Summary of Task Assignment DC044B
This Task Assignment is issued by the State of Florida Department of Environmental Protection (FDEP) to GHD Services, Inc. for supplemental assessment activities at the Heritage Cleaners facility located at 470 Highway 29 North, Escambia County, Pensacola, Florida. The project number is ERIC_4646. The Department Project Manager is Mackenzie Childs, and the Contractor's Project Manager is Brian Moore. The Task Assignment is effective upon signature and has a completion date of December 14, 2025.
The contract authorizes GHD Services, Inc. to conduct supplemental assessment activities consisting of three subtasks: (1) Project Management calculated at 13% of direct labor costs; (2) Groundwater Monitoring Report including installation of one additional downgradient deep monitoring well to a depth of 68 feet below land surface with 10 feet of 1-inch diameter 0.010-slot prepack well screen and blank casing, groundwater sampling at twelve monitoring wells, and preparation of a comprehensive monitoring report; and (3) PFAS sampling at four specified monitoring wells with results incorporated into the groundwater monitoring report. The total Task Assignment value is $20,032.42 on a fixed unit rate basis. Deliverables are due on October 16, 2025, with invoicing contingent upon FDEP review and approval: $17,283.83 for Subtasks 1 & 2 and $2,748.59 for Subtask 3. The underlying Contract Number is HW684.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW684
DC044B Completion December 14, 2025
This Task Assignment authorizes GHD Services, Inc to conduct supplemental assessment activities that include monitoring well installation and groundwater sampling.
Mackenzie Childs 850-245-8929 Contractor GHD Services, Inc. Contractor
Contractor Brian Moore Contractor 813-971-3882
ERIC_4646
470 Hwy 29 N, Escambia County, Pensacola, FL 32526
Heritage Cleaners
Contractor Contractor
✔ $ 20,032.42
$ 20,032.42
Scope of Work
GHD Services, Inc.
Contractor
Brian Moore Digitally signed by Brian Moore Date: 2025.06.11 13:29:58 -04'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2025.06.11 11:32:43 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtasks 1 & 2: Groundwater Monitoring Report (Monitoring Well Installation and Groundwater Sampling) + Project Management 10/16/2025
Subtask 3: PFAS Sampling 10/16/2025
Subtasks 1 & 2: FDEP review and approval of Groundwater Monitoring Report (Well Installation and Groundwater Sampling) + Project Management $ 17,283.83
Subtask 3: FDEP review and approval of PFAS notes and data $ 2,748.59
$ 20,032.42
HW684
DC044B
FFLLORIDA DDEEPARTMENTT OOFF
EEnvironmentall Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ronn DeSantis Governor
Alexiss A.. Lambert Secretary
TO: HW684 Contract File
Mackenzie Childs, Project Manager
Task Assignment DC
ERIC_
FROM:
DATE:
SUBJECT:
This Task Assignment authorizes GHD Services, Inc., hereby referred to as GHD, to
Florida (FL). Erwin Remediation (Erwin) was selected as the lowest responsive and responsible bidder. Specific subtasks are detailed below:
Subtask 1: Project Management Project Management is calculated at 13% of the direct labor.
Subtask 2:
FD
EP
C
OS
T
ES
TI
MA
TE
C on tra ct or
G
H D
S er vi ce s In c.
D at e:
6/
/2
Ta sk
D C
4B
S ub Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
S ite
H er ita ge C le an er s
Ta sk
G ro un dw at er
M on ito rin g S ub Ta sk
A ct iv ity
/P ha se
A ss es sm en t
Ta sk
P
FA
S S am pl in g
S ub
Ta sk
P ro je ct
M an ag er
B ria n
M oo re , P
E
Ta sk
S ub Ta sk
S ub
Ta sk
S ub Ta sk
T T ot al s
La bo r R at e
C at eg or y $5
1.
P P ro je ct
M an ag
JM
8.
8.
$0 .0
P rin ci pa l E ng in ee r/S ci en tis t
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
Te ch ni ca l D ire ct or 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$5
8.
S r P ro fe ss io na l E ng in ee r
JH
2.
2.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
S en io r P ro je ct M an ag er 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$4
5.
P ro fe ss io na l E ng in ee r/S ci e G
E 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$3
9.
P ro je ct
E ng in ee r/S ci en tis t C
H 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$5
1.
P ro je ct
M an ag er
/ E ng in ee
JM
.5
.5
9.
0.
0.
0.
0.
0.
0.
0.
$3
3.
S ta ff E ng in ee r/S ci en tis t
JW
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$3
6.
D at a A na ly st
JL
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$4 6.
Fi el d
M an ag er
O T
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2 5.
S en io r T ec hn ic ia n
S A
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2 9.
S en io r T ec hn ic ia n
W M
.0
.0
6.
0.
0.
0.
0.
0.
0.
0.
$2 7.
S en io r T ec hn ic ia n
D C
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2 1.
Ju ni or
T ec hn ic ia n
W O
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$1 8.
Ju ni or
T ec hn ic ia n
C D
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$3 1.
D ra fti ng T ec hn ic ia n K
J 9.
6.
3.
0.
0.
0.
0.
0.
0.
0.
$2
2.
Ad m in is tra tiv e As si st an t
JJ
.0
5.
5.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
T ot al H ou rs
7.
8.
.5
.5
0.
0.
0.
0.
0.
0.
0.
D ire ct L ab or
$4
,0
.2
$4
.4
$2 ,6
.7
$8
.9
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
O ve rh ea d
9.
$5
,2
.5
$5
.9
$3 ,4
.5
$1
,1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
G en
A dm in 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fr in ge
.8
0% $1
,5
.2
$1
.4
$1 ,0
.2
$3
.5
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al L ab or
$1
0, 4.
$1 ,2
.9
$7
,2
.5
$2 ,2
.5
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Pa ge
FD
EP
C
OS
T
ES
TI
MA
TE
C on tra ct or
G
H D
S er vi ce s In c.
at e:
6/
/2
Ta sk
D C
4B
Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
S ite
H er ita ge C le an
Ta sk
G ro un dw at er
M on ito rin g S ub Ta sk
A ct iv ity
/P ha se
A ss es sm t
Ta sk
P
FA
S S am pl in g
S ub
Ta sk
P ro je ct
M an ag er
B ria n
M oo re , P
E
Ta sk
S ub Ta sk
S ub
Ta sk
S ub Ta sk
T T ot al s
T ra ve l
V eh ic le
R en ta l
$4
.0
$4
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ile ag e
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
A ir Fa re $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P er d ie m
H ot el
$7
.0
$7
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l T ra ve l
$1 ,2
.0
$1
,2
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (E qu ip m en t P ro cu re m t)
A tla nt ic
S up pl y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P ro cu re m en t F ee
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al S ub co nt ra ct or
C os t $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
(S er vi ce s P ro cu re m t) ril lin g (C on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
D ril lin g
(N on
-c on ve nt io na
l) $3
,9
.0
$3 ,9
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ob ile
L ab or at or y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ur ve yi ng $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
ID
W $1
.0
$1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
U til iti es $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
U til ity
L oc at io n $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $4
,0
.0
$4 ,0
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
H an dl in g
Fe e
$4
.5
$4
.5
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al S ub co nt ra ct or
C os t $4
,4
.5
$4 ,4
.5
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
La bo ra to ry
A na ly tic al
C os ts $8
.0
$8
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fa st T ur na ro un d C ha rg es $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S am pl e S hi pp in g
$8 3.
$7
6.
$6 .5
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al L ab or at or y $9
.0
$9
.5
$6
.5
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fi el d
E xp en se
P so na l P ro te ct io n
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E xp en da bl es
$2
.0
$2
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
D ril lin g re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
A na ly tic al re la te
d) $1
,2
.4
$1 ,0
.0
$2
.4
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
ID
W re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
O th er
$1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al F ie ld
E xp en se s $1
,5
.4
$1 ,3
.0
$2
.4
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub to ta l $1
8, 9.
$1 ,2
.9
$1
5, 4.
$2 ,5
.5
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
C om pl et io n
Fe e
$1 ,0
.4
$1
.4
$7
.8
$2
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al E st im at ed
C os t $2
0, 2.
$1 ,3
.3
$1
5, 5.
$2 ,7
.5
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
C os t f ro m P rio r C
E F:
M an ua l E nt ry
C os t f ro m D el ta
C E
F;
M an ua l E nt ry C os t (
P rio r + D el ta
$0
.0
Au to
-C al cu la te d
R ou nd in g E rr or
$2
0, 2.
Au to
-C al cu la te d
Fi na l T ot al C os t:
$2 0, 2.
Au to -C al cu la te d
Pa ge
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Heritage Cleaners SUBTASK 2: Groundwater Monitoring
DATE: 6/10/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr. Professional Engineer JH 2
Project Manager JM Property Owner Contact 1 Project Manager JM Update HASP 1.5 Project Manager JM Utllity Locate 1 Project Manager JM Field Work Preparation 1 Project Manager JM Site background and previous assessment summary 2 Project Manager JM Groundwater sampling methodology 2 Project Manager JM Groundwater flow evaluation (shallow/deep) 3 Project Manager JM Groundwater field parameters 2 Project Manager JM Groundwater analytical results 4 Project Manager JM Laboratory data validation 1 Project Manager JM Conclusions / recommendations 2
20.5
Senior Technician WM mob/demob 16 Senior Technician WM Oversee well installation 6 Senior Technician WM Water levels (all wells 19 total) 3 Senior Technician WM Groundwater sampling (12 wells) 16
Drafting Technician KJ Update site location map 1 Drafting Technician KJ Elevation contour maps (shallow/deep) 2.5 Drafting Technician KJ Groundater analytical figures (shallow/deep) 3
6.5
Administrative Assistant JJ Data Entry (wls, 12 wells) 1.5 Administrative Assistant JJ Update summary tables (wls, water quality, analytical) 2 Administrative Assistant JJ Finalize Groundwater Monitoring Report 2
5.5
TOTAL LABOR 75.5
VEHICLE TYPE RATE UNIT USEAGE
Company Truck $480.00 week 1 $480.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE
Per Diem Sr Technician (WM) $36.00 Per Day 5 $180.00 Hotel Sr Technician (WM) $150.00 night 4 $600.00
TOTAL PER DIEM $780.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Preferred Drilling Mob 1 each $750.00 $750.00 Preferred Drilling Per Diem 0 nights $0.00 $0.00 Preferred Drilling DPT rig 1 day $1,975.00 $1,975.00 Preferred Drilling PVC well material 0 ft $0.00 $0.00 Preferred Drilling PVC well material 12 5 ft $35.00 $420.00 Preferred Drilling prepack screen 2 each $110.00 $220.00 Preferred Drilling completion 1 each $150.00 $150.00 Preferred Drilling development 0 each $0.00 $0.00 Preferred Drilling drums 5 drum $75.00 $375.00 Preferred Drilling Permits 1 each $50.00 $50.00 Erwin Remediation IDW Disposal (GW 1 drum 125.00$ $125.00
TOTAL $4,065.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOHs - gw EPA 8260 $73.00 12 $876.00 MW002, MW003, MW004, MW011, MW012, MW014, MW015, MW016, MW017, MW018, MW019 Sample shipping Large Cooler - 2 day - water $70.00 1 $70.00
Ice $6.50 1 $6.50
TOTAL LAB $952.50
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 5 $200.00
Groundwater Sampling Kit (shallow) $290.00 day 0.5 $145.00 Groundwater Sampling Kit (deep) $415.00 day 1.5 $622.50 Poly Tubing (HDPE) $0.30 ft 695 $208.50 Silicon Tubing $3.00 ft 12 $36.00
Drum $100.00 drum 1 $100.00
TOTAL EQUIPMENT $1,312.00
Conclusions/Recommendations
FINAL --7/24/96
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Heritage Cleaners SUBTASK 3: PFAS Sampling
DATE: 6/10/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager JM Field Work Preparation (PFAS) 1 Project Manager JM Present PFAS Sampling methods and wells 2 Project Manager JM Groundwater analytical results (PFAS) 4 Project Manager JM Laboratory data validation 1 Project Manager JM Conclusions / recommendations 1
Senior Technician WM Groundwater sampling (4 wells) 6
Drafting Technician KJ Groundater analytical figures (shallow/deep) - PFAS 3
Administrative Assistant JJ Data Entry (wls, 12 wells) 1.5 Administrative Assistant JJ Update summary tables (wls, water quality, analytical) 2 Administrative Assistant JJ Finalize Groundwater Monitoring Report 2
5.5
TOTAL LABOR 23.5
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
MW007, MW008, MW009, MW010
Ice $6.50 1 $6.50
TOTAL LAB $6.50
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Groundwater Sampling Kit (shallow) $290.00 day 0.25 $72.50 Groundwater Sampling Kit (deep) $415.00 day 0.25 $103.75 Poly Tubing (HDPE) $0.30 ft 114 $34.20 Silicon Tubing $3.00 ft 4 $12.00
TOTAL EQUIPMENT $222.45
FINAL --7/24/96
COST PROPOSAL FOR TASK DC044B
<Heritage Cleaners /FDEP ERIC_4646>
< Supplemental Assessment>
1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >
GHD Services Inc. (GHD) has been conducting assessment at the Heritage Cleaners facility since 2018. Based on the results of the most recent testing and reporting, additional investigation was recommended. Specifically, additional well installation was recommended along with groundwater sampling. Task DC044B includes additional assessment.
Subtask 1: Project Management Subtask 1 includes all tasks associated with project management for additional assessment activities at the Heritage Cleaners site.
Subtask 2: Monitoring Well Installation and Groundwater Sampling
GHD personnel will oversee the installation of one additional downgradient deep monitoring well. The well will be installed at the location presented in the attached sampling plan. The well will be installed using direct push to a depth of 68 ft bls. The well will be constructed with 10 feet of 1-inch diameter 0.010-slot prepack well screen and blank casing. The well will be completed inside a flush-mounted bolt down manhole.
As part of this phase of investigation, groundwater sampling will be conducted. Groundwater sampling will be conducted at twelve (12) monitor wells. Prior to sampling, depth to water measurements will be made at all site wells (20 total). Groundwater sampling will be sampled in accordance with FDEP standard operating procedures at monitor wells MW002, MW003, MW004, MW011, MW012, MW014, MW015, MW016, MW017, MW018, MW019, and the newly installed well. The groundwater samples will be submitted to a Florida-certified laboratory for volatile organic halocarbon (VOH) analysis by EPA Method 8260.
Upon receipt of analytical data, a Groundwater Monitoring Report will be prepared. The report will include a summary of field methodology and laboratory analytical results. The report will also include recommendations for additional testing and/or remediation.
Subtask 3: PFAS Sampling As part of subtask 3, PFAS sampling will be conducted in accordance with FDEP and GHD standard operating procedures. The PFAS sampling will be conducted at monitoring wells MW007, MW008, MW009, and MW010. The PFAS samples will be shipped to the FDEP laboratory in Tallahassee for analysis.
Upon receipt of PFAS data, the results will be incorporated into the groundwater monitoring report discussed in Subtask 2.
Deliverables:
Deliverable Deliverable Due Date
Groundwater Monitoring Report 10/16/25
PFAS notes and data 10/16/25
Preferred Drilling Solutions, Inc.
8820 66th St. North, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
DIRECT PUSH TECHNOLOGY QUOTE FORM
Date: 5/22/25 FAC ID#:
Unit Unit Rate Number of Units Extended Price whole day $1,975.00 1 1,975.00$ half day $1,475.00 -$ per foot $25.00 -$ each $110.00 2 220.00$ each $50.00 -$ each $35.00 12 420.00$ per well $150.00 1 150.00$ roundtrip $750.00 1 750.00$ per crew / per night $575.00 -$ each $75.00 5 375.00$ per day $150.00 -$ each $50.00 1 50.00$ lump sum $350.00 -$ per day $50.00 -$
TOTAL QUOTE PRICE $3,940.00
Notes: 1. Includes saw cuts, development, standby time, and decon.
Project No.:
Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477
Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782
Signature and Title of Person Submitting Quote: RRose Hood , Rose Hood Estimating & Scheduling Manager Date: 5/22/25
Cantonment, Escambia County, FL
Well Completion (includes 8" MH w/ cover, concrete pad, and locking well cap)
Well Riser (includes all materials) ID 1" 5' Length
Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5"
Pre-Packed Well Screen (includes all materials) ID 1" 5' Length Pack OD 3.5"
Auger Attachment, 2" Well Install
Direct Push Half-Day Rate 1 - on-site half day
Site Name and Location: Heritage Cleaners
Consultant Name: GHD
PROPOSED SCOPE OF WORK:
(1) 1" x 68' MW with 10' prepack screen, soil sampling as needed, drum cuttings, pad and 8" manhole
Days to Complete Scope of Work: 1
Direct Push Daily Rate 1 - on-site day
Equipment Type: Geoprobe 8040DT, 3230DT
*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner
Other (specify)
Steam Cleaner
Decon Pad
GeoProbe Consumables (includes tubing, points, liners, concrete patch, asphalt patch, and grouting)
DOT Approved 55-gal Drum
Per Diem Mobilization
DIRECT PUSH TECHNOLOGY
MISCELLANEOUS
Permits
Sonic Auger DPT Injection Well Abandonment
DATE: 5/21/2025
ESTIMATE #: 525041
Project Description:
ID QTY Unit Rate TOTAL
1 1 each 2,500.00$ 2,500.00$
2 2 night 300.00$ 600.00$
3 1 day 1,850.00$ 1,850.00$
4 each 4.00$ -$
5 68 foot 4.00$ 272.00$
6 Materials: (2) 1" x 5' PVC .010 Slot Prepack Screen, 3" Exp. Point 1 each 175.00$ 175.00$
7 1 each 200.00$ 200.00$
8 1 each 75.00$ 75.00$
9 55 gallon drums (Soil) (As Needed) each 75.00$ -$
10 55 gallon drums (Water) (Estimated) 1 each 75.00$ 75.00$
11 Permits: NWFLWMD 1 each 30.00$ 30.00$
Completion: Subtotal 5,777.00$
Todd Hodgson
TOTAL 5,777.00$
Partner
DESCRIPTION
Mobilization
Utility Locates on Private Property is the responsibility of the client Borehole Clearance to 5’ bgs beyond 20 minutes may require a change order for additional time and cost.
(1) 1" x 68' PVC Well w/10' of .010 Prepack Screen , 2' x 2' Pad w/8" BD Completion, No Soil Sampling
DPT Well Installation
Client Requested Installation by DPT Rig
If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 or Todd@drillprollc.com.
THANK YOU FOR YOUR BUSINESS!
TTodd Hodgson
DPT Rig and Crew
"Actual quantities used and days on site will be invoiced"
1 Day + Travel
Materials: 1" PVC Well Installation
Well Development (up to 1/2 hour w/Pump)
2' x 2' Concrete Pad w/8" BD Completion
Materials: Soil Sample Liners (If Needed)
Per Diem 2 Man Crew-Est. (Min Hotel Cost + $50 Food/ per man)
Drum IDW
Locations must be accessible with track mounted DPT Rig
PROJECT
Heritage Cleaners 470 Highway 29 North
Damages to utilities on private property are the responsibility of the client
5904 Hampton Oaks Pkwy Suite F
CUSTOMER
GHD
Brian Moore, P.E.
Tampa, Florida 33610 Cantonment, Florida
(813) 335-2147
2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586
From: willie smitherman To: Brian Moore Subject: Re: Heritage Cleaners , Cantonment Date: Wednesday, May 21, 2025 1:09:33 PM
Hello Brian….. Too deep and Too far for one well….willie
PLEASE NOTE NEW EMAIL
willie@jaeeenv.com
Willie Smitherman President JAEE Environmental Services, Inc (954)401-9512 cell jaee@bellsouth.net
On May 21, 2025, at 1:04 PM, Brian Moore <Brian.Moore@ghd.com> wrote:
Willie, Can you provide a quote to install 1 well at the above site
1-inch diameter prepack 58-68 ft bls Completion Drum all waste
We have use DP in the past
Thanks
BRIAN MOORE PE
GHD
Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com
CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.
408 Ditmar Street
Pensacola, FL 32503
To: Mr. Brian Moore
GHD
5904 Hampton Oaks Parkway, Suite F Tampa, FL 33610
June 13, 2023
Re: Non-Hazardous Drum Disposal – State of Florida
Mr. Moore:
The price for the transportation and disposal (T&D) of drums of non-hazardous soil and water located in the State of Florida is listed below.
Non-Hazardous Drums:
Description Rate Unit False Mobilization (No drum found) $ 85.00 Per Stop T&D - Non-Haz Soil $ 110.00 Per Drum T&D - Non-Haz Water $ 125.00 Per Drum
The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.
The lab data we require for the disposal of drums of petroleum impacted soils are totals for BTEX and the 4 RCRA metals (arsenic, cadmium, chromium, and lead), with analyses no older than 1 year from the estimated disposal date.
We do not require analyticals for the disposal of Petroleum Contact Water (PCW) as long as it has only been impacted with petroleum - not pesticides, herbicides or dry-cleaning solvents etc.
Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc.
This quote is valid for 90 days.
408 Ditmar Street Pensacola, FL 32503
Respectfully, Robert Donado Erwin Remediation, Inc.
Email: Robert@erwinremediation.com Office: (850) 466-2358 p y, Robert Donado
6/28/22, 10:23 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 1/2
Quote Number: 19644
QUOTE
QUOTED TO: Brian Moore QUOTE DATE: 1/1/2022
COMPANY NAME: GHD - 2022 QUOTED BY: Craig Burns
PHONE NUMBER: Ext.
FAX NUMBER:
PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS
CUSTOMER PO:
CONTACT EMAIL:
SITE ADDRESS: TBD
CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING
COST ESTIMATE FOR THE SITE/ PROJECT LISTED ABOVE.
DESCRIPTION PRICE QTY. UNIT TOTAL
NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00
NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00
TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$30.00 DRUM $0.00
TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$40.00 DRUM $0.00
TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site
$50.00 DRUM $0.00
Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax
$0.00 . $0.00
HAZ Drums to be quoted case-by-case $0.00 . $0.00
OPTIONAL LINE ITEMS
***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00
TOTAL REQUIRED ITEMS $0.00
TOTAL OPTIONAL ITEMS $0.00
GRAND TOTAL $0.00
NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups. **Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns
863.327.6289 - cburns@clarkenv.com
This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.
6/28/22, 10:23 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 2/2
Name (print) Title
Signature Date
CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854
WWW.ClarkEnvironmental.com
From: Craig Burns To: Brian Moore Subject: GHD_IDW Drum Rates FL Date: Tuesday, June 28, 2022 10:26:46 AM Attachments: image001.png image002.png image003.png image004.png image005.png GHD Drum Rates FL 2022.pdf
Here you go Brian. I do this for a lot of engineering/consulting firms.
Be aware of the low stop less than 6 drums at $50/flat Be aware of the 10% to the total cost for FSC (implemented April 15).
Pass around the GHD Florida offices
From: Brian Moore <Brian.Moore@ghd.com> Sent: Tuesday, June 28, 2022 10:05 AM To: Craig Burns <cburns@clarkenvironmental.com> Subject: IDW Drums
Craig, Is it possible to provide a generic quote for IDW water disposal.
Assumption is non-haz with necessary analytical Maybe provide a range of locations
South florida or central florida, or both?
Thanks in advance
We have many sites that we generate 1 gw drum of IDW and would like to streamline the vendor coordination
BRIAN MOORE PE
GHD
Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com
The Power of Commitment Connect
Please consider our environment before printing this email
CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.
Whatever Waste, LLC 3834 Mandarin Woods Dr. No.
Jacksonville, Florida 32223 United States 904.881.1957
Brian Moore PE
GHD
5904 Hampton Road Parkway Suite F Tampa, FL 33610
Estimate Number 062922.1
Notes Dry Cleaner Site Locations: Central and South Florida Regions excluding Florida Keys Required analytical data for non-haz disposal acceptance would be VOCs and includes waste profiling assistance if the IDW-GW drums don't fall under a blanket waste profile DOT shippable drums must be on a hard surface at each accessible location
Terms Non-hazardous IDW drum pickup, transport and disposal pricing is based on per service event No-load drum fee if unable to pickup drums on any site in Central FL is $150; in South FL is $200 Pricing is valid or subject to change on a monthly basis in part due to escalating fuel prices Payment required within 45 days after email receipt of invoice
Indemnification: Each party agrees to indemnify, defend and hold harmless each other for and from any loss
Estimate Date 06/29/2022
Description Rate Qty Line Total
IDW-GW Drum Transport & Disposal - Central FL Sites
(1) Regional Stop Fee $600 - then $150 per 55-gal drum < 10 drums
$150.00 1 $150.00
IDW-GW Drum Transport & Disposal - Central FL Sites
(1) Regional Stop Fee $300 - then $150 per 55-gal drum > 10 drums
$150.00 1 $150.00
IDW-GW Drum Transport & Disposal - South FL Sites
(1) Regional Stop Fee $850 - then $200 per 55-gal drum < 10 drums
$200.00 1 $200.00
IDW-GW Drum Transport & Disposal - South FL Sites
(1) Regional Stop Fee $425 - then $200 per 55-gal drum > 10 drums
$200.00 1 $200.00
Subtotal
Tax
700.00
0.00
Estimate Total (USD) $700.00 or liability arising out of the party's breach of this agreement, scope of work, except for gross negligence, willful misconduct or bad faith.
From: Dalton, James B To: Childs, Mackenzie Subject: RE: Heritage Cleaners (ERIC_4646) Well Installation Date: Tuesday, June 10, 2025 9:41:26 AM
I approve of the proposed scope of work.
Thanks Breck
James Breck Dalton, P.G.
Professional Geologist II Waste Site Cleanup Section Florida Department of Environmental Protection James.b.dalton@FloridaDEP.gov Office: 850-245-8892
From: Childs, Mackenzie <Mackenzie.Childs@FloridaDEP.gov> Sent: Tuesday, June 10, 2025 8:55 AM To: Dalton, James B <James.B.Dalton@FloridaDEP.gov> Subject: Heritage Cleaners (ERIC_4646) Well Installation
Breck, The location for this well was agreed upon in the Annual Review Meeting. Do you need to look at his specifications before I send the TA on?
Thanks!
Mackenzie Childs, FCCM Florida Department of Environmental Protection Waste Site Cleanup Section Environmental Specialist II Mackenzie.Childs@FloridaDEP.gov Office: 850-245-8929
File details come from the government source that posted it. Updated .