Task Assignment Summary
This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) under underlying Contract Number HW684. The task assignment, numbered DC043C, is between FDEP and GHD Services, Inc., a contractor based in Tampa, Florida. The project involves soil vapor extraction (SVE) system piping installation at Dryclean USA #11423, located at 3013 Yamato Road, Boca Raton, Palm Beach County, Florida. The assignment was signed on October 31, 2023, with project completion scheduled for February 15, 2024.
The scope of work includes two subtasks: Subtask 1 covers project management activities, and Subtask 2 encompasses underground piping installation, including the installation of two new SVE wells to depths of 3 feet below land surface with 2.5 feet of well screen and blank casing, below-ground piping from three previously installed piezometers to the building exterior, and field documentation with as-built drawings. GHD Services will coordinate with subcontractors including Ryan Herco (materials procurement), Cemex (concrete repair), and Erwin Remediation (industrial waste disposal services). The total task assignment value is $21,690.09 on a fixed unit rate basis, with labor costs of $14,822.41, travel expenses of $2,040.00, subcontractor costs totaling $2,325.44, field expenses of $1,020.00, and a completion fee of $1,482.24. The deliverable—field documentation and as-built drawings—is due December 15, 2023, with invoice payment contingent upon FDEP approval of these deliverables.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW684
DC043C Completion February 15, 2024
GHD will install the piping and infrastructure for an SVE system based on their layout design at Dryclean USA#11423.
Nicole Knutson 850-245-8763 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
GHD Services, Inc
GHD Services, Inc
Brian Moore 813 257 0658
ERIC_5163
3013 Yamato Rd, Boca Raton, Palm Beach County
Dryclean USA#11423
✔ $ 21,690.09
$ 21,690.09
Scope of Work
Brian Moore Digitally signed by Brian Moore Date: 2023.11.04 19:26:03 -04'00' Kelly Crain Digitally signed by Kelly Crain
Date: 2023.10.31 14:54:53 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Field Documentation and As-Built Drawings & PM - Subtasks 1 & 2 12/15/2023
FDEP Approval of Field Documentation and As-Built Drawings & PM - Subtasks 1 & 2 $ 21,690.09
$ 21,690.09
HW684
DC043C
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: ERIC_5163
Dryclean USA#11423
FROM: Nicole Knutson, Project Manager
SUBJECT: Negotiation Summary
HW684 DC043C
DATE: October 30, 2023
GHD will install the piping and infrastructure for an SVE system based on their layout design at Dryclean USA#11423. Ryan Herco will provide materials for the SVE system, Cemex will perform concrete repair, and Erwin Remediation will perform IDW T&D services. Following the completion of the piping installation, GHD will provide field documentation and As-Built Drawings.
Total task amount is $21,690.09. GHD’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date is December 15, 2023. Task completion date is February 15, 2024.
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 10/30/2023
Task #: DC043C SubTask 1 Project Management SubTask 6
Site: Dryclean USA#11423 SubTask 2 Construction SubTask 7
Activity/Phase: Construction SubTask 3 SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$49.53 Project Manager JM 12.87 12.87 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Technical Director 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$56.19 Sr Professional Engineer JH 6.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$45.07 Professional Engineer/Sc GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $39.28 Project Engineer/Scientis CH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $43.08 Project Manager/ Enginee SC 7.00 7.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.67 Staff Engineer/Scientist ED 49.00 49.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $32.40 Data Analyst JL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $43.35 Field Manager OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.55 Senior Technician DC 50.00 50.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.26 Senior Technician BJ 50.00 50.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.55 Senior Technician DC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.21 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.00 Junior Technician JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.69 Drafting Technician PM 4.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $21.63 Administrative Assistant JJ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 178.87 12.87 166.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $5,539.02 $637.23 $4,901.79 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 129.80% $7,189.64 $827.12 $6,362.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.80% $2,093.75 $240.87 $1,852.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $14,822.41 $1,705.22 $13,117.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 10/30/2023
Task #: DC043C SubTask 1 Project Management SubTask 6
Site: Dryclean USA#11423 SubTask 2 Construction SubTask 7
Activity/Phase: Construction SubTask 3 SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $480.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $1,560.00 $1,560.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $2,040.00 $2,040.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) Ryan Herco $442.33 $442.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $442.33 $442.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $44.23 $44.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $486.56 $486.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $550.00 $550.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Cemex $1,121.71 $1,121.71 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $1,671.71 $1,671.71 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $167.17 $167.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $1,838.88 $1,838.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $200.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $820.00 $820.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,020.00 $1,020.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $20,207.85 $1,705.22 $18,502.63 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,482.24 $170.52 $1,311.72 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $21,690.09 $1,875.74 $19,814.35 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cost from Prior CEF: Manual Entry Cost from Delta CEF; Manual Entry
Cost (Prior + Delta): $0.00 Auto-Calculated Rounding Error: $21,690.09 Auto-Calculated
Final Total Cost: $21,690.09 Auto-Calculated
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Dryclean USA #11423 SUBTASK 2: Construction
DATE: 10/30/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr Professional Engineer JH Site access with Property Manager 2 Sr Professional Engineer JH Daily Updates (0.5 hr / day) 2 Sr Professional Engineer JH As-Built Drawing Package 2
Construction/Superintendent SC Field scope for Construction Technicians 2 Construction/Superintendent SC Daily Updates (1 hour / day) 5
Senior Technician DC Mob/Demob 6 Senior Technician DC Install SVE wells (2 total) 4 Senior Technician DC Concrete Cutting 16 Senior Technician DC Interior Piping 12 Senior Technician DC Backfill and Concrete Repair 12
Senior Technician BJ Mob/Demob 6 Senior Technician BJ Install SVE wells (2 total) 4 Senior Technician BJ Concrete Cutting 16 Senior Technician BJ Interior Piping 12 Senior Technician BJ Backfill and Concrete Repair 12
Staff Scientist/Engineer ED Mob/Demob (5 days) 5 Staff Scientist/Engineer ED Concrete Cutting 4 Staff Scientist/Engineer ED Piping As-Builts 16 Staff Scientist/Engineer ED Interior Piping 12 Staff Scientist/Engineer ED Backfill and Concrete Repair 12
Drafting Technician PM Prepare As-Built Drawings 4
TOTAL LABOR 166
VEHICLE TYPE RATE UNIT USEAGE
Company Truck $480.00 week 1 $480.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE
Per Diem Sr Tech (DC) 5 days $36.00 Per Day 5 $180.00 Per Diem Sr Tech (BJ) 5 days $36.00 Per Day 5 $180.00
Hotel Sr Tech (DC) 4 nights $150.00 Per Day 4 $600.00 Hotel Sr Tech (BJ) 4 nights $150.00 Per Day 4 $600.00
TOTAL PER DIEM $1,560.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Ryan Herco PVC Pipe 2" bell end 240 ft $1.40 $336.00 Ryan Herco PVC Cap 2" 5 each $0.90 $4.50 Ryan Herco PVC 90 degree 2" 29 each $1.75 $50.75 Ryan Herco PVC Primer 1 each $11.42 $11.42 Ryan Herco PVC Cement 1 each $10.72 $10.72 Ryan Herco Taxes 7% $28.94 Cemex Concrete 3 yard $195.00 $585.00 Cemex Fuel Surcharge 1 each $78.33 $78.33 Cemex Env Fee 1 each $25.00 $25.00 Cemex handling fee 1 each $10.00 $10.00 Cemex load charge 1 each $350.00 $350.00 Cemex tax 7% $73.38 Erwin IDW Disposal (soil) 5 drum $110.00 $550.00
TOTAL $2,114.04
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 5 $200.00
Concrete Saw $240.00 week 1 $240.00 Portable Generator $280.00 week 1 $280.00 Construction O&M Supplies $300.00 week 1 $300.00
TOTAL EQUIPMENT $1,020.00
FINAL --7/24/96
COST PROPOSAL FOR TASK DC043C
<Drycleaner USA#11423, ERIC_5163>
< SVE Piping Installation>
1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >
GHD Services Inc. (GHD) recently completed assessment activities at the Dryclean USA #11423 site. Based on the results of the assessment, soil vapor extraction (SVE) operations are being considered as a possible remedial effort in the future. Accordingly, GHD recently prepared SVE layout design drawings. Task DC043C includes labor and expenses for the installation of subsurface SVE piping in accordance with GHD’s design drawings.
Subtask 1: Project Management Subtask 1 includes all activities associated with management of the SVE piping installation.
Subtask 2: underground piping During MAGS, GHD installed three (3) piezometers that will be incorporated into the existing SVE piping. Additional 2 new SVE wells will be installed. The wells will be constructed to depths of 3 ft bls and will be constructed with 2.5 feet of well screen (0.010 slot) and blank casing.
Following well installation, the SVE wells will be piped (below ground) to the rear of the building as shown in the design drawings (see drawings). The wells will be plumbed to the exterior of the building and attached to the exterior of the building. The wells will be capped for future use as remedial wells if deemed necessary.
Upon completion of the field activities, GHD will provide field documentation of the well installation and piping activities as well as As-Built Drawings.
Deliverables:
Deliverable Deliverable Due Date
Field Documentation and As-Built Drawings 12/15/23
From: Brian Moore To: Knutson, Nicole Cc: Cheryl Tidwell; Jenna Martin Subject: Dryclean USA#11423 Date: Saturday, October 28, 2023 9:11:48 AM Attachments: image001.png image002.png image003.png image004.png image005.png TA_043C.doc Schedule - TA_043C.pdf Bids - TA_043C.pdf TA_043C.xlsx
EXTERNAL MESSAGE
This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.
Nikki, Our proposal for SVE piping installation at DC USA is attached for your review. As we discussed, we have this tentatively scheduled to start November 6th.
We were only able to get 2 bids for the concrete repair, we contacted several others including Continental Concrete, Ready 2 Resurface , and Tarmac Standard Concrete, but they did not respond to our requests for quotes.
Thank you
BRIAN MOORE PE
GHD
Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com
The Power of Commitment
Connect
Please consider our environment before printing this email
CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.
mailto:Brian.Moore@ghd.com mailto:Nicole.Knutson@FloridaDEP.gov mailto:Cheryl.Tidwell@ghd.com mailto:Jenna.Martin@ghd.com http://secure-web.cisco.com/1eKjEqq1QB9HAYDFNK6-6LXXlRmRxWd_pCgD4rrUlYHh3CJeXEKJZV_IJdBYQG8VadDp67STUss-UJ3N5v78KF9ykBU3Co00ygg1Dhjc00ojqtbaryhTGRbUo2V81RM-5MxXp3FYlP1kholdUypL8836yNHwc_UaEOGXwDWojJyC0z6Fyz6pLPHvubuiELz-An8sM8C-a3MkzRU5BhbJrWeO6PD6y2BXO_0R6K2OwFWgRrCXgoE16FzE7P16rVBy3bl8H0jYXElPeMxblzfn2h57CpRoOsm0YOd-zsUB6wU7JKMhmEMNOGP7Ccnw4UGS4/http%3A%2F%2Fwww.ghd.com%2F mailto:brian.moore@ghd.com https://secure-web.cisco.com/1EIIGULJG3y6rMSNOmf1aTDvyuS98sLTsixmTFW52t0oPTrlR12oRePCWbJ7eNJ2wS2QPuG5u3TlZV0EfQ_DZeSkM-btMF2lDZhbvPT6kJsUcLjKPx_qF5bG6_PgNkNBj45edYrqCjaereccFiENps3OXC7MvMRfxPbMBYuTNbV1usuuATGmfiQ21l2KzheNugx0f_Tfd5CxcA6QozB44DdJDk6BKlhR4v8GPJtZGzfHUEGRG8bhjzHTFk9mnbE-y7Bgw9EojH8b9m66HZxKvFgdTkveVdjx-Bp-G1eOQDb0-NpnbMsJCvSjk0sxZych_/https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fghd%2F https://secure-web.cisco.com/1QK3oG2xjGMB77SvfkSp6W9SzCYtDJtfXW6cgE-yLz90IfOmbw6AIO77Eos0x50Fdu8hEFxbffkCRG1wTKmJ9ZkHvD6VF0wOA5VuR23vnSEI60dukH16_UoId7MaeeVuoTaKdXAM7FSPdX0uSbarKkk75kUyddxjk8JQQ1VYKIkcDE9Fhqprw3h0dYKov6G8ekGK4hYvWuA0Djs86Wsgxj7GGM3mafmQYU_C9ka8RRqAJHq6v-utmbm7Nw81ZM3jIzajvV1TwjfvCIIouE0rZoUVhBpH87rDc8e4Lt4ynWvT_w_8bEGfacmpHChDqX3Wm/https%3A%2F%2Fwww.facebook.com%2FGHDGroup https://secure-web.cisco.com/124WJf1YGGrYFFsGsSoWB6XdDllBDoQiQA6KV2zMvgVyJfwgTBsGN3LR4MCmWIe3WToJ5ILF0yWRhQYvSCDzkC2iDEJ-2vQYM-K8ig7bZ_z7jcJ-YkfCTN30eMQQanKKrRdpPNjSK41sO_Ptm-XGre5ZMtiGGt520LHW07PNta63-GTSpX_cWaM4Hbs-AM_Lge69P99wN0wzmdHl2oGs2OP6ZLXig_1XpiQAKJraQg6BfP-wzKweaj3XARMIZURyNobnY6E0tQ7darONfXlinQhfu9ZEvsPCCnqpvN0HFgqg--t3aVhN4sZxpOa4Y2xQr/https%3A%2F%2Ftwitter.com%2FGHDspeaks https://secure-web.cisco.com/1PL3p0yH3FAYPxQBb3aXDP79gBNfYjt6GVZ2wrr1CLWW7wqUPEtQYkdYBnqUxtIcPr2inZD6fxu7rMbBm4ko_Pze9xBfE7slvsyT_VsJ01Q9SHPtu2ivg-v8HQKL3o9ef8Wul96pQQ5Coo6oSWMQnEG8s_nMxkL0AFlWG8b2g4x_Ns2nmfMxEWpQITouuwT1J19NWPTTNoRF8dwes1Vgx6Tf5GBnOcZMEskId55vDMzCwkKnr89bOteLLgfcOr-9VIaGU1mecrXWI9Ge7S_4tdUBUS9VUDqfeiUKVYByUpppkbOcNnxicuJwNsN7WbZmK/https%3A%2F%2Fwww.youtube.com%2Fchannel%2FUCwUGfe6zgaddIXqA7entIwQ
COST PROPOSAL FOR TASK DC043C
<Drycleaner USA#11423, ERIC_5163>
< SVE Piping Installation>
1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >
GHD Services Inc. (GHD) recently completed assessment activities at the Dryclean USA #11423 site. Based on the results of the assessment, soil vapor extraction (SVE) operations are being considered as a possible remedial effort in the future. Accordingly, GHD recently prepared SVE layout design drawings. Task DC043C includes labor and expenses for the installation of subsurface SVE piping in accordance with GHD’s design drawings.
Subtask 1: Project Management
Subtask 1 includes all activities associated with management of the SVE piping installation.
Subtask 2: underground piping
During MAGS, GHD installed three (3) piezometers that will be incorporated into the existing SVE piping. Additional 2 new SVE wells will be installed. The wells will be constructed to depths of 3 ft bls and will be constructed with 2.5 feet of well screen (0.010 slot) and blank casing.
Following well installation, the SVE wells will be piped (below ground) to the rear of the building as shown in the design drawings (see drawings). The wells will be plumbed to the exterior of the building and attached to the exterior of the building. The wells will be capped for future use as remedial wells if deemed necessary.
Upon completion of the field activities, GHD will provide field documentation of the well installation and piping activities as well as As-Built Drawings.
Deliverables:
Deliverable
Deliverable Due Date
Field Documentation and As-Built Drawings
12/15/23
ID Task Mode
Task Name Duration Start Finish
1 LOE Submittal/Approval 3 days Fri 10/27/23 Tue 10/31/23
2 Subtask 1: Project Management
33 days Wed 11/1/23
Fri 12/15/23
3 Subtask 2: SVE Piping Installation
31 days Thu 11/2/23 Thu 12/14/23
4 Field Work Preparation 2 days Thu 11/2/23 Fri 11/3/23
5 Saw Cutting 2 days Mon 11/6/23Tue 11/7/23
6 Excavation 1 day Wed 11/8/23Wed 11/8/23
7 Piping Installation 1 day Thu 11/9/23 Thu 11/9/23
8 Restoration 1 day Fri 11/10/23 Fri 11/10/23
9 As‐Builts 4 wks Fri 11/17/23 Thu 12/14/23
Je
10/15 10/22 10/29 November
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC043C at the Dryclean USA#11423 site located in Boca Raton, Palm Beach
Project: TA_043C Date: Sat 10/28/23
9 As‐Builts 4 wks Fri 11/17/23 Thu 12/14/23 enna Martin
Dalvise Curry,Brett Jones,Edgar Diaz
Dalvise Curry,Brett Jones,Edgar Diaz
Dalvise Curry,Edgar Diaz,Brett Jones
Dalvise Curry,Edgar Diaz,Brett Jones
11/5 11/12 11/19
Schedule for the Implementation of Task DC043C at the Dryclean USA#11423 site located in Boca Raton, Palm Beach
9 As‐Builts 4 wks Fri 11/17/23 Thu 12/14/23 Jerem
11/26 12/3 12/10 December
Schedule for the Implementation of Task DC043C at the Dryclean USA#11423 site located in Boca Raton, Palm Beach
9 As‐Builts 4 wks Fri 11/17/23 Thu 12/14/23my Hess,Jenna Martin,Peter McLean
12/17 12/24 12/31 January
Schedule for the Implementation of Task DC043C at the Dryclean USA#11423 site located in Boca Raton, Palm Beach
Subtask 2
SITE : Dryclean USA #11423
SUBTASK 2: Construction
DATE: 10/28/23
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr Professional Engineer JH Site access with Property Manager 2
Sr Professional Engineer JH Daily Updates (0.5 hr / day) 2
Sr Professional Engineer JH As-Built Drawing Package 2
Construction/Superintendent SC Field scope for Construction Technicians 2
Construction/Superintendent SC Daily Updates (1 hour / day) 5
Senior Technician DC Mob/Demob 6
Senior Technician DC Install SVE wells (2 total) 4
Senior Technician DC Concrete Cutting 16
Senior Technician DC Interior Piping 12
Senior Technician DC Backfill and Concrete Repair 12
Senior Technician BJ Mob/Demob 6
Senior Technician BJ Install SVE wells (2 total) 4
Senior Technician BJ Concrete Cutting 16
Senior Technician BJ Interior Piping 12
Senior Technician BJ Backfill and Concrete Repair 12
Staff Scientist/Engineer ED Mob/Demob (5 days) 5
Staff Scientist/Engineer ED Concrete Cutting 4
Staff Scientist/Engineer ED Piping As-Builts 16
Staff Scientist/Engineer ED Interior Piping 12
Staff Scientist/Engineer ED Backfill and Concrete Repair 12
Drafting Technician PM Prepare As-Built Drawings 4
TOTAL LABOR 166
VEHICLE TYPE RATE UNIT USEAGE
Company Truck $480.00 week 1 $480.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE
Per Diem Sr Tech (DC) 5 days $36.00 Per Day 5 $180.00
Per Diem Sr Tech (BJ) 5 days $36.00 Per Day 5 $180.00
Hotel Sr Tech (DC) 4 nights $150.00 Per Day 4 $600.00
Hotel Sr Tech (BJ) 4 nights $150.00 Per Day 4 $600.00
TOTAL PER DIEM $1,560.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Ryan Herco PVC Pipe 2" bell end 240 ft $1.40 $336.00
Ryan Herco PVC Cap 2" 5 each $0.90 $4.50
Ryan Herco PVC 90 degree 2" 29 each $1.75 $50.75
Ryan Herco PVC Primer 1 each $11.42 $11.42
Ryan Herco PVC Cement 1 each $10.72 $10.72
Ryan Herco Taxes 7% $28.94
Cemex Concrete 3 yard $195.00 $585.00
Cemex Fuel Surcharge 1 each $78.33 $78.33
Cemex Env Fee 1 each $25.00 $25.00
Cemex handling fee 1 each $10.00 $10.00
Cemex load charge 1 each $350.00 $350.00
Cemex tax 7% $73.38
Erwin IDW Disposal (soil) 5 drum $110.00 $550.00
TOTAL $2,114.04
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 5 $200.00
Concrete Saw $240.00 week 1 $240.00
Portable Generator $280.00 week 1 $280.00
Construction O&M Supplies $300.00 week 1 $300.00
TOTAL EQUIPMENT $1,020.00
&"Times New Roman,Regular"&12LEVEL OF EFFORT/EXPENSE WORKSHEET
FINAL --7/24/96
Page &P
Bids
Piping
Ryan Herco Home Depot Lowes
2" PVC pipe $1.40 ft 240 $336.00 $14.19 /10 ft 24 $340.56 $14.19 /10 ft 24 $340.56
2" caps $0.90 each 5 $4.50 $2.61 each 5 $13.05 $2.60 each 5 $13.00
2" PVC elbows $1.75 each 29 $50.75 $4.42 each 29 $128.18 $4.58 each 29 $132.82
2" PVC coupling $0.00 ft 0 $0.00 $2.11 each 24 $50.64 $2.18 each 24 $52.32
PVC Primer $11.42 each 1 $11.42 $10.94 each 1 $10.94 $11.68 each 1 $11.68
PVC Cement $10.72 each 1 $10.72 $0.00 each 0 $0.00 $0.00 each 0 $0.00
7% $28.94 $38.04 $38.53
$442.33 $581.41 $588.91
IDW
Erwin Enviroserve Hepaco
IDW Soil T&D $110.00 drum 5 $550.00 $120.00 drum 5 $600.00 $160.00 drum 5 $800.00
Low Stop Fee $0.00 each 5 $0.00 $50.00 each 5 $250.00 $0.00 each 0 $0.00
FSC $0.00 each 0 $0.00 10% $60.00 $0.00 each 0 $0.00
T&D $135.00 hr 1 $135.00
$550.00 $910.00 $935.00
Concrete
Cemex Supermix No response on 3rd bid
Concrete $195.00 yard 3 $585.00 $1,273.30 each 1 $1,273.30
Fuel Surcharge $78.33 each 1 $78.33
Env Fee $25.00 each 1 $25.00 3% $38.20 handling fee $10.00 each 1 $10.00 load charge $350.00 each 1 $350.00 tax 7% $73.38
$1,121.71 $1,311.50 $0.00
Cost Estimate
Contractor: GHD Services Inc.
Date: 10/28/23
Task #: DC043C SubTask 1 Project Management SubTask 6
Site: Dryclean USA#11423 SubTask 2 Construction SubTask 7
Activity/Phase: Construction SubTask 3 SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Labor Rate Category
$49.53 Project Manager JM 12.87 12.87
$0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Technical Director 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$56.19 Sr Professional Engineer JH 6.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$45.07 Professional Engineer/Scientist GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$39.28 Project Engineer/Scientist CH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$43.08 Project Manager/ Engineer SC 7.00 7.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$29.67 Staff Engineer/Scientist ED 49.00 49.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$32.40 Data Analyst JL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$43.35 Field Manager OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$24.55 Senior Technician DC 50.00 50.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$29.26 Senior Technician BJ 50.00 50.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$24.55 Senior Technician DC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$20.21 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$19.00 Junior Technician JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$29.69 Drafting Technician PM 4.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$21.63 Administrative Assistant JJ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 178.87 12.87 166.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $5,539.02 $637.23 $4,901.79 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 129.80% $7,189.64 $827.12 $6,362.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fringe 37.80% $2,093.75 $240.87 $1,852.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $14,822.41 $1,705.22 $13,117.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel
Vehicle Rental $480.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $1,560.00 $1,560.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $2,040.00 $2,040.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
Ryan Herco $442.33 $442.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $442.33 $442.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $44.23 $44.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $486.56 $486.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $550.00 $550.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cemex $1,121.71 $1,121.71 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $1,671.71 $1,671.71 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee $167.17 $167.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $1,838.88 $1,838.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $200.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $820.00 $820.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $1,020.00 $1,020.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $20,207.85 $1,705.22 $18,502.63 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Completion Fee $1,482.24 $170.52 $1,311.72 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $21,690.09 $1,875.74 $19,814.35 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cost from Prior CEF: Manual Entry
Cost from Delta CEF; Manual Entry
Cost (Prior + Delta): $0.00 Auto-Calculated
Rounding Error: $21,690.09 Auto-Calculated
Final Total Cost: $21,690.09 Auto-Calculated
&"CG Times,Bold"&16FDEP COST ESTIMATE
Formula Sheet
Project Management
Subtask 1 Subtask 2 Subtask 3 Subtask 4 Subtask 5 Subtask 6 Subtask 7 Subtask 8 Subtask 9 Subtask 10
Labor Costs $637.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$337.14 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$301.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$1,453.83 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$1,227.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$1,463.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$118.76 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 total labor dollars $637.45 $4,901.79 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Project Management $4,901.79 = sum of Direct Labor Costs from Subtasks 2 through 10
$637.23 =13% of Direct Labor Costs (Project Management)
12.866 = Hours of Project Management (based on hourly salary of the Contractor Project Manager)
Subcontractor $44.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$44.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Service Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$55.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$112.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$167.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Knutson_N Highlight
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_v2.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v1.pdf |
| Cost Estimate |
| Subtask 2 |
| Subtask 3 |
| Subtask 4 |
| Subtask 5 |
| Subtask 6 |
| 2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev1_12-12-22.pdf |
| Table 1 for SAWP |
| Monitoring Well Locations |
| Utility Locate Bids_Compiled.pdf |
| Geosyntec Utility-272_Geotek_1500 |
| Geoview Utility Quote_2000_COT FTF SIS |
| Tallahassee Fire Training Division_V1_Bloodhound_3700 |
| Drilling Bids_Compiled.pdf |
| PDS_Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (sonic) |
| Direct Push |
| City of Tallahassee Fire Training Site_GW Protection PFAS Free Water Estimate Email |
| Cascade_Geosyntec Consultants, Inc. - City of Tallahassee Fire Training Facility - PN221026-118844 |
| GW Protection_Geosyntec (T) 1022060 S.pdf |
| Invoice |
| Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (MOT).xlsx.pdf |
| Sheet1 |
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v1.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v2.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v2.pdf |
| Cost Estimate |
| Subtask 2 |
| Subtask 3 |
| Subtask 4 |
| Subtask 5 |
| Subtask 6 |
| 2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev2.pdf |
| Table 1 for SAWP |
| Monitoring Well Locations |
File details come from the government source that posted it. Updated .