW-GW Drum Transport & Disposal - South FL Sites

(1) Regional Stop Fee $425 - then $200 per 55-gal drum > 10 drums

$200.00 1 $200.00

Subtotal

Tax

700.00

0.00

Estimate Total (USD) $700.00 or liability arising out of the party's breach of this agreement, scope of work, except for gross negligence, willful misconduct or bad faith.

10220 U.S. Highway 92 East Phone: 813-621-4929 Tampa, Florida 33610 Fax: 813-621-7194 Web: www.survtechsolutions.com Email: Sales@survtechsolutions.com

Friday, August 12, 2022

Brian Moore

GHD

4019 E. Fowler Ave., Tampa, FL 33617

RE: Proposal for Services for Michael The Cleaners located at 6513 14th St W, Bradenton, FL, 34207-5803; Folio No.: N/A; Estimate No.: 221810; Project No.: N/A

Dear Brian;

SurvTech Solutions, Inc. is pleased to submit the following information for your consideration in selecting a firm to perform the necessary services, as noted above. We feel that you will find SurvTech Solutions, Inc. is well qualified to accomplish all services set forth in the request for proposal. Our outstanding staff of professional, technical, and support personnel has extensive and varied qualifications.

The lump-sum cost for the project will be $2,495.00, with an estimated time frame of 28 days from notice to proceed. Please see attached scope of work for a detailed breakdown of costs and services. If a quicker schedule is needed, please contact us, and we will try to accommodate your schedule.

If this proposal is acceptable, please sign the attached contract and send it to SurvTech Solutions via fax, email, or U.S. Mail. SurvTech cannot start said project without having a signed contract in place. If your firm wishes to use its own in-house contract or purchase order, then please forward them to SurvTech for review and signatures. SurvTech Solutions, Inc. appreciates this opportunity to submit this proposal for services. We look forward to serving GHD on this project.

Respectfully submitted, SurvTech Solutions, Inc.

Florida Licensed Business No. 7340

Matthew S. Brooks, PSM, LS, PLS V.P. of Contracts Management

PROPOSAL 221810

Specific Purpose Survey to FDEP PLS Requirements

See Scope of Services Below

$2,495.00

TOTAL $2,495.00

Scope of Services

Standards of Practice:

1. All Surveying and Mapping will be performed per “The Florida Standards of Practice for Surveying and Mapping” and signed and sealed by a Florida Licensed Surveyor and Mapper.

Geodesy & Datums

1. Survey project data will be on the following coordinate system(s) and datum(s):

Horizontal datum (x, y; easting, northing)

SPC NAD1983, Florida West zone state plane coordinates

2. Units for the project shall be:

U.S. Survey Feet International Feet Meters Other: ___________________________________________

FDEP Pre-Approval Specific Purpose Survey

1. The base map shall be prepared by a Professional Surveyor and Mapper (PSM). SurvTech shall deliver a signed and sealed map, electronic and paper copies. The electronic format shall be in its original updateable format (AutoCAD). The electronic copy shall be forwarded to the client (or contracted local program, as appropriate) so that it can be kept on file to be used by future Contractors to build upon as necessary (also see section 3.5.6 – Access to Public Records).

2. This proposal does NOT include the potable well survey and the area use survey; these activities do not need to be performed by a PSM.

3. SurvTech shall coordinate with the client, if requested, so that the survey task can be coordinated with another on-site task, such as the “Area Survey.”

4. The scope of work for this survey is as follows [maps to be provided in both paper and electronic format (typically Auto CADD)]:

a. Designation of North direction;

b. The scale of the drawing (the scale should be written and represented as a bar scale);

c. The date of the field survey;

d. The location of the property in relation to bordering roads and streets, neighboring properties and the locations of the property entrances from the roadway. Business names and street addresses of adjoining properties should be marked on the site plan;

e. Approximate property boundaries and right-of-ways;

f. Accurate dimensions and locations of the foundation outlines of any existing structures on the subject property, including buildings, pump islands, tank areas, UST vents, septic drain fields and treatment systems;

g. Accurate dimensions and locations of the foundation outlines of any existing structures that establish a reasonably continuous and uniform construction line, including any permanent walls or fences;

h. Accurate location and elevation of top-of-casing for any…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .