Task Assignment Summary

This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) under underlying Contract Number HW684. The task assignment, numbered DC043C, is between FDEP and GHD Services, Inc., a contractor based in Tampa, Florida. The project involves soil vapor extraction (SVE) system piping installation at Dryclean USA #11423, located at 3013 Yamato Road, Boca Raton, Palm Beach County, Florida. The assignment was signed on October 31, 2023, with project completion scheduled for February 15, 2024.

The scope of work includes two subtasks: Subtask 1 covers project management activities, and Subtask 2 encompasses underground piping installation, including the installation of two new SVE wells to depths of 3 feet below land surface with 2.5 feet of well screen and blank casing, below-ground piping from three previously installed piezometers to the building exterior, and field documentation with as-built drawings. GHD Services will coordinate with subcontractors including Ryan Herco (materials procurement), Cemex (concrete repair), and Erwin Remediation (industrial waste disposal services). The total task assignment value is $21,690.09 on a fixed unit rate basis, with labor costs of $14,822.41, travel expenses of $2,040.00, subcontractor costs totaling $2,325.44, field expenses of $1,020.00, and a completion fee of $1,482.24. The deliverable—field documentation and as-built drawings—is due December 15, 2023, with invoice payment contingent upon FDEP approval of these deliverables.

View the file

Other files

File Type Posted
CN-370000-GC922.pdf PDF
CN-370000-HW684-BIL01A.pdf PDF
CN-370000-HW684-BIL02C.pdf PDF
CN-370000-HW684-BIL02E.pdf PDF
CN-370000-HW684-BIL1ACO1.pdf PDF
CN-370000-HW684-BIL2CCO2.pdf PDF
CN-370000-HW684-CSS03A.pdf PDF
CN-370000-HW684-DC001C.pdf PDF
CN-370000-HW684-DC001E.pdf PDF
CN-370000-HW684-DC003A.pdf PDF
CN-370000-HW684-DC003C.pdf PDF
CN-370000-HW684-DC004B.pdf PDF
CN-370000-HW684-DC005C.pdf PDF
CN-370000-HW684-DC007B.pdf PDF
CN-370000-HW684-DC009A.pdf PDF
CN-370000-HW684-DC010A.pdf PDF
CN-370000-HW684-DC010B.pdf PDF
CN-370000-HW684-DC010C.pdf PDF
CN-370000-HW684-DC012A.pdf PDF
CN-370000-HW684-DC012B.pdf PDF
CN-370000-HW684-DC014B.pdf PDF
CN-370000-HW684-DC014C.pdf PDF
CN-370000-HW684-DC015D.pdf PDF
CN-370000-HW684-DC018E.pdf PDF
CN-370000-HW684-DC020C.pdf PDF
CN-370000-HW684-DC021B.pdf PDF
CN-370000-HW684-DC021E.pdf PDF
CN-370000-HW684-DC024A.pdf PDF
CN-370000-HW684-DC024B.pdf PDF
CN-370000-HW684-DC025D.pdf PDF
CN-370000-HW684-DC026A.pdf PDF
CN-370000-HW684-DC026C.pdf PDF
CN-370000-HW684-DC027B.pdf PDF
CN-370000-HW684-DC028A.pdf PDF
CN-370000-HW684-DC028E.pdf PDF
CN-370000-HW684-DC029A.pdf PDF
CN-370000-HW684-DC02A.pdf PDF
CN-370000-HW684-DC030A.pdf PDF
CN-370000-HW684-DC030B.pdf PDF
CN-370000-HW684-DC031D.pdf PDF
CN-370000-HW684-DC033A.pdf PDF
CN-370000-HW684-DC033B.pdf PDF
CN-370000-HW684-DC033C.pdf PDF
CN-370000-HW684-DC034A.pdf PDF
CN-370000-HW684-DC036A.pdf PDF
CN-370000-HW684-DC037A.pdf PDF
CN-370000-HW684-DC039B.pdf PDF
CN-370000-HW684-DC042A.pdf PDF
CN-370000-HW684-DC044B.pdf PDF
CN-370000-HW684-DC045A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW684

DC043C Completion February 15, 2024

GHD will install the piping and infrastructure for an SVE system based on their layout design at Dryclean USA#11423.

Nicole Knutson 850-245-8763 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

GHD Services, Inc

GHD Services, Inc

Brian Moore 813 257 0658

ERIC_5163

3013 Yamato Rd, Boca Raton, Palm Beach County

Dryclean USA#11423

✔ $ 21,690.09

$ 21,690.09

Scope of Work

Brian Moore Digitally signed by Brian Moore Date: 2023.11.04 19:26:03 -04'00' Kelly Crain Digitally signed by Kelly Crain

Date: 2023.10.31 14:54:53 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Field Documentation and As-Built Drawings & PM - Subtasks 1 & 2 12/15/2023

FDEP Approval of Field Documentation and As-Built Drawings & PM - Subtasks 1 & 2 $ 21,690.09

$ 21,690.09

HW684

DC043C

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: ERIC_5163

Dryclean USA#11423

FROM: Nicole Knutson, Project Manager

SUBJECT: Negotiation Summary

HW684 DC043C

DATE: October 30, 2023

GHD will install the piping and infrastructure for an SVE system based on their layout design at Dryclean USA#11423. Ryan Herco will provide materials for the SVE system, Cemex will perform concrete repair, and Erwin Remediation will perform IDW T&D services. Following the completion of the piping installation, GHD will provide field documentation and As-Built Drawings.

Total task amount is $21,690.09. GHD’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date is December 15, 2023. Task completion date is February 15, 2024.

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 10/30/2023

Task #: DC043C SubTask 1 Project Management SubTask 6

Site: Dryclean USA#11423 SubTask 2 Construction SubTask 7

Activity/Phase: Construction SubTask 3 SubTask 8

Project Manager: Brian Moore, PE SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$49.53 Project Manager JM 12.87 12.87 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Technical Director 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$56.19 Sr Professional Engineer JH 6.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$45.07 Professional Engineer/Sc GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $39.28 Project Engineer/Scientis CH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $43.08 Project Manager/ Enginee SC 7.00 7.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.67 Staff Engineer/Scientist ED 49.00 49.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $32.40 Data Analyst JL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $43.35 Field Manager OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.55 Senior Technician DC 50.00 50.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.26 Senior Technician BJ 50.00 50.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.55 Senior Technician DC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.21 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.00 Junior Technician JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.69 Drafting Technician PM 4.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $21.63 Administrative Assistant JJ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 178.87 12.87 166.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $5,539.02 $637.23 $4,901.79 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 129.80% $7,189.64 $827.12 $6,362.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.80% $2,093.75 $240.87 $1,852.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $14,822.41 $1,705.22 $13,117.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 10/30/2023

Task #: DC043C SubTask 1 Project Management SubTask 6

Site: Dryclean USA#11423 SubTask 2 Construction SubTask 7

Activity/Phase: Construction SubTask 3 SubTask 8

Project Manager: Brian Moore, PE SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $480.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $1,560.00 $1,560.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $2,040.00 $2,040.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) Ryan Herco $442.33 $442.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $442.33 $442.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $44.23 $44.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $486.56 $486.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $550.00 $550.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Cemex $1,121.71 $1,121.71 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $1,671.71 $1,671.71 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $167.17 $167.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $1,838.88 $1,838.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $200.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $820.00 $820.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,020.00 $1,020.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $20,207.85 $1,705.22 $18,502.63 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,482.24 $170.52 $1,311.72 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $21,690.09 $1,875.74 $19,814.35 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Cost from Prior CEF: Manual Entry Cost from Delta CEF; Manual Entry

Cost (Prior + Delta): $0.00 Auto-Calculated Rounding Error: $21,690.09 Auto-Calculated

Final Total Cost: $21,690.09 Auto-Calculated

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Dryclean USA #11423 SUBTASK 2: Construction

DATE: 10/30/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr Professional Engineer JH Site access with Property Manager 2 Sr Professional Engineer JH Daily Updates (0.5 hr / day) 2 Sr Professional Engineer JH As-Built Drawing Package 2

Construction/Superintendent SC Field scope for Construction Technicians 2 Construction/Superintendent SC Daily Updates (1 hour / day) 5

Senior Technician DC Mob/Demob 6 Senior Technician DC Install SVE wells (2 total) 4 Senior Technician DC Concrete Cutting 16 Senior Technician DC Interior Piping 12 Senior Technician DC Backfill and Concrete Repair 12

Senior Technician BJ Mob/Demob 6 Senior Technician BJ Install SVE wells (2 total) 4 Senior Technician BJ Concrete Cutting 16 Senior Technician BJ Interior Piping 12 Senior Technician BJ Backfill and Concrete Repair 12

Staff Scientist/Engineer ED Mob/Demob (5 days) 5 Staff Scientist/Engineer ED Concrete Cutting 4 Staff Scientist/Engineer ED Piping As-Builts 16 Staff Scientist/Engineer ED Interior Piping 12 Staff Scientist/Engineer ED Backfill and Concrete Repair 12

Drafting Technician PM Prepare As-Built Drawings 4

TOTAL LABOR 166

VEHICLE TYPE RATE UNIT USEAGE

Company Truck $480.00 week 1 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

Per Diem Sr Tech (DC) 5 days $36.00 Per Day 5 $180.00 Per Diem Sr Tech (BJ) 5 days $36.00 Per Day 5 $180.00

Hotel Sr Tech (DC) 4 nights $150.00 Per Day 4 $600.00 Hotel Sr Tech (BJ) 4 nights $150.00 Per Day 4 $600.00

TOTAL PER DIEM $1,560.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Ryan Herco PVC Pipe 2" bell end 240 ft $1.40 $336.00 Ryan Herco PVC Cap 2" 5 each $0.90 $4.50 Ryan Herco PVC 90 degree 2" 29 each $1.75 $50.75 Ryan Herco PVC Primer 1 each $11.42 $11.42 Ryan Herco PVC Cement 1 each $10.72 $10.72 Ryan Herco Taxes 7% $28.94 Cemex Concrete 3 yard $195.00 $585.00 Cemex Fuel Surcharge 1 each $78.33 $78.33 Cemex Env Fee 1 each $25.00 $25.00 Cemex handling fee 1 each $10.00 $10.00 Cemex load charge 1 each $350.00 $350.00 Cemex tax 7% $73.38 Erwin IDW Disposal (soil) 5 drum $110.00 $550.00

TOTAL $2,114.04

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 day 5 $200.00

Concrete Saw $240.00 week 1 $240.00 Portable Generator $280.00 week 1 $280.00 Construction O&M Supplies $300.00 week 1 $300.00

TOTAL EQUIPMENT $1,020.00

FINAL --7/24/96

COST PROPOSAL FOR TASK DC043C

<Drycleaner USA#11423, ERIC_5163>

< SVE Piping Installation>

1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >

GHD Services Inc. (GHD) recently completed assessment activities at the Dryclean USA #11423 site. Based on the results of the assessment, soil vapor extraction (SVE) operations are being considered as a possible remedial effort in the future. Accordingly, GHD recently prepared SVE layout design drawings. Task DC043C includes labor and expenses for the installation of subsurface SVE piping in accordance with GHD’s design drawings.

Subtask 1: Project Management Subtask 1 includes all activities associated with management of the SVE piping installation.

Subtask 2: underground piping During MAGS, GHD installed three (3) piezometers that will be incorporated into the existing SVE piping. Additional 2 new SVE wells will be installed. The wells will be constructed to depths of 3 ft bls and will be constructed with 2.5 feet of well screen (0.010 slot) and blank casing.

Following well installation, the SVE wells will be piped (below ground) to the rear of the building as shown in the design drawings (see drawings). The wells will be plumbed to the exterior of the building and attached to the exterior of the building. The wells will be capped for future use as remedial wells if deemed necessary.

Upon completion of the field activities, GHD will provide field documentation of the well installation and piping activities as well as As-Built Drawings.

Deliverables:

Deliverable Deliverable Due Date

Field Documentation and As-Built Drawings 12/15/23

From: Brian Moore To: Knutson, Nicole Cc: Cheryl Tidwell; Jenna Martin Subject: Dryclean USA#11423 Date: Saturday, October 28, 2023 9:11:48 AM Attachments: image001.png image002.png image003.png image004.png image005.png TA_043C.doc Schedule - TA_043C.pdf Bids - TA_043C.pdf TA_043C.xlsx

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Nikki, Our proposal for SVE piping installation at DC USA is attached for your review. As we discussed, we have this tentatively scheduled to start November 6th.

We were only able to get 2 bids for the concrete repair, we contacted several others including Continental Concrete, Ready 2 Resurface , and Tarmac Standard Concrete, but they did not respond to our requests for quotes.

Thank you

BRIAN MOORE PE

GHD

Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com

The Power of Commitment

Connect

Please consider our environment before printing this email

CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.

mailto:Brian.Moore@ghd.com mailto:Nicole.Knutson@FloridaDEP.gov mailto:Cheryl.Tidwell@ghd.com mailto:Jenna.Martin@ghd.com http://secure-web.cisco.com/1eKjEqq1QB9HAYDFNK6-6LXXlRmRxWd_pCgD4rrUlYHh3CJeXEKJZV_IJdBYQG8VadDp67STUss-UJ3N5v78KF9ykBU3Co00ygg1Dhjc00ojqtbaryhTGRbUo2V81RM-5MxXp3FYlP1kholdUypL8836yNHwc_UaEOGXwDWojJyC0z6Fyz6pLPHvubuiELz-An8sM8C-a3MkzRU5BhbJrWeO6PD6y2BXO_0R6K2OwFWgRrCXgoE16FzE7P16rVBy3bl8H0jYXElPeMxblzfn2h57CpRoOsm0YOd-zsUB6wU7JKMhmEMNOGP7Ccnw4UGS4/http%3A%2F%2Fwww.ghd.com%2F mailto:brian.moore@ghd.com https://secure-web.cisco.com/1EIIGULJG3y6rMSNOmf1aTDvyuS98sLTsixmTFW52t0oPTrlR12oRePCWbJ7eNJ2wS2QPuG5u3TlZV0EfQ_DZeSkM-btMF2lDZhbvPT6kJsUcLjKPx_qF5bG6_PgNkNBj45edYrqCjaereccFiENps3OXC7MvMRfxPbMBYuTNbV1usuuATGmfiQ21l2KzheNugx0f_Tfd5CxcA6QozB44DdJDk6BKlhR4v8GPJtZGzfHUEGRG8bhjzHTFk9mnbE-y7Bgw9EojH8b9m66HZxKvFgdTkveVdjx-Bp-G1eOQDb0-NpnbMsJCvSjk0sxZych_/https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fghd%2F https://secure-web.cisco.com/1QK3oG2xjGMB77SvfkSp6W9SzCYtDJtfXW6cgE-yLz90IfOmbw6AIO77Eos0x50Fdu8hEFxbffkCRG1wTKmJ9ZkHvD6VF0wOA5VuR23vnSEI60dukH16_UoId7MaeeVuoTaKdXAM7FSPdX0uSbarKkk75kUyddxjk8JQQ1VYKIkcDE9Fhqprw3h0dYKov6G8ekGK4hYvWuA0Djs86Wsgxj7GGM3mafmQYU_C9ka8RRqAJHq6v-utmbm7Nw81ZM3jIzajvV1TwjfvCIIouE0rZoUVhBpH87rDc8e4Lt4ynWvT_w_8bEGfacmpHChDqX3Wm/https%3A%2F%2Fwww.facebook.com%2FGHDGroup https://secure-web.cisco.com/124WJf1YGGrYFFsGsSoWB6XdDllBDoQiQA6KV2zMvgVyJfwgTBsGN3LR4MCmWIe3WToJ5ILF0yWRhQYvSCDzkC2iDEJ-2vQYM-K8ig7bZ_z7jcJ-YkfCTN30eMQQanKKrRdpPNjSK41sO_Ptm-XGre5ZMtiGGt520LHW07PNta63-GTSpX_cWaM4Hbs-AM_Lge69P99wN0wzmdHl2oGs2OP6ZLXig_1XpiQAKJraQg6BfP-wzKweaj3XARMIZURyNobnY6E0tQ7darONfXlinQhfu9ZEvsPCCnqpvN0HFgqg--t3aVhN4sZxpOa4Y2xQr/https%3A%2F%2Ftwitter.com%2FGHDspeaks https://secure-web.cisco.com/1PL3p0yH3FAYPxQBb3aXDP79gBNfYjt6GVZ2wrr1CLWW7wqUPEtQYkdYBnqUxtIcPr2inZD6fxu7rMbBm4ko_Pze9xBfE7slvsyT_VsJ01Q9SHPtu2ivg-v8HQKL3o9ef8Wul96pQQ5Coo6oSWMQnEG8s_nMxkL0AFlWG8b2g4x_Ns2nmfMxEWpQITouuwT1J19NWPTTNoRF8dwes1Vgx6Tf5GBnOcZMEskId55vDMzCwkKnr89bOteLLgfcOr-9VIaGU1mecrXWI9Ge7S_4tdUBUS9VUDqfeiUKVYByUpppkbOcNnxicuJwNsN7WbZmK/https%3A%2F%2Fwww.youtube.com%2Fchannel%2FUCwUGfe6zgaddIXqA7entIwQ

COST PROPOSAL FOR TASK DC043C

<Drycleaner USA#11423, ERIC_5163>

< SVE Piping Installation>

1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >

GHD Services Inc. (GHD) recently completed assessment activities at the Dryclean USA #11423 site. Based on the results of the assessment, soil vapor extraction (SVE) operations are being considered as a possible remedial effort in the future. Accordingly, GHD recently prepared SVE layout design drawings. Task DC043C includes labor and expenses for the installation of subsurface SVE piping in accordance with GHD’s design drawings.

Subtask 1: Project Management

Subtask 1 includes all activities associated with management of the SVE piping installation.

Subtask 2: underground piping

During MAGS, GHD installed three (3) piezometers that will be incorporated into the existing SVE piping. Additional 2 new SVE wells will be installed. The wells will be constructed to depths of 3 ft bls and will be constructed with 2.5 feet of well screen (0.010 slot) and blank casing.

Following well installation, the SVE wells will be piped (below ground) to the rear of the building as shown in the design drawings (see drawings). The wells will be plumbed to the exterior of the building and attached to the exterior of the building. The wells will be capped for future use as remedial wells if deemed necessary.

Upon completion of the field activities, GHD will provide field documentation of the well installation and piping activities as well as As-Built Drawings.

Deliverables:

Deliverable

Deliverable Due Date

Field Documentation and As-Built Drawings

12/15/23

ID Task Mode

Task Name Duration Start Finish

1 LOE Submittal/Approval 3 days Fri 10/27/23 Tue 10/31/23

2 Subtask 1: Project Management

33 days Wed 11/1/23

Fri 12/15/23

3 Subtask 2: SVE Piping Installation

31 days Thu 11/2/23 Thu 12/14/23

4 Field Work Preparation 2 days Thu 11/2/23 Fri 11/3/23

5 Saw Cutting 2 days Mon 11/6/23Tue 11/7/23

6 Excavation 1 day Wed 11/8/23Wed 11/8/23

7 Piping Installation 1 day Thu 11/9/23 Thu 11/9/23

8 Restoration 1 day Fri 11/10/23 Fri 11/10/23

9 As‐Builts 4 wks Fri 11/17/23 Thu 12/14/23

Je

10/15 10/22 10/29 November

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC043C at the Dryclean USA#11423 site located in Boca Raton, Palm Beach

Project: TA_043C Date: Sat 10/28/23

9 As‐Builts 4 wks Fri 11/17/23 Thu 12/14/23 enna Martin

Dalvise Curry,Brett Jones,Edgar Diaz

Dalvise Curry,Brett Jones,Edgar Diaz

Dalvise Curry,Edgar Diaz,Brett Jones

Dalvise Curry,Edgar Diaz,Brett Jones

11/5 11/12 11/19

Schedule for the Implementation of Task DC043C at the Dryclean USA#11423 site located in Boca Raton, Palm Beach

9 As‐Builts 4 wks Fri 11/17/23 Thu 12/14/23 Jerem

11/26 12/3 12/10 December

Schedule for the Implementation of Task DC043C at the Dryclean USA#11423 site located in Boca Raton, Palm Beach

9 As‐Builts 4 wks Fri 11/17/23 Thu 12/14/23my Hess,Jenna Martin,Peter McLean

12/17 12/24 12/31 January

Schedule for the Implementation of Task DC043C at the Dryclean USA#11423 site located in Boca Raton, Palm Beach

Subtask 2

SITE : Dryclean USA #11423

SUBTASK 2: Construction

DATE: 10/28/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr Professional Engineer JH Site access with Property Manager 2

Sr Professional Engineer JH Daily Updates (0.5 hr / day) 2

Sr Professional Engineer JH As-Built Drawing Package 2

Construction/Superintendent SC Field scope for Construction Technicians 2

Construction/Superintendent SC Daily Updates (1 hour / day) 5

Senior Technician DC Mob/Demob 6

Senior Technician DC Install SVE wells (2 total) 4

Senior Technician DC Concrete Cutting 16

Senior Technician DC Interior Piping 12

Senior Technician DC Backfill and Concrete Repair 12

Senior Technician BJ Mob/Demob 6

Senior Technician BJ Install SVE wells (2 total) 4

Senior Technician BJ Concrete Cutting 16

Senior Technician BJ Interior Piping 12

Senior Technician BJ Backfill and Concrete Repair 12

Staff Scientist/Engineer ED Mob/Demob (5 days) 5

Staff Scientist/Engineer ED Concrete Cutting 4

Staff Scientist/Engineer ED Piping As-Builts 16

Staff Scientist/Engineer ED Interior Piping 12

Staff Scientist/Engineer ED Backfill and Concrete Repair 12

Drafting Technician PM Prepare As-Built Drawings 4

TOTAL LABOR 166

VEHICLE TYPE RATE UNIT USEAGE

Company Truck $480.00 week 1 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

Per Diem Sr Tech (DC) 5 days $36.00 Per Day 5 $180.00

Per Diem Sr Tech (BJ) 5 days $36.00 Per Day 5 $180.00

Hotel Sr Tech (DC) 4 nights $150.00 Per Day 4 $600.00

Hotel Sr Tech (BJ) 4 nights $150.00 Per Day 4 $600.00

TOTAL PER DIEM $1,560.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Ryan Herco PVC Pipe 2" bell end 240 ft $1.40 $336.00

Ryan Herco PVC Cap 2" 5 each $0.90 $4.50

Ryan Herco PVC 90 degree 2" 29 each $1.75 $50.75

Ryan Herco PVC Primer 1 each $11.42 $11.42

Ryan Herco PVC Cement 1 each $10.72 $10.72

Ryan Herco Taxes 7% $28.94

Cemex Concrete 3 yard $195.00 $585.00

Cemex Fuel Surcharge 1 each $78.33 $78.33

Cemex Env Fee 1 each $25.00 $25.00

Cemex handling fee 1 each $10.00 $10.00

Cemex load charge 1 each $350.00 $350.00

Cemex tax 7% $73.38

Erwin IDW Disposal (soil) 5 drum $110.00 $550.00

TOTAL $2,114.04

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 day 5 $200.00

Concrete Saw $240.00 week 1 $240.00

Portable Generator $280.00 week 1 $280.00

Construction O&M Supplies $300.00 week 1 $300.00

TOTAL EQUIPMENT $1,020.00

&"Times New Roman,Regular"&12LEVEL OF EFFORT/EXPENSE WORKSHEET

FINAL --7/24/96

Page &P

Bids

Piping

Ryan Herco Home Depot Lowes

2" PVC pipe $1.40 ft 240 $336.00 $14.19 /10 ft 24 $340.56 $14.19 /10 ft 24 $340.56

2" caps $0.90 each 5 $4.50 $2.61 each 5 $13.05 $2.60 each 5 $13.00

2" PVC elbows $1.75 each 29 $50.75 $4.42 each 29 $128.18 $4.58 each 29 $132.82

2" PVC coupling $0.00 ft 0 $0.00 $2.11 each 24 $50.64 $2.18 each 24 $52.32

PVC Primer $11.42 each 1 $11.42 $10.94 each 1 $10.94 $11.68 each 1 $11.68

PVC Cement $10.72 each 1 $10.72 $0.00 each 0 $0.00 $0.00 each 0 $0.00

7% $28.94 $38.04 $38.53

$442.33 $581.41 $588.91

IDW

Erwin Enviroserve Hepaco

IDW Soil T&D $110.00 drum 5 $550.00 $120.00 drum 5 $600.00 $160.00 drum 5 $800.00

Low Stop Fee $0.00 each 5 $0.00 $50.00 each 5 $250.00 $0.00 each 0 $0.00

FSC $0.00 each 0 $0.00 10% $60.00 $0.00 each 0 $0.00

T&D $135.00 hr 1 $135.00

$550.00 $910.00 $935.00

Concrete

Cemex Supermix No response on 3rd bid

Concrete $195.00 yard 3 $585.00 $1,273.30 each 1 $1,273.30

Fuel Surcharge $78.33 each 1 $78.33

Env Fee $25.00 each 1 $25.00 3% $38.20 handling fee $10.00 each 1 $10.00 load charge $350.00 each 1 $350.00 tax 7% $73.38

$1,121.71 $1,311.50 $0.00

Cost Estimate

Contractor: GHD Services Inc.

Date: 10/28/23

Task #: DC043C SubTask 1 Project Management SubTask 6

Site: Dryclean USA#11423 SubTask 2 Construction SubTask 7

Activity/Phase: Construction SubTask 3 SubTask 8

Project Manager: Brian Moore, PE SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Labor Rate Category

$49.53 Project Manager JM 12.87 12.87

$0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Technical Director 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$56.19 Sr Professional Engineer JH 6.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$45.07 Professional Engineer/Scientist GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$39.28 Project Engineer/Scientist CH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$43.08 Project Manager/ Engineer SC 7.00 7.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$29.67 Staff Engineer/Scientist ED 49.00 49.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$32.40 Data Analyst JL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$43.35 Field Manager OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$24.55 Senior Technician DC 50.00 50.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$29.26 Senior Technician BJ 50.00 50.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$24.55 Senior Technician DC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$20.21 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$19.00 Junior Technician JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$29.69 Drafting Technician PM 4.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$21.63 Administrative Assistant JJ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 178.87 12.87 166.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $5,539.02 $637.23 $4,901.79 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 129.80% $7,189.64 $827.12 $6,362.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 37.80% $2,093.75 $240.87 $1,852.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $14,822.41 $1,705.22 $13,117.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel

Vehicle Rental $480.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $1,560.00 $1,560.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $2,040.00 $2,040.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

Ryan Herco $442.33 $442.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $442.33 $442.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $44.23 $44.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $486.56 $486.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $550.00 $550.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Cemex $1,121.71 $1,121.71 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $1,671.71 $1,671.71 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $167.17 $167.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $1,838.88 $1,838.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $200.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) $820.00 $820.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $1,020.00 $1,020.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $20,207.85 $1,705.22 $18,502.63 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Completion Fee $1,482.24 $170.52 $1,311.72 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $21,690.09 $1,875.74 $19,814.35 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Cost from Prior CEF: Manual Entry

Cost from Delta CEF; Manual Entry

Cost (Prior + Delta): $0.00 Auto-Calculated

Rounding Error: $21,690.09 Auto-Calculated

Final Total Cost: $21,690.09 Auto-Calculated

&"CG Times,Bold"&16FDEP COST ESTIMATE

Formula Sheet

Project Management

Subtask 1 Subtask 2 Subtask 3 Subtask 4 Subtask 5 Subtask 6 Subtask 7 Subtask 8 Subtask 9 Subtask 10

Labor Costs $637.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$337.14 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$301.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$1,453.83 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$1,227.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$1,463.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$118.76 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 total labor dollars $637.45 $4,901.79 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Project Management $4,901.79 = sum of Direct Labor Costs from Subtasks 2 through 10

$637.23 =13% of Direct Labor Costs (Project Management)

12.866 = Hours of Project Management (based on hourly salary of the Contractor Project Manager)

Subcontractor $44.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$44.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Service Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$55.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$112.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$167.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Knutson_N Highlight

COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_v2.pdf
Subtask 1 – Project Management
Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling
Subtask 3 –Monitoring Well Installation
Right-of-Way Permitting
Utility Locate and Drilling Subcontractors
Monitoring Well Installation
Subtask 4 – Monitoring Well Sampling and Surveying
Laboratory Analysis
Trip Report
Subtask 5 – Investigation Derived Waste
Trip Report
Subtask 6 – Supplemental Site Assessment Report
Invoice and Deliverable Schedule:
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
ATTACHMENT F
Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v1.pdf
Cost Estimate
Subtask 2
Subtask 3
Subtask 4
Subtask 5
Subtask 6
2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev1_12-12-22.pdf
Table 1 for SAWP
Monitoring Well Locations
Utility Locate Bids_Compiled.pdf
Geosyntec Utility-272_Geotek_1500
Geoview Utility Quote_2000_COT FTF SIS
Tallahassee Fire Training Division_V1_Bloodhound_3700
Drilling Bids_Compiled.pdf
PDS_Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (sonic)
Direct Push
City of Tallahassee Fire Training Site_GW Protection PFAS Free Water Estimate Email
Cascade_Geosyntec Consultants, Inc. - City of Tallahassee Fire Training Facility - PN221026-118844
GW Protection_Geosyntec (T) 1022060 S.pdf
Invoice
Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (MOT).xlsx.pdf
Sheet1
COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v1.pdf
Subtask 1 – Project Management
Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling
Subtask 3 –Monitoring Well Installation
Right-of-Way Permitting
Utility Locate and Drilling Subcontractors
Monitoring Well Installation
Subtask 4 – Monitoring Well Sampling and Surveying
Laboratory Analysis
Trip Report
Subtask 5 – Investigation Derived Waste
Trip Report
Subtask 6 – Supplemental Site Assessment Report
Invoice and Deliverable Schedule:
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
ATTACHMENT F
COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v2.pdf
Subtask 1 – Project Management
Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling
Subtask 3 –Monitoring Well Installation
Right-of-Way Permitting
Utility Locate and Drilling Subcontractors
Monitoring Well Installation
Subtask 4 – Monitoring Well Sampling and Surveying
Laboratory Analysis
Trip Report
Subtask 5 – Investigation Derived Waste
Trip Report
Subtask 6 – Supplemental Site Assessment Report
Invoice and Deliverable Schedule:
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
ATTACHMENT F
Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v2.pdf
Cost Estimate
Subtask 2
Subtask 3
Subtask 4
Subtask 5
Subtask 6
2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev2.pdf
Table 1 for SAWP
Monitoring Well Locations