CN-370000-HW684-DC021D.pdf
PDF 5 MB Posted
- Contract number
- HW684
- Issued by
- Florida
About this file
This document is a Task Assignment (TA) issued under Contract Number HW684 by the State of Florida Department of Environmental Protection (FDEP). The Task Assignment is between FDEP and GHD Services, Inc., with Mackenzie Childs serving as the Department Project Manager and Brian Moore as the Contractor's Project Manager. The work location is 6210 N Florida Ave, Tampa, Hillsborough County, Florida, at the McNatt's Cleaners facility (Project ERIC_4716).
The Task Assignment authorizes GHD Services, Inc. to repair the existing fence on the north side of the equipment compound, cap unused PVC pipes, and remove unused equipment from the site. The total contract value is $6,143.84 on a fixed unit rate basis, with a completion date of April 4, 2025. The scope includes two subtasks: Project Management (calculated at 13% of direct labor, totaling $539.43) and Equipment Compound Repair ($5,550.47), which requires 47 total labor hours including project management, site mobilization/demobilization, fence repair and scrap equipment removal by senior and project management personnel. Deliverables include field notes and photographs due February 4, 2025, with invoice requirements tied to completion of Subtasks 1 and 2. Direct costs include labor ($4,688.94), vehicle rental ($240.00), subcontractor equipment procurement from Home Depot ($450.92 plus 10% procurement fee), field expendables and equipment ($250.00), and a completion fee ($468.89), with overhead calculated at 129.80% and fringe benefits at 37.80%.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW684
DC021D Completion April 4, 2025
This Task Assignment authorizes GHD Services, Inc to repair the existing fence located on the north side of the equipment compound, cap unused PVC pipes, and remove unused equipment from the site.
Mackenzie Childs 850-245-8929 Contractor GHD Services, Inc. Contractor
Contractor Brian Moore Contractor 813-971-3882
ERIC_4716
6210 N Florida Ave, Tampa, Hillsborough County
McNatt's Cleaners
Contractor Contractor
✔ $ 6,143.84
$ 6,143.84
Scope of Work
GHD Services, Inc.
Contractor
Brian Moore Digitally signed by Brian Moore Date: 2024.12.12 09:23:28 -05'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2024.12.12 08:09:16 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 1 and 2: Field notes and photographs + Project Management 02/04/2025
Subtask 1 and 2: Field notes and photographs + Project Management $ 6,143.84
$ 6,143.84
HW684
DC021D
RRonn DeSantis Governor
JJeanette Nuñez Lt. Governor
Shawnn Hamilton Secretary
TO:
FROM:
DATE:
SUBJECT:
FLORIDAA DEPARTMENTT OFF
Environmentall Protectionn
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
F D E P
C O S T
E S T I M A T E
C on tra ct or
G H
D S er vi ce s
In c.
at e:
/1
0/
Ta sk
D C
1D
S ub Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
S ite
M cN at ts (F lo rid a)
Ta sk
C om po un d
C le an up
S ub
Ta sk
A ct iv ity
/P ha se
C on st ru ct io n
Ta sk
S ub Ta sk
P ro je ct
M an ag er
B ria n
M oo re , P
E
Ta sk
S ub Ta sk
S ub
Ta sk
S ub Ta sk
T To ta ls
La bo r
R at e C at eg or y
$5 1.
P ro je ct M an ag er
JM
3.
3.
$0
.0
P rin ci pa l E ng in ee r/S ci en tis t 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
Te ch ni ca l D ire ct or
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$5 8.
S r P ro fe ss io na l E ng in ee r
JH
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
S en io r P ro je ct
M an ag er
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$4 5.
P ro fe ss io na l E ng in ee r/S ci G
E 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$4
6.
P ro je ct
E ng in ee r/S ci en tis t S
C 8.
8.
0.
0.
0.
0.
0.
0.
0.
0.
$5
1.
P ro je ct
M an ag er
/ E ng in ee
JM
3.
3.
0.
0.
0.
0.
0.
0.
0.
0.
$3
3.
S ta ff E ng in ee r/S ci en tis t
JW
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$3
6.
D at a A na ly st
JL
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$4 6.
Fi el d
M an ag er
O T
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2 5.
S en io r T ec hn ic ia n
S A
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2 9.
S en io r T ec hn ic ia n
W M
.0
.0
0.
0.
0.
0.
0.
0.
0.
0.
$2 7.
S en io r T ec hn ic ia n
D C
.0
.0
0.
0.
0.
0.
0.
0.
0.
0.
$2 1.
Ju ni or
T ec hn ic ia n
W O
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$1 8.
Ju ni or
T ec hn ic ia n
C D
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$3 1.
D ra fti ng T ec hn ic ia n K
J 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2
2.
Ad m in is tra tiv e As si st an t
JJ
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
To ta l H ou rs
.9
3.
.0
0.
0.
0.
0.
0.
0.
0.
0.
D ire ct L ab or
$1
,7
.2
$2
.5
$1 ,5
.6
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
O ve rh ea d
9.
$2
,2
.3
$2
.6
$2 ,0
.7
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
G en
A dm in 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fr in ge
.8
0% $6
.3
$7
6.
$5
.1
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l L ab or
$4 ,6
.9
$5
.4
$4
,1
.5
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Pa ge
F
E P
C O S T
E S T I M A T E
C on tra ct or
G H
D S er vi ce s
In c.
at e:
/1
0/
Ta sk
D C
1D
Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
S ite
M cN at ts (F lo rid a)
Ta sk
C om po un d
C le an up
S ub
Ta sk
A ct iv ity
/P ha se
C on st ru ct io n
Ta sk
S ub Ta sk
P ro je ct
M an ag er
B ria n
M oo re , P
E
Ta sk
S ub Ta sk
S ub
Ta sk
S ub Ta sk
TTo ta ls
TTr av el
V eh ic le
R en ta l
$2
.0
$2
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ile ag e
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
A ir Fa re $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P er d ie m
H ot el
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l T ra ve l
$$2
.0
$2
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S S ub co nt ra ct or (E qu ip m en t P ro cu re m en t)
H om e D ep ot
$4
.9
$4
.9
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$4
.9
$4
.9
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P ro cu re m en t F ee
$4 5.
$4
5.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l S ub co nt ra ct or C os t
$4
.0
$4
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S S ub co nt ra ct or (S er vi ce s
P ro cu re m en t) ril lin g
(C on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
D ril lin g (N on -c on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ob ile L ab or at or y $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ur ve yi ng
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
ID
W
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til iti es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til ity L oc at io n
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
H an dl in g Fe e $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l S ub co nt ra ct or
C os t $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
L La bo ra to ry
A na ly tic al
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fa st T ur na ro un d C ha rg es $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S am pl e S hi pp in g
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l L ab or at or y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
F Fi el d E xp en se s
P er so na l P ro te ct io n $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E xp en da bl es $8
0.
$8 0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( D ril lin g re la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( A na ly tic al re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
ID
W re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
O th er
$1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l F ie ld E xp en se s
$2
.0
$2
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
SS
ub to ta l $5
,6
.9
$5
.4
$5 ,1
.5
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
C C om pl et io n Fe e $4
.8
$5
3.
$4
.9
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l E st im at ed C os t
$6 ,1
.8
$5
.3
$5
,5
.4
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
C os t f ro m P rio r C
E F:
M an ua l E nt ry
C os t f ro m D el ta
C E
F;
M an ua l E nt ry C os t (
P rio r + D el ta
$0
.0
Au to
-C al cu la te d
R ou nd in g E rr or
$6
,1
.8
Au to
-C al cu la te d
Fi na l T ot al C os t:
$6 ,1
.8
Au to -C al cu la te d
Pa ge
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : McNatts Florida SUBTASK 2: Compound Cleanup
DATE: 12/9/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager JM Scope of work 1 Project Manager JM Prepare field package deliverable 2
Project Manager/Engineer SC mob/demob 2 Project Manager/Engineer SC Project Kickoff and Final Inspection/punchlist 6
Senior Technician DC mob/demob (2 days) 2 Senior Technician DC Remove/repair fence and scrap equipment 16
Senior Technician WM mob/demob (2 days) 2
Senior Technician WM Remove/repair fence and scrap equipment 16
TOTAL LABOR 47
VEHICLE TYPE RATE UNIT USEAGE
Company Truck $120.00 day 2 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Home Depot 6-ft by 8-ft stockade fence panel $54.98 each 4 $219.92 Home Depot 4-in x 4-in post $10.78 each 6 $64.68 Home Depot Concrete (50#) $6.65 bag 6 $39.90 Home Depot Deck Screws (10x3") $21.47 each 1 $21.47 Home Depot Delivery $79.00 each 1 $79.00 Home Depot tax $25.95
TOTAL $450.92
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 2 $80.00
Construction O&M Supplies $85.00 day 2 $170.00
TOTAL EQUIPMENT $250.00
FINAL --7/24/96
COST PROPOSAL FOR TASK DC021D
McNatt’s Cleaners, 29950106 Equipment Compound Repair
1. INTRODUCTION:
GHD is currently operating and maintaining a remediation system at the McNatts Cleaners facility located in Tampa, Florida. Recently, the Department was contacted by an adjacent property owner regarding the equipment compound and a damaged fence. Task DC021D includes repairing the equipment compound, capping PVC pipes that are not in use and removing unused equipment.
Subtask 1-Project Management Includes all tasks associated with project management for the repair of the equipment compound.
Subtask 2 – Equipment compound repair GHD personnel will mobilize to the site and repair the existing fence located on the north side of the equipment compound. GHD personnel will also cap unused PVC pipes and remove unused equipment from the site. Following completion of the field activities, notes and photographs will be provided.
Deliverables:
Deliverable Deliverable Due Date
Field notes and photographs 2/4/25
File details come from the government source that posted it. Updated .