This document is a Task Assignment Change Order (TACO #3) issued by the State of Florida Department of Environmental Protection (FDEP) to GHD Services, Inc. The change order amends Task Assignment DC001A under Contract HW684 and reconciles Work Change Directive #2. The contract involves multiple project sites managed by FDEP Project Manager Nicole Knutson and Contractor Project Manager Brian Moore. The document establishes the formal authorization for modifications to the original task scope and associated compensation.

The change order increases the total task amount from $7,309.65 to $9,770.10, representing an increase of $2,460.45. The compensation structure is based on a fixed unit rate for services including labor, vehicle expenses, and associated costs. The deliverables include documentation of completed pre-strike and post-strike Hurricane Ian site evaluations/visits for multiple sites, Loretto Cleaners Modified Active Gas Sampling (MAGS) field notes, and documentation of pre-strike and post-strike Hurricane Idalia site evaluations/visits. Invoice payments are contingent upon FDEP approval, with individual amounts of $2,500.00, $1,494.80, $3,314.85, and $2,460.45 corresponding to different deliverables. The task completion date remains December 21, 2026. Labor costs include staff at various levels (Project Manager, Staff Engineers/Scientists, Senior and Junior Technicians) with overhead and fringe benefit calculations included in the total cost estimate. Attachment 1 was replaced with Attachment 1-3, and all other terms and conditions of the original task assignment remain in effect.

View the file

Other files

File Type Posted
CN-370000-GC922.pdf PDF
CN-370000-HW684-BIL01A.pdf PDF
CN-370000-HW684-BIL02C.pdf PDF
CN-370000-HW684-BIL02E.pdf PDF
CN-370000-HW684-BIL1ACO1.pdf PDF
CN-370000-HW684-BIL2CCO2.pdf PDF
CN-370000-HW684-CSS03A.pdf PDF
CN-370000-HW684-DC001C.pdf PDF
CN-370000-HW684-DC001E.pdf PDF
CN-370000-HW684-DC003A.pdf PDF
CN-370000-HW684-DC003C.pdf PDF
CN-370000-HW684-DC004B.pdf PDF
CN-370000-HW684-DC005C.pdf PDF
CN-370000-HW684-DC007B.pdf PDF
CN-370000-HW684-DC009A.pdf PDF
CN-370000-HW684-DC010A.pdf PDF
CN-370000-HW684-DC010B.pdf PDF
CN-370000-HW684-DC010C.pdf PDF
CN-370000-HW684-DC012A.pdf PDF
CN-370000-HW684-DC012B.pdf PDF
CN-370000-HW684-DC014B.pdf PDF
CN-370000-HW684-DC014C.pdf PDF
CN-370000-HW684-DC015D.pdf PDF
CN-370000-HW684-DC018E.pdf PDF
CN-370000-HW684-DC020C.pdf PDF
CN-370000-HW684-DC021B.pdf PDF
CN-370000-HW684-DC021E.pdf PDF
CN-370000-HW684-DC024A.pdf PDF
CN-370000-HW684-DC024B.pdf PDF
CN-370000-HW684-DC025D.pdf PDF
CN-370000-HW684-DC026A.pdf PDF
CN-370000-HW684-DC026C.pdf PDF
CN-370000-HW684-DC027B.pdf PDF
CN-370000-HW684-DC028A.pdf PDF
CN-370000-HW684-DC028E.pdf PDF
CN-370000-HW684-DC029A.pdf PDF
CN-370000-HW684-DC02A.pdf PDF
CN-370000-HW684-DC030A.pdf PDF
CN-370000-HW684-DC030B.pdf PDF
CN-370000-HW684-DC031D.pdf PDF
CN-370000-HW684-DC033A.pdf PDF
CN-370000-HW684-DC033B.pdf PDF
CN-370000-HW684-DC033C.pdf PDF
CN-370000-HW684-DC034A.pdf PDF
CN-370000-HW684-DC036A.pdf PDF
CN-370000-HW684-DC037A.pdf PDF
CN-370000-HW684-DC039B.pdf PDF
CN-370000-HW684-DC042A.pdf PDF
CN-370000-HW684-DC043C.pdf PDF
CN-370000-HW684-DC044B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. ☐ There are no changes to the TA compensation.

☐ The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO ☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. ☐ There are no changes to the TA Expiration Date.

☐ The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. ☐ There are no changes to the Attachments.

☐ Attachment ___ is replaced with Attachment -____.

7. ☐ No Additional Changes.

☐ Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

DC001A 3 HW684

This Change Order reconciles WCD #2.

Nicole Knutson 850-245-8763 Contractor Contractor

Contractor Contractor

Contractor

GHD Services, Inc Brian Moore 813-257-0658

Multiple

Multiple

✔ $ 9,770.10 $ 7,309.65

$ 9,770.10 $ 7,309.65 ✔ Completion

Completion 0

✔ 1 1 3

Brian Moore Digitally signed by Brian Moore Date: 2023.09.28 15:58:34 -04'00' Kelly Crain Digitally signed by Kelly Crain

Date: 2023.09.28 15:25:08 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01_18

Contract Number:

Task Assignment #:

Change Order #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW684

DC001A

$ 9,770.10

Documentation of Completed Activities

Documentation of completed pre-strike and post-strike Hurricane Ian site evaluations/visits for multiple sites

Loretto Cleaners MAGS Field Notes

Documentation of completed pre-strike and post-strike Hurricane Idalia site evaluations/visits for multiple sites

Upon FDEP approval of documentation of completed site activities

Upon FDEP approval of Loretto Cleaners MAGS Field Notes

Upon FDEP approval of documentation of completed pre-strike and post-strike Hurricane Idalia site evaluations/visits for multiple sites

Upon FDEP approval of documentation of completed pre-strike and post-strike Hurricane Ian site evaluations/visits for multiple sites

12/21/2026

12/21/2022

10/27/2023

10/31/2023

$ 1,494.80

$ 2,500.00

$ 3,314.85

$ 2,460.45

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

Memorandum TO: Multiple Sites

FROM: Nicole Knutson, Project Manager

SUBJECT: Negotiation Summary

HW684 DC001A

Change Order #3

DATE: September 28, 2023

This Change Order reconciles WCD #2, which authorized GHD to complete pre- and post-strike Hurricane Idalia site evaluations and visits.

The total task amount has increased from $7,309.65 to $9,770.10 for a change in cost of $2,460.45. GHD’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date remains December 21, 2026. Task completion date remains December 21, 2026.

FDEP COST ESTI MATEContractor: GHD Services Inc.

Date: 9/28/2023

Task #: DC001A SubTask 1 Project Management SubTask 6

Site: NA SubTask 2 SubTask 7

Activity/Phase: SubTask 3 SubTask 8

Project Manager: Brian Moore, PE SubTask 4 WCD#2 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$44.81 Project Manager JM 1.96 1.96 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Technical Director 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$51.08 Sr Professional Engineer JH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$43.28 Professional Engineer/Sc GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $40.11 Project Engineer/Scientis TC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $44.81 Project Manager/ Enginee JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $35.16 Staff Engineer/Scientist DB 9.00 0.00 0.00 9.00 0.00 0.00 0.00 0.00 0.00 0.00 $27.40 Staff Engineer/Scientist VB 3.00 0.00 0.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 $43.35 Field Manager OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.53 Senior Technician SA 4.00 0.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.35 Senior Technician SC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.89 Senior Technician WM 4.00 0.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.25 Junior Technician WO 5.00 0.00 0.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.00 Junior Technician JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.69 Drafting Technician PM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $23.16 Administrative Assistant DA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 26.96 1.96 0.00 0.00 25.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $764.52 $87.95 $0.00 $0.00 $676.57 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 129.80% $992.35 $114.16 $0.00 $0.00 $878.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.80% $288.99 $33.25 $0.00 $0.00 $255.74 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $2,045.86 $235.36 $0.00 $0.00 $1,810.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

FDEP COST ESTI MATEContractor: GHD Services Inc.

Date: 9/28/2023

Task #: DC001A SubTask 1 Project Management SubTask 6

Site: NA SubTask 2 SubTask 7

Activity/Phase: SubTask 3 SubTask 8

Project Manager: Brian Moore, PE SubTask 4 WCD#2 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $210.00 $0.00 $0.00 $210.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $210.00 $0.00 $0.00 $210.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $2,255.86 $235.36 $0.00 $0.00 $2,020.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $204.59 $23.54 $0.00 $0.00 $181.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $2,460.45 $258.90 $0.00 $0.00 $2,201.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Cost from Prior CEF: $1,494.80 Manual Entry Cost from Delta CEF; $3,314.85 Manual Entry

Cost (Prior + Delta): $4,809.65 Auto-Calculated Rounding Error: ($2,349.20) Auto-Calculated

Final Total Cost: $2,460.45 Auto-Calculated

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : NA

SUBTASK 2: WCD#2

DATE: 09/28/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Technician WM NuWay/PC Laundry/Mcnatt fl/T&C 4

Senior Technician WO Michael the Cleaners (Main) -shutdown / Courtesy (secure drums) 5

Staff Engineer/Scientists DB Weaver/Pharmco/Sunshine shutdown 4 Staff Engineer/Scientists DB Weaver/Pharmco/Sunshine restart 5

Staff Engineer/Scientist VB Dixie shutdown 1 Staff Engineer/Scientist VB Dixie restart 2

Senior Technician SA Mcnatts, MTC, Nuway restart 4

TOTAL LABOR 25

VEHICLE TYPE RATE UNIT USEAGE

Company Truck WO $120.00 day 0.5 $60.00 Company Truck DB $120.00 day 1 $120.00 Company Truck SA $120.00 day 0.25 $30.00

TOTAL VEHICLE $210.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

$0.00

Equipment (Analytical Related)

$0.00

Equipment (Other) $0.00

TOTAL EQUIPMENT $0.00

FINAL --7/24/96

ATTACHMENT D

CHANGE ORDER EXPLANATION

From: Brian Moore To: Knutson, Nicole Cc: Cheryl Tidwell; Jenna Martin Subject: DC001A Date: Friday, September 22, 2023 8:57:16 AM Attachments: image001.png image002.png image003.png image004.png image005.png TA_001A Final CO2.xlsx TA_001A Final CO3.xlsx 12572543-FLD-Field Notes_Hurricane Idalia.pdf TA_001A Delta CO3.xlsx

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Nikki, Our proposed change order is attached for Hurricane Irma response to rectify WCD#2

Thank you

BRIAN MOORE PE

GHD

Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com

The Power of Commitment

Connect

Please consider our environment before printing this email

CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.

mailto:Brian.Moore@ghd.com mailto:Nicole.Knutson@FloridaDEP.gov mailto:Cheryl.Tidwell@ghd.com mailto:Jenna.Martin@ghd.com http://secure-web.cisco.com/1MwQGPH5knutwy3gOcqmLLsY477sIOc2iYRH3ypPV3zSmea6bYC1rg3q0Bubc3nxFDy5ulWt4-G2znsHiKUK6qsCVyzbldzpE_OG4CV4lHHPKijuRIv0SIPLapYUkLXEswRTreWCwMohQkjj_9QC4G8c8gUPH8_BHiBzPIZK7NaMSTuvba7-1LlSCWSyoaA-rV08cFLmmOod-mTWEI1WpEmcUX4GPA6VQjBZlUQvVntteKDFQnPYA-OCBgtZ-zPVzajBoeUgirn0StPruKu27sEV1xaZC0XPPEuncCjtyQCNYfz3IsMGj-Kt1cmyZksDticOoJjz_iuVC-LctXPLIrQ/http%3A%2F%2Fwww.ghd.com%2F mailto:brian.moore@ghd.com https://secure-web.cisco.com/1bXQKBjpAONJZ69LQ0F5DhJbnggqNAEQB3AURW4RBPPWioA_eB75fbbbiiT6yjhmKQMW919vnGX2e1vvBvULP7lo2eO4iu311seivTxPj4o_byfyTBv0d0rEvFG4auSd3pvA_LLVuKHrypBKhK5ofw0Qjuq6VPaajYHdaFr3IEL-9zKKAr0iU2-14Mc1MaQe4DIYkK1wS4oEHJnZEL_yMHZOI1wXxs63inDmYQqA_stlkgQ1v-JKUbWFKlR14UpWglSkvzu48rNy6cRwwTxqQmjx3IdzJ6WnFVJ78Dt7nSoGUm2RchuZ-F1T_B4pV4C1tAvfP8--RVGngMlTKhS7oyQ/https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fghd%2F https://secure-web.cisco.com/1iy7hFah9ZYBtTj-bGSQAGtqbKMNaTJxN9ejuXp2WcslS0ZhSndFfoTwEysE1nYtRUf5h263zEwNBCQeHPClGnBpn9HhApvznhu72q-wzPICP4GxfI6F3txGtplhRpQAJCS7W29WEXQjskTsjRgFi1oKGGcpzxnNAQkiy2cMi2iZkUpFG2ZwKMpG5Z3M5HQxUAZWNrSItTaF9e3d_1xjWqU7fKf1otMnMrXkKZnNzb9YIBiUnZYlHjJqgdYNWznUHWkt3xeaTQaYSdaAhm_ZMtF2ow_cl1H7Mp8YlVOU0gbX96Xp20ympcFx_MSLANQCydWVms-EAorPOf7PI74cPLg/https%3A%2F%2Fwww.facebook.com%2FGHDGroup https://secure-web.cisco.com/1TyL_1GjDU_nAfGKyj2dhkdMRvA12wCXMZx6yCFKIVhcKnTRcMFcJd6oqyhaUXuobzDzt1InJ58JGTZLqgwZy0OfOuK2RQRRZ3_EQLwYPr5J4nlKUXFqiftdmawpL0mubTk39ujCkDLVKOMrrdUPBq1JFgoghY_cJdu8bvyNidmQzJCknCxRjP0F6QltE1NwVBocN_n6VBRGmaWnlO6lgAS3FPefOwsX2twkRJDde0D7Dlvva4X2rODhqHe6uBK18BZ4LSQ4X1fc8Jh953AhwNfN_5_dd27lQ2RbdJjoAA8NpPHLMC4pT9UDSeWIRrYGJNU4O3ZasmPkrZZrSjpSiqw/https%3A%2F%2Ftwitter.com%2FGHDspeaks https://secure-web.cisco.com/1hbx8BUn1eedLxpPj8huhLyaGmRJimxKSWaaq660mKOIiy57rK6YJTqO7ZZReOt7pZuYfxp64c3YQUoW4e88Xj_TRLA_v-wbu2Ch9go3XS4CtI1F5Thy0vkxthlHJp4utBCOMDvs66Sn2sXVPDy9EOJad1G9rZjzZ83BwXBActcOsy8oPRjg1i1-N5TErEl2yJtPZO_Eo8dRzXxst3cDit0qEhnMdHRGtGe-ug8uzvH0BfoPMM3xuBAfLOIN-etUGkOpMYjwenrUEnkjYTDDsDerbqyJ77R2GZfSUB-IKoJ2U-aC68sbqddYKTTTrEfKviAR8-clYplg2lULzPOQPeg/https%3A%2F%2Fwww.youtube.com%2Fchannel%2FUCwUGfe6zgaddIXqA7entIwQ

WCD#1

SITE : NA

SUBTASK 2: WCD#1

DATE: 07/21/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Technician WM Michael the Cleaners (Main) -shutdown 3

Senior Technician WM Valet - shutdown 1.5

Senior Technician WM McNatts - Shutdown 1

5.5

Staff Engineer/Scientists DB Weavers - Shutdown 2.5

Staff Engineer/Scientists DB Weavers - Restart 2

4.5

Senior Technician SA Valet - Restart 1

Senior Technician SA Michael the Cleaners (Main) - restart 3

TOTAL LABOR 14

VEHICLE TYPE RATE UNIT USEAGE

Company Truck WM $120.00 day 1 $120.00

Company Truck DB $120.00 day 0.5 $60.00

Company Truck SA $120.00 day 0.5 $60.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

$0.00

Equipment (Analytical Related)

$0.00

Equipment (Other)

$0.00

TOTAL EQUIPMENT $0.00

&"Times New Roman,Regular"&12LEVEL OF EFFORT/EXPENSE WORKSHEET

Page &P

Subtask 3

SITE : Loretto Cleaners

SUBTASK 2: MAGS

DATE: 7/21/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager JM Conference calls with ECT 2

Project Manager JM Field Work Preparation 4

Project Manager JM Field note package submittal 2

Senior Technician WM Conference calls with ECT 2

Senior Technician WM Mob/demob 7

Senior Technician WM Complete MAGS 8

TOTAL LABOR 25

VEHICLE TYPE RATE UNIT USEAGE

Company Truck $120.00 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel Sr Tech $150 night 1 $150.00

Per Diem Sr Tech $36 day 1 $36.00

TOTAL PER DIEM $186.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 day 1 $40.00

MAGS blower $180.00 day 1 $180.00

Generator $70.00 day 1 $70.00 tedlar bags $20.00 each 2 $40.00 anemometer $33.00 day 1 $33.00 vacuum gauges $19.00 day 1 $19.00 air sampling pump $27.00 day 1 $27.00

TOTAL EQUIPMENT $409.00

&"Times New Roman,Regular"&12LEVEL OF EFFORT/EXPENSE WORKSHEET

Page &P

Cost Estimate Final CO2

Contractor:

Date:

Task #: SubTask 1 Project Management SubTask 6

Site: SubTask 2 WCD#1 SubTask 7

Activity/Phase: SubTask 3 MAGS SubTask 8

Project Manager: SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Labor Rate Category

$44.81 Project Manager JM 3.36 3.36

$0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Technical Director 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$51.08 Sr Professional Engineer JH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$43.28 Professional Engineer/Scientist GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$40.11 Project Engineer/Scientist TC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$44.81 Project Manager/ Engineer JM 8.00 0.00 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$35.16 Staff Engineer/Scientist DB 4.50 4.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$32.40 Data Analyst JL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$43.35 Field Manager OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$20.53 Senior Technician SA 4.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$20.35 Senior Technician SC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$24.89 Senior Technician WM 22.50 5.50 17.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$19.25 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$19.00 Junior Technician JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$29.69 Drafting Technician PM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$23.16 Administrative Assistant DA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 42.36 3.36 14.00 25.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $1,309.50 $150.65 $377.24 $781.61 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 129.80% $1,699.73 $195.54 $489.66 $1,014.53 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 37.80% $495.00 $56.95 $142.60 $295.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $3,504.23 $403.14 $1,009.50 $2,091.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel

Vehicle Rental $360.00 $240.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $186.00 $0.00 $186.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $546.00 $240.00 $306.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $40.00 $0.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $369.00 $0.00 $369.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $409.00 $0.00 $409.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $4,459.23 $403.14 $1,249.50 $2,806.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Completion Fee $350.42 $40.31 $100.95 $209.16 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $4,809.65 $443.45 $1,350.45 $3,015.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Cost from Prior CEF: $1,494.80 Manual Entry

Cost from Delta CEF; $3,314.85 Manual Entry

Cost (Prior + Delta): $4,809.65 Auto-Calculated

Rounding Error: $0.00 Auto-Calculated

Final Total Cost: $4,809.65 Auto-Calculated

&"CG Times,Bold"&16FDEP COST ESTIMATE

Formula Sheet

Project Management

Subtask 1 Subtask 2 Subtask 3 Subtask 4 Subtask 5 Subtask 6 Subtask 7 Subtask 8 Subtask 9 Subtask 10

Labor Costs $150.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $358.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$158.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$82.12 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$136.90 $423.13 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 total labor dollars $150.56 $377.24 $781.61 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Project Management $1,158.85 = sum of Direct Labor Costs from Subtasks 2 through 10

$150.65 =13% of Direct Labor Costs (Project Management)

3.362 = Hours of Project Management (based on hourly salary of the Contractor Project Manager)

Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Service Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

WCD#1

SITE : NA

SUBTASK 2: WCD#1

DATE: 09/22/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Technician WM Michael the Cleaners (Main) -shutdown 3

Senior Technician WM Valet - shutdown 1.5

Senior Technician WM McNatts - Shutdown 1

5.5

Staff Engineer/Scientists DB Weavers - Shutdown 2.5

Staff Engineer/Scientists DB Weavers - Restart 2

4.5

Senior Technician SA Valet - Restart 1

Senior Technician SA Michael the Cleaners (Main) - restart 3

TOTAL LABOR 14

VEHICLE TYPE RATE UNIT USEAGE

Company Truck WM $120.00 day 1 $120.00

Company Truck DB $120.00 day 0.5 $60.00

Company Truck SA $120.00 day 0.5 $60.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

$0.00

Equipment (Analytical Related)

$0.00

Equipment (Other)

$0.00

TOTAL EQUIPMENT $0.00

&"Times New Roman,Regular"&12LEVEL OF EFFORT/EXPENSE WORKSHEET

Page &P

Subtask 3

SITE : Loretto Cleaners

SUBTASK 2: MAGS

DATE: 9/22/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager JM Conference calls with ECT 2

Project Manager JM Field Work Preparation 4

Project Manager JM Field note package submittal 2

Senior Technician WM Conference calls with ECT 2

Senior Technician WM Mob/demob 7

Senior Technician WM Complete MAGS 8

TOTAL LABOR 25

VEHICLE TYPE RATE UNIT USEAGE

Company Truck $120.00 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel Sr Tech $150 night 1 $150.00

Per Diem Sr Tech $36 day 1 $36.00

TOTAL PER DIEM $186.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 day 1 $40.00

MAGS blower $180.00 day 1 $180.00

Generator $70.00 day 1 $70.00 tedlar bags $20.00 each 2 $40.00 anemometer $33.00 day 1 $33.00 vacuum gauges $19.00 day 1 $19.00 air sampling pump $27.00 day 1 $27.00

TOTAL EQUIPMENT $409.00

&"Times New Roman,Regular"&12LEVEL OF EFFORT/EXPENSE WORKSHEET

Page &P

WCD#2

SITE : NA

SUBTASK 2: WCD#2

DATE: 09/22/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Technician WM NuWay/PC Laundry/Mcnatt fl/T&C 4

Senior Technician WO Michael the Cleaners (Main) -shutdown / Courtesy (secure drums) 5

Staff Engineer/Scientists DB Weaver/Pharmco/Sunshine shutdown 4

Staff Engineer/Scientists DB Weaver/Pharmco/Sunshine restart 5

Staff Engineer/Scientist VB Dixie shutdown 1

Staff Engineer/Scientist VB Dixie restart 2

Senior Technician SA Mcnatts, MTC, Nuway restart 4

TOTAL LABOR 25

VEHICLE TYPE RATE UNIT USEAGE

Company Truck WO $120.00 day 0.5 $60.00

Company Truck DB $120.00 day 1 $120.00

Company Truck SA $120.00 day 0.25 $30.00

TOTAL VEHICLE $210.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

$0.00

Equipment (Analytical Related)

$0.00

Equipment (Other)

$0.00

TOTAL EQUIPMENT $0.00

&"Times New Roman,Regular"&12LEVEL OF EFFORT/EXPENSE WORKSHEET

Page &P

Cost Estimate Final CO3

Contractor:

Date:

Task #: SubTask 1 Project Management SubTask 6

Site: SubTask 2 WCD#1 SubTask 7

Activity/Phase: SubTask 3 MAGS SubTask 8

Project Manager: SubTask 4 WCD#2 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Labor Rate Category

$44.81 Project Manager JM 5.33 5.33

$0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Technical Director 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$51.08 Sr Professional Engineer JH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$43.28 Professional Engineer/Scientist GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$40.11 Project Engineer/Scientist TC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$44.81 Project Manager/ Engineer JM 8.00 0.00 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$35.16 Staff Engineer/Scientist DB 13.50 4.50 0.00 9.00 0.00 0.00 0.00 0.00 0.00 0.00

$27.40 Staff Engineer/Scientist VB 3.00 0.00 0.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00

$43.35 Field Manager OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$20.53 Senior Technician SA 8.00 4.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00

$20.35 Senior Technician SC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$24.89 Senior Technician WM 26.50 5.50 17.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00

$19.25 Junior Technician WO 5.00 0.00 0.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00

$19.00 Junior Technician JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$29.69 Drafting Technician PM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$23.16 Administrative Assistant DA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 69.33 5.33 14.00 25.00 25.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $2,074.02 $238.60 $377.24 $781.61 $676.57 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 129.80% $2,692.08 $309.70 $489.66 $1,014.53 $878.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 37.80% $783.98 $90.19 $142.60 $295.45 $255.74 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $5,550.08 $638.49 $1,009.50 $2,091.59 $1,810.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel

Vehicle Rental $570.00 $240.00 $120.00 $210.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $186.00 $0.00 $186.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $756.00 $240.00 $306.00 $210.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $40.00 $0.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $369.00 $0.00 $369.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $409.00 $0.00 $409.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $6,715.08 $638.49 $1,249.50 $2,806.59 $2,020.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Completion Fee $555.01 $63.85 $100.95 $209.16 $181.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $7,270.09 $702.34 $1,350.45 $3,015.75 $2,201.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Cost from Prior CEF: $7,309.65 Manual Entry

Cost from Delta CEF; $2,460.45 Manual Entry

Cost (Prior + Delta): $9,770.10 Auto-Calculated

Rounding Error: ($2,500.01) Auto-Calculated

Final Total Cost: $7,270.09 Auto-Calculated

&"CG Times,Bold"&16FDEP COST ESTIMATE

Project Management

Subtask 1 Subtask 2 Subtask 3 Subtask 4 Subtask 5 Subtask 6 Subtask 7 Subtask 8 Subtask 9 Subtask 10

Labor Costs $238.84 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $358.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$158.22 $0.00 $316.44 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $82.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$82.12 $0.00 $82.12 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$136.90 $423.13 $99.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $96.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 total labor dollars $238.84 $377.24 $781.61 $676.57 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Project Management $1,835.42 = sum of Direct Labor Costs from Subtasks 2 through 10

$238.60 =13% of Direct Labor Costs (Project Management)

5.325 = Hours of Project Management (based on hourly salary of the Contractor Project Manager)

Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Service Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Q a a y tee Hvisane Sayteer S h e d hemas

I R D i I a e =

Ta ntE L I T 8 4 2 7 PhounceCrburshnes e a e ips vovo0esr> e e v e e f e e | t w tb s ¢ g z i e

Ww4 p o ' t 9 e tose Shap obrren t o f e r . _Leove_s, te e d - _ o e

N e B i n t a t t i u a s i s a p i e n t e e n l a k a l g e e W z o v w " + l o v e s v a n s D i n e

\ Leavy, ? N f ) E -t t r a n d -? s s w o t S t l e g e d b h o u y sa n e t r a e a a d p a c h r t h a eS e r e ? t n

{ $ 7 0 b e cT h e b a n e e o

6 P 0 0 Ww m t o f

Scale: 1 s q u a r e =

2 9 -/-23 AS]syE_Suppte behets (mnulpol Loiaban,) a a d e b t }- fluwm Fad Store # QbD7S- OF ( F a cio ( 9 4- 8 1 9 1 9 )

? _ @ c c _ _ t e e r eo f h e e A f o d 4 s 4 M o s o s Sig) Hse o l v e s t e c t s y s k e n

? a T T fone!S t o P L t a p e s e a e

?a 750 Leef e h e l e n e S k dd e a e

= a W e H o : $ 6 7 4 A S e s 35 S i r

GFP T e ? H F p 0 0 : * s e a l n a ? { Mente 1 2 ° Hie t t _ _ _ _ _ = Aso = | Ace ? N a v e c h S m s t n a _ w u s d a l j q a m e e e k e e P l a c e a ? T a b u h e ? a

4 s a e R a n t s S i b i e d e

* 104) Airdive c t P h e r m s o c l d i n l a t e w e r e p e e aeey e S x e

S e e e t e t o e l g

A o t W E S o t n ei T h t | GW KS ?

?at h e t t f t 3 {oe v Orlende * / Sb? o l f a a k p t e K w g u y b e e f y t g s

5 - 2 0 2 3 v Ww /2Z p y *

= l2ps. D o n k (wuries ja O r lencls a t e A e e t W e e d ves h o r t S y s t e SO a a

9 1 - 2 0 2 3 S u s h i a e Figeh M a c d 5 4 9 _?W209u0.

B eWpecrs in O l e h " | 4 4 s Ani aside, testo t y shew, B 0 2 __eerned Inge sulk 13°72 _ A h e U 7 _ _ _ _ _ _ 2 / = Amivt he, o y ot oJ i aD

L Z Scale: 1 s q u a r e = y E b in t h e Kaun.

WCD#2

SITE : NA

SUBTASK 2: WCD#2

DATE: 09/22/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Technician WM NuWay/PC Laundry/Mcnatt fl/T&C 4

Senior Technician WO Michael the Cleaners (Main) -shutdown / Courtesy (secure drums) 5

Staff Engineer/Scientists DB Weaver/Pharmco/Sunshine shutdown 4

Staff Engineer/Scientists DB Weaver/Pharmco/Sunshine restart 5

Staff Engineer/Scientist VB Dixie shutdown 1

Staff Engineer/Scientist VB Dixie restart 2

Senior Technician SA Mcnatts, MTC, Nuway restart 4

TOTAL LABOR 25

VEHICLE TYPE RATE UNIT USEAGE

Company Truck WO $120.00 day 0.5 $60.00

Company Truck DB $120.00 day 1 $120.00

Company Truck SA $120.00 day 0.25 $30.00

TOTAL VEHICLE $210.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

$0.00

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

$0.00

Equipment (Analytical Related)

$0.00

Equipment (Other)

$0.00

TOTAL EQUIPMENT $0.00

&"Times New Roman,Regular"&12LEVEL OF EFFORT/EXPENSE WORKSHEET

Page &P

Cost Estimate Delta CO3

Contractor: GHD Services Inc.

Date: 9/22/23

Task #: DC001A SubTask 1 Project Management SubTask 6

Site: NA SubTask 2 SubTask 7

Activity/Phase: SubTask 3 SubTask 8

Project Manager: Brian Moore, PE SubTask 4 WCD#2 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Labor Rate Category

$44.81 Project Manager JM 1.96 1.96

$0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Technical Director 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$51.08 Sr Professional Engineer JH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$43.28 Professional Engineer/Scientist GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$40.11 Project Engineer/Scientist TC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$44.81 Project Manager/ Engineer JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$35.16 Staff Engineer/Scientist DB 9.00 0.00 0.00 9.00 0.00 0.00 0.00 0.00 0.00 0.00

$27.40 Staff Engineer/Scientist VB 3.00 0.00 0.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00

$43.35 Field Manager OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$20.53 Senior Technician SA 4.00 0.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00

$20.35 Senior Technician SC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$24.89 Senior Technician WM 4.00 0.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00

$19.25 Junior Technician WO 5.00 0.00 0.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00

$19.00 Junior Technician JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$29.69 Drafting Technician PM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$23.16 Administrative Assistant DA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 26.96 1.96 0.00 0.00 25.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $764.52 $87.95 $0.00 $0.00 $676.57 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 129.80% $992.35 $114.16 $0.00 $0.00 $878.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 37.80% $288.99 $33.25 $0.00 $0.00 $255.74 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $2,045.86 $235.36 $0.00 $0.00 $1,810.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel

Vehicle Rental $210.00 $0.00 $0.00 $210.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $210.00 $0.00 $0.00 $210.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $2,255.86 $235.36 $0.00 $0.00 $2,020.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Completion Fee $204.59 $23.54 $0.00 $0.00 $181.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $2,460.45 $258.90 $0.00 $0.00 $2,201.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Cost from Prior CEF: $1,494.80 Manual Entry

Cost from Delta CEF; $3,314.85 Manual Entry

Cost (Prior + Delta): $4,809.65 Auto-Calculated

Rounding Error: ($2,349.20) Auto-Calculated

Final Total Cost: $2,460.45 Auto-Calculated

&"CG Times,Bold"&16FDEP COST ESTIMATE

Project Management

Subtask 1 Subtask 2 Subtask 3 Subtask 4 Subtask 5 Subtask 6 Subtask 7 Subtask 8 Subtask 9 Subtask 10

Labor Costs $87.83 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $316.44 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $82.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $82.12 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $99.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $96.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 total labor dollars $87.83 $0.00 $0.00 $676.57 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Project Management $676.57 = sum of Direct Labor Costs from Subtasks 2 through 10

$87.95 =13% of Direct Labor Costs (Project Management)

1.963 = Hours of Project Management (based on hourly salary of the Contractor Project Manager)

Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Service Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

ATTACHMENT E

PREVIOUS CHANGE ORDER

Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation…