CN-370000-HW684-DC004E.pdf

PDF 4 MB Posted

Attached to
Master Agreement FL|HW684|68b160b8827755ddf560142dd2a41e53
Contract number
HW684
Issued by
Florida

About this file

This Task Assignment (TA) is a contract modification executed between the State of Florida Department of Environmental Protection (FDEP) and GHD Services, Inc., under the indefinite delivery vehicle Contract Number HW684. The task assignment authorizes work at the Garland Supply Co. site located at 7800 W 25th Avenue, Miami-Dade County, Hialeah, Florida. The relevant FDEP project manager is Mackenzie Childs, and the contractor's project manager is Brian Moore. The work is identified as ERIC_4464 and is scheduled for completion by June 12, 2026.

The scope of work consists of two subtasks: Subtask 1 involves project management calculated at 13 percent of direct labor costs, and Subtask 2 encompasses supplemental site assessment activities including the installation and development of eleven replacement monitoring wells (four shallow wells at 4-14 feet below land surface, four intermediate wells at 23-28 feet below land surface, and three deep wells at 43-48 feet below land surface), groundwater sampling at all newly installed wells, and preparation of a supplemental site assessment report due April 9, 2026. The contract is structured as a fixed unit rate with a total task assignment value of $29,897.57. This amount covers all labor (including project management, engineering, and technical staff), overhead, general and administrative costs, fringe benefits, travel, subcontractor services for drilling and well installation, laboratory analytical costs for volatile organic compound analysis, and field expenses. The single invoice milestone requires FDEP review and approval of the supplemental site assessment report plus project management deliverables before the contractor can invoice the full authorized amount.

View the file

Other files

File Type Posted
CN-370000-GC922.pdf PDF
CN-370000-HW684-BIL01A.pdf PDF
CN-370000-HW684-BIL02C.pdf PDF
CN-370000-HW684-BIL02E.pdf PDF
CN-370000-HW684-BIL1ACO1.pdf PDF
CN-370000-HW684-BIL2CCO2.pdf PDF
CN-370000-HW684-CSS03A.pdf PDF
CN-370000-HW684-DC001C.pdf PDF
CN-370000-HW684-DC001E.pdf PDF
CN-370000-HW684-DC003A.pdf PDF
CN-370000-HW684-DC003C.pdf PDF
CN-370000-HW684-DC004B.pdf PDF
CN-370000-HW684-DC005C.pdf PDF
CN-370000-HW684-DC007B.pdf PDF
CN-370000-HW684-DC009A.pdf PDF
CN-370000-HW684-DC010A.pdf PDF
CN-370000-HW684-DC010B.pdf PDF
CN-370000-HW684-DC010C.pdf PDF
CN-370000-HW684-DC012A.pdf PDF
CN-370000-HW684-DC012B.pdf PDF
CN-370000-HW684-DC014B.pdf PDF
CN-370000-HW684-DC014C.pdf PDF
CN-370000-HW684-DC015D.pdf PDF
CN-370000-HW684-DC018E.pdf PDF
CN-370000-HW684-DC020C.pdf PDF
CN-370000-HW684-DC021B.pdf PDF
CN-370000-HW684-DC021E.pdf PDF
CN-370000-HW684-DC024A.pdf PDF
CN-370000-HW684-DC024B.pdf PDF
CN-370000-HW684-DC025D.pdf PDF
CN-370000-HW684-DC026A.pdf PDF
CN-370000-HW684-DC026C.pdf PDF
CN-370000-HW684-DC027B.pdf PDF
CN-370000-HW684-DC028A.pdf PDF
CN-370000-HW684-DC028E.pdf PDF
CN-370000-HW684-DC029A.pdf PDF
CN-370000-HW684-DC02A.pdf PDF
CN-370000-HW684-DC030A.pdf PDF
CN-370000-HW684-DC030B.pdf PDF
CN-370000-HW684-DC031D.pdf PDF
CN-370000-HW684-DC033A.pdf PDF
CN-370000-HW684-DC033B.pdf PDF
CN-370000-HW684-DC033C.pdf PDF
CN-370000-HW684-DC034A.pdf PDF
CN-370000-HW684-DC036A.pdf PDF
CN-370000-HW684-DC037A.pdf PDF
CN-370000-HW684-DC039B.pdf PDF
CN-370000-HW684-DC042A.pdf PDF
CN-370000-HW684-DC043C.pdf PDF
CN-370000-HW684-DC044B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW684

DC004E Completion June 12, 2026

This Task Assignment authorizes GHD Services, Inc to conduct supplemental site assessment activities that includes well installation at Garland Supply Co.

Mackenzie Childs 850-245-8929 Contractor GHD Services, Inc. Contractor

Contractor Brian Moore Contractor 813-971-3882

ERIC_4464

7800 W 25th Ave, Miami-Dade County, Hialeah, FL 33016

Garland Supply Co

Contractor Contractor

✔ $ 29,897.57

$ 29,897.57

Scope of Work

GHD Services, Inc.

Contractor

Brian Moore Digitally signed by Brian Moore Date: 2026.01.20 17:35:05 -05'00'

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2026.01.20 15:54:18 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtasks 1 & 2: Supplemental Site Assessment Report + Project Management 04/09/2026

Subtasks 1 & 2: FDEP review and approval of Supplemental Site Assessment Report + Project Management $ 29,897.57

$ 29,897.57

HW684

DC004E

TO: HW684 Contract File

Mackenzie Childs, Project Manager

Task Assignment DC

ERIC_

FROM:

DATE:

SUBJECT:

This Task Assignment authorizes GHD Services, Inc., hereby referred to as GHD, to

Florida (FL). Erwin Remediation (Erwin) was selected as the lowest responsive and responsible bidder. Specific subtasks are detailed below:

Subtask 1: Project Management Project Management is calculated at 13% of the direct labor.

Subtask 2:

FD

EP

C

OS

T

ES

TI

MA

TE

C on tra ct or

G

H D

S er vi ce s In c.

D at e:

1/

/2

Ta sk

D C

S ub

Ta sk

P ro je ct M an ag em en t S ub Ta sk

S ite

S ub Ta sk

S up pl em en ta l S ite

A ss es sm en t

S ub

Ta sk

A ct iv ity

/P ha se

A ss es sm en t

S ub

Ta sk

S ub Ta sk

P ro je ct

M an ag er

B ria n

M oo re , P

E S ub Ta sk

S ub

Ta sk

S ub

Ta sk

S ub Ta sk

TT

ot al s

La bo r R at e

C at eg or y $5

3.

PP

ro je ct

M an ag er

JM

8.

$0 .0

P rin ci pa l E ng in ee r/S ci en tis t

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

Te ch ni ca l D ire ct or 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$6

0.

S r P ro fe ss io na l E ng in ee r

JH

2.

2.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

S en io r P ro je ct M an ag er 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$7

4.

P ro fe ss io na l E ng in ee r/S c

R H

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

P ro je ct E ng in ee r/S ci en tis C

H 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$5

3.

P ro je ct

M an ag er

/ E ng in ee

JM

.0

.0

0.

0.

0.

0.

0.

0.

0.

0.

$3

3.

S ta ff E ng in ee r/S ci en tis t

E D

.0

.0

0.

0.

0.

0.

0.

0.

0.

0.

$4 1.

D at a

A na ly st

JL

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$4

6.

Fi el d M an ag er O

T 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2

9.

S en io r T ec hn ic ia n S

A 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$3

4.

S en io r T ec hn ic ia n W

M 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2

8.

S en io r T ec hn ic ia n D

H 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2

4.

Ju ni or T ec hn ic ia n W

O 0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2

3.

Ju ni or T ec hn ic ia n

JB

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$2 3.

D ra fti ng T ec hn ic ia n K

J 7.

7.

0.

0.

0.

0.

0.

0.

0.

0.

$2

2.

Ad m in is tra tiv e As si st an t

JJ

4.

4.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0

.0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

$0 .0

0.

0.

0.

0.

0.

0.

0.

0.

0.

0.

T ot al

H ou rs

5.

8.

.0

0.

0.

0.

0.

0.

0.

0.

0.

D ire ct L ab or

$4

,0

.9

$4

.8

$3 ,5

.1

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

O ve rh ea d

.0 0%

$3 ,1

.6

$3

.9

$2

,8

.6

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

G en

A dm in

.0

0% $1

,4

.6

$1

.6

$1 ,2

.9

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fr in ge

.1

0% $1

,5

.1

$1

.8

$1 ,3

.3

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

L ab or

$1 0, 7.

$1

,1

.3

$9 ,0

.1

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

G ar la nd

S up pl y

RE

V:

9/

CE

F

GH

D Pa ge

FD

EP

C

OS

T

ES

TI

MA

TE

C on tra ct or

G

H D

S er vi ce s In c.

D at e:

1/

/2

Ta sk

D C

S ub

Ta sk

P ro je ct M an ag em en t S ub Ta sk

S ite

S ub Ta sk

S up pl em en ta l S ite

A ss es sm en t

S ub

Ta sk

A ct iv ity

/P ha se

A ss es sm en t

S ub

Ta sk

S ub Ta sk

P ro je ct

M an ag er

B ria n

M oo re , P

E S ub Ta sk

S ub

Ta sk

S ub

Ta sk

S ub Ta sk

TT

ot al s

G ar la nd

S up pl y

TT

ra ve l

V eh ic le

$4

.0

$4

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ile ag e

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

A ir Fa re $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ea ls

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

H ot el $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $ $4

.0

$4

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

(E qu ip m en t P ro cu re m en t)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P ro cu re m en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T ot al S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

(S er vi ce s P ro cu re m en t)

D ril lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$1 4, 3.

$1

4, 3.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ur ve yi ng

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$6

.0

$6

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til iti es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til ity L oc at io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$1 4, 3.

$1

4, 3.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

H an dl in g Fe e $1

,4

.3

$1 ,4

.3

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

S ub co nt ra ct or C os t

$1 6, 1.

$1

6, 1.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

La bo ra to ry A na ly tic al

C os ts $8

.0

$8

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fa st T ur na ro un d C ha rg es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S am pl e S hi pp in g

$5 8.

$5

8.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

T ot al L ab or at or y $8

.5

$8

.5

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fi el d

E xp en se s P er so na l P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E xp en da bl es $2

.0

$2

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( D ril lin g R el at ed

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

A na ly tic al re la te

d) $7

.6

$7

.6

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t (

ID

W re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( O th er

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

F ie ld E xp en se s

$9

.6

$9

.6

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub to ta l $2

8, 6.

$1 ,1

.3

$2

7, 2.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

C om pl et io n

Fe e

$1 ,0

.7

$1

.4

$9

.3

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al E st im at ed

C os t $2

9, 7.

$1 ,2

.7

$2

8, 5.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

RE

V:

9/

CE

F

GH

D Pa ge

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Garland Supply SUBTASK 2: Supplemental Site Assessment

DATE: 1/14/2026

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr Professional Engineer JH Conclusions/recommendations 2

Project Manager JM Field work preparation 1 Project Manager JM Utility locate 1 Project Manager JM Background information (SSAR) 4 Project Manager JM Well installation summary 2 Project Manager JM Groundwater sampling methodology 2 Project Manager JM Groundwater elevation data (3 zones) 3 Project Manager JM Groundwater analytical data (3 zones) 3 Project Manager JM Laboratory data validation 2 Project Manager JM Conclusions/recommendations 2

Staff Scientist ED mob/demob (5 days) 20 Staff Scientist ED Oversee well installation 20 Staff Scientist ED Survey new wells (11 total) 5 Staff Scientist ED water levels (all wells - 19 total) 2.5 Staff Scientist ED Groundwater sampling (11 wells) 16.5

64.0

Drafting Technician KJ Create new site plan add wells 1 Drafting Technician KJ Groundwater elevations (3 zones) 3 Drafting Technician KJ Groundwater analytical (3 zones) 3

Administrative Assistant JJ Data entry (wl, wells, gw samples) 2 Administrative Assistant JJ Finalize report pdf 2

TOTAL LABOR 97.0

VEHICLE TYPE RATE UNIT USEAGE

Company Truck $480.00 week 1 $480.00

TOTAL VEHICLE $480.00

MEALS STAFF RATE UNIT USEAGE

TOTAL MEALS $0.00

HOTEL STAFF RATE UNIT USEAGE

TOTAL HOTEL $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Groundwater Protection mobilization $1,500.00 day 1 $1,500.00 Groundwater Protection Per Diem $350.00 night 3 $1,050.00 Groundwater Protection Daily Rate $1,850.00 day 2 $3,700.00 Groundwater Protection 1/2 day rate $1,295.00 1/2 day 1 $1,295.00 Groundwater Protection well install $4.00 ft 352 $1,408.00 Groundwater Protection prepack $95.00 each 3 $285.00 Groundwater Protection prepack $175.00 each 4 $700.00 Groundwater Protection prepack $245.00 each 4 $980.00 Groundwater Protection Completion $200.00 each 11 $2,200.00 Groundwater Protection Development $50.00 hr 11 $550.00 Groundwater Protection Permit $115.00 each 2 $230.00 Groundwater Protection Drum $75.00 drum 5 $375.00 Erwin Remediation IDW drum disposal (soil) $110.00 drum 1 $110.00 Erwin Remediation IDW drum disposal (water) $125.00 drum 4 $500.00

TOTAL $14,883.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOHs EPA 8260 $73.00 11 $803.00 large cooler sample shipping (2 day) $52.00 1 $52.00

Ice $6.50 1 $6.50

TOTAL LAB $861.50

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expndables $40.00 day 5 $200.00

Total Survey Station $50.00 day 1 $50.00 Groundwater sampling kit $290.00 day 2 $580.00 poly tubing $0.30 ft 312 $93.60 silicon tubing $3.00 ft 11 $33.00

TOTAL EQUIPMENT $956.60

FINAL --7/24/96

COST PROPOSAL FOR TASK DC004

< Garland Supply , FDEP ERIC_4464>

< Supplemental Site Assessment >

1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >

GHD previously completed well abandonment and source removal activities at the Garland Supply site located in Hialeah. Following source removal, the property was redeveloped. Task DC004F includes installation of replacement monitoring wells and groundwater sampling.

The wells will be installed on-site to determine current groundwater quality conditions.

Subtask 1 – Project Management Subtask 1 includes all those activities associated with project management for the implementation of supplemental site assessment activities.

Subtask 2 – Supplemental Assessment Subtask 2 includes supplemental assessment activities. Specifically, GHD will oversee the installation of eleven (11) replacement monitoring wells. The wells will include four (4) shallow, 4 intermediate, and three (3) deep wells. The proposed well locations are depicted on the attached site plan. The well screens/depths are as follows

Shallow – 4-14 ft bls Intermediate – 23-28 ft bls Deep – 43-48 ft bls

The wells will be installed and then developed. Following installation, the top of casings of the newly installed wells will be surveyed by GHD personnel.

Following installation and surveying groundwater sampling will be conducted at the eleven newly installed monitoring wells. Prior to sampling, depth to water measurements will be gathered at all available site monitor wells. Groundwater sampling will be conducted in accordance with FDEP standard operating procedures. Groundwater samples will be analyzed for the presence of volatile organic halocarbons.

Upon receipt of analytical data, a supplemental site assessment report (SSAR) will be prepared and submitted to the Department. The SSAR will include a summary of well installation and groundwater sampling.

Deliverable Deliverable Due Date Supplemental Site Assessment Report 4/9/26

Pr op os ed

S ha llo w

W el l (4

-1 ft bl s)

Pr op os ed

In te rm ed ia te

W el l

(2 3-ft b ls

Pr op os ed

S ha llo w

W el l (4

3-ft b ls

Ap pr ox im at e lo ca tio n of so ur ce re m ov al

From: Dalton, James B To: Brian Moore Cc: Childs, Mackenzie Subject: RE: Garland Supply ERIC_4464 Date: Thursday, November 20, 2025 4:25:53 PM

Agreed.

Thanks Breck

James Breck Dalton, P.G.

Professional Geologist II Waste Site Cleanup Section Florida Department of Environmental Protection James.b.dalton@FloridaDEP.gov Office: 850-245-8892

-----Original Message----- From: Brian Moore <brian.moore@ghd.com> Sent: Thursday, November 20, 2025 3:44 PM To: Dalton, James B <James.B.Dalton@FloridaDEP.gov> Cc: Childs, Mackenzie <Mackenzie.Childs@FloridaDEP.gov> Subject: RE: Garland Supply ERIC_4464

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Breck, Per our discussion, the plan is to install the well clusters shown on the attached map to determine if residual material is located near the former source areas and immediately downgradient.

If residual contaminant is confirmed we can discuss delineation in the future

3 shallow/intermediate/deep clusters - including a cluster in SE corner of property if feasible with overhead lines 1 shallow/intermediate cluster

Thank you

BRIAN MOORE PE

GHD

Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com

The Power of Commitment

Connect

From: Brian Moore To: Willie Smitherman Subject: RE: Garland Supply - 800 W 25th Ave, Hialeah, FL Date: Monday, November 24, 2025 11:39:00 AM

OK,

Can you send a revised quote?

From: Willie Smitherman <willie@jaeeenv.com> Sent: Monday, November 24, 2025 11:37 AM To: Brian Moore <Brian.Moore@ghd.com> Subject: Re: Garland Supply - 800 W 25th Ave, Hialeah, FL

How about this, let’s set it up for three days and that should cover any extra work…. So add $2400.00 to quote…. will that work,…willie

PLEASE NOTE NEW EMAIL

willie@jaeeenv.com

Willie Smitherman President JAEE Environmental Services, Inc 3101 Peachtree Circle, Davie, Florida 33328

(954) 401-9512 Cell

On Nov 24, 2025, at 11:35 AM, WIllie Smitherman <willie@jaeeenv.com> wrote:

For you yes… we will use a solid stem auger to break through and then use DPT push rods…. thanks willie

I can charge extra if it is in the budget, it is extra work going down twice….

thanks willie

Willie Smitherman President JAEE Environmental Services, Inc 3101 Peachtree Circle, Davie, Florida 33328

(954) 401-9512 Cell

<logo1740339_md.jpg>

On Nov 24, 2025, at 11:13 AM, Brian Moore <Brian.Moore@ghd.com> wrote:

Willie, Does this price include an auger attachment to get through hardpan?

Thanks

BRIAN MOORE PE

GHD

Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com

Sent: Friday, November 21, 2025 7:53 AM

Hello Brian…. Please find attached the quote for the work in nHialeah…. Please send site map and authorization letter when ready….thanks willie

Willie Smitherman President JAEE Environmental Services, Inc 3101 Peachtree Circle, Davie, Florida 33328

(954) 401-9512 Cell

<image001.jpg>

On Nov 21, 2025, at 7:44 AM, Brian Moore <Brian.Moore@ghd.com> wrote:

No soil

Sent: Friday, November 21, 2025 7:44 AM

Soil sampling??? If so what depths Sent from my iPhone

On Nov 21, 2025, at 7:35 AM, Brian Moore <Brian.Moore@ghd.com> wrote:

Willie, Can you provide a quote for the following

4 shallow wells (4-14 ft bls) 4 intermediate wells (23-38 ft bls) 3 deep wells (43-48 ft bls)

Microwells, prepacks OK Drum all waste Surface completions

Thank you

BRIAN MOORE PE

Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610

USA

O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com

CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.

Sonic Auger DPT Injection Well Abandonment

DATE: 11/21/2025

ESTIMATE #: 1125033

Project Description:

ID QTY Unit Rate TOTAL

1 1 each 1,500.00$ 1,500.00$

2 3 night 350.00$ 1,050.00$

3 DPT Combo Rig 2 day 1,850.00$ 3,700.00$

3a DPT Combo Rig (up to 5 hours on site) 1 1/2 day 1,295.00$ 1,295.00$

4 each 4.00$ -$

5 352 foot 4.00$ 1,408.00$

6 3 each 95.00$ 285.00$

7 4 each 175.00$ 700.00$

8 4 each 245.00$ 980.00$

9 11 each 200.00$ 2,200.00$

8 11 each 50.00$ 550.00$

9 55 gallon drums (Soil) (Estimated) 1 each 75.00$ 75.00$

10 55 gallon drums (Water) (Estimated) 4 each 75.00$ 300.00$

11 Permits: Miami Dade County (Up to 8 Per App/Parcel) 2 each 115.00$ 230.00$

Subtotal 14,273.00$

Todd Hodgson

TOTAL 14,273.00$

Partner

Tampa, Florida 33610 Hialeah, Miami Dade County, Florida

Drum All IDW

PROJECT

Garland Supply 7800 W. 25th Avenue

5904 Hampton Oaks Parkway, Ste. F

CUSTOMER

GHD

Brian Moore, P.E.

Locations must be accessible with track mounted DPT rig and support equipment Note: It is Groundwater Protection policy that if 'Pea Gravel' is encountered, ANY type of boring/drilling will be terminated immediately, and the boring location will need to be relocated to a clear location by the client.

Borehole clearance to 5' bgs beyond 20 minutes will require a change order for additional time and cost.

Utility locates on Private Property are the responsibility of the client.

Damage to utilities on private property is the responsibility of the client.

Materials: 1" PVC Well Installation

DPT Well Installation (813) 971-3882

(4) 1" x 14' PVC MW w/10' of .010 Prepack Screen, 2' x 2' Pad w/ 8" BD Completion. No Soil Sampling

(4) 1" x 38' PVC MW w/15' of .010 Prepack Screen, 2' x 2' Pad w/ 8" BD Completion. No Soil Sampling

(3) 1" x 48' PVC MW w/5' of .010 Prepack Screen, 2' x 2' Pad w/ 8" BD Completion. No Soil Sampling

DESCRIPTION

Per Diem - 2 Man Crew Est. (Actual Hotel Cost + $70/Man for food)

Well Development (Up to 1/2 hour with Pump)

Materials: Soil Sample Liners (If Needed)

Mobilization/Demobilization

2' x 2' Concrete Pad w/8" BD Completion

Materials: 1" x 5' PVC ,010 Prepack Screen, 3" Exp Point

Materials: (2) 1" x 5' PVC ,010 Prepack Screen, 3" Exp Point

Materials: (3) 1" x 5' PVC ,010 Prepack Screen, 3" Exp Point

If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 or Todd@drillprollc.com.

THANK YOU FOR YOUR BUSINESS!

TTodd Hodgson "Actual quantities used and days on site will be invoiced"

Completion: 2.5 to 3 Days

2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586

2703 NW 19th Street, Pompano Beach, FL 33069

Monitoring Wells Sparge Wells Direct Push Geotechnical Drilling SONIC Drilling

DATE

CLIENT: PHONE

SITE:

PROPOSED SCOPE OF WORK:

Unit Number Rate of Units

Sonic Daily Rate per day $3,800.00 4

8" Sonic Override Casing per foot $25.00 0

Compact Loader for Tooling & Water Support per day $550.00 4

1" PVC Well Material (includes all annular backfill) per foot $14.00 352 2" PVC Well Material (includes all annular backfill) per foot $16.00 4" PVC Well Material (includes all annular backfill) per foot 1" x 5' Prepack Screen each $100.00 0

8" Bolt-down completion per well $225.00 11 12" Bolt-down completion per well PVC Stickup w/ Development per well $135.00 Above Grade Protector (Aluminum) per well Well Development 1/2 hour $75.00 11

Mobilization (Sonic Drill with all associated equipment) roundtrip $1,200.00 1 Daily Roundtrip for Crew roundtrip $500.00 3

Per Diem per night Permits each $130.00 2 Decontamination Pad (incl. setup & breakdown) lump sum Water Meter and usage (IF NEEDED) lump sum $1,500.00 0 DOT Approved 55-gal Drum (Estimated) each $80.00 8 Borehole Abandonment per foot $10.00 0 Standby / Difficult Moving Time per hour $550.00 0 Days to Complete Scope of Work 3 to 4 Submitted By: Charles Bucher TOTAL QUOTE PRICE $29,228.00

$1,200.00

$0.00 $260.00

$640.00

$0.00

$0.00 $0.00

SONIC DRILL Unit Extended Price

$15,200.00

MISCELLANEOUS

$2,200.00

$0.00

WELL MATERIALS

$0.00

Drum Soil & Water

Sonic Daily Rate (Compact Track) Price Includes a ten hour work day ( 7 to 5 ) Unless otherwise stated in this quote.

(4) MW 1" x 14' w/ 10' .010" Screen (20/30 Sand) - 8" BD Completion - No Soil Coring/Sampling

$0.00

$1,500.00

$0.00

$825.00

(3) MW 1" x 48' w/ 5' .010" Screen (20/30 Sand) - 8" BD Completion - No Soil Coring/Sampling

11/21/2025

Garland Supply - 7800 W 25th Ave. - Hialeah, FL Client to provide access to water source

Hand Clear ALL Locations to 5' or REFUSAL

(813) 257-0658

(4) MW 1" x 38' w/ 15' .010" Screen (20/30 Sand) - 8" BD Completion - No Soil Coring/Sampling

GHD Brian Moore

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Well Completion (includes bolt-down manhole, concrete pad(2'x2' or 10" circle) & lockable well cap $2,475.00

$4,928.00 $0.00

408 Ditmar Street

Pensacola, FL 32503

To: Mr. Brian Moore

5904 Hampton Oaks Parkway, Suite F Tampa, FL 33610

June 13, 2023

Re: Non-Hazardous Drum Disposal – State of Florida

Mr. Moore:

The price for the transportation and disposal (T&D) of drums of non-hazardous soil and water located in the State of Florida is listed below.

Non-Hazardous Drums:

Description Rate Unit False Mobilization (No drum found) $ 85.00 Per Stop T&D - Non-Haz Soil $ 110.00 Per Drum T&D - Non-Haz Water $ 125.00 Per Drum

The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.

The lab data we require for the disposal of drums of petroleum impacted soils are totals for BTEX and the 4 RCRA metals (arsenic, cadmium, chromium, and lead), with analyses no older than 1 year from the estimated disposal date.

We do not require analyticals for the disposal of Petroleum Contact Water (PCW) as long as it has only been impacted with petroleum - not pesticides, herbicides or dry-cleaning solvents etc.

Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc.

This quote is valid for 90 days.

408 Ditmar Street Pensacola, FL 32503

Respectfully, Robert Donado Erwin Remediation, Inc.

Email: Robert@erwinremediation.com Office: (850) 466-2358 p y, Robert Donado

6/28/22, 10:23 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 1/2

Quote Number: 19644

QUOTE

QUOTED TO: Brian Moore QUOTE DATE: 1/1/2022

COMPANY NAME: GHD - 2022 QUOTED BY: Craig Burns

PHONE NUMBER: Ext.

FAX NUMBER:

PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS

CUSTOMER PO:

CONTACT EMAIL:

SITE ADDRESS: TBD

CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING

COST ESTIMATE FOR THE SITE/ PROJECT LISTED ABOVE.

DESCRIPTION PRICE QTY. UNIT TOTAL

NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00

NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00

TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$30.00 DRUM $0.00

TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$40.00 DRUM $0.00

TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site

$50.00 DRUM $0.00

Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax

$0.00 . $0.00

HAZ Drums to be quoted case-by-case $0.00 . $0.00

OPTIONAL LINE ITEMS

***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00

TOTAL REQUIRED ITEMS $0.00

TOTAL OPTIONAL ITEMS $0.00

GRAND TOTAL $0.00

NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups. **Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns

863.327.6289 - cburns@clarkenv.com

This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.

6/28/22, 10:23 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 2/2

Name (print) Title

Signature Date

CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854

WWW.ClarkEnvironmental.com

From: Craig Burns To: Brian Moore Subject: GHD_IDW Drum Rates FL Date: Tuesday, June 28, 2022 10:26:46 AM Attachments: image001.png image002.png image003.png image004.png image005.png GHD Drum Rates FL 2022.pdf

Here you go Brian. I do this for a lot of engineering/consulting firms.

Be aware of the low stop less than 6 drums at $50/flat Be aware of the 10% to the total cost for FSC (implemented April 15).

Pass around the GHD Florida offices

From: Brian Moore <Brian.Moore@ghd.com> Sent: Tuesday, June 28, 2022 10:05 AM To: Craig Burns <cburns@clarkenvironmental.com> Subject: IDW Drums

Craig, Is it possible to provide a generic quote for IDW water disposal.

Assumption is non-haz with necessary analytical Maybe provide a range of locations

South florida or central florida, or both?

Thanks in advance

We have many sites that we generate 1 gw drum of IDW and would like to streamline the vendor coordination

BRIAN MOORE PE

GHD

Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com

The Power of Commitment Connect

Please consider our environment before printing this email

CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.

Whatever Waste, LLC 3834 Mandarin Woods Dr. No.

Jacksonville, Florida 32223 United States 904.881.1957

Brian Moore PE

GHD

5904 Hampton Road Parkway Suite F Tampa, FL 33610

Estimate Number 062922.1

Notes Dry Cleaner Site Locations: Central and South Florida Regions excluding Florida Keys Required analytical data for non-haz disposal acceptance would be VOCs and includes waste profiling assistance if the IDW-GW drums don't fall under a blanket waste profile DOT shippable drums must be on a hard surface at each accessible location

Terms Non-hazardous IDW drum pickup, transport and disposal pricing is based on per service event No-load drum fee if unable to pickup drums on any site in Central FL is $150; in South FL is $200 Pricing is valid or subject to change on a monthly basis in part due to escalating fuel prices Payment required within 45 days after email receipt of invoice

Indemnification: Each party agrees to indemnify, defend and hold harmless each other for and from any loss

Estimate Date 06/29/2022

Description Rate Qty Line Total

IDW-GW Drum Transport & Disposal - Central FL Sites

(1) Regional Stop Fee $600 - then $150 per 55-gal drum < 10 drums

$150.00 1 $150.00

IDW-GW Drum Transport & Disposal - Central FL Sites

(1) Regional Stop Fee $300 - then $150 per 55-gal drum > 10 drums

$150.00 1 $150.00

IDW-GW Drum Transport & Disposal - South FL Sites

(1) Regional Stop Fee $850 - then $200 per 55-gal drum < 10 drums

$200.00 1 $200.00

IDW-GW Drum Transport & Disposal - South FL Sites

(1) Regional Stop Fee $425 - then $200 per 55-gal drum > 10 drums

$200.00 1 $200.00

Subtotal

Tax

700.00

0.00

Estimate Total (USD) $700.00 or liability arising out of the party's breach of this agreement, scope of work, except for gross negligence, willful misconduct or bad faith.

File details come from the government source that posted it. Updated .