This is a Task Assignment (TA) document executed between the State of Florida Department of Environmental Protection (FDEP) and GHD Services, Inc. for operations and maintenance services at the former Valet Cleaners site located at 123 E Bloomingdale Ave, Brandon, Hillsborough County, Florida. The Task Assignment DC003A is issued under Contract Number HW684, with Kevin Kane serving as the FDEP Project Manager and Brian Moore as the contractor's Project Manager. The document is effective through December 16, 2022, with a completion date for deliverables on September 30, 2022.
GHD Services, Inc. will conduct six months of operations and maintenance activities comprising three subtasks: Subtask 1 (Project Management at 13% of direct labor), Subtask 2 (Six Months O&M including semi-annual site visits, monitoring well installation and replacement at 34 feet depth with 5-foot well screen, annual groundwater monitoring at five wells, and preparation of a Remedial Action Status Report), and Subtask 3 (utility charges for six months at $45 per month). The total Task Assignment value is $9,056.16, consisting of a fixed unit rate of $8,786.16 and cost reimbursement of $270.00. Invoicing will occur upon submission and FDEP approval of the Remedial Action Status Report (due 06/23/2022) for Subtasks 1 and 2 at $8,666.16, and upon submittal of paid utility invoices (due 09/30/2022) for Subtask 3 at $390.00. Subcontractors for well installation and investigation derived waste disposal were selected on a lowest-cost basis. The FDEP maintains a valid Site Access Agreement for this site, signed February 11, 2019.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW684
DC003A Completion December 16, 2022
GHD Services, Inc. will conduct 6 months of operations and maintenance (O&M) at the former Valet Cleaners site. All work will be conducted in accordance with the scope of work and cost proposal submitted on January 26, 2022.
Kevin Kane (850) 245-8971 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
GHD Services, Inc.
GHD Services, Inc.
Brian Moore (813) 257-0658
ERIC_4731
123 E Bloomingdale Ave, Brandon, Hillsborough County
Valet Cleaners
✔ $ 8,786.16 ✔ $ 270.00
$ 9,056.16
Scope of Work
Brian Moore
Contract Manager
Brian Moore Digitally signed by Brian Moore Date: 2022.02.04 16:44:03 -05'00'
William E. Burns Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.02.01 10:19:10 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Remedial Action Status Report + Project Management 06/23/2022
Paid Utility Invoices 09/30/2022
Subtasks 1 and 2: Upon submittal and FDEP approval of the Remedial Action Status Report + Project Management $ 8,666.16
Subtask 3: Upon submittal of Paid Utility Invoices Utilities (Cost Plus Fixed Fee) not to exceed $270 Utilities Handling Fee: $120
$ 390.00
$ 9,056.16
HW684
DC003A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Interim Secretary
TO: HW684 Contract File Valet Cleaners
ERIC_4731
Brandon, Hillsborough County
FROM: Kevin Kane, Contract Manager
DATE: February 1, 2022
SUBJECT: Task Assignment Summary
HW684 TA DC003A
Operation and Maintenance
GHD Services, Inc. (GHD) will conduct 6 months of O&M. All work will be conducted in accordance with the scope of work and cost proposal submitted on January 26, 2022.
Specific subtasks are detailed below:
Subtask 1: Project Management Project management is calculated at 13% of the direct labor.
Subtask 2: Six Months O&M GHD will conduct one semi-annual site visit to conduct O&M of the on-site low flow vapor recovery system. GHD personnel will measure vacuums and flows, as well as collect a vapor discharge sample to verify function of the system. As part of Subtask 2, GHD will oversee the installation of replacement of monitoring well MW001. The monitor well will be installed to a total depth of 34 feet and will be constructed with 5 feet of 1-inch diameter well screen and blank casing.
Following well installation, GHD will conduct annual groundwater monitoring at five site monitoring wells (MW001R, MW004, MW011, MW015, and MW016). Prior to sampling, a complete set of depth to water measurements will be gathered. Sampling will be conducted in accordance with FDEP SOPs. The groundwater samples will be analyzed for the presence of volatile organic compounds (BTEX and VOHs) by EPA Method 8260.
The laboratory analytical results for the EPA Method 8260 parameters and the groundwater flow data will be analyzed and included in a Remedial Action Status Report (RASR) describing system operations, contaminant trends, natural attenuation characteristics, groundwater flow patterns, and recommendations for additional system operations and/or monitoring in order to achieve site closure.
Subtask 3: Utilities Subtask 3 includes six months of utility charges associated with the operation of the low-flow vapor recovery system.
Subcontractors for well installation and investigation derived waste (IDW) disposal were chosen on a lowest-cost basis.
The Florida Department of Environmental Protection (FDEP) has a current and valid Site Access Agreement for this site, signed February 11, 2019.
Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and the GHD proposal. The final deliverable due date is September 30, 2022, and the completion date for the task assignment is December 16, 2022.
The final cost total for Task Assignment DC003A is $9,056.16.
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 01/31/22
Task #: DC003A SubTask 1 Project Management SubTask 6
Site: Valet Cleaners SubTask 2 O&M SubTask 7
Activity/Phase: O&M SubTask 3 Utilities (6 Months) SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$40.12 Project Manager JM 4 4.2 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Technical Director 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$46.33 Sr Professional Engineer JH 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$43.28 Professional Engineer/Sc GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $39.82 Project Engineer/Scientis TC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $40.12 Project Manager/ Engine JM 14.00 14.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $33.17 Staff Engineer/Scientist DB 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $32.40 Data Analyst JL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $43.35 Field Manager OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.76 Senior Technician SA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.65 Senior Technician SC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $23.69 Senior Technician WM 22.50 22.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.58 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.75 Junior Technician JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.69 Drafting Technician PM 2.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $22.44 Administrative Assistant DA 4.50 4.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Driller 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 HSEQ&R Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0 0 0 0 0 0 0 0 0
Total Hours 48.20 4.20 44.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $1,470.58 $169.18 $1,301.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 129.80% $1,908.82 $219.60 $1,689.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.80% $555.88 $63.95 $491.93 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,935.28 $452.73 $3,482.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle Rental $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 Page 1
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 01/31/22
Task #: DC003A SubTask 1 Project Management SubTask 6
Site: Valet Cleaners SubTask 2 O&M SubTask 7
Activity/Phase: O&M SubTask 3 Utilities (6 Months) SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $2,161.00 $2,161.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $200.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $270.00 $0.00 $270.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $2,631.00 $2,361.00 $270.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $356.10 $236.10 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $2,987.10 $2,597.10 $390.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $860.00 $860.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $162.00 $162.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,022.00 $1,022.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $318.25 $318.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $358.25 $358.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $8,662.63 $452.73 $7,819.90 $390.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $393.53 $45.27 $348.26 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $9,056.16 $498.00 $8,168.16 $390.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET Subtask 2
SITE : Valet Cleaners
SUBTASK 2: O&M
DATE: 01/31/22
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr. Professional Engineer JH Conclusions/Recommendations 1
Professional Engineer JM Prepare field scope of work, order sampling kit 1 Professional Engineer JM Review COC, Field notes, O&M and laboratory data 1 Professional Engineer JM Detail system operations (performance criteria, flow variations) 1.5 Professional Engineer JM Detail system troubleshooting (runtime, major repairs, operational issues) 1.5 Professional Engineer JM Detail system influent data (mass calculation, concentration trends) 1.5 Professional Engineer JM Groundwater Field Parameter Results and evaluation 1.5 Professional Engineer JM Water Level evaluation 1.5 Professional Engineer JM Groundwater analytical results evaluataion 2 Professional Engineer JM QA/QC (1 gw report and 1 air report) 1.5 Professional Engineer JM Conclustion and Recommendations 1
Senior Technician WM Mob/demob (2 days) 3 Senior Technician WM Oversee Well Installation 6 Senior Technician WM Survey new well 1 Senior Technician WM Semi-annual visit 4 Senior Technician WM Water Levels (16 wells) 1 Senior Technician WM Groundwater sampling 5 wells 7.5
22.5
Drafting Technician PM Prepare GW Flow Figure 1 Drafting Technician PM Prepare GW Analytical Figure 1
Staff Assistants DA Data Entry and Table Generation 0.5 Staff Assistants DA Document Preparation/Publishing 2 Staff Assistants DA GIS Update/ADAPT 2
4.5
TOTAL LABOR 44
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 Day 3 $360.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Groundwater Protection Mobilization 1 each $500 $500.00 Groundwater Protection Daily Rate (1/2 day) 1 1/2 day $1,050 $1,050.00 Groundwater Protection Well Material 34 ft $6 $204.00 Groundwater Protection Well Screen 1 each $95 $95.00 Groundwater Protection well development 1 each $50 $50.00 Groundwater Protection concrete pad 1 each $100 $100.00 Groundwater Protection Drums 2 drum $55 $110.00 Groundwater Protection Permit 1 each $52 $52.00 Erwin Remediation IDW Disposal 2 drum $100 $200.00
TOTAL $2,361.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOCs (BTEX and VOHs) (PID/Hall Series) $110.00 5 1 $660.00
TO15 $200.00 1 $200.00
sample shipping (Two Day) GW VOCs $52.00 1 $52.00 sample shipping (Next Day) AIR $110.00 1 $110.00
TOTAL LAB $1,022.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables
Expendables $40.00 day 1 $40.00
Equipment (Analytical Related)
Air Sampling Pump $25.25 Day 1 $25.25 Anemometer $17.50 Day 1 $17.50 Vacuum Gauges $19.40 Day 1 $19.40 Tedlar Air Bags $14.55 each 1 $14.55 Groundwater Sampling Kit $208.55 Day 1 $208.55 Poly Tubing $0.20 ft 105 $21.00 Silicone Tubing $2.00 ft 6 $12.00
Equipment (Other) $0.00
TOTAL EQUIPMENT $358.25
FINAL --7/24/96
LEVEL OF EFFORT/EXPENSE WORKSHEET Subtask 3
SITE : Valet Cleaners SUBTASK 3: Utilities (6 Months)
DATE: 01/31/22
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Tampa Electric Monthly Electric 6 month $45 $270.00 Handling Fee 6 month $20 $120.00
TOTAL $390.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables
Equipment (Analytical Related)
Equipment (Other) $0.00
TOTAL EQUIPMENT $0.00
FINAL --7/24/96
COST PROPOSAL FOR TASK DC003A
<Valet Cleaners, ERIC_4731>
< SVE Operations & Maintenance > March 2022 through August 2022
1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >
GHD Services Inc. (GHD) installed and is overseeing operations of a low flow vapor recovery system in accordance with the approved Pilot Test Plan at the Valet Cleaners site. Task DC003A includes six (6) additional months of operations and maintenance of the existing system. Task DC003A also includes well installation and annual groundwater monitoring at five wells.
Subtask 1: Project Management Subtask 1 includes all activities associated with management of the operations and maintenance of the existing system for six (6) months.
Subtask 2: Six Months O&M (March through August 2022) GHD will conduct one semi-annual site visit to conduct operations and maintenance of the existing system in April 2022. GHD recommends semi-annual site visits to verify system operations.
During semi-annual site visits, GHD personnel will measure vacuums and flows and also collect one vapor discharge sample to verify compliance.
As part of task DC003A, GHD will oversee the installation of replacement of monitoring well MW001. The monitor well will be installed to a total depth of 34 feet and will be constructed with 5 feet of 1-inch diameter well screen and blank casing. The well will be finished inside a boltdown steel manhole. Following installation, GHD will conduct annual groundwater monitoring at five site monitoring wells in accordance with recent recommendations and FDEP approval. GHD proposes to conduct annual groundwater sampling in May/June 2022. The groundwater monitoring will consist of sampling deep monitor wells (MW001-replacement well and MW004) and shallow monitor wells (MW011, MW015, and MW016). Prior to sampling, a complete set of depth to water measurements will be gathered. Sampling will be conducted in accordance with FDEP SOPs. The groundwater samples will be analyzed for the presence of volatile organic compounds (BTEX and VOHs) by EPA Method 8260. The laboratory analytical results for the EPA Method 8260 parameters and the groundwater flow data will be analyzed and assimilated into a Remedial Action Status Report (RASR) describing contaminant trends, natural attenuation characteristics, and groundwater flow patterns, with recommendations.
A RASR will be prepared that summarizes the six months of system operation, analytical data, and evaluation of data trends. The RASR will also include recommendations for additional system operations and/or monitoring.
Subtask 3: Utilities (6 months) Subtask 4 includes six months of utility charges (mid-February 2022 through mid-August 2022).
The utility charges are estimated at $45 per month.
Deliverables:
Deliverable Deliverable Due Date Remedial Action Status Report 6/23/22
6 month utilities (mid-February 2022 through mid-August 2022) 9/30/22
Sonic Auger DPT Horizontal Directional Drilling
DATE: 11/12/2021
ESTIMATE #: 1121031
Project Description:
ID QTY Unit Rate TOTAL
1 1 ls 500.00$ 500.00$
2 0 night 200.00$ -$
3 1 1/2 day 1,050.00$ 1,050.00$
4 34 foot 6.00$ 204.00$
5 1 each 95.00$ 95.00$
6 1 each 50.00$ 50.00$
7 1 each 100.00$ 100.00$
8 55 gallon drums (Soil) (Estimated) 1 each 55.00$ 55.00$
9 55 gallon drums (Water) (Estimated) 1 each 55.00$ 55.00$
10 Permits: SWFLWMD (1 Parcel/$52 each) 1 each 52.00$ 52.00$
Completion: Subtotal 2,161.00$
Todd Hodgson
TOTAL 2,161.00$
Partner
PROJECT
Valet Cleaners 123 E. Bloomingdale Ave
Damages to utilities on private property during borehole clearance are the responsibility of the client
5904 Hampton Oaks Pkwy Suite F
CUSTOMER
GHD
Brian Moore
Tampa, Florida 33610 Brandon, Florida
DPT Well Installation
1" PVC Well Installation
1" x 5' PVC .010 Slot Prepack Screen (5' total), 3" Expendable Point
(813) 971-3882
(1) 1" x 34' MW w/5' of .010 Prepack Screen - 8" Flush Completion- DPT Soil Sampling Drum all IDW
If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 or Todd@drillprollc.com.
THANK YOU FOR YOUR BUSINESS!
Todd Hodgson
DPT Rig and Crew
"Actual quantities used and days on site will be invoiced"
1/2 Day
2' x 2' Concrete Pad w/8" Flush Completion
DESCRIPTION
Mobilization
Utility Locates on Private Property is the responsibility of the client
Well Development (Up to 1/2 hour w/pump)
Borehole Clearance to 5’ bgs beyond 30 minutes may require a change order for additional time and cost.
Per Diem (2 man crew)
2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586
Preferred Drilling Solutions, Inc.
8820 66th St. North, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
DIRECT PUSH TECHNOLOGY QUOTE FORM
Consultant Name: GHD
Site Name and Location: Valet Cleaners Date: 11/12/21
123 E Bloomingdale Ave, Brandon, FL
PROPOSED SCOPE OF WORK:
(1) 1" x 34' MW with 5' prepacked screen, with soils, drum cuttings, complete with 8" MH/pad
*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner
Unit Unit Rate Number of Units Extended Price
Equipment Type: Geoporbe 8040DT, Geoprobe 3230DT, Georpobe 7822DT
Direct Push Daily Rate 1 - on-site day whole day $1,600.00 $0.00
Direct Push Half-Day Rate 1 - on-site half day half day $1,200.00 1 $1,200.00 Auger Attachment, 2" Well Install per foot $15.00 $0.00 Pre-Packed Well Screen (includes all materials) ID 1" 5' Length Pack OD 3.5" each $95.00 1 $95.00 Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5" each $38.00 $0.00 Well Riser (includes all materials) ID 1" 5' Length each $20.00 6 $120.00 Well Completion (includes MH w/ cover, concrete pad, and locking well cap) per well $120.00 1 $120.00
Mobilization roundtrip $525.00 1 $525.00 Per Diem per crew / per night $350.00 $0.00 DOT Approved 55-gal Drum each $55.00 1 $55.00 Permits each $75.00 1 $75.00 Other (specify) $0.00 Other (specify) $0.00 Other (specify) $0.00
TOTAL QUOTE PRICE $2,190.00
Notes:
1. Includes expendables, tubing, points, liners, caps, plugs, sawcuts, development, standby time, steamcleaning decon, and grouting.
Days to Complete Scope of Work: .5 Project No.:
Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477
Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782
Signature and Title of Person Submitting Quote: ___________________________________Kevin Bonacum, Estimator Date: 11/12/21
DIRECT PUSH TECHNOLOGY
MISCELLANEOUS
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Brian Moore
GHD
5904 Hampton Oaks Parkway – Suite F
Tampa, FL 33610
March 16, 2020
Re: IP Cleaners - Miami, FL
Mr. Moore:
The price for disposal of two (2) drums of non-hazardous groundwater located in Miami, FL will be $100.00 per drum, or $200.00 total, for both transportation and disposal.
Respectfully, Jonathan Erwin
Erwin Remediation, Inc.
Email: ErwinRemediation@Gmail.com
Office: (850) 292-6511 mailto:Remediation@Gmail.com
From: Jamie Infinger To: Brian Moore Subject: RE: IP Cleaners - Miami Date: Monday, March 16, 2020 8:39:32 AM Attachments: image001.png image002.png image003.png image004.png
$95.00 per drum plus $150.00 stop charge Have a great day
Thanks, Jamie Infinger A Nationwide Waste Disposal Company Clean Management Environmental Group, Inc.
P: (800)-538-8131 F: (843)-538-7845 C: (912)-674-6783 jinfinger@cleanmanagement.com www.cleanmanagement.com
From: Brian.Moore@ghd.com [mailto:Brian.Moore@ghd.com] Sent: Sunday, March 15, 2020 11:45 AM To: Jamie Infinger <jinfinger@cleanmanagement.com> Subject: IP Cleaners - Miami
Jamie, Can you provide quote for disposal of 2 drums of water from the above site. Low level solvents, assume non-haz thanks
Brian Moore, PE
GHD
Proudly employee owned T: 813 257 0658 | M: 813 335 2147 | E: Brian.Moore@ghd.com 5904 Hampton Oaks Parkway Suite F Tampa Florida 33610 USA | www.ghd.com Connect
WATER | ENERGY & RESOURCES | ENVIRONMENT | PROPERTY & BUILDINGS | TRANSPORTATION
mailto:jinfinger@cleanmanagement.com mailto:Brian.Moore@ghd.com mailto:jinfinger@cleanmanagement.com http://www.cleanmanagement.com/ mailto:Brian.Moore@ghd.com http://www.ghd.com/ https://www.linkedin.com/company/ghd https://www.facebook.com/GHDGroup https://twitter.com/GHD_Namerica https://www.youtube.com/channel/UCwUGfe6zgaddIXqA7entIwQ https://www.ghd.com/en/sectors/water.aspx https://www.ghd.com/en/sectors/energy---resources.aspx https://www.ghd.com/en/sectors/environment.aspx https://www.ghd.com/en/sectors/property---buildings.aspx https://www.ghd.com/en/sectors/transportation.aspx
Please consider our environment before printing this email
CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.
This e-mail has been scanned for viruses
ID Task Mode
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Thu 1/13/22 Wed 1/26/22
2 Subtask 1: Project Management
144 days Thu 1/27/22 Tue 8/16/22
3 Subtask 2: O&M (6 month59 days Mon 4/4/22 Thu 6/23/22
4 Field Work Preparation 2 wks Mon 4/4/22 Fri 4/15/22
5 O&M Site Visit 1 day Mon 4/18/22Mon 4/18/22
6 Well Installation 1 day Mon 4/25/22Mon 4/25/22
7 Groundwater Sampling 1 day Thu 5/5/22 Thu 5/5/22
8 Remedial Action Status Report
6 wks Fri 5/13/22 Thu 6/23/22
9 Subtask 3: Utilities (6 months)
6.6 mons Mon 2/14/22
Tue 8/16/22
1/2 1/9 1/16 1/23 1/30 2/6 2/13 2/20 2/27 January February March
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC003A at the Valet Cleaners site located in Brandon, Hillsborough County
Project: TA_003A Date: Thu 1/13/22
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Thu 1/13/22 Wed 1/26/22
2 Subtask 1: Project Management
144 days Thu 1/27/22 Tue 8/16/22
3 Subtask 2: O&M (6 month59 days Mon 4/4/22 Thu 6/23/22
4 Field Work Preparation 2 wks Mon 4/4/22 Fri 4/15/22
5 O&M Site Visit 1 day Mon 4/18/22Mon 4/18/22
6 Well Installation 1 day Mon 4/25/22Mon 4/25/22
7 Groundwater Sampling 1 day Thu 5/5/22 Thu 5/5/22
8 Remedial Action Status Report
6 wks Fri 5/13/22 Thu 6/23/22
9 Subtask 3: Utilities (6 months)
6.6 mons Mon 2/14/22
Tue 8/16/22
Jenna Martin
William McKinney
William Mc
W
3/6 3/13 3/20 3/27 4/3 4/10 4/17 4/24 5/1 April May
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC003A at the Valet Cleaners site located in Brandon, Hillsborough County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Thu 1/13/22 Wed 1/26/22
2 Subtask 1: Project Management
144 days Thu 1/27/22 Tue 8/16/22
3 Subtask 2: O&M (6 month59 days Mon 4/4/22 Thu 6/23/22
4 Field Work Preparation 2 wks Mon 4/4/22 Fri 4/15/22
5 O&M Site Visit 1 day Mon 4/18/22Mon 4/18/22
6 Well Installation 1 day Mon 4/25/22Mon 4/25/22
7 Groundwater Sampling 1 day Thu 5/5/22 Thu 5/5/22
8 Remedial Action Status Report
6 wks Fri 5/13/22 Thu 6/23/22
9 Subtask 3: Utilities (6 months)
6.6 mons Mon 2/14/22
Tue 8/16/22 y cKinney
William McKinney
Jeremy Hess,Jen
5/8 5/15 5/22 5/29 6/5 6/12 6/19 6/26 7/3 June July
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC003A at the Valet Cleaners site located in Brandon, Hillsborough County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Thu 1/13/22 Wed 1/26/22
2 Subtask 1: Project Management
144 days Thu 1/27/22 Tue 8/16/22
3 Subtask 2: O&M (6 month59 days Mon 4/4/22 Thu 6/23/22
4 Field Work Preparation 2 wks Mon 4/4/22 Fri 4/15/22
5 O&M Site Visit 1 day Mon 4/18/22Mon 4/18/22
6 Well Installation 1 day Mon 4/25/22Mon 4/25/22
7 Groundwater Sampling 1 day Thu 5/5/22 Thu 5/5/22
8 Remedial Action Status Report
6 wks Fri 5/13/22 Thu 6/23/22
9 Subtask 3: Utilities (6 months)
6.6 mons Mon 2/14/22
Tue 8/16/22 enna Martin,Peter McLean,Debra Andrews
7/10 7/17 7/24 7/31 8/7 8/14 8/21 8/28 9/4 August September
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC003A at the Valet Cleaners site located in Brandon, Hillsborough County
File details come from the government source that posted it. Updated .