This Task Assignment (TA) represents a contract modification issued by the State of Florida Department of Environmental Protection (FDEP) to GHD Services, Inc. for environmental remediation work at the former Garland Supply Co. site located at 7800 W 25th Ave, Hallandale, Miami-Dade County, Florida. The underlying contract number is HW684, with this specific task assignment numbered DC004B. Kevin Kane serves as the FDEP project manager, while Brian Moore is the contractor's project manager. The work is identified under FDEP project number ERIC_4464 and involves the preparation of an Interim Source Removal Plan (ISRP) for the contaminated site.

The task assignment authorizes three subtasks: Subtask 1 involves project management calculated at 13% of direct labor costs; Subtask 2 encompasses groundwater sampling of seven monitoring wells using EPA Method 8260 for volatile organic halocarbon analysis, including depth-to-water measurements from all 17 wells; and Subtask 3 covers preparation of a comprehensive ISRP that details soil excavation methodology, health and safety protocols, backfill specifications, and completion scheduling. The total contract value is $14,533.01 on a fixed unit rate basis, with deliverables due on August 12, 2022 (field notes and analytical data) and August 19, 2022 (ISRP), and a task completion date of November 18, 2022. Invoice payment is contingent upon FDEP approval of deliverables, with $4,186.21 invoiced upon approval of field notes and analytical data, and $10,346.80 invoiced upon approval of the ISRP and project management documentation.

View the file

Other files

File Type Posted
CN-370000-GC922.pdf PDF
CN-370000-HW684-BIL01A.pdf PDF
CN-370000-HW684-BIL02C.pdf PDF
CN-370000-HW684-BIL02E.pdf PDF
CN-370000-HW684-BIL1ACO1.pdf PDF
CN-370000-HW684-BIL2CCO2.pdf PDF
CN-370000-HW684-CSS03A.pdf PDF
CN-370000-HW684-DC001C.pdf PDF
CN-370000-HW684-DC001E.pdf PDF
CN-370000-HW684-DC003A.pdf PDF
CN-370000-HW684-DC003C.pdf PDF
CN-370000-HW684-DC005C.pdf PDF
CN-370000-HW684-DC007B.pdf PDF
CN-370000-HW684-DC009A.pdf PDF
CN-370000-HW684-DC010A.pdf PDF
CN-370000-HW684-DC010B.pdf PDF
CN-370000-HW684-DC010C.pdf PDF
CN-370000-HW684-DC012A.pdf PDF
CN-370000-HW684-DC012B.pdf PDF
CN-370000-HW684-DC014B.pdf PDF
CN-370000-HW684-DC014C.pdf PDF
CN-370000-HW684-DC015D.pdf PDF
CN-370000-HW684-DC018E.pdf PDF
CN-370000-HW684-DC020C.pdf PDF
CN-370000-HW684-DC021B.pdf PDF
CN-370000-HW684-DC021E.pdf PDF
CN-370000-HW684-DC024A.pdf PDF
CN-370000-HW684-DC024B.pdf PDF
CN-370000-HW684-DC025D.pdf PDF
CN-370000-HW684-DC026A.pdf PDF
CN-370000-HW684-DC026C.pdf PDF
CN-370000-HW684-DC027B.pdf PDF
CN-370000-HW684-DC028A.pdf PDF
CN-370000-HW684-DC028E.pdf PDF
CN-370000-HW684-DC029A.pdf PDF
CN-370000-HW684-DC02A.pdf PDF
CN-370000-HW684-DC030A.pdf PDF
CN-370000-HW684-DC030B.pdf PDF
CN-370000-HW684-DC031D.pdf PDF
CN-370000-HW684-DC033A.pdf PDF
CN-370000-HW684-DC033B.pdf PDF
CN-370000-HW684-DC033C.pdf PDF
CN-370000-HW684-DC034A.pdf PDF
CN-370000-HW684-DC036A.pdf PDF
CN-370000-HW684-DC037A.pdf PDF
CN-370000-HW684-DC039B.pdf PDF
CN-370000-HW684-DC042A.pdf PDF
CN-370000-HW684-DC043C.pdf PDF
CN-370000-HW684-DC044B.pdf PDF
CN-370000-HW684-DC045A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW684

DC004B Completion November 18, 2022

This Task Assignment authorizes GHD Services, Inc. to prepare an Interim Source Removal Plan for the former Garland Supply Co. site in accordance with the GHD scope of work, cost estimate form, and schedule received on June 21, 2022.

Kevin Kane (850) 245-8971 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

GHD Services, Inc.

GHD Services, Inc.

Brian Moore (813) 257-0658

ERIC_ 4464

7800 W 25th Ave, Hallandale, Miami-Dade County

Garland Supply Co.

✔ $ 14,533.01

$ 14,533.01

Scope of Work

Brian Moore

Project Manager

Brian Moore Digitally signed by Brian Moore Date: 2022.07.13 19:36:35 -04'00'

William E. Burns, Jr.

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2022.07.12 09:16:10 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Field Notes and Analytical Data 08/12/2022

Interim Source Removal Plan + Project Management 08/19/2022

Subtask 2: Upon submittal and FDEP approval of the Field Notes and Analytical Data $ 4,186.21

Subtasks 1 & 3: Upon submittal and FDEP approval of the Interim Source Removal Plan + Project Management $ 10,346.80

$ 14,533.01

HW684

DC004B

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

TO: HW684 Contract File

FROM: Kevin Kane, Contract Manager

DATE: July 7, 2022

SUBJECT: Task Assignment DC004B

Garland Supply Co.

ERIC_4644

ISRP

This Task Assignment authorizes GHD Services, Inc. (GHD) to prepare an Interim Source Removal Plan for the former Garland Supply Co. site. Specific subtasks are detailed below:

Subtask 1: Project Management Project Management is calculated at 13% of direct labor costs.

Subtask 2: Groundwater Sampling Groundwater sampling will be conducted as part of the ISRP preparation. Monitoring wells MW001, MW002, MW003, MW006, MW007, MW009, and MW016 will be sampled with volatile organic halocarbon (VOH) analysis using EPA Method 8260. During mobilization for sampling, depth to water measurements will be gathered from all wells (17 total). Groundwater sampling will be conducted in general accordance with FDEP SOPs. Following groundwater sampling and receipt of analytical data, the results will be incorporated into the ISRP that will be prepared as part of Subtask 3.

Subtask 3: ISRP Preparation In order to remediate shallow soil impacts, excavation has been recommended. Task DC004B includes preparation of an ISRP for the Garland Supply Company site. Since the property is currently vacant, source removal can be implemented easily. The ISRP will propose methods for excavating soils with off-site disposal. The ISRP will include detailed summaries of historical and current site assessment activities, a proposal for excavation that includes dimensions and quantities, confirmatory soil analysis, and disposal options (characterization analysis). The ISRP will describe the proposed sequencing associated with soil excavation at the site. Health and Safety protocols will be identified along with any proposed monitoring requirements. The proposed backfill will be specified along with analytical and geotechnical testing to ensure its suitability.

The ISRP will also include a detailed plan for proper backfill protocols and testing as well as a schedule for completion. A RAP Checklist will also be included in the final ISRP.

Subcontractors for drilling and investigation derived waste (IDW) disposal were chosen on a lowest-cost basis.

GHD and the FDEP confirmed on July 7, 2022, that an Access Agreement with the current real property owner of the aforementioned site has been executed.

This work will be conducted in line with the scope of work included with GHD’s proposal, received June 21, 2022.

Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and proposal letter. The final deliverable due date is August 19, 2022, and the completion date for the task assignment is November 18, 2022.

The final cost total for Task Assignment DC004B is $14,533.01.

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 07/06/22

Task #: DC004B SubTask 1 Project Management SubTask 6

Site: Garland Supply SubTask 2 Groundwater Sampling SubTask 7

Activity/Phase: Design SubTask 3 ISR Plan Preparation SubTask 8

Project Manager: Brian Moore, PE SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$40.12 Project Manager JM 12.50 12.5 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Technical Director 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$62.50 Sr Professional Engineer GK 43.00 3.00 40.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $46.33 Sr Professional Engineer JH 4.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $43.28 Professional Engineer/Sc GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $39.82 Project Engineer/Scientis TC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $40.12 Project Manager/ Engine JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $31.25 Staff Engineer/Scientist CH 17.50 17.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $32.40 Data Analyst JL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $43.35 Field Manager OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.76 Senior Technician SA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.65 Senior Technician SC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $23.69 Senior Technician WM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.58 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.75 Junior Technician JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.69 Drafting Technician PM 8.00 0.00 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $22.44 Administrative Assistant DA 9.25 5.25 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Driller 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 HSEQ&R Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 94.25 12.50 25.75 56.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $4,367.21 $502.42 $852.19 $3,012.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 129.80% $5,668.63 $652.14 $1,106.14 $3,910.35 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.80% $1,650.80 $189.91 $322.13 $1,138.76 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $11,686.64 $1,344.47 $2,280.46 $8,061.71 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 Page 1

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 07/06/22

Task #: DC004B SubTask 1 Project Management SubTask 6

Site: Garland Supply SubTask 2 Groundwater Sampling SubTask 7

Activity/Phase: Design SubTask 3 ISR Plan Preparation SubTask 8

Project Manager: Brian Moore, PE SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $222.00 $222.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $342.00 $342.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $11.00 $11.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $121.00 $121.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $511.00 $511.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $58.50 $58.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $569.50 $569.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $605.20 $605.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $645.20 $645.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $13,364.34 $1,344.47 $3,958.16 $8,061.71 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,168.67 $134.45 $228.05 $806.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $14,533.01 $1,478.92 $4,186.21 $8,867.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Garland Supply SUBTASK 2: Groundwater Sampling

DATE: 07/06/22

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr Professional Engineer GK Field scope of work and sampling kit coordination 0.5 Sr Professional Engineer GK Site access and property contact 0.5 Sr Professional Engineer GK Review field notes and COC 1 Sr Professional Engineer GK Review analytical results (QA/QC) 1

Staff Engineer Scientist CH mob/demob (from Ft Myers) 4 Staff Engineer Scientist CH Water Levels (all wells - 17 wells) 3 Staff Engineer Scientist CH Groundwater Sampling (7 wells) 10.5

17.5

Administrative Assistant DA Data Entry (wls and 7 wells) 1.25 Administrative Assistant DA Summary tables (incorporate historical data from Arcadis) 4

5.25

TOTAL LABOR 25.75

VEHICLE TYPE RATE UNIT USEAGE

Company Truck $120.00 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel $150.00 night 1 $150.00 Per Diem $36.00 day 2 $72.00

TOTAL PER DIEM $222.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW Disposal 1 drum $110.00 $110.00

TOTAL $110.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOHs EPA 8260 $73.00 7 $511.00 Sample shipping (small cooler - 2 day) $52.00 1 $52.00 Ice $6.50 1 $6.50

TOTAL LAB $569.50

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

Expendables $40.00 day 1 $40.00

Equipment (Analytical Related) Groundwater Sampling Kit $290.00 day 1.5 $435.00 Poly Tubing $0.30 ft 164 $49.20 Silicon Tubing $3.00 ft 7 $21.00 Drum $100.00 drum 1 $100.00

Equipment (Other) $0.00

TOTAL EQUIPMENT $645.20

FINAL --7/24/96

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Garland Supply SUBTASK 3: ISR Plan Preparation

DATE: 07/06/22

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr Professional Engineer JH Review previous assessment, source removal, and monitoring data for site 2 Sr Professional Engineer JH ISR Plan preparation 2

Professional Engineer GK Review Site assessment data and previous ISR activities 6 Professional Engineer GK Assessment Summary and previous ISR Summary 4 Professional Engineer GK Groundwater Sampling Methodology 2 Professional Engineer GK Groundwater Flow Evaluation 2 Professional Engineer GK Groundwater Analytical Results 2 Professional Engineer GK Establish cleanup criteria and goals 2 Professional Engineer GK Determine excavation limits/volumes 2 Professional Engineer GK Soil excavation methods 4 Professional Engineer GK Dewatering treatment/disposal 4 Professional Engineer GK Backfill source/disposal location 2 Professional Engineer GK Sequence Field Activities (H&S/PPE) 4 Professional Engineer GK Site Restoration Activities/Backfilling/Compaction Testing 2 Professional Engineer GK RAP Checklist 2 Professional Engineer GK Schedule 2

Drafting Technician PM Summary assessment figures 1 Drafting Technician PM Excavation Plan and Details (summary of previous data) 6 Drafting Technician PM Excavation Layout 1

Administrative Assistant DA Finalize ISR Plan 4

TOTAL LABOR 56

VEHICLE TYPE RATE UNIT USEAGE

$0.00 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $0.00 $0.00 $0.00 $0.00

Equipment (Analytical Related) $2.00 $0.00 $0.00

Equipment (Other) $0.00 $0.00

TOTAL EQUIPMENT $2.00

FINAL --7/24/96

COST PROPOSAL FOR TASK DC004B

<Garland Supply Company/FDEP ERIC_4464>

< Interim Source Removal Plan>

1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >

Arcadis completed site assessment activities and source removal activities for the former Garland Supply Company site. The assessment identified elevated levels of drycleaning chemicals in soil and groundwater beneath the former facility. GHD recently completed soil and groundwater testing in the central portion of the property. The testing identified a potential soil source on the property. As requested, Task DC004B includes preparation of an ISRP, by GHD, for the former Garland Supply Company site. It is anticipated that the ISRP will include soil excavation and off-site disposal. As part of the ISRP preparation, GHD will also collect current groundwater analytical data.

Subtask 1: Project Management Subtask 1 includes all tasks associated with project management for an ISRP at the former Garland Supply Company site.

Subtask 2: Groundwater Sampling Groundwater sampling will be conducted as part of the ISRP preparation. Monitoring wells MW001, Mw002, MW003, MW006, MW007, MW009, and MW016 will be sampled with volatile organic halocarbon (VOH) analysis using EPA Method 8260. During mobilization for sampling, depth to water measurements will be gathered from all wells (17 total).

Groundwater sampling will be conducted in general accordance with FDEP SOPs.

Following groundwater sampling and receipt of analytical data, the results will be incorporated into the ISRP that will be prepared as part of Subtask 3.

Subtask 3: ISRP Preparation

In order to remediate shallow soil impacts, excavation has been recommended. Task DC004B includes preparation of an ISRP for the Garland Supply Company site. Since the property is currently vacant, source removal can be implemented easily. The ISRP will propose methods for excavating soils with off-site disposal. The ISRP will include detailed summaries of historical and current site assessment activities, a proposal for excavation that includes dimensions and quantities, confirmatory soil analysis, and disposal options (characterization analysis).

The ISRP will describe the proposed sequencing associated with soil excavation at the site.

Health and Safety protocols will be identified along with any proposed monitoring requirements. The proposed backfill will be specified along with analytical and geotechnical testing to ensure its suitability. The ISRP will also include a detailed plan for proper backfill protocols and testing.

The ISRP will also include a detailed schedule for completion. A RAP Checklist will also be included in the final ISRPs.

Deliverables:

Deliverable Deliverable Due Date

Field notes and groundwater analytical data 8/12/22

Interim Source Removal Plan 8/19/22

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511

To: Mr. Brian Moore

GHD

5904 Hampton Oaks Parkway – Suite F

Tampa, FL 33610

May 23, 2022

Re: Transportation and Disposal of Non-Hazardous Soil and Water – Florida

Mr. Moore:

The price for disposal of drums of non-hazardous soil or groundwater located in the State of Florida will be $110.00 per drum, for both transportation and disposal.

This pricing is valid for all regions in the State of Florida except for the Florida Keys.

Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.

This quote is valid for 180 days.

Respectfully, Jonathan Erwin

Erwin Remediation, Inc.

Email: ErwinRemediation@Gmail.com

Office: (850) 292-6511 mailto:Remediation@Gmail.com

6/28/22, 10:23 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 1/2

Quote Number: 19644

QUOTE

QUOTED TO: Brian Moore

QUOTE DATE: 1/1/2022

COMPANY NAME: GHD - 2022 QUOTED BY: Craig Burns

PHONE NUMBER:

Ext.

FAX NUMBER:

PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS

CUSTOMER PO:

CONTACT EMAIL:

SITE ADDRESS: TBD

CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING

COST ESTIMATE FOR

THE SITE/ PROJECT LISTED ABOVE.

DESCRIPTION PRICE QTY. UNIT TOTAL

NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00

NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00

TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$30.00 DRUM $0.00

TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$40.00 DRUM $0.00

TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site

$50.00 DRUM $0.00

Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax

$0.00 . $0.00

HAZ Drums to be quoted case-by-case $0.00 . $0.00

OPTIONAL LINE ITEMS

***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00

TOTAL REQUIRED ITEMS $0.00

TOTAL OPTIONAL ITEMS $0.00

GRAND TOTAL $0.00

NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.

**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns

863.327.6289 - cburns@clarkenv.com

This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.

6/28/22, 10:23 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 2/2

Name (print) Title

Signature Date

CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854

WWW.ClarkEnvironmental.com

Whatever Waste, LLC 3834 Mandarin Woods Dr. No.

Jacksonville, Florida 32223 United States 904.881.1957

Brian Moore PE

GHD

5904 Hampton Road Parkway Suite F Tampa, FL 33610

Estimate Number 062922.1

Notes Dry Cleaner Site Locations: Central and South Florida Regions excluding Florida Keys Required analytical data for non-haz disposal acceptance would be VOCs and includes waste profiling assistance if the IDW-GW drums don't fall under a blanket waste profile DOT shippable drums must be on a hard surface at each accessible location

Terms Non-hazardous IDW drum pickup, transport and disposal pricing is based on per service event No-load drum fee if unable to pickup drums on any site in Central FL is $150; in South FL is $200 Pricing is valid or subject to change on a monthly basis in part due to escalating fuel prices Payment required within 45 days after email receipt of invoice

Indemnification: Each party agrees to indemnify, defend and hold harmless each other for and from any loss

Estimate Date 06/29/2022

Description Rate Qty Line Total

IDW-GW Drum Transport & Disposal - Central FL Sites

(1) Regional Stop Fee $600 - then $150 per 55-gal drum < 10 drums

$150.00 1 $150.00

IDW-GW Drum Transport & Disposal - Central FL Sites

(1) Regional Stop Fee $300 - then $150 per 55-gal drum > 10 drums

$150.00 1 $150.00

IDW-GW Drum Transport & Disposal - South FL Sites

(1) Regional Stop Fee $850 - then $200 per 55-gal drum < 10 drums

$200.00 1 $200.00

IDW-GW Drum Transport & Disposal - South FL Sites

(1) Regional Stop Fee $425 - then $200 per 55-gal drum > 10 drums

$200.00 1 $200.00

Subtotal

Tax

700.00

0.00

Estimate Total (USD) $700.00 or liability arising out of the party's breach of this agreement, scope of work, except for gross negligence, willful misconduct or bad faith.

ID Task Mode

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Wed 6/22/22Tue 7/5/22

2 Subtask 1: Project Management

33 days Wed 7/6/22 Fri 8/19/22

3 Subtask 2: Groundwater Sampling

27 days Wed 7/6/22 Thu 8/11/22

4 Field Work Preparation 2 wks Wed 7/6/22 Tue 7/19/22

5 Groundwater Sampling 2 days Mon 7/25/22Tue 7/26/22

6 Data Review 2 wks Fri 7/29/22 Thu 8/11/22

7 Subtask 3: ISR Plan Preparation

20 days Mon 7/25/22

Fri 8/19/22

8 Assessment Summary 2 wks Mon 7/25/22Fri 8/5/22

9 Source Removal Plan 2 wks Mon 8/8/22 Fri 8/19/22

10 Monitoring 1 wk Mon 8/8/22 Fri 8/12/22

11 Schedule 1 wk Mon 8/15/22Fri 8/19/22

6/12 6/19 6/26 July

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC004B at the Garland Supply Company site located in Hialeah, Miami-Dade County

Project: TA_004B Date: Wed 6/22/22

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Wed 6/22/22Tue 7/5/22

2 Subtask 1: Project Management

33 days Wed 7/6/22 Fri 8/19/22

3 Subtask 2: Groundwater Sampling

27 days Wed 7/6/22 Thu 8/11/22

4 Field Work Preparation 2 wks Wed 7/6/22 Tue 7/19/22

5 Groundwater Sampling 2 days Mon 7/25/22Tue 7/26/22

6 Data Review 2 wks Fri 7/29/22 Thu 8/11/22

7 Subtask 3: ISR Plan Preparation

20 days Mon 7/25/22

Fri 8/19/22

8 Assessment Summary 2 wks Mon 7/25/22Fri 8/5/22

9 Source Removal Plan 2 wks Mon 8/8/22 Fri 8/19/22

10 Monitoring 1 wk Mon 8/8/22 Fri 8/12/22

11 Schedule 1 wk Mon 8/15/22Fri 8/19/22

Guy Kamin

7/3 7/10 7/17

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC004B at the Garland Supply Company site located in Hialeah, Miami-Dade County

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Wed 6/22/22Tue 7/5/22

2 Subtask 1: Project Management

33 days Wed 7/6/22 Fri 8/19/22

3 Subtask 2: Groundwater Sampling

27 days Wed 7/6/22 Thu 8/11/22

4 Field Work Preparation 2 wks Wed 7/6/22 Tue 7/19/22

5 Groundwater Sampling 2 days Mon 7/25/22Tue 7/26/22

6 Data Review 2 wks Fri 7/29/22 Thu 8/11/22

7 Subtask 3: ISR Plan Preparation

20 days Mon 7/25/22

Fri 8/19/22

8 Assessment Summary 2 wks Mon 7/25/22Fri 8/5/22

9 Source Removal Plan 2 wks Mon 8/8/22 Fri 8/19/22

10 Monitoring 1 wk Mon 8/8/22 Fri 8/12/22

11 Schedule 1 wk Mon 8/15/22Fri 8/19/22 nski

Connor Haydon

Guy

Guy Kaminski

G

7/24 7/31 8/7 August

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC004B at the Garland Supply Company site located in Hialeah, Miami-Dade County

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Wed 6/22/22Tue 7/5/22

2 Subtask 1: Project Management

33 days Wed 7/6/22 Fri 8/19/22

3 Subtask 2: Groundwater Sampling

27 days Wed 7/6/22 Thu 8/11/22

4 Field Work Preparation 2 wks Wed 7/6/22 Tue 7/19/22

5 Groundwater Sampling 2 days Mon 7/25/22Tue 7/26/22

6 Data Review 2 wks Fri 7/29/22 Thu 8/11/22

7 Subtask 3: ISR Plan Preparation

20 days Mon 7/25/22

Fri 8/19/22

8 Assessment Summary 2 wks Mon 7/25/22Fri 8/5/22

9 Source Removal Plan 2 wks Mon 8/8/22 Fri 8/19/22

10 Monitoring 1 wk Mon 8/8/22 Fri 8/12/22

11 Schedule 1 wk Mon 8/15/22Fri 8/19/22

Kaminski,Debra Andrews

Guy Kaminski,Jeremy Hess,Peter McLean,Deb

Guy Kaminski

Guy Kaminski

8/14 8/21 8/28 September

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC004B at the Garland Supply Company site located in Hialeah, Miami-Dade County