This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) under Contract Number HW684. The Task Assignment DC010A was executed between FDEP and GHD Services, Inc., a contractor specializing in environmental consulting services. The document was signed on April 21, 2022, by Brian Moore, Contract Manager for GHD Services, Inc., and William E. Burns, Jr., Secretary or Designee for FDEP. The project is located at 8490 W Hillsborough Ave, Tampa, Hillsborough County, Florida, at the former Town & Country Cleaners site (ERIC_4730).

The Task Assignment encompasses groundwater sampling and monitoring services valued at $6,285.91 on a fixed unit rate basis. The work consists of two subtasks: Subtask 1 includes project management calculated at 13 percent of direct labor costs ($499.85), and Subtask 2 involves annual groundwater sampling at ten monitoring wells (MW001, MW003-MW007, MW009, MW011-MW013) with analysis for volatile organic halocarbons using EPA Method 8260. The scope includes depth-to-water measurements, groundwater elevation figures, analytical evaluation, investigation-derived waste disposal, and preparation of a comprehensive Groundwater Monitoring Report. The final deliverable was due September 1, 2022, with task completion by December 2, 2022. Direct costs include labor ($3,949.83), travel ($120.00), subcontractor services for waste disposal ($110.00), laboratory analysis ($879.50), and field equipment and supplies ($831.60), plus a completion fee of $394.98. The contract was performed under a current Site Access Agreement signed January 11, 2013.

View the file

Other files

File Type Posted
CN-370000-HW684-BIL02F.pdf PDF
CN-370000-HW684-BIL2CC03.pdf PDF
CN-370000-HW684-BIL2ECO1.pdf PDF
CN-370000-HW684-BIL2FCO1.pdf PDF
CN-370000-HW684-BIL2GCO1.pdf PDF
CN-370000-HW684-CSS02A.pdf PDF
CN-370000-HW684-CSS03B.pdf PDF
CN-370000-HW684-D033CCO1.pdf PDF
CN-370000-HW684-DC001A.pdf PDF
CN-370000-HW684-DC001F.pdf PDF
CN-370000-HW684-DC002B.pdf PDF
CN-370000-HW684-DC002C.pdf PDF
CN-370000-HW684-DC002D.pdf PDF
CN-370000-HW684-DC003D.pdf PDF
CN-370000-HW684-DC004D.pdf PDF
CN-370000-HW684-DC005A.pdf PDF
CN-370000-HW684-DC005D.pdf PDF
CN-370000-HW684-DC006B.pdf PDF
CN-370000-HW684-DC009C.pdf PDF
CN-370000-HW684-DC009D.pdf PDF
CN-370000-HW684-DC009E.pdf PDF
CN-370000-HW684-DC011A.pdf PDF
CN-370000-HW684-DC011C.pdf PDF
CN-370000-HW684-DC012D.pdf PDF
CN-370000-HW684-DC013B.pdf PDF
CN-370000-HW684-DC014D.pdf PDF
CN-370000-HW684-DC014F.pdf PDF
CN-370000-HW684-DC015A.pdf PDF
CN-370000-HW684-DC015C.pdf PDF
CN-370000-HW684-DC016B.pdf PDF
CN-370000-HW684-DC016C.pdf PDF
CN-370000-HW684-DC017C.pdf PDF
CN-370000-HW684-DC018C.pdf PDF
CN-370000-HW684-DC019C.pdf PDF
CN-370000-HW684-DC019D.pdf PDF
CN-370000-HW684-DC01ACO2.pdf PDF
CN-370000-HW684-DC020B.pdf PDF
CN-370000-HW684-DC025A.pdf PDF
CN-370000-HW684-DC026B.pdf PDF
CN-370000-HW684-DC026D.pdf PDF
CN-370000-HW684-DC027C.pdf PDF
CN-370000-HW684-DC028C.pdf PDF
CN-370000-HW684-DC029C.pdf PDF
CN-370000-HW684-DC031A.pdf PDF
CN-370000-HW684-DC034B.pdf PDF
CN-370000-HW684-DC03ACO1.pdf PDF
CN-370000-HW684-DC03CCO1.pdf PDF
CN-370000-HW684-DC03CCO2.pdf PDF
CN-370000-HW684-DC040A.pdf PDF
CN-370000-HW684-DC045B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW684

DC010A Completion December 2, 2022

GHD Services, Inc. will conduct groundwater sampling at the former Town & Country Cleaners site located in Tampa, Florida. All work will be conducted in accordance with the scope of work and cost proposal submitted on April 5, 2022.

Kevin Kane (850) 245-8971 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

GHD Services, Inc.

GHD Services, Inc.

Brian Moore (813) 257-0658

ERIC_4730

8490 W Hillsborough Ave, Tampa, Hillsborough County

Town & Country Cleaners

✔ $ 6,285.91

$ 6,285.91

Scope of Work

Brian Moore

Contract Manager

Brian Moore Digitally signed by Brian Moore Date: 2022.04.21 14:18:06 -04'00'

William E. Burns, Jr.

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2022.04.20 20:53:28 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Groundwater Monitoring Report + Project Management 09/01/2022

Subtasks 1 and 2: Upon submittal and FDEP approval of the Groundwater Monitoring Report + Project Management $ 6,285.91

$ 6,285.91

HW684

DC010A

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

TO: HW684 Contract File

FROM: Kevin Kane, Contract Manager

DATE: April 20, 2022

SUBJECT: Task Assignment DC010A

Town & Country Cleaners

ERIC_4730

Monitoring

GHD Services, Inc. (GHD) will conduct two groundwater sampling events. Specific subtasks are detailed below:

Subtask 1: Project Management Project management is calculated at 13% of the direct labor.

Subtask 2: Groundwater Sampling Annual groundwater sampling will be conducted at site monitoring wells MW001, MW003, MW004, MW005, MW006, MW007, MW009, MW011, MW012, and MW013.

Prior to sampling, depth to water measurements will be gathered from all existing wells.

Groundwater sampling will then be conducted in accordance with FDEP SOPs. All groundwater samples will be analyzed for the presence of volatile organic halocarbons by EPA Method 8260. Following receipt of groundwater analytical results, a summary report will be prepared. The summary report will include a description of field sampling methodology and analytical results. Groundwater elevation and analytical figures will also be prepared. The report will also include recommendations regarding the next step toward site rehabilitation.

Investigation derived waste (IDW) disposal is anticipated and has been accounted for under this subtask. Subcontractors for IDW disposal were chosen on a lowest-cost basis.

The Florida Department of Environmental Protection (FDEP) has a current and valid Site Access Agreement for this site, signed January 11, 2013.

This work will be conducted in line with the scope of work included with GHD’s proposal, received April 5, 2022. Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and proposal letter. The final deliverable due date is September 1, 2022, and the completion date for the task assignment is December 2, 2022.

The final cost total for Task Assignment DC010A is $6,285.91.

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 04/20/22

Task #: DC010A SubTask 1 Project Management SubTask 6

Site: Town & Country SubTask 2 Groundwater Monitoring SubTask 7

Activity/Phase: Monitoring SubTask 3 SubTask 8

Project Manager: Brian Moore, PE SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$40.12 Project Manager JM 4.20 4.2 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Technical Director 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$46.33 Sr Professional Engineer JH 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$43.28 Professional Engineer/Sc GE 13.00 13.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $39.82 Project Engineer/Scientis TC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $40.12 Project Manager/ Engine JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $33.17 Staff Engineer/Scientist DB 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $32.40 Data Analyst JL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $43.35 Field Manager OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.76 Senior Technician SA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.65 Senior Technician SC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $23.69 Senior Technician WM 10.50 10.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.58 Junior Technician WO 10.50 10.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.75 Junior Technician JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.69 Drafting Technician PM 4.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $22.44 Administrative Assistant DA 6.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Driller 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 HSEQ&R Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 49.20 4.20 45.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $1,476.02 $169.81 $1,306.21 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 129.80% $1,915.87 $220.41 $1,695.46 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.80% $557.94 $64.19 $493.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,949.83 $454.41 $3,495.42 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 Page 1

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 04/20/22

Task #: DC010A SubTask 1 Project Management SubTask 6

Site: Town & Country SubTask 2 Groundwater Monitoring SubTask 7

Activity/Phase: Monitoring SubTask 3 SubTask 8

Project Manager: Brian Moore, PE SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $10.00 $10.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $803.00 $803.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $76.50 $76.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $879.50 $879.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $791.60 $791.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $831.60 $831.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $5,890.93 $454.41 $5,436.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $394.98 $45.44 $349.54 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $6,285.91 $499.85 $5,786.06 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Town & Country SUBTASK 2: Groundwater Monitoring

DATE: 04/20/22

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr. Professional Engineer JH Conclusions/Recommendations 1

Professional Geologist GE Coordinate site access to the interior 0.5 Professional Geologist GE Field work scope and QA/QC field data package 1 Professional Geologist GE Coordinate IDW Disposal 1 Professional Geologist GE Groundwater sampling methdology 1.5 Professional Geologist GE Groundwater Elevation evaluation (shallow/intermediate) 3 Professional Geologist GE Groundwater analytical evaluation (shallow/intermediate) 4 Professional Geologist GE QA/QC (Laboratory) 1 Professional Geologist GE Conclusions and Recommendations 1

Senior Technician WM Mob/Demob (2 days) 2 Senior Technician WM Equipment Calibration/COC forms 1 Senior Technician WM Groundwater Sampling (5 wells) 7.5

10.5

Junior Technician WO Mob/Demob 1 Junior Technician WO Water Levels (all wells - 14 total) 2.25 Junior Technician WO Groundwater Sampling (5 wells) 7.5

10.75

Drafting Technician PM Prepare Groundwater Contour Figures (shallow/intermediate) 2 Drafting Technician PM Prepare Groundwater Analytical Figures (shallow/intermediate) 2

Staff Assistants DA Data Entry (10 wells + water levels) 1.5 Staff Assistants DA Update summary tables 1 Staff Assistants DA Document Preparation/Publishing/PDF 2 Staff Assistants DA GIS/Adapt update 1.5

TOTAL LABOR 45.25

VEHICLE TYPE RATE UNIT USEAGE

Company Truck $120.00 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin IDW Disposal 1 drum $100.00 $100.00

TOTAL $100.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method 8260 VOHs $73.00 10 $730.00 EPA Method 8260 VOHs $73.00 1 $73.00 sample shipping (two day - large cooler) $70.00 1 $70.00 Ice $6.50 1 $6.50

TOTAL LAB $879.50

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

Expandables $40.00 day 1 $40.00

Equipment (Analytical Related) one per technician Groundwater Sampling Kit $290.00 Day 2 $580.00 Poly Tubing (HDPE) $0.30 Ft 272 $81.60 Silicon Tubing $3.00 Ft 10 $30.00 55-gallon drum $100.00 drum 1 $100.00

Equipment (Other) $0.00

TOTAL EQUIPMENT $831.60

FINAL --7/24/96

COST PROPOSAL FOR TASK DC010A

<Town & Country Cleaners/FDEP ERIC_4730>

<Groundwater Monitoring >

1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >

GHD submitted a Supplemental Site Assessment Report (SSAR) in February 2020 for the Town & Country Cleaners site located in Tampa, Hillsborough County. The results of the groundwater sampling conducted identified vinyl chloride as the primary contaminant of concern at the site. The SSAR was approved along with the assessment for the site and periodic groundwater sampling was recommended. Task Assignment DC010A includes annual groundwater sampling at selected site monitoring wells in accordance with recommendations from GHD’s previous monitoring report (dated September 3, 2021), and Department comments dated October 18, 2021.

Subtask 1: Project Management Subtask 1 includes all activities associated with completion of groundwater sampling and preparation of a Groundwater Monitoring Report.

Subtask 2: Groundwater Sampling Groundwater sampling is recommended in order to evaluate concentration trends over time.

Annual groundwater sampling will be conducted at site monitoring wells MW001, MW003, MW004, MW005, MW006, MW007, MW009, MW011, MW012, and MW013. Prior to sampling, depth to water measurements will be gathered from all existing wells. Groundwater sampling will then be conducted in accordance with FDEP SOPs. All groundwater samples will be analyzed for the presence of volatile organic halocarbons by EPA Method 8260.

Following receipt of groundwater analytical results, a summary report will be prepared. The summary report will include a description of field sampling methodology and analytical results. Groundwater elevation and analytical figures will also be prepared. The report will also include recommendations regarding the next step toward site rehabilitation.

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

Groundwater Monitoring Report 9/1/22

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511

To: Mr. Brian Moore

GHD

5904 Hampton Oaks Parkway – Suite F

Tampa, FL 33610

March 16, 2020

Re: IP Cleaners - Miami, FL

Mr. Moore:

The price for disposal of two (2) drums of non-hazardous groundwater located in Miami, FL will be $100.00 per drum, or $200.00 total, for both transportation and disposal.

Respectfully, Jonathan Erwin

Erwin Remediation, Inc.

Email: ErwinRemediation@Gmail.com

Office: (850) 292-6511 mailto:Remediation@Gmail.com

From: Jamie Infinger To: Brian Moore Subject: RE: IP Cleaners - Miami Date: Monday, March 16, 2020 8:39:32 AM Attachments: image001.png image002.png image003.png image004.png

$95.00 per drum plus $150.00 stop charge Have a great day

Thanks, Jamie Infinger A Nationwide Waste Disposal Company Clean Management Environmental Group, Inc.

P: (800)-538-8131 F: (843)-538-7845 C: (912)-674-6783 jinfinger@cleanmanagement.com www.cleanmanagement.com

From: Brian.Moore@ghd.com [mailto:Brian.Moore@ghd.com] Sent: Sunday, March 15, 2020 11:45 AM To: Jamie Infinger <jinfinger@cleanmanagement.com> Subject: IP Cleaners - Miami

Jamie, Can you provide quote for disposal of 2 drums of water from the above site. Low level solvents, assume non-haz thanks

Brian Moore, PE

GHD

Proudly employee owned T: 813 257 0658 | M: 813 335 2147 | E: Brian.Moore@ghd.com 5904 Hampton Oaks Parkway Suite F Tampa Florida 33610 USA | www.ghd.com Connect

WATER | ENERGY & RESOURCES | ENVIRONMENT | PROPERTY & BUILDINGS | TRANSPORTATION

mailto:jinfinger@cleanmanagement.com mailto:Brian.Moore@ghd.com mailto:jinfinger@cleanmanagement.com http://www.cleanmanagement.com/ mailto:Brian.Moore@ghd.com http://www.ghd.com/ https://www.linkedin.com/company/ghd https://www.facebook.com/GHDGroup https://twitter.com/GHD_Namerica https://www.youtube.com/channel/UCwUGfe6zgaddIXqA7entIwQ https://www.ghd.com/en/sectors/water.aspx https://www.ghd.com/en/sectors/energy---resources.aspx https://www.ghd.com/en/sectors/environment.aspx https://www.ghd.com/en/sectors/property---buildings.aspx https://www.ghd.com/en/sectors/transportation.aspx

Please consider our environment before printing this email

CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.

This e-mail has been scanned for viruses

ID Task Mode

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Wed 4/6/22 Tue 4/19/22

2 Subtask 1: Project Management

96 days Wed 4/20/22

Wed 8/31/22

3 Subtask 2: Groundwater Monitoring

50 days Fri 6/24/22 Thu 9/1/22

4 Field Work Preparation 2 wks Fri 6/24/22 Thu 7/7/22

5 Groundwater Sampling 1 day Tue 7/12/22 Tue 7/12/22

6 Groundwater Monitoring Report

6 wks Fri 7/22/22 Thu 9/1/22

3/27 4/3 4/10 4/17 4/24 April

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC010A at the Town & Country Cleaners site located in Tampa, Hillsborough County

Project: TA_010A Date: Tue 4/5/22

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Wed 4/6/22 Tue 4/19/22

2 Subtask 1: Project Management

96 days Wed 4/20/22

Wed 8/31/22

3 Subtask 2: Groundwater Monitoring

50 days Fri 6/24/22 Thu 9/1/22

4 Field Work Preparation 2 wks Fri 6/24/22 Thu 7/7/22

5 Groundwater Sampling 1 day Tue 7/12/22 Tue 7/12/22

6 Groundwater Monitoring Report

6 wks Fri 7/22/22 Thu 9/1/22

5/1 5/8 5/15 5/22 5/29 May June

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC010A at the Town & Country Cleaners site located in Tampa, Hillsborough County

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Wed 4/6/22 Tue 4/19/22

2 Subtask 1: Project Management

96 days Wed 4/20/22

Wed 8/31/22

3 Subtask 2: Groundwater Monitoring

50 days Fri 6/24/22 Thu 9/1/22

4 Field Work Preparation 2 wks Fri 6/24/22 Thu 7/7/22

5 Groundwater Sampling 1 day Tue 7/12/22 Tue 7/12/22

6 Groundwater Monitoring Report

6 wks Fri 7/22/22 Thu 9/1/22

Ga

6/5 6/12 6/19 6/26 7/3 July

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC010A at the Town & Country Cleaners site located in Tampa, Hillsborough County

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Wed 4/6/22 Tue 4/19/22

2 Subtask 1: Project Management

96 days Wed 4/20/22

Wed 8/31/22

3 Subtask 2: Groundwater Monitoring

50 days Fri 6/24/22 Thu 9/1/22

4 Field Work Preparation 2 wks Fri 6/24/22 Thu 7/7/22

5 Groundwater Sampling 1 day Tue 7/12/22 Tue 7/12/22

6 Groundwater Monitoring Report

6 wks Fri 7/22/22 Thu 9/1/22 abrielle Enos

William McKinney,William Ouchie

7/10 7/17 7/24 7/31 8/7 August

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC010A at the Town & Country Cleaners site located in Tampa, Hillsborough County

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Wed 4/6/22 Tue 4/19/22

2 Subtask 1: Project Management

96 days Wed 4/20/22

Wed 8/31/22

3 Subtask 2: Groundwater Monitoring

50 days Fri 6/24/22 Thu 9/1/22

4 Field Work Preparation 2 wks Fri 6/24/22 Thu 7/7/22

5 Groundwater Sampling 1 day Tue 7/12/22 Tue 7/12/22

6 Groundwater Monitoring Report

6 wks Fri 7/22/22 Thu 9/1/22 Jeremy Hess,Gabrielle Enos,P

8/14 8/21 8/28 9/4 9/11 September

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC010A at the Town & Country Cleaners site located in Tampa, Hillsborough County