CN-370000-HW684-DC021C.pdf

PDF 1 MB Posted

Attached to
Master Agreement FL|HW684|68b160b8827755ddf560142dd2a41e53
Contract number
HW684
Issued by
Florida

About this file

This is a Task Assignment (TA) document DC021C under Contract Number HW684 between the State of Florida Department of Environmental Protection (FDEP) and GHD Services, Inc. The task involves operations and maintenance (O&M) activities at McNatt's Cleaners, located at 6210 N Florida Ave, Tampa, Hillsborough County. The Department Project Manager is Nicole Knutson (850-245-8763), and the Contractor's Project Manager is Brian Moore (813-257-0658). The task completion date is June 25, 2025.

The scope of work includes 12 months of SVE system operation to mitigate methane accumulation and semi-annual groundwater monitoring to evaluate remedial performance. GHD will conduct quarterly site visits to verify SVE system operations and collect performance data, prepare Remedial Action Status Reports, and manage groundwater sampling and analysis. Utilities costs are provided by TECO for six-month periods, with IDW transportation and disposal services supplied by Erwin Remediation. The total TA value is $33,926.14, consisting of a fixed unit rate of $19,526.14 and cost reimbursement of $14,400.00. Payment is structured in four invoices tied to specific deliverables: Remedial Action Status Report ($9,393.10 due 7/24/2024), Paid Utility Receipts for March-August 2024 ($7,320.00 due 10/30/2024), Remedial Action Status Report and PM ($9,893.04 due 1/23/2025), and Paid Utility Receipts for September 2024-March 2025 ($7,320.00 due 4/25/2025). The task was effective January 31, 2024, and is signed by Brian Moore for GHD Services, Inc. and Jennifer Farrell, Secretary or Designee for FDEP.

View the file

Other files

File Type Posted
CN-370000-GC922.pdf PDF
CN-370000-HW684-BIL01A.pdf PDF
CN-370000-HW684-BIL02C.pdf PDF
CN-370000-HW684-BIL02E.pdf PDF
CN-370000-HW684-BIL1ACO1.pdf PDF
CN-370000-HW684-BIL2CCO2.pdf PDF
CN-370000-HW684-CSS03A.pdf PDF
CN-370000-HW684-DC001C.pdf PDF
CN-370000-HW684-DC001E.pdf PDF
CN-370000-HW684-DC003A.pdf PDF
CN-370000-HW684-DC003C.pdf PDF
CN-370000-HW684-DC004B.pdf PDF
CN-370000-HW684-DC005C.pdf PDF
CN-370000-HW684-DC007B.pdf PDF
CN-370000-HW684-DC009A.pdf PDF
CN-370000-HW684-DC010A.pdf PDF
CN-370000-HW684-DC010B.pdf PDF
CN-370000-HW684-DC010C.pdf PDF
CN-370000-HW684-DC012A.pdf PDF
CN-370000-HW684-DC012B.pdf PDF
CN-370000-HW684-DC014B.pdf PDF
CN-370000-HW684-DC014C.pdf PDF
CN-370000-HW684-DC015D.pdf PDF
CN-370000-HW684-DC018E.pdf PDF
CN-370000-HW684-DC020C.pdf PDF
CN-370000-HW684-DC021B.pdf PDF
CN-370000-HW684-DC021E.pdf PDF
CN-370000-HW684-DC024A.pdf PDF
CN-370000-HW684-DC024B.pdf PDF
CN-370000-HW684-DC025D.pdf PDF
CN-370000-HW684-DC026A.pdf PDF
CN-370000-HW684-DC026C.pdf PDF
CN-370000-HW684-DC027B.pdf PDF
CN-370000-HW684-DC028A.pdf PDF
CN-370000-HW684-DC028E.pdf PDF
CN-370000-HW684-DC029A.pdf PDF
CN-370000-HW684-DC02A.pdf PDF
CN-370000-HW684-DC030A.pdf PDF
CN-370000-HW684-DC030B.pdf PDF
CN-370000-HW684-DC031D.pdf PDF
CN-370000-HW684-DC033A.pdf PDF
CN-370000-HW684-DC033B.pdf PDF
CN-370000-HW684-DC033C.pdf PDF
CN-370000-HW684-DC034A.pdf PDF
CN-370000-HW684-DC036A.pdf PDF
CN-370000-HW684-DC037A.pdf PDF
CN-370000-HW684-DC039B.pdf PDF
CN-370000-HW684-DC042A.pdf PDF
CN-370000-HW684-DC043C.pdf PDF
CN-370000-HW684-DC044B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW684

DC021C Completion June 25, 2025

GHD will complete O&M activities at McNatt's Cleaners, as detailed in the January 25, 2024 proposal.

Nicole Knutson 850-245-8763 Contractor GHD Services, Inc Contractor

Contractor Brian Moore Contractor 813-257-0658

ERIC_4716

6210 N Florida Ave, Tampa, Hillsborough County

McNatt's Cleaners

Contractor Contractor

✔ $ 19,526.14 ✔ $ 14,400.00

$ 33,926.14

Scope of Work

GHD Services, Inc Contractor

Brian Moore Digitally signed by Brian Moore Date: 2024.01.31 14:00:35 -05'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2024.01.31 13:35:37 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Remedial Action Status Report 07/24/2024

Paid Utility Receipts (March through August 2024) Includes cost reimbursement of $7,200 and handling fee of $120 10/30/2024

Remedial Action Status Report & PM 01/23/2025

Paid Utility Receipts (September 2024 through March 2025) Includes cost reimbursement of $7,200 and handling fee of $120 04/25/2025

Upon FDEP Approval of Remedial Action Status Report $ 9,393.10

Upon Submittal of Paid Utility Receipts (March through August 2024) Includes cost reimbursement of $7,200 and handling fee of $120 $ 7,320.00

Upon FDEP Approval of Remedial Action Status Report & PM $ 9,893.04

Upon Submittal of Paid Utility Receipts (September 2024 through March 2025) Includes cost reimbursement of $7,200 and handling fee of $120 $ 7,320.00

$ 33,926.14

HW684

DC021C

FFLORIDAA DEPARTMENTT OF

EEnvironmentall Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ronn DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawnn Hamilton Secretary

Memorandum

TO: ERIC_4726

McNatt’s Cleaners

FROM: Nicole Knutson, Project Manager

SUBJECT: Negotiation Summary

HW684 DC021C

DATE: January 25, 2024

GHD will complete O&M activities at McNatt's Cleaners, as detailed in the January 25, 2024 proposal. Erwin Remediation will provide IDW transportation and disposal services.

Total task amount is $33,926.14. GHD’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date is April 25, 2025.

Task completion date is June 25, 2025.

FD

EP

C

OS

T

ES

TI

MA

TE

C on tra ct or

G

H D

S er vi ce s In c.

D at e:

1/

/2

Ta sk

D C

1C

S ub Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

S ite

M cN at t C le an er s

Ta sk

O

M

(6 m on th

s) S ub Ta sk

A ct iv ity

/P ha se

O

M

Ta sk

U til iti es (6

M on th s)

S ub

Ta sk

P ro je ct

M an ag er

B ria n

M oo re , P

E

Ta sk

O

M

(6 M on th

s) S ub Ta sk

S ub

Ta sk

U til iti es S ub Ta sk

TTo ta ls

La bo r

R at e C at eg or y

$4 9.

PP

ro je ct M an ag

JM

.4

.4

$0

.0

P rin ci pa l E ng in ee r/S ci en tis t 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

Te ch ni ca l D ire ct or

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$5 6.

S r P ro fe ss io na l E ng in ee r

JH

2.

1.

0.

1.

0.

0.

0.

0.

0.

0.

$0 .0

S en io r P ro je ct

M an ag er

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4 5.

P ro fe ss io na l E ng in ee r/S c G

E 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3

9.

P ro je ct

E ng in ee r/S ci en tis

C H

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4 9.

P ro je ct M an ag er / E ng in ee

JM

.0

.0

0.

.0

0.

0.

0.

0.

0.

0.

$3

1.

S ta ff E ng in ee r/S ci en tis t

JW

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3

2.

D at a A na ly st

JL

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4 3.

Fi el d

M an ag er

O T

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2 2.

S en io r T ec hn ic ia n

S A

.5

.5

0.

.0

0.

0.

0.

0.

0.

0.

$2

6.

S en io r T ec hn ic ia n W

M

.0

.0

0.

8.

0.

0.

0.

0.

0.

0.

$2

4.

S en io r T ec hn ic ia n D

C 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2

0.

Ju ni or T ec hn ic ia n W

O 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$1

9.

Ju ni or T ec hn ic ia n

JM

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2 9.

D ra fti ng T ec hn ic ia n P

M 8.

4.

0.

4.

0.

0.

0.

0.

0.

0.

$2

1.

Ad m in is tra tiv e As si st an t

JJ

.0

7.

0.

6.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

To ta l H ou rs

0.

.4

.0

0.

.5

0.

0.

0.

0.

0.

0.

D ire ct L ab or

$4

,4

.2

$5

.4

$2 ,0

.8

$0

.0

$1 ,9

.9

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

O ve rh ea d

9.

$5

,8

.0

$6

.3

$2 ,6

.8

$0

.0

$2 ,4

.8

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

G en

A dm in 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fr in ge

.8

0% $1

,6

.9

$1

.2

$7

.3

$0 .0

$7

.3

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or

$1

2, 3.

$1 ,3

.0

$5

,4

.0

$0 .0

$5

,1

.1

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pa ge

FD

EP

C

OS

T

ES

TI

MA

TE

C on tra ct or

G

H D

S er vi ce s In c.

at e:

1/

/2

Ta sk

D C

1C

Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

S ite

M cN at t C le an

Ta sk

O

M

(6 m on th

s) S ub Ta sk

A ct iv ity

/P ha se

O

M

Ta sk

U til iti es (6

M on th s)

S ub

Ta sk

P ro je ct

M an ag er

B ria n

M oo re , P

E

Ta sk

O

M

(6 M on th

s) S ub Ta sk

S ub

Ta sk

U til iti es S ub Ta sk

TTo ta ls

TTr av el

V eh ic le

R en ta l

$7

.0

$3

.0

$0 .0

$3

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ile ag e C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

A ir

Fa re

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P er d ie m

H ot el $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $$7

.0

$3

.0

$0

.0

$3

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (E qu ip m en t P ro cu re m en t)

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P ro cu re m en t F ee $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

(S er vi ce s P ro cu re m en t) ril lin g (C on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

D ril lin g

(N on

-c on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ob ile

L ab or at or y

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ur ve yi ng $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

ID

W $2

.0

$1

.0

$0

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til iti es

$1 4, 0.

$0

.0

$7 ,2

.0

$0

.0

$7 ,2

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til ity L oc at io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$1 4, 0.

$1

.0

$7

,2

.0

$1

.0

$7 ,2

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

H an dl in g Fe e $2

.0

$1

2.

$1

.0

$1 2.

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$1 4, 5.

$1

.5

$7

,3

.0

$1

.5

$7 ,3

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

La bo ra to ry

A na ly tic al C os ts

$2 ,7

.0

$1

,6

.0

$0 .0

$1

,0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fa st

T ur na ro un d

C ha rg es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S am pl e

S hi pp in g $3

.0

$1

.5

$0

.0

$1

.5

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L ab or at or y

$3 ,0

.0

$1

,8

.5

$0 .0

$1

,2

.5

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fi el d E xp en se

P so na l P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E xp en da bl es $2

.0

$1

.0

$0

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

D ril lin g re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

A na ly tic al re la te

d) $1

,5

.6

$8

.5

$0 .0

$7

.1

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t (

ID

W re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( O th er

$2

.0

$1

.0

$0

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l F ie ld E xp en se s

$2 ,0

.6

$1

,0

.5

$0 .0

$9

.1

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub to ta l $3

2, 4.

$1 ,3

.0

$8

,8

.5

$7 ,3

.0

$7

,8

.2

$7 ,3

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

C om pl et io n

Fe e

$1 ,2

.3

$1

.2

$5

.6

$0

.0

$5

.5

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l E st im at ed C os t

$3 3, 6.

$1

,5

.2

$9 ,3

.1

$7

,3

.0

$8 ,3

.7

$7

,3

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

C os t f ro m P rio r C

E F:

M an ua l E nt ry

C os t f ro m D el ta

C E

F;

M an ua l E nt ry C os t (

P rio r + D el ta

$0

.0

A ut o- C al cu la te d R ou nd in g

E rr or

$3 3, 6.

A ut o-

C al cu la te d

Fi na l T ot al C os t:

$3 3, 6.

A ut o-

C al cu la te d

Pa ge

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : McNatts Florida SUBTASK 2: O&M (6 months)

DATE: 1/25/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr. Professional Engineer JH Conclusions Recommendations - semi-annual summary 1

Project Manager JM Prepare field scope of work (2 quarterly visits) 2 Project Manager JM Analyze O&M data (calculate flow rates and vacuums) - 1 hr per qtr 2 Project Manager JM Summarize O&M activities and system operations - remedial action status report 8 Project Manager JM Summarize semi-annual groundwater sampling methods - remedial action status report 1 Project Manager JM Summarize semi-annual groundwater elevation data (shallow/deep) - remedial action status report 2 Project Manager JM Summarize semi-annual groundwater field parameters - remedial action status report 2 Project Manager JM Summarize semi-annual groundwater analytical results - remedial action status report 2 Project Manager JM Conclusions/Recommendations - remedial action status report 1

Senior Technician SA Mob/Demob (3 total) 3 Senior Technician SA O&M for SVE System (2 quarters) 8 Senior Technician SA Water Levels (all wells - 32 total) 2.5 Senior Technician SA Groundwater Sampling (4 wells) 6

19.5

Senior Technician WM Mob/demob 1 Senior Technician WM Water Levels (all wells - 32 total) 2.5 Senior Technician WM Groundwater Sampling (5 wells) 7.5

Drafting Technician PM Groundwater Elevation Figures (shallow / deep) 2 Drafting Technician PM Groundwater Analytical Figures (shallow / deep) 2

Staff Assistants JJ Input field data (2 O&M Site Visits) 1.5 Staff Assistants JJ Input field data (wls and 9 wells) 1.5 Staff Assistants JJ Update summary tables (O&M and groundwater) 2.5 Staff Assistants JJ Prepare semi-annual summary 2

7.5

TOTAL LABOR 63

VEHICLE TYPE RATE UNIT USEAGE

Company Truck $120.00 day 3 $360.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW Disposal $125 drum 1 $125.00

TOTAL $125.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOHs 8260 $73.00 9 $657.00 MW001, 2, 5, 9, 20, 21, 23, 28, 29 ammonia SM4500 $24.00 1 $24.00 MW021 total organic carbon 9060 $30.00 3 $90.00 MW001, 21, 28 Dissolved Gases RSK 175 $180.00 3 2 $900.00 MW001, 9, 21 shipping arge cooler (1 day) $150.00 1 $150.00

Ice $6.50 1 $6.50

TOTAL LAB $1,827.50

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

Expendables $40.00 day 3 $120.00

Equipment (Analytical Related)

Groundwater Sampling Kit $290.00 day 2 $580.00 Poly Tubing $0.30 ft 305 $91.50 Silicon Tubing $3.00 ft 9 $27.00 Anemometer $33.00 day 2 $66.00 Vacuum Gauges $19.00 day 2 $38.00

Equipment (IDW related)

Drum $100.00 drum 1 $100.00

TOTAL EQUIPMENT $1,022.50

FINAL --7/24/96

SUBTASK 3: Utilities (6 Months)

DATE: 1/25/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TECO Monthly Utility Charges $1,200 month 6 $7,200.00 Handling Fee $20 month 6 $120.00

TOTAL $7,320.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

SUBTASK 3: O&M (6 Months)

DATE: 1/25/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr. Professional Engineer JH Conclusions Recommendations - semi-annual summary 1

Project Manager JM Prepare field scope of work (2 quarterly visits) 2 Project Manager JM Analyze O&M data (calculate flow rates and vacuums) - 1 hr per qtr 2 Project Manager JM Summarize O&M activities and system operations - semi-annual summary 8 Project Manager JM Summarize semi-annual groundwater sampling methods - semi-annual summary 1 Project Manager JM Summarize semi-annual groundwater elevation data (shallow/deep) - semi-annual summary 2 Project Manager JM Summarize semi-annual groundwater field parameters - semi-annual summary 2 Project Manager JM Summarize semi-annual groundwater analytical results - semi-annual summary 2 Project Manager JM Conclusions/Recommendations - semi-annual summary 1

Senior Technician SA Mob/Demob (3 total) 3 Senior Technician SA O&M for SVE System (2 quarters) 8 Senior Technician SA Water Levels (all wells - 32 total) 2.5 Senior Technician SA Groundwater Sampling (3 wells) 4.5

Senior Technician WM Mob/demob 1 Senior Technician WM Water Levels (all wells - 32 total) 2.5 Senior Technician WM Groundwater Sampling (3 wells) 4.5

Drafting Technician PM Groundwater Elevation Figures (shallow / deep) 2 Drafting Technician PM Groundwater Analytical Figures (shallow / deep) 2

Staff Assistants JJ Input field data (2 O&M Site Visits) 1.5 Staff Assistants JJ Input field data (wls and 6 wells) 1 Staff Assistants JJ Update summary tables (O&M and groundwater) 2 Staff Assistants JJ Prepare semi-annual summary 2

6.5

TOTAL LABOR 57.5

VEHICLE TYPE RATE UNIT USEAGE

Company Truck $120.00 day 3 $360.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW Disposal $125 drum 1 $125.00

TOTAL $125.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOHs 8260 $73.00 6 $438.00 ammonia SM4500 $24.00 1 $24.00 total organic carbon 9060 $30.00 3 $90.00 Dissolved Gases RSK 175 $180.00 3 $540.00 shipping arge cooler (1 day) $150.00 1 $150.00

Ice $6.50 1 $6.50

TOTAL LAB $1,248.50

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

Expendables $40.00 day 3 $120.00

Equipment (Analytical Related)

Groundwater Sampling Kit $290.00 day 2 $580.00 Poly Tubing $0.30 ft 187 $56.10 Silicon Tubing $3.00 ft 6 $18.00 Anemometer $33.00 day 2 $66.00 Vacuum Gauges $19.00 day 2 $38.00

Equipment (IDW related)

Drum $100.00 drum 1 $100.00

TOTAL EQUIPMENT $978.10

SITE : McNatts Cleaners SUBTASK 5: Utilities

DATE: 01/25/24

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

$0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TECO Monthly Utility Charges $1,200 month 6 $7,200.00 Handling Fee $20 month 6 $120.00

TOTAL $7,320.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

Equipment (Analytical Related)

Equipment (IDW related)

TOTAL EQUIPMENT $0.00

COST PROPOSAL FOR TASK DC021C

McNatt’s Cleaners, 299501069

12 Months O&M

1. INTRODUCTION:

GHD submitted a Remedial Action Plan (RAP) Modification in March 2017 that was approved by the Department. Based on the results of recent performance monitoring, it appeared that carbon and nutrient limitations again existed in the subsurface that were inhibiting further reductive dechlorination processes. As recommended and approved by FDEP, GHD completed an additional remedial injection event consistent with the RAP Modification in late January 2021. As part of the RAP Modification monitoring, periodic groundwater sampling and SVE system operation was recommended. Task DC021C includes 12 additional months of SVE system operation (to mitigate methane accumulation) and semi-annual groundwater monitoring (to evaluate remedial performance). Since the RAP Modification specified an initial year of monitoring with data evaluation, quarterly sampling is not recommended at this time.

Subtask 1-Project Management Includes all tasks associated with project management for the continued SVE system operations and performance groundwater monitoring.

Subtask 2 – O&M and Annual Groundwater Monitoring SVE system performance will be verified during quarterly site visits. Specifically, GHD personnel will verify system operations and collect vacuum and flow data for the overall system and at each individual well leg. No soil vapor sampling has been recommended as part of the semi-annual monitoring.

Groundwater monitoring will be conducted in March 2023 (representing two years following remedial injections) in order to evaluate volatile organic, ammonia, dissolved gas, and total organic carbon concentration trends. Prior to sampling, depth to water measurements will be gathered from all available wells. Sampling will be conducted in accordance with FDEP SOPs.

Monitor wells MW001, MW002, MW005, MW009, MW020, MW021, MW023, MW028, and MW029 will be sampled and analyzed for volatile organics. The groundwater sample from MW021 will also be analyzed for ammonia. The groundwater samples from MW001, MW0021, and MW028 will be analyzed for the presence of total organic carbon (TOC).

Groundwater samples from MW001, MW009, and MW021 will be analyzed for the dissolved gases (ethane, ethene, and methane). Dissolved gas analysis is recommended in order to evaluate the potential for methane gas accumulation beneath and in the vicinity of the subject drycleaner. Quality Control samples will be collected for the dissolved gas analysis and will include an equipment blank and a blind field duplicate.

Following receipt of analytical data and completion of quarterly O&M visits, a Remedial Action Status Report will be prepared. The Report will include a summary of analytical data and recommendations for additional monitoring and/or SVE operations.

Subtask 3 – 6 months of utilities (March through August 2024) In accordance with the approved RAP Modification, GHD will continue SVE operations during quarterly monitoring in order to mitigate the potential for methane accumulation. The SVE system will operate with all wells open and the system will be checked during periodic visits. Costs associated with 6 months of utilities are included in Subtask 3. The necessity for continued SVE operation will be evaluated following collection of dissolved gas samples each quarter.

Subtask 4 – O&M and Semi-annual Groundwater Monitoring SVE system performance will be verified during quarterly site visits. Specifically, GHD personnel will verify system operations and collect vacuum and flow data for the overall system and at each individual well leg. No soil vapor sampling has been recommended as part of the semi-annual monitoring.

Semi-annual groundwater monitoring will be conducted in September 2023 (representing two years following remedial injections) in order to evaluate volatile organic, ammonia, dissolved gas, and total organic carbon concentration trends. Prior to sampling, depth to water measurements will be gathered from all available wells. Sampling will be conducted in accordance with FDEP SOPs. Monitor wells MW001, MW005, MW009, MW020, MW021, and MW028 will be sampled and analyzed for volatile organics. The groundwater sample from MW021 will also be analyzed for ammonia. The groundwater samples from MW001, MW0021, and MW028 will be analyzed for the presence of total organic carbon (TOC).

Groundwater samples from MW001, MW009, and MW021 will be analyzed for the dissolved gases (ethane, ethene, and methane). Dissolved gas analysis is recommended in order to evaluate the potential for methane gas accumulation beneath and in the vicinity of the subject drycleaner. Quality Control samples will be collected for the dissolved gas analysis and will include an equipment blank and a blind field duplicate.

Following receipt of analytical data and completion of quarterly O&M visits, a Remedial Action Status Report will be prepared. The Report will include a summary of analytical data and recommendations for additional monitoring and/or SVE operations.

Subtask 5 – 6 months of utilities (September 2024 through March 2024) In accordance with the approved RAP Modification, GHD will continue SVE operations during quarterly monitoring in order to mitigate the potential for methane accumulation. The SVE system will operate with all wells open and the system will be checked during periodic visits. Costs associated with 6 months of utilities are included in Subtask 3. The necessity for continued SVE operation will be evaluated following collection of dissolved gas samples each quarter.

Deliverables:

Deliverable Deliverable Due Date

Remedial Action Status Report 7/24/24

Paid Utility Receipts (March through August 2024), includes cost reimbursement of $7,200 and handling fee of $120 10/30/24

Remedial Action Status Report 1/23/25

Paid Utility Receipts (September 2024 through March 2025), includes cost reimbursement of $7,200 and handling fee of $120 4/25/25

408 Ditmar Street

Pensacola, FL 32503

To: Mr. Brian Moore

GHD

5904 Hampton Oaks Parkway, Suite F Tampa, FL 33610

June 13, 2023

Re: Non-Hazardous Drum Disposal – State of Florida

Mr. Moore:

The price for the transportation and disposal (T&D) of drums of non-hazardous soil and water located in the State of Florida is listed below.

Non-Hazardous Drums:

Description Rate Unit False Mobilization (No drum found) $ 85.00 Per Stop T&D - Non-Haz Soil $ 110.00 Per Drum T&D - Non-Haz Water $ 125.00 Per Drum

The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.

The lab data we require for the disposal of drums of petroleum impacted soils are totals for BTEX and the 4 RCRA metals (arsenic, cadmium, chromium, and lead), with analyses no older than 1 year from the estimated disposal date.

We do not require analyticals for the disposal of Petroleum Contact Water (PCW) as long as it has only been impacted with petroleum - not pesticides, herbicides or dry-cleaning solvents etc.

Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc.

This quote is valid for 90 days.

408 Ditmar Street Pensacola, FL 32503

Respectfully, Robert Donado Erwin Remediation, Inc.

Email: Robert@erwinremediation.com Office: (850) 466-2358 p y, Robert Donado

6/28/22, 10:23 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 1/2

Quote Number: 19644

QUOTE

QUOTED TO: Brian Moore QUOTE DATE: 1/1/2022

COMPANY NAME: GHD - 2022 QUOTED BY: Craig Burns

PHONE NUMBER: Ext.

FAX NUMBER:

PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS

CUSTOMER PO:

CONTACT EMAIL:

SITE ADDRESS: TBD

CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING

COST ESTIMATE FOR THE SITE/ PROJECT LISTED ABOVE.

DESCRIPTION PRICE QTY. UNIT TOTAL

NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00

NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00

TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$30.00 DRUM $0.00

TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$40.00 DRUM $0.00

TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site

$50.00 DRUM $0.00

Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax

$0.00 . $0.00

HAZ Drums to be quoted case-by-case $0.00 . $0.00

OPTIONAL LINE ITEMS

***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00

TOTAL REQUIRED ITEMS $0.00

TOTAL OPTIONAL ITEMS $0.00

GRAND TOTAL $0.00

NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups. **Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns

863.327.6289 - cburns@clarkenv.com

This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.

6/28/22, 10:23 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 2/2

Name (print) Title

Signature Date

CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854

WWW.ClarkEnvironmental.com

From: Craig Burns To: Brian Moore Subject: GHD_IDW Drum Rates FL Date: Tuesday, June 28, 2022 10:26:46 AM Attachments: image001.png image002.png image003.png image004.png image005.png GHD Drum Rates FL 2022.pdf

Here you go Brian. I do this for a lot of engineering/consulting firms.

Be aware of the low stop less than 6 drums at $50/flat Be aware of the 10% to the total cost for FSC (implemented April 15).

Pass around the GHD Florida offices

From: Brian Moore <Brian.Moore@ghd.com> Sent: Tuesday, June 28, 2022 10:05 AM To: Craig Burns <cburns@clarkenvironmental.com> Subject: IDW Drums

Craig, Is it possible to provide a generic quote for IDW water disposal.

Assumption is non-haz with necessary analytical Maybe provide a range of locations

South florida or central florida, or both?

Thanks in advance

We have many sites that we generate 1 gw drum of IDW and would like to streamline the vendor coordination

BRIAN MOORE PE

GHD

Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com

The Power of Commitment Connect

Please consider our environment before printing this email

CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.

Whatever Waste, LLC 3834 Mandarin Woods Dr. No.

Jacksonville, Florida 32223 United States 904.881.1957

Brian Moore PE

GHD

5904 Hampton Road Parkway Suite F Tampa, FL 33610

Estimate Number 062922.1

Notes Dry Cleaner Site Locations: Central and South Florida Regions excluding Florida Keys Required analytical data for non-haz disposal acceptance would be VOCs and includes waste profiling assistance if the IDW-GW drums don't fall under a blanket waste profile DOT shippable drums must be on a hard surface at each accessible location

Terms Non-hazardous IDW drum pickup, transport and disposal pricing is based on per service event No-load drum fee if unable to pickup drums on any site in Central FL is $150; in South FL is $200 Pricing is valid or subject to change on a monthly basis in part due to escalating fuel prices Payment required within 45 days after email receipt of invoice

Indemnification: Each party agrees to indemnify, defend and hold harmless each other for and from any loss

Estimate Date 06/29/2022

Description Rate Qty Line Total

IDW-GW Drum Transport & Disposal - Central FL Sites

(1) Regional Stop Fee $600 - then $150 per 55-gal drum < 10 drums

$150.00 1 $150.00

IDW-GW Drum Transport & Disposal - Central FL Sites

(1) Regional Stop Fee $300 - then $150 per 55-gal drum > 10 drums

$150.00 1 $150.00

IDW-GW Drum Transport & Disposal - South FL Sites

(1) Regional Stop Fee $850 - then $200 per 55-gal drum < 10 drums

$200.00 1 $200.00

IDW-GW Drum Transport & Disposal - South FL Sites

(1) Regional Stop Fee $425 - then $200 per 55-gal drum > 10 drums

$200.00 1 $200.00

Subtotal

Tax

700.00

0.00

Estimate Total (USD) $700.00 or liability arising out of the party's breach of this agreement, scope of work, except for gross negligence, willful misconduct or bad faith.

File details come from the government source that posted it. Updated .